Welcome and Housekeeping
• Due to the large number of people registered all
participants will be muted.
• After testing your speakers, please do remember to
connect your audio by using the “Join Audio” icon at the
bottom left of the screen or dial in via phone using the
number provided in the joining instructions.
• If you have any technical problems, please use the chat to
seek advice from the host (Jess Dobbyne).
• Questions and Answers there is a separate Q&A box, any
questions please use this function
• Please use the chat function to introduce yourself, please
note due to GDPR we cannot share the chat. Capture
what you need
PLEASE NOTE – THE WEBINAR IS BEING RECORDED
The recording and slides will be made available via the
KTN website
Welcome to our How to Create a Good Horizon
Europe Proposal Webinar
• 10:00 – Welcome and Introduction | Jane Watkins, Innovate UK KTN
• 10:05 – How to read a topic and understand the requirements | Louise Mothersole UK Horizon
Europe National Contact Point for Mobility
• 10:25 – Roles and responsibilities in the consortium Introduction to Part A | Chris Young, UK
Horizon Europe National Contact Point for Legal and Financial
• 10:45 – Case Study | Jenny Rainbird and Takis Katsoulakos - Inlecom Systems
• 10:50 – Q&A
• 11.00 – Break
• 11:10 – Part B – Impact, Implementation and Excellence | Nic Wallet, UK Horizon Europe National
Contact Point Climate
• 11:35 – The Evaluation | Catherine Holt, UK Horizon Europe National Contact Point for Space
• 11:45 – An Evaluator’s personal perspective | Dr Erica Yang, Managing Director – Chilton
Computing Limited
• 12:05 – NCP Panel discussion and Q&A | UK Horizon Europe National Contact Points
Overview
Horizon Europe – How to read a
topic and understand the
requirements
Louise Mothersole
Horizon Europe UK National Contact Point for Mobility
louise.mothersole@iuk.ukri.org
Team of country based, sector specific, advisors to support everyone to successfully
participate in EU Framework Programmes
Horizon Europe National Contact Points (NCPs)
Full list of UK
National Contact
Points
NCPs for Europe
and the rest of the
world
2
• RaisingAwarenessoftheprogramme
• FindingtherightTopic
• Identifyingthebestwaystofindpartners
• Navigatingtheportal
• Developingtheproposal
• Answeringquestions
• Supportingyoutosucceed!
Horizon Europe
€95.5bn funding agreed for 2021-2027
Budget figures exclude UK and other Associate Country contributions
• The most recent guidance issued by the European Commission on 4th October states that the UK’s association to the
programme is imminent. https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-
2027/common/guidance/list-3rd-country-participation_horizon-euratom_en.pdf
• The General Annexes referred to in the above guidance states “For the purposes of the eligibility conditions, applicants
established in Horizon 2020 Associated Countries or in other third countries negotiating association to Horizon Europe will
be treated as entities established in an Associated Country” https://ec.europa.eu/info/funding-
tenders/opportunities/docs/2021-2027/horizon/wp-call/2021-2022/wp-13-general-annexes_horizon-2021-2022_en.pdf
• EC has published a Q&A on UK association that states “Thanks to the Associated Country status, UK participants will have
the same rights as EU participants, with the very limited aforementioned exceptions. UK entities are eligible for funding at
the same rates and under the same conditions. They can lead project consortia. They also count towards the minimum
number of countries in calls for transnational projects.”
https://ec.europa.eu/info/sites/default/files/research_and_innovation/strategy_on_research_and_innovation/document
s/ec_rtd_uk-participation-in-horizon-europe.pdf
• To provide reassurance, the government has guaranteed funding for the first wave of eligible, successful applicants to
Horizon Europe, but who have been unable to sign grant agreements with the EU
https://www.gov.uk/government/news/uk-government-provides-financial-safety-net-for-horizon-europe-applicants
Status of UK Association to Horizon Europe
A quick look at ‘The Portal’
Funding & tender opportunities
Funding & Tender Opportunities
Register so that you have your own,
personal, account
Funding & Tender Opportunities
Participant Identification Code (PIC)
Participant Identification Code (PIC)
Participant Identification Code (PIC)
Participant Identification Code (PIC)
Register your organisation
Understanding the Topic
requirement
Other Tabs on the Portal
Narrow down the options
Finding your Topic
Finding your Topic
The Topic Webpage
Expected Outcome and Scope
Topic details in the Work Programme
§ Always worth
looking at the
Work
Programme
itself for
additional
details
Background to the Topic
§ Read up the relevant parts of the Work Programme:
Introduction, Destination, etc.
§ If any previous projects mentioned, look them up on Cordis
§ e.g. “Project(s) is/are expected to co-operate closely with the Horizon 2020
project MOSES which is already addressing aspects of robotic cargo handling
and autonomous vessel manoeuvring and docking”
§ Find out about other initiatives mentioned in the Topic or
Destination
§ e.g. “Furthermore, in the context of the EU’s digital strategy “A Europe Fit for
the Digital Age” the waterborne transport sector will have to embrace a wide-
ranging digitalisation…”
Topic Description
§ Expected Outcome
§ Some mandatory and so must be achieved
§ Some desirable – evaluation will reward more of these being
addressed
§ Scope
§ Some mandatory
§ Some desirable – again evaluation rewards scope coverage
§ Additional requirements, some examples:
§ International cooperation
§ Technology Readiness Level
§ Extended proposal length
Click on Start submission early
Funding: Submission Service
The Proposal
The proposal contains two parts:
§ Part A of the proposal is generated by the IT system.
§ It is based on the information entered by the participants through the submission
system in the Funding & Tenders Portal.
§ The participants can update the information in the submission system at any time
before final submission.
§ Part B of the proposal is the narrative part that includes three sections that
each correspond to an evaluation criterion.
§ Part B needs to be uploaded as a PDF document following the templates
downloaded by the applicants in the submission system for the specific call or topic.
@UKRI_news UK Research and Innovation UK Research and Innovation
Roles and responsibilities in the
consortium - Introduction to Part A
Chris Young
Horizon Europe UK National Contact Point
Legal and Financial
chris.young@iuk.ukri.org
Roles and responsibilities - general principles
§ Depending on the programme and type of action, organisations can participate in various roles: as
coordinator, beneficiaries, affiliated entities, associated partners, in-kind contributors, subcontractors or
recipients of financial support to third parties.
§ Sufficient capacity must be demonstrated in the proposal and be available at the moment of the
implementation of the work (i.e. not necessarily at the moment of submitting the proposal or signing the
GA, but at least when the work starts).
§ It is the beneficiaries that remain fully responsible towards the European Commission (the Commission)
(since they are the ones that sign the Grant Agreement (GA)). For all the other consortium members, the
obligations under the GA are indirect (meaning that in case of non-compliance the Commission will turn to
the beneficiaries to enforce).
Roles and responsibilities – Coordinator v beneficiary
§ Beneficiaries are entities that sign the Grant Agreement
§ The coordinator is the beneficiary who is the central contact point for the Commission
and represents the consortium (towards the Commission). For mono-beneficiary grants,
the mono-beneficiary also has the coordinator role.
§ Ideally, the work should be done by the beneficiaries and their affiliated entities
themselves, but if needed, they may involve other partners and rely on outside resources
(purchase new equipment, goods, works or services, subcontract a part of the work or
involve associated partners, etc).
Roles and responsibilities – Beneficiary v affiliated entity
§ Affiliated entities (new for 2021-2027; previously called ‘linked third parties’) are in
practice treated largely like beneficiaries (except that they don’t sign the GA).
§ They have a link (e.g. legal or capital) with a beneficiary which goes beyond the
implementation of the action.
§ They must fulfil the same conditions for participation and funding as the beneficiaries and
need to have a validated participant identification code (PIC)
Example (implementation by affiliated entity): Company X and company Y do not control each other, but
they are both fully owned by company Z. Company X is beneficiary in the grant and company Y implements
some of the action tasks described in Annex 1(testing and analysis of the resistance of a new component
under high temperatures).
Roles and responsibilities – Associated partners
§ Associated partners – they implement action tasks but do not receive EU funding
§ They do not sign the Grant Agreement but are actively involved in the consortium
§ The Grant Agreement mentions them and defines their role but they are NOT
beneficiaries
§ The consortium is responsible for the implementation of the actions tasks by the
Associated partner
§ They do not have to account for their costs but applicants should include their costs in the
budget of their proposal under other sources of finance, financial contributions and own
resources headings
Roles and responsibilities – Third parties providing in-kind
contributions
§ Beneficiaries may use in-kind contributions provided by third parties if necessary to
implement the action
§ The third party does not sign the Grant Agreement
§ In-kind contributions refers only to the case where a third party makes available some of
its resources to a beneficiary for FREE (ie no payment)
§ The beneficiary makes no payment and therefore there is NO cost to the beneficiary
(therefore costs are not usually eligible).
§ In contrast, if there is any payment between the third party and the beneficiary related to
the in-kind contribution provided, the beneficiary can declare the costs eg personnel,
equipment, purchase of goods works or services etc
§ In-kind contributions and the third party contributing them must be mentioned in Annex 1
Roles and responsibilities – Subcontractor
§ Subcontracts – these concern the implementation of ”action tasks” as set out in Annex I
of the Grant Agreement ie part of the project/project tasks that have been outsourced.
§ The price for the subcontracts will be declared as subcontracting costs in the financial
statement.
§ Subcontractor’s motivation is financial, not the project itself and is paid by the beneficiary
in exchange for its work
§ Subcontracting is limited and certain tasks are excluded (eg. Coordination)
Example : Subcontract to organise a conference that is set as part of the tasks in the description of the action
Roles and responsibilities – recipients of financial support to
third parties
§ Recipients of financial support to third parties (grants, prizes etc) - they
do not sign the Grant Agreement and are not part of the consortium
§ They do not take part in action tasks but do benefit from them and receive
(indirectly) a part of EU funding and therefore the GA mentions them and
defines their role.
§ The beneficiaries are responsible for the proper use of the funds by the
recipient and ensure they comply with certain obligations (eg confidentiality,
ethics etc)
Part A and the evaluation
Evaluation – the evaluator will have both Part A and Part B
Quality of the participants and the consortium as a whole – important information on the
role of individual participants and previous experience.
The evaluation committee will take position on the operational capacity of the
consortium and individual participants to properly implement the tasks planned. This
assessment will be based on the competence and experience of the participants,
including operational resources (human, technical and other)
Part A – Contents
1. General
Information (1)
Note the importance of the
abstract
1. General
Information (2)
2. Participants (1)
2. Participants (2)
2. Participants (3)
2. Participants (4)
Consider the number of
contact persons
2. Participants (5)
Include only researchers involved in the action NOT
other persons
2. Participants (6)
2. Participants (7)
2. Participants (8)
Gender Equality Plan - applicable to:
Public bodies, research organisations and higher
education establishments;
Member States and Associated Countries;
calls with deadlines in 2022 and thereafter
3. Budget for the proposal
3. Budget for the proposal
3. Budget for the proposal
• Only the white cells need to be filled in (the grey cells are not applicable or automatically filled by the
system).
• Cross-check with Part B to see if you will also need to submit a detailed budget table or outline
budgetary details in Part B.
• The budget categories to be used for the call are set out in the call conditions and explained in the
AGA — Annotated Grant Agreement.
• The budgeted costs should be based on a detailed and accurate estimation of your estimated project
costs (based on the cost eligibility rules set out in the Grant Agreement). They should include all your
estimated costs.
• Keep your estimates on file — you may be required to produce them later on.
4. Ethics and
Security (1)
4. Ethics and
Security(2)
4. Ethics and
Security (3)
4. Ethics and
Security (4)
5. Other questions
@UKRI_news UK Research and Innovation UK Research and Innovation
2021
2019
Spin-out of commercialisation
centre of competency
(Inlecom Commercial
Pathways Ireland)
Spinout of key technical “Connected
Intelligence” patents and
technologies (Konnecta Ireland)
2015
Expanded R&D and Project/Program
management expertise in Athens,
Greece (Inlecom Innovation)
1996
Originally established a core
R&D team in in United
Kingdom (Inlecom Systems)
2016
Subsequent expansion to Group
& Corporate HQ in Brussels,
Belgium (Inlecom Group)
INLECOM Group History
Inlecom Group Mission Statement
Supporting the European Commission in evidencing commercial
and economic outputs from EC funded Research & Innovation
Themes:
Transport & Logistics
ICT and Robotics
Security
Green buildings / cities
Health
Food
Manufacture
Energy
Track record in winning & managing EU projects
circa 70% H2020 proposal success rate vs EU <10% average
6 Projects currently coordinated 20 EU-funded completed projects
7 EU-funded projects coordinated + 8 as technical coordinator
in the top 1% of EU SMEs for winning EC R&D grant funding
>350 successfully granted patents (100% success rate) vs EU 40% avg
New PROBONO Green Buildings - ZEROW Zero Food waste -
ERATOSTHENIS Data Privacy and Cybersecurity
Why were our proposals funded? Our Approach
Inlecom pay attention to the key EC areas of impact focus
Awareness Raising General Interests Website, Leaflets, Targeted Events
Academic Research Community
Scientific Publications, Journals,
Conferences…
Business Stakeholders (Knowledge
Contributors, Users, SMEs,
Advisors)
Commercial Workshops, Industry
Onboarding/Training
Economic/Industrial/
Commercialisation
Knowledge Transfer and
IP Exploitation
Business Stakeholders
(Multipliers)
Target Group Tools, Means, Channels
VC brokerage events
Commercial Accelerators
Impact Focus
Broader Public/Society General Community
Press, Media, YouTube, LinkedIn,
Twitter, Facebook, Public Events,
EC Events
International
Cooperation
USA, Japan, China, Canada, etc
where appropriate
Adding to advisory board, PhD
Secondments, Involvement in
Project (funded/unfunded)
Societal EU Citizens & Stakeholders
Community Intersection, Focused
Events, EU Policy KPIs, Societal
Impact KPIs
EU
Projects
Have
Typically
Focused
Here
for
broad
project
dissemination
and
communications
I
M
P
A
C
T
How do we typically find partners?
• Previous Inlecom collaborations where partners supported strong outputs
• Leaders of projects from previous calls who reach out to merge efforts
• Prominent industry partners with compelling R&D vision who reach out for our help
• Classifications of actors/partners that we know the EC is keen to support
• Recommendations from partners who join Inlecom projects/proposals
• Deserving early stage SMEs made know to us by e.g. Enterprise Ireland, Science
Foundation Ireland and other EU Gov bodies
Issues at submission and delivery
• The principal reason for poor success rates in EU programs is actors starting
proposals too late, and submitting as moderately or insignificantly incomplete
• A second reason is not allowing sufficient time for partners to contribute to and
assist in a well thought out submission that intersects with EC’s interests and
objectives
• A third reason is some partners are trying to partner/participate in too many
proposal submission, and quality/contributions in each is weak
• At Inlecom, we ensure to focus on a small number and we ask our partners to
support us by working exclusively with us on the given proposal
• this approach has led to 4 back-to-back consecutive success in 2021 (and similar pattern of
success in previous years)
Hints on proposal writing
• Grant writers with previous experience are essential, who also understand the EC
program and what the EC are trying to achieve
• Have a compelling innovation, clearly written objectives that align with the EC’s
call text, and a commensurately strong Impact commitment
• Start with clear but ‘interesting’ overview/concept with a clear conclusion as to
why your concept is important
• Use simple/clear language in the main, and convincing scientific language in SOTA
and research sections that is also written clearly
ZEROW ‘Zero Food waste’ Overview
PRBONO
Green
Buildings
and
Neighbourhoods
Stakeholder engagement in
the co-design and co-creation
of GBN interventions,
Innovation Support Clusters
E2 Social Engagement and
Innovation Clusters
in spatial, economic, technical,
environmental, regulatory and
social context, aligned to the
EU Taxonomy
E1 GBN Strategic Planning
PROBONO GBNs Real- Life Demonstrators Implementation
PROBONO GBN Transition Acceleration Enablers
Scale Up, Transferability, Transition
European Alliance of GBN Innovation Clusters
GBN Planning & LCA Evaluation
Framework, Impact
Assessment Validation
GBN Climate Neutral
Energy Systems
E5 GBNs
Digital Twins
Knowledge
Integrator
Smart Green Building
Materials and Lifecycle
Workflows and Controls
Systemic Innovations
E4 GBN Construction &
Rennovation
Maturing Innovations for GBN
Energy Monitoring &Clean
Energy Production, Storage
and Distribution (Bioclimatic
measures towards energy
positive GBNs)
E3 GBN Green Energy
Data
Monitoring
Decision
Support
Control
GBN
Optimisation
Summary
• The key ingredients for success :
• Ensure to start early (at least 4-5 months before submission)
• Assemble the correct/winning consortium (or ask for help in building this)
• Ensure a strong/proven grant writer and proposal coordinator leading the proposal
• Take advantage of the heterogeneity and skills of the partners, ask each to make a small
contribution specific to their area of interest and expertise
• Allow time for iterative reviews, improvements, refinement for all sections
• Ensure 3rd party reviews (in your own team is fine) to experts who have not seen/read
the proposal before and are taking the position of a friendly evaluation
• Submit with confidence of at least a decent score and a good chance of a winning bid !!
Thank you for your attention
Mrs. Jenny Rainbird
Dr. Takis Katsoulakos
Mr. Yash Chadha
Inlecom.eu
Tel: +44 (0) 20 8989 1341
contact@inlecom.com
Inlecom Systems
60 Mansfield Road
London E11 2JN
Part B: Impact / Implementation / Excellence
Nicolas Wallet
Horizon Europe UK National Contact Point
@NicolasWallet
Nicolas.wallet@iuk.ukri.org
Part B of the
proposal
• Part B of the proposal is the narrative part that includes
three sections that each correspond to an evaluation
criterion.
• Part B needs to be uploaded as a PDF document following
the templates downloaded by the applicants in the
submission system for the specific call or topic.
• The templates for a specific call may slightly differ from the
example provided. Template is to be used in a single-stage
submission procedure or at the 2nd stage of a two-stage
submission procedure.
Part B: You
MUST think
about what
the Evaluator
will read &
only Read
• Evaluator only score what is on the
paper – NOT the potential!
• Only proposals that successfully
address all the required aspects will
have a chance of being funded
• NO significant changes to content,
budget and consortium composition
during grant preparation
… of course formatting is important…
Think also spaces, line breaks etc.
Readability MUST be easy
Excellence
Impact
Implementation
Content: How to create a good Horizon Europe proposal - Part B
“Science is a way of thinking much
more than it is a body of knowledge.”
Carl Sagan
“Everybody has a plan until they get
punched in the face.”
Mike Tyson
“Measure what is measurable, and
make measurable what is not so”
Galileo Galilei
2
1
3
Impact
• Credibility of the pathways to
achieve the expected outcomes
and impacts specified in the
work programme, and the likely
scale and significance of the
contributions from the project
• Suitability and quality of the
measures to maximise expected
outcomes and impacts, as set
out in the dissemination and
exploitation plan, including
communication activities.
Pathway
to
impact
Logical steps towards the achievement of the expected impacts of
the project over time, in particular beyond the duration of a
project.
A pathway begins with the projects’ results, to their dissemination,
exploitation and communication, contributing to the expected
outcomes in the work programme topic, and ultimately to the
wider scientific, economic and societal impacts of the work
programme destination.
What change
will the
achievement of
the objectives
bring?
Why the project is
necessary?
• Address a challenge
What the project
will achieve?
• Specific objective
How will the
project achieve its
specific objectives?
• Implementation &
workplan
IMPACT
THREE TYPES OF IMPACT BASED ON OBJECTIVES
Scientific impact
Promote scientific excellence, support the creation and diffusion of high-quality
new fundamental and applied knowledge, skills, training and mobility of
researchers, attract talent at all levels, and contribute to full engagement of
Union's talent pool in actions supported under the Programme.
Societal impact
Generate knowledge, strengthen the impact of R&I in developing, supporting and
implementing Union policies, and support the uptake of innovative solutions in
industry, notably in SMEs, and society to address global challenges, inter alia the
SDGs
Economic impact
Foster all forms of innovation, facilitate technological development, demonstration
and knowledge transfer, and strengthen deployment of innovative solutions
Scientific
Impact
Economic/
Technological
Impact
1. Creating high-quality new knowledge
2. Strengthening human capital in R&I
3. Fostering diffusion of knowledge and Open Science
7. Generating innovation-based growth
8. Creating more and better jobs
9. Leveraging investments in R&I
Societal
Impact
4. Addressing EU policy priorities & global challenges through R&I
5. Delivering benefits & impact via R&I missions
6. Strengthening the uptake of R&I in society
HORIZON EUROPE LEGISLATION defines three types of impact,
tracked with Key Impact Pathways
Article 50 & Annex V ‘Time-bound indicators to report on an annual basis on progress of the
Programme towards the achievement of the objectives referred to in Article 3 and set in Annex V along
impact pathways’
Provide a
narrative
tailored to
YOUR project
explaining how
the project
result EXPECT
to make a
difference
beyond its
scope
HORIZON EUROPE IMPACT IMPLEMENTATION
EC POLICY PRIORITIES Political Guidelines for the European Commission 2019-2024 (and other key
strategic documents - e.g. Green Deal)
KEY STRATEGIC
ORIENTATIONS FOR R&I
Set of strategic objectives within the EC policy priorities where R&I investments
are expected to make a difference
IMPACT AREAS Group of expected impacts highlighting the most important transformation to be
fostered through R&I
EXPECTED IMPACTS
ÞDESTINATIONS
= General objectives
Wider effects on society (incl. the environment), the
economy and science enabled by the outcomes of R&I
investments (long term).
EXPECTED OUTCOMES
=>TOPICS
= Specific objectives
Effects of Horizon Europe projects such as uptake,
diffusion, use and deployment of the projects’ results
by direct target groups (medium term)
PROJECT RESULTS
= Operational objectives
What is produced during the project implementation, such as innovative solutions,
algorithms, new business models, guidelines, policy recommendations,
methodologies, publications, database, prototypes, trained researchers, new
infrastructures, proof of feasibility, networks, etc. (short term)
STRATEGIC
PLAN
WORK
PROGRAMME
PROJECT
European
Commission
DG
Research
&
Innovation
(Angelica
Marino,
DG
R&I-G2)
Impact is about the
future and it should
be measured
“Measure what is measurable, and
make measurable what is not so”
Galileo Galilei
Excellence: section 2 Impact
• Project’s pathways towards impact
• Also mention barriers and how you will overcome them
• Describe the scale/significance project contribution to expected outcomes &
impacts – Use baseline/benchmark
• Only use your project impact - NO other actions can count here.
• Measure to maximise impact - Dissemination, exploitation and communication
• To whom, What, How and Who does it?
• Horizon, CORDIS, Innovation Radar and other platform are useful to
communicate/disseminate/Exploitation
• If exploitation is expected primarily in non-associated third countries, explain how
this is STILL in EU’s interest
• Outline your strategy for Ips etc. and this support the Exploitation
COMMUNICATION, DISSEMINATION AND EXPLOITATION
Communication VS Dissemination
- About the project and results
- Multiple audiences
Beyond the project's own community
(include the media and the public)
- Inform and reach out to society, show the
benefits of research
- About results only
- Audiences that may use the results in their
own work
e.g. peers (scientific or the project's own community),
industry and other commercial actors, professional
organisations, policymakers)
- Enable use and uptake of results
Dissemination VS Exploitation
Describe and make results visible
To audiences that may use the results
That may enable their use and uptake
Actual use of the results for scientific,
societal, economic purposes or for policy
making
All results generated during the project
lifetime but also after its end
KPI: Pathway To Impact &
Climate!
• Climate Impact Pilot
• The EU aims to be climate-neutral by
2050 and 35% of Horizon Europe
investment is committed to tackling
climate change.
If relevant, you could
consider it but focus on
the Work Programme!
More in depth –
watch EU
Commission
webinar here.
Excellence
Clarity and pertinence of the project’s objectives,
and the extent to which the proposed work is
ambitious, and goes beyond the state of the art.
Soundness of the proposed methodology,
including the underlying concepts, models,
assumptions, inter-disciplinary approaches,
appropriate consideration of the gender
dimension in research and innovation content,
and the quality of open science practices,
including sharing and management of research
outputs and engagement of citizens, civil society
and end users where appropriate.
Grants world
motivation is to have
a proposal text ‘lean
and mean’!
Excellence: section 1.1
Objectives and ambition
• Briefly describe the objectives of your proposed work. Why are
they pertinent to the work programme topic? Are they measurable
and verifiable? Are they realistically achievable?
• Describe how your project goes beyond the state-of-the-art, and
the extent the proposed work is ambitious. Indicate any exceptional
ground-breaking R&I, novel concepts and approaches, new products,
services or business and organisational models.
• Where relevant, illustrate the advance by referring to products
and services already available on the market. Refer to any patent or
publication search carried out.
• Describe where the proposed work is positioned in terms of R&I
maturity (i.e. where it is situated in the spectrum from ‘idea to
application’, or from ‘lab to market’). Where applicable, provide an
indication of the Technology Readiness Level, if possible
distinguishing the start and by the end of the project.
Excellence: section 1.1 Objectives and ambition
• State of the art – Keep text lean and mean! No lengthy literature review.
• Scan, analyse and present the field of interest to clearly show the State of the Art
and its current implications
• Describe any national or international research and innovation activities which
will be linked with the project, especially where the outputs from these will feed
into the project
• Defines and establishes the knowledge gap, and then how the project plans to go
beyond this state of the art
• Describe existing R&D, products & services available (inc. patent search if
relevant) to finds shortcomings, solutions, gaps of knowledge, and the ways these
limiting science and society. Stressing this will make the motivation for your
project clearer
Excellence: section 1.1 Objectives and ambition
• Start thinking SMART objectives
• Take time to formulate SMART objectives, which should relate to the expected
impact sought and will in turn link to the work package structure
• Avoid having too many objectives (5-8 will normally be optimum) and make sure
they are framed correctly as objectives rather than the tasks to be carried out
• Describe the innovation potential (e.g. ground-breaking objectives, novel concepts
and approaches, new products, services or business and organisational
models) which the proposal represents. Where relevant, refer to products and
services already available on the market. Please refer to the results of any patent
search carried out.
• Describe the advance your proposal would provide beyond the state-of-the-
art, and the extent the proposed work is ambitious.
Specific / Measurable / Achievable / Relevant / Time bound
EU Commission TRLs
definition
• TRL 1 – basic principles observed
• TRL 2 – technology concept formulated
• TRL 3 – experimental proof of concept
• TRL 4 – technology validated in lab
• TRL 5 – technology validated in relevant environment (industrially
relevant environment in the case of key enabling technologies)
• TRL 6 – technology demonstrated in relevant environment (industrially
relevant environment in the case of key enabling technologies)
• TRL 7 – system prototype demonstration in operational environment
• TRL 8 – system complete and qualified
• TRL 9 – actual system proven in operational environment (competitive
manufacturing in the case of key enabling technologies; or in space)
Excellence: section 1.2 Methodology
• The logic and the principles – Not the details of the tasks
• only initial references will do, since a detailed description is expected only in
section 3 - Implementation
• Instead of “how”, explain the scientific and/or technological methods
• e.g. for research, demonstration, piloting, first market replication, etc;
• Identify any inter-disciplinary considerations and, where relevant, use of
stakeholder knowledge; where relevant, include measures taken for public/societal
engagement on issues related to the project
• Refer to the main challenges identified in the methodology and how you will
overcome them
if relevant, include how the project methodology complies with
the ‘do no significant harm’ principle as per Article 17 of
Regulation (EU) No 2020/852