DEMOLITION and
EXPLOSIVES
SAFE DEMOLITION REQUIRES ADEQUATE
PLANNING
Why Plan?
Identify the Hazards
Meet Legislative Requirements
Ensure Appropriate Equipment
Ensure Safe Disposal of Materials
Determine Appropriate Methods of Demolition
Determine Cost of Demolition
SAFE DEMOLITION REQUIRES ADEQUATE
PLANNING
Key Areas for Planning
Type of Construction
Type of Structure (Ht., Use)
State of Structure
Structural Hazards
Hazardous Substances
Location of Services
General Conditions of Adjoining Structures
Access and Egress
Suitability of Site for Equipment
DEMOLITION TECHNIQUE
Sequential – gradual reduction of
height in reverse order to its
construction
Induced – key structural members
are weakened or removed, causing the
whole part of the structure to collapse
METHODS OF DEMOLITION
Manual – use of hand held tools
Mechanical – use of heavy
equipment, wires and chain, power
shear, etc.
Explosives – use of explosives
RULE 1417 - 1418: DEMOLITION
1. Structures over 6m high must be under the
supervision of a competent person
2. The area is strictly for demolition workers only
(Demolition area - w/in a distance equal to 1.5 x H of
structure)
3. If the above distance is not possible, the structure
shall be fenced around
4. Danger signs should be posted around the structure
5. Ensure all electrical services are cut-off
RULE 1417 - 1418: DEMOLITION
7. Demolition should proceed storey by storey, in a
descending order; work on the upper floors should be
completely over before removing the supporting
members on the lower floor
8. No part of the structure shall be overloaded w/ debris
or mat’ls.
9. Stairs (incl. railings), passageways & ladders should
be demolished last
HAZARDS ASSOCIATED WITH DEMOLITION
Falls
Being Hit/Trapped/Crushed by Objects
Manual Handling
Hazardous Substances and Dangerous Goods
Noise and Vibration
Electric Shock
Fires and Explosions
Equipment
EXPLOSIVES
By Competent Person
Precautions from:
Smokes, matches & open flames
Radio Frequency for Electrical Detonators
Transport of Explosives
Vehicles shall have tight floors covered w/ wood
Explosives and Blasting implements shall not be
transported with other materials
EXPLOSIVES
Storage
All explosives must be accounted for
Follow manufacturer’s instructions
Detonators should be stored in a separate magazine
Storage should be fire and bullet-resistant
Proper Use
Operation between Sunup & Sundown
Precaution on the use of f mobile radio transmitting
equipment.
Suspension of operation during electrical storm
EXPLOSIVES
After Blasting
Disconnect firing line from blasting
machine
Allow dust and smoke to subside
Inspect if all charges have been
exploded

More Related Content

Similar to demolition.ppt

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safety
srujanmoily
 
ConstructionHazards.ppt
ConstructionHazards.pptConstructionHazards.ppt
ConstructionHazards.ppt
Keerthana454531
 
Pp 13 electrical hazards, risks and controls
Pp 13 electrical hazards, risks  and controlsPp 13 electrical hazards, risks  and controls
Pp 13 electrical hazards, risks and controls
ScottDickenson2
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
SnehaGhadigaonkar
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
jaimin1702
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
Dwarika Bhushan Sharma
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
LisayahManobangs
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
ijceronline
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
simonslater16
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Muizz Anibire
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
Alvin160771
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Ahmad Nazib
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
LuisValente37
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
HSEXINYIPROJECT
 
Safety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptxSafety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptx
Renuka581330
 
REMINDING SAFETY
REMINDING SAFETYREMINDING SAFETY
REMINDING SAFETY
YAWAR H.KHAN
 
Building Construction 1 Project 1
Building Construction 1 Project 1Building Construction 1 Project 1
Building Construction 1 Project 1
dtan97
 

Similar to demolition.ppt (20)

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safety
 
ConstructionHazards.ppt
ConstructionHazards.pptConstructionHazards.ppt
ConstructionHazards.ppt
 
Pp 13 electrical hazards, risks and controls
Pp 13 electrical hazards, risks  and controlsPp 13 electrical hazards, risks  and controls
Pp 13 electrical hazards, risks and controls
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Safety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptxSafety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptx
 
REMINDING SAFETY
REMINDING SAFETYREMINDING SAFETY
REMINDING SAFETY
 
Building Construction 1 Project 1
Building Construction 1 Project 1Building Construction 1 Project 1
Building Construction 1 Project 1
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 

demolition.ppt

  • 2. SAFE DEMOLITION REQUIRES ADEQUATE PLANNING Why Plan? Identify the Hazards Meet Legislative Requirements Ensure Appropriate Equipment Ensure Safe Disposal of Materials Determine Appropriate Methods of Demolition Determine Cost of Demolition
  • 3. SAFE DEMOLITION REQUIRES ADEQUATE PLANNING Key Areas for Planning Type of Construction Type of Structure (Ht., Use) State of Structure Structural Hazards Hazardous Substances Location of Services General Conditions of Adjoining Structures Access and Egress Suitability of Site for Equipment
  • 4. DEMOLITION TECHNIQUE Sequential – gradual reduction of height in reverse order to its construction Induced – key structural members are weakened or removed, causing the whole part of the structure to collapse
  • 5. METHODS OF DEMOLITION Manual – use of hand held tools Mechanical – use of heavy equipment, wires and chain, power shear, etc. Explosives – use of explosives
  • 6. RULE 1417 - 1418: DEMOLITION 1. Structures over 6m high must be under the supervision of a competent person 2. The area is strictly for demolition workers only (Demolition area - w/in a distance equal to 1.5 x H of structure) 3. If the above distance is not possible, the structure shall be fenced around 4. Danger signs should be posted around the structure 5. Ensure all electrical services are cut-off
  • 7. RULE 1417 - 1418: DEMOLITION 7. Demolition should proceed storey by storey, in a descending order; work on the upper floors should be completely over before removing the supporting members on the lower floor 8. No part of the structure shall be overloaded w/ debris or mat’ls. 9. Stairs (incl. railings), passageways & ladders should be demolished last
  • 8. HAZARDS ASSOCIATED WITH DEMOLITION Falls Being Hit/Trapped/Crushed by Objects Manual Handling Hazardous Substances and Dangerous Goods Noise and Vibration Electric Shock Fires and Explosions Equipment
  • 9. EXPLOSIVES By Competent Person Precautions from: Smokes, matches & open flames Radio Frequency for Electrical Detonators Transport of Explosives Vehicles shall have tight floors covered w/ wood Explosives and Blasting implements shall not be transported with other materials
  • 10. EXPLOSIVES Storage All explosives must be accounted for Follow manufacturer’s instructions Detonators should be stored in a separate magazine Storage should be fire and bullet-resistant Proper Use Operation between Sunup & Sundown Precaution on the use of f mobile radio transmitting equipment. Suspension of operation during electrical storm
  • 11. EXPLOSIVES After Blasting Disconnect firing line from blasting machine Allow dust and smoke to subside Inspect if all charges have been exploded