Defect	
  Metrics	
  for	
  Organization	
  and	
  
Project	
  Health	
  
	
  
Presented	
  by:	
  
	
  
David	
  	
  Bialek	
  
American	
  Greetings	
  
	
  
Brought	
  to	
  you	
  by:	
  	
  
	
  	
  
	
  
	
  
	
  
	
  
350	
  Corporate	
  Way,	
  Suite	
  400,	
  Orange	
  Park,	
  FL	
  32073	
  	
  
888-­‐-­‐-­‐268-­‐-­‐-­‐8770	
  ·∙·∙	
  904-­‐-­‐-­‐278-­‐-­‐-­‐0524	
  -­‐	
  info@techwell.com	
  -­‐	
  http://www.stareast.techwell.com/	
  	
  	
  
	
  
 	
  
	
  
	
  
David	
  	
  Bialek	
  
American	
  Greetings	
  
	
  
The	
  manager	
  of	
  quality	
  assurance	
  engineering	
  at	
  American	
  Greetings,	
  David	
  
Bialek	
  is	
  responsible	
  for	
  directing	
  the	
  quality	
  assurance	
  effort	
  for	
  all	
  software	
  
development.	
  During	
  his	
  sixteen	
  year	
  IT	
  career,	
  he	
  was	
  a	
  QA	
  consultant	
  for	
  
Compuware	
  and	
  senior	
  QA/BA	
  with	
  the	
  Regional	
  Income	
  Tax	
  Agency.	
  David	
  is	
  
currently	
  on	
  the	
  board	
  of	
  the	
  Northern	
  Ohio	
  Software	
  Quality	
  Assurance	
  
Association	
  and	
  served	
  on	
  the	
  board	
  for	
  the	
  SID	
  Network	
  of	
  Ohio.	
  David	
  lives	
  in	
  
Ohio	
  with	
  his	
  wife	
  Kimberly	
  and	
  their	
  two	
  children.	
  
	
  
	
  
	
  
Defect Metrics for Organization and
Project Health
T11- Metrics
Thursday 11:15 AM
David Bialek
American Greetings
dbialek@ag.com
drb359@hotmail.com
@drb359 - Twitter
The Manager of Quality Assurance Engineering at
American Greetings, David Bialek is responsible
for directing the quality assurance effort for all
software development. During his sixteen year IT
career, he was a QA consultant for Compuware
and senior QA/BA with the Regional Income Tax
Agency. David is currently on the board of the
Northern Ohio Software Quality Assurance
Association and served on the board for the SID
Network of Ohio. David lives in Ohio with his wife
Kimberly and their two children.
Insert QA pic
Discussion
• Need for Bug Metrics
• Bug List
• Root Cause Analysis
• Resolution Analysis
• Step by Step “How –To”
Why discuss bug metrics?
• Track Progress
• Show measure of work
• Fragility
• Strength
• Disservice to business
Why discuss bug metrics?
• Track Progress
Why discuss bug metrics?
• Measure of work
Why discuss bug metrics?
• Fragility
Why discuss bug metrics?
• Strength
Why discuss bug metrics?
Disservice to business if
you do nothing!
Pillar of our metrics
BUG LIST
• Why do we need these?
Bug List
These reports are one of the things that
business people, users are interested in
more so then our automation or test scripts
• Construct the list or report – Keep it Simple
• Priority vs Criticality
• Common Rankings
• Critical
• High
• Medium
• Low
• Superficial
Bug List
• Criticality is not indicative of priority
• Think of these two items separately
• Pre / Post Prod depending on your
methodology
Critical / High Priority
Simplistic Example
# Date
opened?
Issue System Priority Status
1 2/1 Unable to login to
cardstore.com with
authenticated user .
Username –
s3te@ag.com –
Password - testing
Xyzs.com Critical Open
Pillar of our metrics
ROOT CAUSE
Root Cause Analysis
• Much research already out there
• Exploring technically and functionally
the origins of bugs
• Creating logical groupings and roll up
bugs into categories
• Avoid miscellaneous
Root Cause Description
Requirement Bug can be traced to an incorrect/incomplete/misunderstood requirement
Coding fix Bug was a result of a Code Change
Compatibility Bug was found on specific Browser / OS or Mobile device
System Integration Bug was found when code was moved across environments (Stage, Gold,
Work)
Database Change Bug was a result of a DB change/update/upgrade
Environment Bug related to VM, server or other hardware
Third Party Bug is from a Third Party Application
Code Release Bug related to the release of Code
Invalid Bug that should have never been opened
Duplicate Duplicate of another bug
Site Content Bug on content / graphics
Pillar of our metrics
RESOLUTION
Resolution Analysis
• Again, much research out there
• Looking at how we resolve issues to
see bug scrub results and
development fixes
Resolution Meaning/Usage
Fixed All the work to satisfy the issue is complete and if the bug
was fixed by another bug.
Won't Fix For bugs, this means the problem has been acknowledged,
but nobody plans to do anything about it. For features and
improvements, it can indicate something has been deemed
out of scope.
Duplicate This issue will be handled with another one addressing the
same work.
Incomplete There isn't enough information to take action upon. For
bugs that can't be reproduced, use the Cannot
Reproduce status
Cannot Reproduce A bug can't be recreated given the information presented
with the bug.
Cancelled This issue should never have existed
Works As Designed Issue is in conflict with the design
Case Study
Needed to show value of QA to
organization plus team velocity and
effectiveness
Quandary
Have a great tool for tracking bugs.
But too many groups had
involvement in how issues were
reported leading to disparate results
Data integrity did not seem to be a
requirement
No root cause or resolution analysis
existed
No bug reporting! Except for looking at
a super massive list of issues
that went back years……
Where to Start?
• Step 1 – Create / Dissect Bug List
• Use Bugzilla, Jira or other product to sift
• Quantifications:
• Total Bugs
• Criticality
• Cleaned and scrubbed
• Removed dated ones
• This took a significant effort
Step 2 – Narrow Focus
• Focus on
• Data Integrity
• Open bugs to get them to Fixed
• Closed for further analysis
• Analysis began on the most critical/high
priority closed items
Step 3 – Group for Priority/Criticality
• Priority based grouping
• Criticality as a secondary attribute
Step 4 – Think and Report
• Think !!
• You know the business you are in and use
those intrinsic heuristics to get to what is
valuable and actionable
• Buy-in is everything
• Construct reports – here are some examples
of ones that had the most impact and were
easy to follow
2%
50%
37%
11%
Closed Bugs By Priority
Critical-89
High-2315
Medium-1711
Low-506
4%
4% 4%
7%
11%
13%
57%
Third Party - 156
Environment - 182
Duplicate - 183
Browser Compatibility - 274
Requirement - 479
Invalid - 555
Code Change - 2419
Root Cause
4%
6% 5%
9%
62%
7%
7% Resolutions
Cannot Reproduce - 166
Cancelled - 253
Duplicate - 242
Closed - 404
Fixed - 2743
Wont Fix - 301
Works As Designed - 308
Step 5 – Expand to Release/Build
• With all the data organized analyze build
/ release information to find
commonalities and start to see velocity
0
50
100
150
200
250
300
350
1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct
Pre Prod
Prod
Total Release issues
FB's
Stage Builds/Mth
Step 6 - Create action items
• Root Cause
• Duplicates
• Third Party
• Invalid
• Requirement
• Hold those accountable and measure at
regular intervals (by release or major release)
Step 7 – Establish Meters for measuring
project and organizational wellness
• By Project
• For Organizational health
Step 8 – Plan with predictive awareness
• This term is a marketing one, but applies
in this situation
• We cannot assume that one release or
one project is the exact same as another
• Plan with caution!
Step 1 – Create / Dissect Bug List
Step 2 – Narrow Focus
Step 3 – Group for Priority / Criticality
Step 4 – Think and Report
Step 5 – Expand to Releases / Builds
Step 6 – Create Action Items
Step 7 – Establish Meters
Step 8 – Plan with predictive awareness
David Bialek
American Greetings
dbialek@ag.com
drb359@hotmail.com
@drb359 - Twitter

Defect Metrics for Organization and Project Health

  • 1.
              T11   Metrics   5/5/16  11:15               Defect  Metrics  for  Organization  and   Project  Health     Presented  by:     David    Bialek   American  Greetings     Brought  to  you  by:                 350  Corporate  Way,  Suite  400,  Orange  Park,  FL  32073     888-­‐-­‐-­‐268-­‐-­‐-­‐8770  ·∙·∙  904-­‐-­‐-­‐278-­‐-­‐-­‐0524  -­‐  info@techwell.com  -­‐  http://www.stareast.techwell.com/        
  • 2.
            David    Bialek   American  Greetings     The  manager  of  quality  assurance  engineering  at  American  Greetings,  David   Bialek  is  responsible  for  directing  the  quality  assurance  effort  for  all  software   development.  During  his  sixteen  year  IT  career,  he  was  a  QA  consultant  for   Compuware  and  senior  QA/BA  with  the  Regional  Income  Tax  Agency.  David  is   currently  on  the  board  of  the  Northern  Ohio  Software  Quality  Assurance   Association  and  served  on  the  board  for  the  SID  Network  of  Ohio.  David  lives  in   Ohio  with  his  wife  Kimberly  and  their  two  children.        
  • 3.
    Defect Metrics forOrganization and Project Health T11- Metrics Thursday 11:15 AM
  • 4.
  • 5.
    The Manager ofQuality Assurance Engineering at American Greetings, David Bialek is responsible for directing the quality assurance effort for all software development. During his sixteen year IT career, he was a QA consultant for Compuware and senior QA/BA with the Regional Income Tax Agency. David is currently on the board of the Northern Ohio Software Quality Assurance Association and served on the board for the SID Network of Ohio. David lives in Ohio with his wife Kimberly and their two children.
  • 6.
  • 7.
    Discussion • Need forBug Metrics • Bug List • Root Cause Analysis • Resolution Analysis • Step by Step “How –To”
  • 8.
    Why discuss bugmetrics? • Track Progress • Show measure of work • Fragility • Strength • Disservice to business
  • 9.
    Why discuss bugmetrics? • Track Progress
  • 10.
    Why discuss bugmetrics? • Measure of work
  • 11.
    Why discuss bugmetrics? • Fragility
  • 12.
    Why discuss bugmetrics? • Strength
  • 13.
    Why discuss bugmetrics? Disservice to business if you do nothing!
  • 14.
    Pillar of ourmetrics BUG LIST
  • 15.
    • Why dowe need these? Bug List These reports are one of the things that business people, users are interested in more so then our automation or test scripts
  • 16.
    • Construct thelist or report – Keep it Simple • Priority vs Criticality • Common Rankings • Critical • High • Medium • Low • Superficial Bug List
  • 17.
    • Criticality isnot indicative of priority • Think of these two items separately • Pre / Post Prod depending on your methodology Critical / High Priority
  • 18.
    Simplistic Example # Date opened? IssueSystem Priority Status 1 2/1 Unable to login to cardstore.com with authenticated user . Username – s3te@ag.com – Password - testing Xyzs.com Critical Open
  • 19.
    Pillar of ourmetrics ROOT CAUSE
  • 20.
    Root Cause Analysis •Much research already out there • Exploring technically and functionally the origins of bugs • Creating logical groupings and roll up bugs into categories • Avoid miscellaneous
  • 21.
    Root Cause Description RequirementBug can be traced to an incorrect/incomplete/misunderstood requirement Coding fix Bug was a result of a Code Change Compatibility Bug was found on specific Browser / OS or Mobile device System Integration Bug was found when code was moved across environments (Stage, Gold, Work) Database Change Bug was a result of a DB change/update/upgrade Environment Bug related to VM, server or other hardware Third Party Bug is from a Third Party Application Code Release Bug related to the release of Code Invalid Bug that should have never been opened Duplicate Duplicate of another bug Site Content Bug on content / graphics
  • 22.
    Pillar of ourmetrics RESOLUTION
  • 23.
    Resolution Analysis • Again,much research out there • Looking at how we resolve issues to see bug scrub results and development fixes
  • 24.
    Resolution Meaning/Usage Fixed Allthe work to satisfy the issue is complete and if the bug was fixed by another bug. Won't Fix For bugs, this means the problem has been acknowledged, but nobody plans to do anything about it. For features and improvements, it can indicate something has been deemed out of scope. Duplicate This issue will be handled with another one addressing the same work. Incomplete There isn't enough information to take action upon. For bugs that can't be reproduced, use the Cannot Reproduce status Cannot Reproduce A bug can't be recreated given the information presented with the bug. Cancelled This issue should never have existed Works As Designed Issue is in conflict with the design
  • 26.
    Case Study Needed toshow value of QA to organization plus team velocity and effectiveness
  • 27.
    Quandary Have a greattool for tracking bugs. But too many groups had involvement in how issues were reported leading to disparate results
  • 28.
    Data integrity didnot seem to be a requirement
  • 29.
    No root causeor resolution analysis existed
  • 30.
    No bug reporting!Except for looking at a super massive list of issues that went back years……
  • 32.
    Where to Start? •Step 1 – Create / Dissect Bug List • Use Bugzilla, Jira or other product to sift • Quantifications: • Total Bugs • Criticality • Cleaned and scrubbed • Removed dated ones • This took a significant effort
  • 33.
    Step 2 –Narrow Focus • Focus on • Data Integrity • Open bugs to get them to Fixed • Closed for further analysis • Analysis began on the most critical/high priority closed items
  • 34.
    Step 3 –Group for Priority/Criticality • Priority based grouping • Criticality as a secondary attribute
  • 35.
    Step 4 –Think and Report • Think !! • You know the business you are in and use those intrinsic heuristics to get to what is valuable and actionable • Buy-in is everything • Construct reports – here are some examples of ones that had the most impact and were easy to follow
  • 36.
    2% 50% 37% 11% Closed Bugs ByPriority Critical-89 High-2315 Medium-1711 Low-506
  • 37.
    4% 4% 4% 7% 11% 13% 57% Third Party- 156 Environment - 182 Duplicate - 183 Browser Compatibility - 274 Requirement - 479 Invalid - 555 Code Change - 2419 Root Cause
  • 38.
    4% 6% 5% 9% 62% 7% 7% Resolutions CannotReproduce - 166 Cancelled - 253 Duplicate - 242 Closed - 404 Fixed - 2743 Wont Fix - 301 Works As Designed - 308
  • 39.
    Step 5 –Expand to Release/Build • With all the data organized analyze build / release information to find commonalities and start to see velocity
  • 41.
    0 50 100 150 200 250 300 350 1-Jul 1-Aug 1-Sep1-Oct 1-Nov 1-Dec 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct Pre Prod Prod Total Release issues FB's Stage Builds/Mth
  • 42.
    Step 6 -Create action items • Root Cause • Duplicates • Third Party • Invalid • Requirement • Hold those accountable and measure at regular intervals (by release or major release)
  • 43.
    Step 7 –Establish Meters for measuring project and organizational wellness • By Project • For Organizational health
  • 44.
    Step 8 –Plan with predictive awareness • This term is a marketing one, but applies in this situation • We cannot assume that one release or one project is the exact same as another • Plan with caution!
  • 45.
    Step 1 –Create / Dissect Bug List Step 2 – Narrow Focus Step 3 – Group for Priority / Criticality Step 4 – Think and Report Step 5 – Expand to Releases / Builds Step 6 – Create Action Items Step 7 – Establish Meters Step 8 – Plan with predictive awareness
  • 46.