Welcome to our open house
Today we’re talking about ideas to replace the
Arlington Street Bridge and improve crossings over the
CPR Yards. We look forward to hearing your views.
To learn about the proposals:
Please look at the information displays and talk to
the people wearing name tags. You can also visit
cprcrossing.winnipeg.ca to find out more.
To share your views:
•	 Complete the survey – either on paper or on the		
cprcrossing.winnipeg.ca website.
•	 Stop by the Table Topic Station, where you can		
provide more detailed input.
1
About this project
The Arlington Street Bridge over the CPR Yards is
nearing the end of its useable life. Winnipeg needs a
sensible plan to replace the bridge while meeting the
needs of everyone affected.
Our Project Advisory Committee was asked to identify
the best, most practical options using a collaborative
planning process. Today we are seeking your feedback on
these options as we prepare our final report to the City of
Winnipeg.
2.1
2.2
The Vision
A safe, convenient and well-situated crossing(s) that:
•	 Connects the north and south communities,
•	 	Supports social interaction, healthy lives, economic
stability and growth and well-managed traffic flow,
and
•	 	Offers accessible, connected transportation options
for all ages and abilities.
The Goals
•	 	To be technically sound
•	 	To be environmentally responsible
•	 	To be cost-effective
•	 To reflect local community needs as well as the city’s
in general
•	 	To be generally understood and accepted by most of
those affected
The collaborative
planning process
Our recommendations are based on thorough consultation,
research and analysis with input from the people who will
be most affected.
Public engagement
In the fall of 2014, we began seeking input from anyone who
uses the bridge to cross the CPR yards, whether by foot, car,
bicycle, truck, wheelchair, stroller or bus. We also reached
out to people who live, work and use services in the area.
Many people and organizations helped shape our
recommendations by participating in meetings,
workshops, surveys and tours.
Analysis
All ideas were rated against the project goals. Some were
eliminated and others were joined together to the strongest
range of crossing options. The strengths and weaknesses
of each were then thoroughly analyzed to help committee
members make the best recommendations.
3.1
3.2
Public Engagement Timeline
COLLABORATIVE
PLANNING
PROCESS
PROJECT
ADVISORY
COMMITTEE
(PAC) AND
PUBLIC
ENGAGEMENT
*Note: Study phase only. Construction
budget has not been allocated at this
time.
PHASE 1
Common Knowledge Base
•	 Community Profile
•	 Bridge studies
•	 PAC sectors/organizations’
interests
PHASE 2
Explore and Develop
Options
•	 Vision and goals
•	 Brainstorm, analyze and
prioritize options
PHASE 3
Public Input
•	 Public communication	
about proposed options
•	 Analyze public’s input
PHASE 4
Evaluate and Recommend
•	 Refine and select best option
•	 Present final plan to public	
and to City Council
LAUNCH
•	 Key person interviews
•	 2 PAC meetings
•	 Community presentations
& dialogue groups
IMAGINE & DIRECTION
•	 Stakeholder Workshop #1
•	 Site tour
•	 3 PAC meetings
•	 Community presentations
& dialogue groups
•	 On-line, interactive, public
engagement website
•	 Stakeholder Workshop #2
CONNECT
•	 Open House #1 & 2
•	 2 PAC meetings
•	 Telephone survey
•	 On-line, interactive, public
engagement website
RECOMMEND
•	 Open House #3
•	 1 PAC meeting
NEXT STEPS
Preliminary Report
NEXT STEPS
Final Report:
Conclusion of Study
Presentation of Study
	Recommendations to
City Council
Fall 2014 	 Fall 2014 to 									 Fall 2015 				 Fall to Winter										
Summer 2015
																										
2015
3.3
What people told us
Top 4 ways this project can contribute to a healthy and
strong community
•	 A long-term solution adaptable to future growth
•	 Better transportation route/connections for all ages and abilities
•	 Improved safety and access for pedestrians and cyclists	
using the crossing
•	 Works for people in the community and city-wide
Top 3 routes in project area for current and future travel
•	 Arlington Street
•	 Main Street
•	 McGregor-Sherbrook area
Why people don’t use the Arlington Bridge now
•	 Inconvenient, poor condition, don’t feel safe
Top planning considerations for new crossing
•	 Community gathering spaces and healthy lives
•	 Well planned and designed
•	 Safety/security
•	 Walking/cycling accommodation
•	 Transit
•	 Connections
•	 Universal accessibility
•	 Community economic vitality
Our questions for you today
After carefully analyzing the possibilities, the Project
Advisory Committee decided there should be 2 phases to this
project development – the first phase to replace the
Arlington Street Bridge within the next decade, and a second
phase to address the expected growth of the city after 2031.
Today we’re seeking your input on these questions:
Phase 1: Replacing the Arlington Street Bridge
•	 What are the best ways of managing different types of
traffic flow?
•	 Could we do more to connect the communities on
either side of the CPR Yards?
Phase 2: Longer-term plans to improve traffic
connections
•	 Should we reconstruct the McPhillips Underpass?
•	 Or should we connect McGregor and Sherbrook by way
of a new tunnel?
4.1
LEARN MORE ABOUT THE OPTIONS
4.2
Phase 1:
Replacing the Arlington Street Bridge
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over Duf-
ferin and Jarvis Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
VEHICLES
PEDESTRIAN/CYCLING
ACCOMMODATION
LEGEND
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over
Dufferin and
Jarvis
Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
VEHICLES
PEDESTRIAN/CYCLING
ACCOMMODATION
LEGEND
The plan
•	 Remove and rebuild starting in 2020
•	 	Accommodate 2-3 lanes of traffic
•	 Accommodate buses and trucks
•	 Separate pedestrian and cycling facilities for greater
comfort, safety and enjoyment
•		 Improve lighting
•	 	Accommodate all movements and users over the bridge
and at major intersections
•	 	Opportunities for local business from traffic flow
•	 Explore potential for green/community gathering space
and public art
Connections
•	 Extend bridge ramp further north to create a more
gradual, accessible slope for people using the crossing
•	 Allow right turns at Stella and Flora for neighbourhood
connections, with raised medians to manage future
increases in traffic crossing Arlington
•	 Set out connections for future pedestrian/cycling routes
4.3
LEGEND
PROPOSED LIMITS / ROAD
WORK
PROPOSED OFFSET
BRIDGE ALIGNMENT
PEDESTRIAN FACILITY
PROPOSED BIKE PATH
EXISTING BICYCLE GREENWAY
TRAFFIC FLOW DIRECTION
POTENTIAL PROPERTY IMPACT
MEDIANS
ARLINGTON ST. & LOGAN AVE. ARLINGTON ST. & STELLA AVE. ARLINGTON ST. & SELKIRK AVE.
Phase1
ReconstructtheArlingtonBridge
Separated two-way cycle lane on west side of bridge, sidewalks on both sides
Separated one-way cycle lane on each side of bridge, sidewalks on both sides
Separated one-way cycle lanes and sidewalks on both sides of bridge
SIDEWALK SIDEWALK
ONE-WAY
CYCLE
PATH
ONE-WAY
CYCLE
PATH
SOUTHBOUND NORTHBOUND
SIDEWALK SIDEWALK
CYCLE
PATH SOUTHBOUND NORTHBOUND
SIDEWALK SIDEWALK
ONE-WAY
CYCLE
PATH
ONE-WAY
CYCLE
PATH
SOUTHBOUND NORTHBOUND
Arlington Street Bridge
Lane Layout Alternatives
DUFFERINAVE.
STELLAAVE.
JARVISAVE.
LOGANAVE.
DUFFERINAVE.
STELLAAVE.
JARVISAVE.
LOGANAVE.
DUFFERINAVE.
STELLAAVE.
JARVISAVE.
LOGANAVE.
Phase 1
Arlington Bridge Concepts
Steel Truss Bridge Concept
Cable Stayed Bridge Concept
Tied Arch Bridge Concept
4.4
Share your views
on Phase 1
What’s the best alternative to manage
vehicle traffic?
•	 1 lane in each direction	
−	 Would leave some northbound congestion south of					
bridge at afternoon peak
•	 2 lanes northbound, 1 lane southbound	
−	 Reduces northbound congestion at afternoon peak
What’s the best way to accommodate
pedestrians/cyclists?
•	 Separated 1-way cyclist lanes and sidewalks on each
side of bridge
•	 Separated 2-way cycle lane on west side, sidewalks on
both sides
•	 Separated 2-way cycle lane on east side, sidewalks on
both sides
4.5
Phase 2, Option A:
Should we reconstruct McPhillips underpass?
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over Duf-
ferin and Jarvis Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over
Dufferin and
Jarvis
Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
VEHICLES
PEDESTRIAN/CYCLING
ACCOMMODATION
LEGEND
The plan
•	 Replace current crossing offering 40% more capacity
with either 6-lane overpass OR an underpass east of
current alignment
•	 Accommodate trucks, remove height restrictions
•	 Accommodate all users with mild ramp grades,
sidewalks on each side of structure and separated 2-way
cycling lane on west side
•	 Improve lighting
•	 Allow opportunities for transit to better serve area
•	 Opportunities for local business from traffic flow
•	 Explore potential for green/community gathering space
and public art
Connections
•	 Enhanced east-west cycling connections to existing
separated bike lanes
4.6
Phase2-OptionA
ReconstructMcPhillipsUnderpass
Phase 2, Option B:
Should we build a new McGregor/Sherbrook
tunnel connection?
4.7
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over Duf-
ferin and Jarvis Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
JARVIS AVE.
DUFFERIN AVE.
LOGAN AVE.
MCPHILLIPSST.
MCGREGORST.
ARLINGTONBRIDGE
SLAWREBCHUKBRIDGE
SALTERST.
SHERBROOKST.
SELKIRK AVE.
ARLINGTONST.
TUNNELCONNECTION
PHASE 2 - Option A
Reconstruct McPhillips
Underpass
PHASE 1
Reconstruct the Arlington
Bridge starting in 2020
New crossing would be built either
in the same place or to one side
of existing bridge
PHASE 2 - Option B
McGregor / Sherbrook
Tunnel Connection
VEHICLES
PEDESTRIAN/CYCLING
ACCOMMODATION
LEGEND
Reconstructing
and widening the
underpass is being
considered
2 or 3 lanes with
pedestrian
and cycling
accommodation
ISABELST.
HENRY AVE.
Proposed
bridge would
pass over
Dufferin and
Jarvis
Proposed tunnel
would run under
Jarvis
Proposed tunnel
would run under
Henry Ave
VEHICLES
PEDESTRIAN/CYCLING
ACCOMMODATION
LEGEND
The plan
•	 A tunnel is the best way to maintain an accessible slope
at the south end and bring together neighbourhoods
on both sides of yards as compared to a bridge.
•	 Would reduce traffic on Salter, Isabel, Main and
neighbourhood streets, but increase traffic on Sherbrook
•	 Could also increase traffic on Selkirk and McGregor,
leading to new business/development opportunities
•	 4 lanes in the tunnel for vehicles, trucks and buses only.
Pedestrians and cyclists will be accommodated on the
Arlington Bridge and a possible Slaw Rebchuk walking/
cycling bridge.
•	 Vehicle capacity on par with other crossings, with
potential to reduce neighbourhood impacts
•	 Potential intersection modifications at Sherbrook and
Notre Dame
•	 Potential for improved transit links between north
Winnipeg, HSC complex and south to U of M
Connections
•	 Fly-over bridges at Jarvis and Henry
• 		Restoration of Higgins
4.8
LEGEND
PROPOSED LIMITS / ROAD WORK
PROPOSED TUNNEL OPTION
TRAFFIC FLOW DIRECTION
POTENTIAL PROPERTY IMPACT
BEYOND 2031
RETAINING WALL
BRIDGE
EXISTING BIKE GREENWAY
PEDESTRIAN FACILITY
MEDIAN
SHERBROOK STREET & LOGAN AVE. McGREGOR STREET & DUFFERIN AVE.
Phase2-OptionB
McGregor/SherbrookTunnelConnection
Share your views on
Phase 2 - Option A and Option B
What do you like and dislike about Options
A and B, considering the impact on:
•	 Pedestrians and cyclists?
•	 Safety and access for all?
•	 Transit service?
•	 Ability to adapt to further growth and traffic flow?
•	 Connections for the community and city-wide?
Overall, what is your preferred crossing
option?
What planning and design elements would
support the success of each option for:
•	 Walking and biking?
•	 Traffic flow and transportation planning?
•	 Community well-being?
4.9
5.0
Thanks for taking part!
You’ve had a chance to learn about our
proposals. We hope you’ll contribute to our
final report by telling us what you think.
Share your views today by filling out
the survey, talking to team members and
participating in table topics.
No time today? You can share your views
later by completing the questionnaire online.
Just click on the Citizen Planner Link at the top
right of the project website.
cprcrossing.winnipeg.ca
Collaborate | Design| Create
®
Crowdsourcing for Better Communities
By Darin Dinsmore

CPR Yards Crossing Study - open house panels

  • 1.
    Welcome to ouropen house Today we’re talking about ideas to replace the Arlington Street Bridge and improve crossings over the CPR Yards. We look forward to hearing your views. To learn about the proposals: Please look at the information displays and talk to the people wearing name tags. You can also visit cprcrossing.winnipeg.ca to find out more. To share your views: • Complete the survey – either on paper or on the cprcrossing.winnipeg.ca website. • Stop by the Table Topic Station, where you can provide more detailed input. 1
  • 2.
    About this project TheArlington Street Bridge over the CPR Yards is nearing the end of its useable life. Winnipeg needs a sensible plan to replace the bridge while meeting the needs of everyone affected. Our Project Advisory Committee was asked to identify the best, most practical options using a collaborative planning process. Today we are seeking your feedback on these options as we prepare our final report to the City of Winnipeg. 2.1
  • 3.
    2.2 The Vision A safe,convenient and well-situated crossing(s) that: • Connects the north and south communities, • Supports social interaction, healthy lives, economic stability and growth and well-managed traffic flow, and • Offers accessible, connected transportation options for all ages and abilities. The Goals • To be technically sound • To be environmentally responsible • To be cost-effective • To reflect local community needs as well as the city’s in general • To be generally understood and accepted by most of those affected
  • 4.
    The collaborative planning process Ourrecommendations are based on thorough consultation, research and analysis with input from the people who will be most affected. Public engagement In the fall of 2014, we began seeking input from anyone who uses the bridge to cross the CPR yards, whether by foot, car, bicycle, truck, wheelchair, stroller or bus. We also reached out to people who live, work and use services in the area. Many people and organizations helped shape our recommendations by participating in meetings, workshops, surveys and tours. Analysis All ideas were rated against the project goals. Some were eliminated and others were joined together to the strongest range of crossing options. The strengths and weaknesses of each were then thoroughly analyzed to help committee members make the best recommendations. 3.1
  • 5.
    3.2 Public Engagement Timeline COLLABORATIVE PLANNING PROCESS PROJECT ADVISORY COMMITTEE (PAC)AND PUBLIC ENGAGEMENT *Note: Study phase only. Construction budget has not been allocated at this time. PHASE 1 Common Knowledge Base • Community Profile • Bridge studies • PAC sectors/organizations’ interests PHASE 2 Explore and Develop Options • Vision and goals • Brainstorm, analyze and prioritize options PHASE 3 Public Input • Public communication about proposed options • Analyze public’s input PHASE 4 Evaluate and Recommend • Refine and select best option • Present final plan to public and to City Council LAUNCH • Key person interviews • 2 PAC meetings • Community presentations & dialogue groups IMAGINE & DIRECTION • Stakeholder Workshop #1 • Site tour • 3 PAC meetings • Community presentations & dialogue groups • On-line, interactive, public engagement website • Stakeholder Workshop #2 CONNECT • Open House #1 & 2 • 2 PAC meetings • Telephone survey • On-line, interactive, public engagement website RECOMMEND • Open House #3 • 1 PAC meeting NEXT STEPS Preliminary Report NEXT STEPS Final Report: Conclusion of Study Presentation of Study Recommendations to City Council Fall 2014 Fall 2014 to Fall 2015 Fall to Winter Summer 2015 2015
  • 6.
    3.3 What people toldus Top 4 ways this project can contribute to a healthy and strong community • A long-term solution adaptable to future growth • Better transportation route/connections for all ages and abilities • Improved safety and access for pedestrians and cyclists using the crossing • Works for people in the community and city-wide Top 3 routes in project area for current and future travel • Arlington Street • Main Street • McGregor-Sherbrook area Why people don’t use the Arlington Bridge now • Inconvenient, poor condition, don’t feel safe Top planning considerations for new crossing • Community gathering spaces and healthy lives • Well planned and designed • Safety/security • Walking/cycling accommodation • Transit • Connections • Universal accessibility • Community economic vitality
  • 7.
    Our questions foryou today After carefully analyzing the possibilities, the Project Advisory Committee decided there should be 2 phases to this project development – the first phase to replace the Arlington Street Bridge within the next decade, and a second phase to address the expected growth of the city after 2031. Today we’re seeking your input on these questions: Phase 1: Replacing the Arlington Street Bridge • What are the best ways of managing different types of traffic flow? • Could we do more to connect the communities on either side of the CPR Yards? Phase 2: Longer-term plans to improve traffic connections • Should we reconstruct the McPhillips Underpass? • Or should we connect McGregor and Sherbrook by way of a new tunnel? 4.1 LEARN MORE ABOUT THE OPTIONS
  • 8.
    4.2 Phase 1: Replacing theArlington Street Bridge JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Duf- ferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection VEHICLES PEDESTRIAN/CYCLING ACCOMMODATION LEGEND Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Dufferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave VEHICLES PEDESTRIAN/CYCLING ACCOMMODATION LEGEND
  • 9.
    The plan • Removeand rebuild starting in 2020 • Accommodate 2-3 lanes of traffic • Accommodate buses and trucks • Separate pedestrian and cycling facilities for greater comfort, safety and enjoyment • Improve lighting • Accommodate all movements and users over the bridge and at major intersections • Opportunities for local business from traffic flow • Explore potential for green/community gathering space and public art Connections • Extend bridge ramp further north to create a more gradual, accessible slope for people using the crossing • Allow right turns at Stella and Flora for neighbourhood connections, with raised medians to manage future increases in traffic crossing Arlington • Set out connections for future pedestrian/cycling routes 4.3
  • 10.
    LEGEND PROPOSED LIMITS /ROAD WORK PROPOSED OFFSET BRIDGE ALIGNMENT PEDESTRIAN FACILITY PROPOSED BIKE PATH EXISTING BICYCLE GREENWAY TRAFFIC FLOW DIRECTION POTENTIAL PROPERTY IMPACT MEDIANS ARLINGTON ST. & LOGAN AVE. ARLINGTON ST. & STELLA AVE. ARLINGTON ST. & SELKIRK AVE. Phase1 ReconstructtheArlingtonBridge
  • 11.
    Separated two-way cyclelane on west side of bridge, sidewalks on both sides Separated one-way cycle lane on each side of bridge, sidewalks on both sides Separated one-way cycle lanes and sidewalks on both sides of bridge SIDEWALK SIDEWALK ONE-WAY CYCLE PATH ONE-WAY CYCLE PATH SOUTHBOUND NORTHBOUND SIDEWALK SIDEWALK CYCLE PATH SOUTHBOUND NORTHBOUND SIDEWALK SIDEWALK ONE-WAY CYCLE PATH ONE-WAY CYCLE PATH SOUTHBOUND NORTHBOUND Arlington Street Bridge Lane Layout Alternatives
  • 12.
  • 13.
    4.4 Share your views onPhase 1 What’s the best alternative to manage vehicle traffic? • 1 lane in each direction − Would leave some northbound congestion south of bridge at afternoon peak • 2 lanes northbound, 1 lane southbound − Reduces northbound congestion at afternoon peak What’s the best way to accommodate pedestrians/cyclists? • Separated 1-way cyclist lanes and sidewalks on each side of bridge • Separated 2-way cycle lane on west side, sidewalks on both sides • Separated 2-way cycle lane on east side, sidewalks on both sides
  • 14.
    4.5 Phase 2, OptionA: Should we reconstruct McPhillips underpass? JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Duf- ferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Dufferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave VEHICLES PEDESTRIAN/CYCLING ACCOMMODATION LEGEND
  • 15.
    The plan • Replacecurrent crossing offering 40% more capacity with either 6-lane overpass OR an underpass east of current alignment • Accommodate trucks, remove height restrictions • Accommodate all users with mild ramp grades, sidewalks on each side of structure and separated 2-way cycling lane on west side • Improve lighting • Allow opportunities for transit to better serve area • Opportunities for local business from traffic flow • Explore potential for green/community gathering space and public art Connections • Enhanced east-west cycling connections to existing separated bike lanes 4.6
  • 16.
  • 17.
    Phase 2, OptionB: Should we build a new McGregor/Sherbrook tunnel connection? 4.7 JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Duf- ferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave JARVIS AVE. DUFFERIN AVE. LOGAN AVE. MCPHILLIPSST. MCGREGORST. ARLINGTONBRIDGE SLAWREBCHUKBRIDGE SALTERST. SHERBROOKST. SELKIRK AVE. ARLINGTONST. TUNNELCONNECTION PHASE 2 - Option A Reconstruct McPhillips Underpass PHASE 1 Reconstruct the Arlington Bridge starting in 2020 New crossing would be built either in the same place or to one side of existing bridge PHASE 2 - Option B McGregor / Sherbrook Tunnel Connection VEHICLES PEDESTRIAN/CYCLING ACCOMMODATION LEGEND Reconstructing and widening the underpass is being considered 2 or 3 lanes with pedestrian and cycling accommodation ISABELST. HENRY AVE. Proposed bridge would pass over Dufferin and Jarvis Proposed tunnel would run under Jarvis Proposed tunnel would run under Henry Ave VEHICLES PEDESTRIAN/CYCLING ACCOMMODATION LEGEND
  • 18.
    The plan • Atunnel is the best way to maintain an accessible slope at the south end and bring together neighbourhoods on both sides of yards as compared to a bridge. • Would reduce traffic on Salter, Isabel, Main and neighbourhood streets, but increase traffic on Sherbrook • Could also increase traffic on Selkirk and McGregor, leading to new business/development opportunities • 4 lanes in the tunnel for vehicles, trucks and buses only. Pedestrians and cyclists will be accommodated on the Arlington Bridge and a possible Slaw Rebchuk walking/ cycling bridge. • Vehicle capacity on par with other crossings, with potential to reduce neighbourhood impacts • Potential intersection modifications at Sherbrook and Notre Dame • Potential for improved transit links between north Winnipeg, HSC complex and south to U of M Connections • Fly-over bridges at Jarvis and Henry • Restoration of Higgins 4.8
  • 19.
    LEGEND PROPOSED LIMITS /ROAD WORK PROPOSED TUNNEL OPTION TRAFFIC FLOW DIRECTION POTENTIAL PROPERTY IMPACT BEYOND 2031 RETAINING WALL BRIDGE EXISTING BIKE GREENWAY PEDESTRIAN FACILITY MEDIAN SHERBROOK STREET & LOGAN AVE. McGREGOR STREET & DUFFERIN AVE. Phase2-OptionB McGregor/SherbrookTunnelConnection
  • 20.
    Share your viewson Phase 2 - Option A and Option B What do you like and dislike about Options A and B, considering the impact on: • Pedestrians and cyclists? • Safety and access for all? • Transit service? • Ability to adapt to further growth and traffic flow? • Connections for the community and city-wide? Overall, what is your preferred crossing option? What planning and design elements would support the success of each option for: • Walking and biking? • Traffic flow and transportation planning? • Community well-being? 4.9
  • 21.
    5.0 Thanks for takingpart! You’ve had a chance to learn about our proposals. We hope you’ll contribute to our final report by telling us what you think. Share your views today by filling out the survey, talking to team members and participating in table topics. No time today? You can share your views later by completing the questionnaire online. Just click on the Citizen Planner Link at the top right of the project website. cprcrossing.winnipeg.ca Collaborate | Design| Create ® Crowdsourcing for Better Communities By Darin Dinsmore