The summary provides information about contracting opportunities for the DC South Capitol Street Corridor Project, including: - 36 DBE firms were awarded contracts totaling $56.7 million, achieving the 13.05% goal for the design phase. - A job fair was held with 309 attendees and 213 applications submitted, though only 4 people were placed in jobs. - The project lists on-the-job training opportunities in design and construction roles.