SlideShare a Scribd company logo
1 of 3
DARREN GREEN
Corner Cottage DOB 8th October 1965
Moorend,
Bradley,
Derbyshire.
DE6 1LQ
Phone: Home: 01335 343841 Mobile: 07971848931
Email: Darren.green2@rolls-royce.com darren.green007@btinternet.com
OBJECTIVE: To be a key player in the future success of a forward thinking company driven by Lean Management.
PERSONEL
A versatile team player who believes any corporations workforce are its major assets when managed effectively.
I have excellent man management and communication skills, which I have put to good effect when team building. I am
well organized and fully utilize my team’s skills to achieve the desired goals. My planning and target setting often
surpass my own expectations. My 22 years experience as a Production Manager has given me the knowledge and
confidence to be successful within any environment. I am conscientious, hard working, with an excellent attendance
record.
During my 13 years experience with Toyota I have learnt all the skills necessary to improve any production environment
through TPS disciplines, which is a field I consider myself to be an expert in these skills include JIT, Kaizen, Kan Ban,
Practical Problem Solving, QC Circles, TPM, 5S Principles, Process Diagnostics and Jishuken implementation.
QUALIFICATIONS
2014- Six Sigma Green Belt
2011- ISO 14001 Environmental Lead Auditor
2010 - ISO 9001 Quality Lead Auditor
2008 - Project Management – Front Situational Leadership – Toyota Best Practice (TBP)
2007 - ISO 9001 and 14001 internal auditor
2003 - Toyota Standardised Work and Job Instruction Certificate.
Toyota Way.
(1992-95) Toyota Problem Solving (PDCA) and QC Tools Certificate.
Toyota Managing Health & Safety at work Certificate.
Toyota Situational Leadership and Communications Certificate.
1999-2000 NEBOSH certificate. North Nott’s College, Nottinghamshire.
1999-2000 NVQ Level 4 in Supervisory Management Ilkeston College, Derbyshire.
1996-1998 NEBS Diploma in Supervisory management. Ilkeston College, Derbyshire.
IT SKILLS
Proficient with Minitab, Word, Excel, Power Point, Internet and E mail.
EDUCATION
1989-1991 HNC Engineering Competences. Peoples College, Nottingham.
1978-1982 All Exams GCE O level Alderman Derbyshire,
Math’s Comprehensive School,
English Language Nottingham.
English Literature
Art
History
Technical Drawing
EMPLOYMENT
2012- Production Leader - Inspections Team, Rolls Royce, Nuclear Subs, Raynesway, Derby.
I am currently the Production Leader for the inspections team, having set up the inspection team and
increased it from 2 to 19 inspectors I have established a disciplined and highly motivated team. We carry out
NDE, Table and CMM inspection as well as operating bespoke inspection equipment measuring components
in microns. Implementation of Toyota’s Problem Solving techniques and improving delivery, Quality and
H&S through Continuous Improvement activities.
2010-2012 Production Group Leader Senior, Toyota UK Derby.
Managing 28 staff and 4 Production Team Leaders. Managing the bumper & spoiler painting lines within
the Plastics shop.
2005-2010 TPS and Quality Group Leader Senior, Toyota UK Derby.
During my previous role from September 2005 to July 2011, I was seconded to the shop TPS group (Toyota
Production System). As the TPS facilitator I managed a small team of specialist Team Leaders and Team
Members.
My responsibilities included the maintenance and improvement of TPS within the Plastic Shop production
groups. I have improved our process diagnostics from 49% to 93% in the past 9 months. During a process
reduction exercise (Jishuken) my team removed 2 processes and changed the shift patterns on two of our
injection moulding machines from 3 to 2 shifts, by means of line rebalancing, GSPH improvements and
Kaizen. This reduced the headcount by 7 members. Future activities will see further reductions of another 2
processes focusing on removing non value added work (NVAW), through member’s participation and
Kaizen activities. The total value of these savings equate to £260,000/annum. I have set up 7 step
improvement plan for self reliance within the Plastics shop. I am responsible for the reduction in NVA work
for all production processes. I am the shop Kaizen mentor training and implementing Kaizen activities. My
responsibilities also include Toyota environmental facilitator which include ISO 14001 auditing, reporting
on any non conformance + corrective actions. Using PPS and TBP approach to ensure non re-occurrence.
2003-2005 Production Group Leader, Toyota Manufacturing UK Derby.
I managed a team of 18 members within the Injection Moulding Department of the Plastics Division which
makes bumpers and instrument panels for both the Avensis and Corolla cars. Responsible for top level
KPIs, Health & Safety - through proactive safety awareness/reporting procedures. Quality - through
maintenance of ISO standards and focused member participation. Production - through key measurable
‘Operational Performance Rate’ (OPR). Cost - through continuous improvements (Kaizen). Members – by
acknowledging their concerns and solving them with mutual trust and respect. Strong focus is on member
development increasing versatility, setting individual objectives as part of our appraisal system, thus
enabling me to have a high skill, flexible work force. Dealing with member’s issues complying with HR
guidelines always striving to find an amicable solution.
2000-2003 Production Cell Manager, Boots Contract Manufacturing, Nottingham.
I managed a team of 18 staff on the tablet manufacturing and packing lines, Producing Paracetamol,
Aspirin, and Vitamins etc. I managed the day to day production of 4 packing lines and 6 tablet
manufacturing machines. Whilst at Boots I reduced machine change over times by 64%and saved 2
processes through improvement activities. I gained a lot of knowledge about FDA, the Pharmaceutical
industry standards governing body.
1996-2000 Business Unit Manager, Pressac Communications Plc. Nottingham.
I was responsible for 80 staff including engineers and QA Technicians, managing the Stamping and
Moulding departments. We made products for the Telecoms and white goods industries. I had responsibility
for the purchase and quality control of raw materials, manufacture of the products through to the on time
delivery to customers. Dealing with suppliers and customers on a daily basis. During my time at Pressac I
saved the equivalent of £237,000 through process improvements, implementing new management systems
and purchase cost reduction activities.
1992-1996 Production Team Leader, Toyota Manufacturing UK Derby.
I managed a team of 10 members 1 year before SOP of the Carina E, helping to set up TPS within the Press
Shop, writing standardized instructions, implementing Kan Ban systems. I learnt my Lean Manufacturing
skills during this time, Just in Time, Kan Ban, Kaizen, 5S, QC tools, Andon, PokeYoke, Effective Meetings
etc. making it probably the most invaluable time of my employment to date.
INTERESTS
My interests include walking, running, circuit training, DIY and keeping up with the children.
ADDITIONAL INFORMATION
Non smoker in excellent health.
Car owner with a full driving license.
References are available upon request.

More Related Content

What's hot

TQM - Total Quality Managemet
TQM - Total Quality ManagemetTQM - Total Quality Managemet
TQM - Total Quality ManagemetAbhishek Shinde
 
An analysis of the impact of total quality management on employee performance...
An analysis of the impact of total quality management on employee performance...An analysis of the impact of total quality management on employee performance...
An analysis of the impact of total quality management on employee performance...nihad341
 
Amy Resume
Amy ResumeAmy Resume
Amy ResumeAmy Pick
 
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.VGANSTUDIO vganstudio
 
TQM concept use by McDonald
TQM concept use by McDonald TQM concept use by McDonald
TQM concept use by McDonald rohit12692
 
Chris Marsh operations resume
Chris Marsh operations resumeChris Marsh operations resume
Chris Marsh operations resumeChris Marsh
 
Sanjay V Deshpande-Resume-030515
Sanjay V  Deshpande-Resume-030515Sanjay V  Deshpande-Resume-030515
Sanjay V Deshpande-Resume-030515Sanjay Deshpande
 

What's hot (20)

TQM - Total Quality Managemet
TQM - Total Quality ManagemetTQM - Total Quality Managemet
TQM - Total Quality Managemet
 
Resume
ResumeResume
Resume
 
An analysis of the impact of total quality management on employee performance...
An analysis of the impact of total quality management on employee performance...An analysis of the impact of total quality management on employee performance...
An analysis of the impact of total quality management on employee performance...
 
Amy Resume
Amy ResumeAmy Resume
Amy Resume
 
Harish Cv Latest 2016
Harish Cv Latest 2016Harish Cv Latest 2016
Harish Cv Latest 2016
 
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.
CAMPUS TO CAREER - TQM WAY. LEARNING MORE ABOUT TQM. TO BE READY FOR THE CAREER.
 
Dinesh CV IPP
Dinesh CV IPPDinesh CV IPP
Dinesh CV IPP
 
CV John Painter
CV John PainterCV John Painter
CV John Painter
 
kanan k
kanan kkanan k
kanan k
 
Karl Branfield CV
Karl Branfield CVKarl Branfield CV
Karl Branfield CV
 
Presentation M De S
Presentation M De SPresentation M De S
Presentation M De S
 
TQM in Motorola
TQM in MotorolaTQM in Motorola
TQM in Motorola
 
TQM concept use by McDonald
TQM concept use by McDonald TQM concept use by McDonald
TQM concept use by McDonald
 
CV_Qori_i
CV_Qori_iCV_Qori_i
CV_Qori_i
 
Chris Marsh operations resume
Chris Marsh operations resumeChris Marsh operations resume
Chris Marsh operations resume
 
Macer, Tony MULTIPURPOSE RESUME
Macer, Tony MULTIPURPOSE RESUMEMacer, Tony MULTIPURPOSE RESUME
Macer, Tony MULTIPURPOSE RESUME
 
Macer, Tony EXPANDED RESUME
Macer, Tony EXPANDED RESUMEMacer, Tony EXPANDED RESUME
Macer, Tony EXPANDED RESUME
 
Sanjay V Deshpande-Resume-030515
Sanjay V  Deshpande-Resume-030515Sanjay V  Deshpande-Resume-030515
Sanjay V Deshpande-Resume-030515
 
Resume
ResumeResume
Resume
 
Resume assembly
Resume assemblyResume assembly
Resume assembly
 

Similar to DARREN GREEN 2014 cv

Charles Roach Resume2.DOC
Charles Roach Resume2.DOCCharles Roach Resume2.DOC
Charles Roach Resume2.DOCCharles Roach
 
Curriculum Vitae 2015 A4
Curriculum Vitae 2015 A4Curriculum Vitae 2015 A4
Curriculum Vitae 2015 A4Neil Thomson
 
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015wirat kungwansomwong
 
ThomasRandallResume2016
ThomasRandallResume2016ThomasRandallResume2016
ThomasRandallResume2016Tom Randall
 
Thomas randallresume2016
Thomas randallresume2016Thomas randallresume2016
Thomas randallresume2016Tom Randall
 
Rashmi with PNG Quality
Rashmi with PNG QualityRashmi with PNG Quality
Rashmi with PNG Qualityrashmi kumari
 
CV2-Full Brake Timothy July 2015
CV2-Full Brake Timothy July 2015CV2-Full Brake Timothy July 2015
CV2-Full Brake Timothy July 2015Timothy Brake
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2John Kidd
 
Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Kamal Sachdeva
 
Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Kamal Sachdeva
 
Arunagiri_Profile_update_1.pdf
Arunagiri_Profile_update_1.pdfArunagiri_Profile_update_1.pdf
Arunagiri_Profile_update_1.pdfraju547414
 
Chetan Final Resume
Chetan Final ResumeChetan Final Resume
Chetan Final ResumeChetan Shah
 
RESUME DR. SANJAY_4-8-2016
RESUME DR. SANJAY_4-8-2016RESUME DR. SANJAY_4-8-2016
RESUME DR. SANJAY_4-8-2016Sanjay Mathur
 
DAZEL CASTRO (1-18-15)
DAZEL CASTRO (1-18-15)DAZEL CASTRO (1-18-15)
DAZEL CASTRO (1-18-15)Daz Castro
 
David Allan Nicholls - CV
David Allan Nicholls - CVDavid Allan Nicholls - CV
David Allan Nicholls - CVDave Nicholls
 

Similar to DARREN GREEN 2014 cv (20)

Charles Roach Resume2.DOC
Charles Roach Resume2.DOCCharles Roach Resume2.DOC
Charles Roach Resume2.DOC
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 
Curriculum Vitae 2015 A4
Curriculum Vitae 2015 A4Curriculum Vitae 2015 A4
Curriculum Vitae 2015 A4
 
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
 
ThomasRandallResume2016
ThomasRandallResume2016ThomasRandallResume2016
ThomasRandallResume2016
 
Thomas randallresume2016
Thomas randallresume2016Thomas randallresume2016
Thomas randallresume2016
 
Rashmi with PNG Quality
Rashmi with PNG QualityRashmi with PNG Quality
Rashmi with PNG Quality
 
CV2-Full Brake Timothy July 2015
CV2-Full Brake Timothy July 2015CV2-Full Brake Timothy July 2015
CV2-Full Brake Timothy July 2015
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2
 
CV_Vinod
CV_VinodCV_Vinod
CV_Vinod
 
Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Business profile cis-latest-jan'17
Business profile cis-latest-jan'17
 
Business profile cis-latest-jan'17
Business profile cis-latest-jan'17Business profile cis-latest-jan'17
Business profile cis-latest-jan'17
 
Arunagiri_Profile_update_1.pdf
Arunagiri_Profile_update_1.pdfArunagiri_Profile_update_1.pdf
Arunagiri_Profile_update_1.pdf
 
Vincent Callaghan CV 220616
Vincent Callaghan CV 220616Vincent Callaghan CV 220616
Vincent Callaghan CV 220616
 
Chetan Final Resume
Chetan Final ResumeChetan Final Resume
Chetan Final Resume
 
aLean Manufacturingeddy
aLean ManufacturingeddyaLean Manufacturingeddy
aLean Manufacturingeddy
 
CV J Singh 2016
CV J Singh 2016CV J Singh 2016
CV J Singh 2016
 
RESUME DR. SANJAY_4-8-2016
RESUME DR. SANJAY_4-8-2016RESUME DR. SANJAY_4-8-2016
RESUME DR. SANJAY_4-8-2016
 
DAZEL CASTRO (1-18-15)
DAZEL CASTRO (1-18-15)DAZEL CASTRO (1-18-15)
DAZEL CASTRO (1-18-15)
 
David Allan Nicholls - CV
David Allan Nicholls - CVDavid Allan Nicholls - CV
David Allan Nicholls - CV
 

DARREN GREEN 2014 cv

  • 1. DARREN GREEN Corner Cottage DOB 8th October 1965 Moorend, Bradley, Derbyshire. DE6 1LQ Phone: Home: 01335 343841 Mobile: 07971848931 Email: Darren.green2@rolls-royce.com darren.green007@btinternet.com OBJECTIVE: To be a key player in the future success of a forward thinking company driven by Lean Management. PERSONEL A versatile team player who believes any corporations workforce are its major assets when managed effectively. I have excellent man management and communication skills, which I have put to good effect when team building. I am well organized and fully utilize my team’s skills to achieve the desired goals. My planning and target setting often surpass my own expectations. My 22 years experience as a Production Manager has given me the knowledge and confidence to be successful within any environment. I am conscientious, hard working, with an excellent attendance record. During my 13 years experience with Toyota I have learnt all the skills necessary to improve any production environment through TPS disciplines, which is a field I consider myself to be an expert in these skills include JIT, Kaizen, Kan Ban, Practical Problem Solving, QC Circles, TPM, 5S Principles, Process Diagnostics and Jishuken implementation. QUALIFICATIONS 2014- Six Sigma Green Belt 2011- ISO 14001 Environmental Lead Auditor 2010 - ISO 9001 Quality Lead Auditor 2008 - Project Management – Front Situational Leadership – Toyota Best Practice (TBP) 2007 - ISO 9001 and 14001 internal auditor 2003 - Toyota Standardised Work and Job Instruction Certificate. Toyota Way. (1992-95) Toyota Problem Solving (PDCA) and QC Tools Certificate. Toyota Managing Health & Safety at work Certificate. Toyota Situational Leadership and Communications Certificate. 1999-2000 NEBOSH certificate. North Nott’s College, Nottinghamshire. 1999-2000 NVQ Level 4 in Supervisory Management Ilkeston College, Derbyshire. 1996-1998 NEBS Diploma in Supervisory management. Ilkeston College, Derbyshire. IT SKILLS Proficient with Minitab, Word, Excel, Power Point, Internet and E mail. EDUCATION 1989-1991 HNC Engineering Competences. Peoples College, Nottingham. 1978-1982 All Exams GCE O level Alderman Derbyshire, Math’s Comprehensive School, English Language Nottingham. English Literature Art History Technical Drawing
  • 2. EMPLOYMENT 2012- Production Leader - Inspections Team, Rolls Royce, Nuclear Subs, Raynesway, Derby. I am currently the Production Leader for the inspections team, having set up the inspection team and increased it from 2 to 19 inspectors I have established a disciplined and highly motivated team. We carry out NDE, Table and CMM inspection as well as operating bespoke inspection equipment measuring components in microns. Implementation of Toyota’s Problem Solving techniques and improving delivery, Quality and H&S through Continuous Improvement activities. 2010-2012 Production Group Leader Senior, Toyota UK Derby. Managing 28 staff and 4 Production Team Leaders. Managing the bumper & spoiler painting lines within the Plastics shop. 2005-2010 TPS and Quality Group Leader Senior, Toyota UK Derby. During my previous role from September 2005 to July 2011, I was seconded to the shop TPS group (Toyota Production System). As the TPS facilitator I managed a small team of specialist Team Leaders and Team Members. My responsibilities included the maintenance and improvement of TPS within the Plastic Shop production groups. I have improved our process diagnostics from 49% to 93% in the past 9 months. During a process reduction exercise (Jishuken) my team removed 2 processes and changed the shift patterns on two of our injection moulding machines from 3 to 2 shifts, by means of line rebalancing, GSPH improvements and Kaizen. This reduced the headcount by 7 members. Future activities will see further reductions of another 2 processes focusing on removing non value added work (NVAW), through member’s participation and Kaizen activities. The total value of these savings equate to £260,000/annum. I have set up 7 step improvement plan for self reliance within the Plastics shop. I am responsible for the reduction in NVA work for all production processes. I am the shop Kaizen mentor training and implementing Kaizen activities. My responsibilities also include Toyota environmental facilitator which include ISO 14001 auditing, reporting on any non conformance + corrective actions. Using PPS and TBP approach to ensure non re-occurrence. 2003-2005 Production Group Leader, Toyota Manufacturing UK Derby. I managed a team of 18 members within the Injection Moulding Department of the Plastics Division which makes bumpers and instrument panels for both the Avensis and Corolla cars. Responsible for top level KPIs, Health & Safety - through proactive safety awareness/reporting procedures. Quality - through maintenance of ISO standards and focused member participation. Production - through key measurable ‘Operational Performance Rate’ (OPR). Cost - through continuous improvements (Kaizen). Members – by acknowledging their concerns and solving them with mutual trust and respect. Strong focus is on member development increasing versatility, setting individual objectives as part of our appraisal system, thus enabling me to have a high skill, flexible work force. Dealing with member’s issues complying with HR guidelines always striving to find an amicable solution. 2000-2003 Production Cell Manager, Boots Contract Manufacturing, Nottingham. I managed a team of 18 staff on the tablet manufacturing and packing lines, Producing Paracetamol, Aspirin, and Vitamins etc. I managed the day to day production of 4 packing lines and 6 tablet manufacturing machines. Whilst at Boots I reduced machine change over times by 64%and saved 2 processes through improvement activities. I gained a lot of knowledge about FDA, the Pharmaceutical industry standards governing body. 1996-2000 Business Unit Manager, Pressac Communications Plc. Nottingham. I was responsible for 80 staff including engineers and QA Technicians, managing the Stamping and Moulding departments. We made products for the Telecoms and white goods industries. I had responsibility for the purchase and quality control of raw materials, manufacture of the products through to the on time delivery to customers. Dealing with suppliers and customers on a daily basis. During my time at Pressac I saved the equivalent of £237,000 through process improvements, implementing new management systems and purchase cost reduction activities.
  • 3. 1992-1996 Production Team Leader, Toyota Manufacturing UK Derby. I managed a team of 10 members 1 year before SOP of the Carina E, helping to set up TPS within the Press Shop, writing standardized instructions, implementing Kan Ban systems. I learnt my Lean Manufacturing skills during this time, Just in Time, Kan Ban, Kaizen, 5S, QC tools, Andon, PokeYoke, Effective Meetings etc. making it probably the most invaluable time of my employment to date. INTERESTS My interests include walking, running, circuit training, DIY and keeping up with the children. ADDITIONAL INFORMATION Non smoker in excellent health. Car owner with a full driving license. References are available upon request.