DAILY SCAFFOLD CHECK LIST
MONTH OF: YES  No x N/A Contract No. 098-C58
Scaffold Check 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
BASE-SOLE BOARD, BASE PLATES
VERTICAL STANDARD PLUM & PINNED
STEEL MEMBERS IN GOOD CONDITION
TOP RAIL AND MID RAIL INSTALLED
DIAGONAL BRACING INSTALLED
FULL WORKING PLATFORM, NO GAPS
BOARDS INSTALLED
SAFE ACCESS, ANGLE STAIR / LADDER
LADDER SECURELY ATTACHED 1m above
TIES / RAKERS IN PLACE
SCAFFOLD WITH LOAD LIMIT
CORRECT COLOR SCAFF TAG IN PLACE
OUT RIGGER / RAKERS INSTALLED (MOBILE)
CASTER WHEEL IN GOOD CONDITION
SCAFFOLD DESIGN IN PLACE
Initial of Inspector:
Unique Scaffold ID#:
Scaffold Location:
Scaffold Erected By:
Inspected By:
Comments:

Daily scaffold check list

  • 1.
    DAILY SCAFFOLD CHECKLIST MONTH OF: YES  No x N/A Contract No. 098-C58 Scaffold Check 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 BASE-SOLE BOARD, BASE PLATES VERTICAL STANDARD PLUM & PINNED STEEL MEMBERS IN GOOD CONDITION TOP RAIL AND MID RAIL INSTALLED DIAGONAL BRACING INSTALLED FULL WORKING PLATFORM, NO GAPS BOARDS INSTALLED SAFE ACCESS, ANGLE STAIR / LADDER LADDER SECURELY ATTACHED 1m above TIES / RAKERS IN PLACE SCAFFOLD WITH LOAD LIMIT CORRECT COLOR SCAFF TAG IN PLACE OUT RIGGER / RAKERS INSTALLED (MOBILE) CASTER WHEEL IN GOOD CONDITION SCAFFOLD DESIGN IN PLACE Initial of Inspector: Unique Scaffold ID#: Scaffold Location: Scaffold Erected By: Inspected By: Comments: