SlideShare a Scribd company logo
Page 1 of 5
UCU MUCHTAROM
Nationality Indonesian
Place, Date of Birth Jakarta, 20 October 1979
Profession Cad Designer
Specialisation Computer Aided Design
Address Perum. Lembah Hijau Jl. Merak No. 66
RT. 007/RW.013, Mekarsari – Cimanggis
Depok - 16452
Mobile phone +62 (0)857 7008 2518
Email ummd0902@gmail.com
KEY QUALIFICATIONS
Ucu is a cad drafter with 8 years’ experience in haul road concept design, tailing storage facilities
concept design. His major experience was mostly in Civil Engineer. At Mining Industry he involved in
earthwork concept design for tailing storage facilities, infrastructures facility and haul road by using
Autodesk Civil 3D for modelling.
Ucu Muchtarom is proficient in the use of software such as AutoCAD, LDD 2006, Autodesk Civil 3D,
Autodesk Infrastructure, Global Mapper and basic ARCGIS.
__________________________________________________________________________________
EDUCATION AND PROFESSIONAL STATUS
Vocational high school 52, field of study: building
Training
 Training for Autodesk Civil 3D 2012 Site Development, EDP Media Jakarta, 2011
 Training for Autodesk Civil 3D 2012 Road Development, EDP Media Jakarta, 2011
 Training for Autodesk Civil 3D 2012 Mining Development, EDP Media Jakarta, 2011
 Training for First Aider SOS, International SOS Jakarta, 2011
 Seminar Nasional Pembangunan dan Pengelolaan Bendungan, Komite Nasional Indonesia
Untuk Bendungan Besar (KNI-BB / INACOLD) at Gedung Pertemuan PT. PLN (Persero), 2013
 Training for First Aider SOS - Level 2, International SOS Jakarta, 2014
__________________________________________________________________________________
EXPERIENCE RECORD
Jun 2015 – Till now PT. RAYHAN TECHNICAL SERVICES
Jun 2015 – Oct 2015 Northern Australian Projects
CAD – Civil 3D drafter
The main components of the Project include:
- Processing data contours base on SRTM data for Letchford project, LOT-250 Virginia road and
LOT-4185 at Northern Australian Projects.
- Design road modeling and earthworks optimization for Letchford project and LOT-250 Virginia
road at Northern Australian Projects.
Page 2 of 5
Oct 2015 – Dec 2015 Northern Australian Projects
CAD – Civil 3D drafter
The main components of the Project include:
- Processing data contours base on SRTM and LIDAR data for LOT-11632 Wedding road,
Pangaea Project – Western Creek Road at Northern Australian Projects.
- Design road modeling and earthworks optimization for LOT-11632 Wedding road, Pangaea
Project – Western Creek Road at Northern Australian Projects.
Dec 2015 – Apr 2016 Sumbawa Timur Mining – Vale Projects
CAD – Civil 3D drafter
The main components of the Project include:
- Processing data contours base on LIDAR data for Vale Pojects at Nusa Tenggara Barat –
Indonesia.
- Design road modeling and earthworks optimization for Vale Pojects at Nusa Tenggara Barat –
Indonesia.
Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area.
Start from preparing concept design criteria and comply secondary data for civil base design, he also
responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork
MTO (Material Take Off). As part of civil team he active discuss with other discipline (Civil
Engineering) to obtain value engineering design.
Sept 2014 – Mar 2015 PT. MOTT MACDONALD INDONESIA
(Member firm of Mott MacDonald Group)
Sept 2014 – Mar 2015 Ngawi - Kertosono Toll Road
Highway cad drafter
PT Mott MacDonald Indonesia has been commissioned by PT Ngawi Kertosono Jaya (NKJ) to carry
out Preliminary and Detailed Design of the Ngawi - Kertosono Toll Road in East Java.
The Ngawi to Kertosono section of the Solo to Kertosono Toll Road consists of 49.35 km of dual two
lane Highway with over 60 Crossing Road, 14 River Bridges, two Interchanges, two Toll Plazas and
two Rest Areas.
Ucu Muchtarom as Highway cad drafter with the main resposibility to drawing layout Toll Facilities and
plan road pavement
Feb 2011 – Apr 2014 Ground Risk Management
CAD Designer
Feb 2011 – Dec 2011 Borneo Indo Bara. Adaro FL Smith, Sinclair
Knight Merz, Bayan Resources.
The main components of the Project include:
- Processing data Lidar contour and channel diversion modeling concept design for Borneo Indo
Bara at Kusan, Sebamban, South Kalimantan.
- Concept design retaining wall for Adaro FL Smith at Tanjung, Tabalong, South Kalimantan.
- Road upgrading concept design for Sinclair Knight Merz at Rantau Dedap, South Sumatera.
- Geotechnical investigation plan hauling and jetty for Bayan Resources at Tabang to Senyiur,
South Kalimantan.
Page 3 of 5
Ucu Muchtarom as Cad Designer and responsible for design earthwork and channel divesion, roads
and infrastructure area. Start from preparing concept design criteria and comply secondary data for
civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for
getting bulk earthwork MTO (Material Take Off). He handles channel diversion design. As part of civil
team he active discuss with other discipline (Geotechnical Engineering,Civil Engineering and
Hydrology) to obtain value engineering design.
Jan 2012 – Dec 2012 Bayan Resources, Solway Industries, Robust
Resources Limited, Runge Indonesia.
The main components of the Project include:
- Geotechnical investigation plan hauling and jetty for Bayan Resources at Tabang to Senyiur,
South Kalimantan.
- Earthwork optimization for infrastructure concept design for Solway Industries at Maba Ferro –
Nickel Mine Project, Eastern Halmahera - Indonesia.
- Earthwork and orientation layout for infrastructure facility and utility area, Robust Resources
Limited at Romang Island, South Maluku.
- Drafting a model for emergency coal pilar at Bunyu Island Coal Project – Runge Indonesia, Bunyu
Island - Indonesia.
Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area.
Start from preparing concept design criteria and comply secondary data for civil base design, he also
responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork
MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical
Engineering, Civil Engineering) to obtain value engineering design.
Jan 2013 – Dec 2013 G-Resources, Sorikmas Mining, SNC Lavalin,
Madhani Talatah Nusantara.
The main components of the Project include:
- Data processing and concept design of mine waste disposal at Martabe Gold Project – G
Resources, North Sumatera.
- Study concept distance between the barge and bridge at Jambi Coal Project – Jambi, Sumatera.
- Study and concept design of mine waste disposal (TSF) at Sihayo Gold Project – PT. Sorikmas
Mining, North Sumatera.
- Concept design of water supply facilities at Dampala Nickel Project – SNC Lavalin, Central
Sulawesi.
- Geotechnical sections for PT. Madhani Talatah Nusantara at Bentuas Coal Mining Project, South
Kalimantan.
Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area.
Start from preparing concept design criteria and comply secondary data for civil base design, he also
responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork
MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical
Engineering, Civil Engineering) to obtain value engineering design.
Jan 2014 – Apr 2014 Worley Parsons, J Resources, Indonesia
Adventure Sport, Bumi Suksesindo.
The main components of the Project include:
- Geotechnical sections for PT. Worley Parsons Indonesia at Indonesian Growth Project
Bahomotefe, Central Sulawesi.
- Concept design of tailing storage facility and plant site for PT. J Resources Nusantara at Pani
Gold Project, South Sulawesi.
- Contour data processing and sections for PT. Indonesia Adventure Sport at Nihiwatu Kuta, Bali.
- Concept mining infrastructure plan for PT. Bumi Suksesindo at Tujuh Bukit Mine Project, East
Java.
Page 4 of 5
Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area.
Start from preparing concept design criteria and comply secondary data for civil base design, he also
responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork
MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical
Engineering, Civil Engineering) to obtain value engineering design.
Nov 2008 – Jan 2011 Graha Rahadi Sarana Mekarsari
Drafter, Progress Monitoring
Jun 2010 – Jan 2011 Hotel Lor In - Sentul.
The main components of the Project include:
- Topography, Architecture, Structure and Landscape.
- Monitoring schedule progress and Bill of Quantity.
Ucu Muchtarom as Drafter and responsible for design structure, architecture, landscape and schedule
progress. Start from preparing design landscape, structure and architecture criteria and comply
secondary data for civil base design, he also responsible for applied all earthwork design into civil
software (Land desktop 2006) for getting bulk earthwork MTO (Material Take Off. As part of civil team
he active discuss with other discipline (Architecture Engineering,Civil Engineering and Structure
Engineering) to obtain value engineering design.
Nov 2008 – Jun 2010 Waterpark Fruit Garden Mekarsari.
The main components of the Project include:
- Topography, Architecture, Structure and Landscape.
- Monitoring schedule progress and Bill of Quantity.
Ucu Muchtarom as Drafter and responsible for design structure, architecture, landscape and schedule
progress. Start from preparing design landscape, structure and architecture criteria and comply
secondary data for civil base design, he also responsible for applied all earthwork design into civil
software (Land desktop 2006) for getting bulk earthwork MTO (Material Take Off. As part of civil team
he active discuss with other discipline (Mechanical Electrical Engineering, Architecture
Engineering,Civil Engineering and Structure Engineering) to obtain value engineering design.
Jun 2008 – Sept 2008 Lumada Sapta Mitra (LSM – Visar Group)
Drafter
The main components of the Project include:
- Topography, Surveyor
Ucu Muchtarom as Drafter and responsible for topography surveyor, he also responsible for applied
all design into civil software (Land desktop 2004) for topography. As part of civil team he active
discuss with other discipline (Hydrology Engineering, Civil Engineering and Structure Engineering) to
obtain value engineering design.
Jun 2007 – May 2008 Data Top Survey
Drafter
The main components of the Project include:
- Topography, Surveyor
Ucu Muchtarom as Drafter and responsible for topography surveyor, he also responsible for applied
all design into civil software (Land desktop 2004) for topography. As part of civil team he active
discuss with other discipline (Hydrology Engineering, Civil Engineering and Structure Engineering) to
obtain value engineering design.
Page 5 of 5
LANGUAGE CAPABILITY
Indonesian : Mother tongue
English : Spoken – fair; written – fair; reading – fair
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016

More Related Content

Viewers also liked

Johnson Professional CV- NOV
Johnson Professional CV- NOVJohnson Professional CV- NOV
Johnson Professional CV- NOV
Martijn Johnson
 
Statement of service
Statement of serviceStatement of service
Statement of service
David Marshall
 
Dacalos, Junice - Statement of Service Sept2014
Dacalos, Junice - Statement of Service Sept2014Dacalos, Junice - Statement of Service Sept2014
Dacalos, Junice - Statement of Service Sept2014
Junice Dacalos
 
Canberra Labor Club Statement of Service
Canberra Labor Club Statement of ServiceCanberra Labor Club Statement of Service
Canberra Labor Club Statement of ServiceSimon Cox
 
HSD_Statement of Service_Abel_Vetassess
HSD_Statement of Service_Abel_VetassessHSD_Statement of Service_Abel_Vetassess
HSD_Statement of Service_Abel_Vetassess
Abel Soares
 
Vetassess Outcome Letter
Vetassess Outcome LetterVetassess Outcome Letter
Vetassess Outcome Letter
Michelle Bevilacqua Canton
 

Viewers also liked (6)

Johnson Professional CV- NOV
Johnson Professional CV- NOVJohnson Professional CV- NOV
Johnson Professional CV- NOV
 
Statement of service
Statement of serviceStatement of service
Statement of service
 
Dacalos, Junice - Statement of Service Sept2014
Dacalos, Junice - Statement of Service Sept2014Dacalos, Junice - Statement of Service Sept2014
Dacalos, Junice - Statement of Service Sept2014
 
Canberra Labor Club Statement of Service
Canberra Labor Club Statement of ServiceCanberra Labor Club Statement of Service
Canberra Labor Club Statement of Service
 
HSD_Statement of Service_Abel_Vetassess
HSD_Statement of Service_Abel_VetassessHSD_Statement of Service_Abel_Vetassess
HSD_Statement of Service_Abel_Vetassess
 
Vetassess Outcome Letter
Vetassess Outcome LetterVetassess Outcome Letter
Vetassess Outcome Letter
 

Similar to CV_Lengkap-Ucu_Muchtarom-2016

cv wuryanto
cv wuryantocv wuryanto
cv wuryanto
wuryanto wuryanto
 
Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom
 
CV Asdian-2015 (English)
CV Asdian-2015 (English)CV Asdian-2015 (English)
CV Asdian-2015 (English)
Asdian ak
 
Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018
ABDUL WALI BAIG
 
Dennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 MarchDennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 March
Dennis Albarracin
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
Engr Jerson Oducayen
 
CV - Fery Cahyono - Completed-1
CV - Fery Cahyono - Completed-1CV - Fery Cahyono - Completed-1
CV - Fery Cahyono - Completed-1
Fery Cahyono
 
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKATCV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
Frans Paterson Barnabas
 
Resume - Lingasami K
Resume - Lingasami KResume - Lingasami K
Resume - Lingasami K
Lingasami K
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
Gusyahri Hidayat
 
CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1
Johan Kruger
 
CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016
Adhy Prabowo
 
CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)
KYUYOUNG HAN
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Dhaka University of Engineering & Technology, Gazipur
 
RESUME np
RESUME npRESUME np
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921
Brian Parkinson
 
SALVADOR VECIANA JR (updated)
SALVADOR VECIANA JR (updated)SALVADOR VECIANA JR (updated)
SALVADOR VECIANA JR (updated)
Buddy Veciana
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
ronnyjawir
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
Mohamad Safarudin
 

Similar to CV_Lengkap-Ucu_Muchtarom-2016 (20)

cv wuryanto
cv wuryantocv wuryanto
cv wuryanto
 
Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017
 
CV Asdian-2015 (English)
CV Asdian-2015 (English)CV Asdian-2015 (English)
CV Asdian-2015 (English)
 
Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018
 
Dennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 MarchDennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 March
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
CV - Fery Cahyono - Completed-1
CV - Fery Cahyono - Completed-1CV - Fery Cahyono - Completed-1
CV - Fery Cahyono - Completed-1
 
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKATCV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
 
Resume - Lingasami K
Resume - Lingasami KResume - Lingasami K
Resume - Lingasami K
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
 
CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1
 
CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016
 
CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
RESUME np
RESUME npRESUME np
RESUME np
 
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921
 
SALVADOR VECIANA JR (updated)
SALVADOR VECIANA JR (updated)SALVADOR VECIANA JR (updated)
SALVADOR VECIANA JR (updated)
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 

CV_Lengkap-Ucu_Muchtarom-2016

  • 1. Page 1 of 5 UCU MUCHTAROM Nationality Indonesian Place, Date of Birth Jakarta, 20 October 1979 Profession Cad Designer Specialisation Computer Aided Design Address Perum. Lembah Hijau Jl. Merak No. 66 RT. 007/RW.013, Mekarsari – Cimanggis Depok - 16452 Mobile phone +62 (0)857 7008 2518 Email ummd0902@gmail.com KEY QUALIFICATIONS Ucu is a cad drafter with 8 years’ experience in haul road concept design, tailing storage facilities concept design. His major experience was mostly in Civil Engineer. At Mining Industry he involved in earthwork concept design for tailing storage facilities, infrastructures facility and haul road by using Autodesk Civil 3D for modelling. Ucu Muchtarom is proficient in the use of software such as AutoCAD, LDD 2006, Autodesk Civil 3D, Autodesk Infrastructure, Global Mapper and basic ARCGIS. __________________________________________________________________________________ EDUCATION AND PROFESSIONAL STATUS Vocational high school 52, field of study: building Training  Training for Autodesk Civil 3D 2012 Site Development, EDP Media Jakarta, 2011  Training for Autodesk Civil 3D 2012 Road Development, EDP Media Jakarta, 2011  Training for Autodesk Civil 3D 2012 Mining Development, EDP Media Jakarta, 2011  Training for First Aider SOS, International SOS Jakarta, 2011  Seminar Nasional Pembangunan dan Pengelolaan Bendungan, Komite Nasional Indonesia Untuk Bendungan Besar (KNI-BB / INACOLD) at Gedung Pertemuan PT. PLN (Persero), 2013  Training for First Aider SOS - Level 2, International SOS Jakarta, 2014 __________________________________________________________________________________ EXPERIENCE RECORD Jun 2015 – Till now PT. RAYHAN TECHNICAL SERVICES Jun 2015 – Oct 2015 Northern Australian Projects CAD – Civil 3D drafter The main components of the Project include: - Processing data contours base on SRTM data for Letchford project, LOT-250 Virginia road and LOT-4185 at Northern Australian Projects. - Design road modeling and earthworks optimization for Letchford project and LOT-250 Virginia road at Northern Australian Projects.
  • 2. Page 2 of 5 Oct 2015 – Dec 2015 Northern Australian Projects CAD – Civil 3D drafter The main components of the Project include: - Processing data contours base on SRTM and LIDAR data for LOT-11632 Wedding road, Pangaea Project – Western Creek Road at Northern Australian Projects. - Design road modeling and earthworks optimization for LOT-11632 Wedding road, Pangaea Project – Western Creek Road at Northern Australian Projects. Dec 2015 – Apr 2016 Sumbawa Timur Mining – Vale Projects CAD – Civil 3D drafter The main components of the Project include: - Processing data contours base on LIDAR data for Vale Pojects at Nusa Tenggara Barat – Indonesia. - Design road modeling and earthworks optimization for Vale Pojects at Nusa Tenggara Barat – Indonesia. Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area. Start from preparing concept design criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork MTO (Material Take Off). As part of civil team he active discuss with other discipline (Civil Engineering) to obtain value engineering design. Sept 2014 – Mar 2015 PT. MOTT MACDONALD INDONESIA (Member firm of Mott MacDonald Group) Sept 2014 – Mar 2015 Ngawi - Kertosono Toll Road Highway cad drafter PT Mott MacDonald Indonesia has been commissioned by PT Ngawi Kertosono Jaya (NKJ) to carry out Preliminary and Detailed Design of the Ngawi - Kertosono Toll Road in East Java. The Ngawi to Kertosono section of the Solo to Kertosono Toll Road consists of 49.35 km of dual two lane Highway with over 60 Crossing Road, 14 River Bridges, two Interchanges, two Toll Plazas and two Rest Areas. Ucu Muchtarom as Highway cad drafter with the main resposibility to drawing layout Toll Facilities and plan road pavement Feb 2011 – Apr 2014 Ground Risk Management CAD Designer Feb 2011 – Dec 2011 Borneo Indo Bara. Adaro FL Smith, Sinclair Knight Merz, Bayan Resources. The main components of the Project include: - Processing data Lidar contour and channel diversion modeling concept design for Borneo Indo Bara at Kusan, Sebamban, South Kalimantan. - Concept design retaining wall for Adaro FL Smith at Tanjung, Tabalong, South Kalimantan. - Road upgrading concept design for Sinclair Knight Merz at Rantau Dedap, South Sumatera. - Geotechnical investigation plan hauling and jetty for Bayan Resources at Tabang to Senyiur, South Kalimantan.
  • 3. Page 3 of 5 Ucu Muchtarom as Cad Designer and responsible for design earthwork and channel divesion, roads and infrastructure area. Start from preparing concept design criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork MTO (Material Take Off). He handles channel diversion design. As part of civil team he active discuss with other discipline (Geotechnical Engineering,Civil Engineering and Hydrology) to obtain value engineering design. Jan 2012 – Dec 2012 Bayan Resources, Solway Industries, Robust Resources Limited, Runge Indonesia. The main components of the Project include: - Geotechnical investigation plan hauling and jetty for Bayan Resources at Tabang to Senyiur, South Kalimantan. - Earthwork optimization for infrastructure concept design for Solway Industries at Maba Ferro – Nickel Mine Project, Eastern Halmahera - Indonesia. - Earthwork and orientation layout for infrastructure facility and utility area, Robust Resources Limited at Romang Island, South Maluku. - Drafting a model for emergency coal pilar at Bunyu Island Coal Project – Runge Indonesia, Bunyu Island - Indonesia. Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area. Start from preparing concept design criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical Engineering, Civil Engineering) to obtain value engineering design. Jan 2013 – Dec 2013 G-Resources, Sorikmas Mining, SNC Lavalin, Madhani Talatah Nusantara. The main components of the Project include: - Data processing and concept design of mine waste disposal at Martabe Gold Project – G Resources, North Sumatera. - Study concept distance between the barge and bridge at Jambi Coal Project – Jambi, Sumatera. - Study and concept design of mine waste disposal (TSF) at Sihayo Gold Project – PT. Sorikmas Mining, North Sumatera. - Concept design of water supply facilities at Dampala Nickel Project – SNC Lavalin, Central Sulawesi. - Geotechnical sections for PT. Madhani Talatah Nusantara at Bentuas Coal Mining Project, South Kalimantan. Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area. Start from preparing concept design criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical Engineering, Civil Engineering) to obtain value engineering design. Jan 2014 – Apr 2014 Worley Parsons, J Resources, Indonesia Adventure Sport, Bumi Suksesindo. The main components of the Project include: - Geotechnical sections for PT. Worley Parsons Indonesia at Indonesian Growth Project Bahomotefe, Central Sulawesi. - Concept design of tailing storage facility and plant site for PT. J Resources Nusantara at Pani Gold Project, South Sulawesi. - Contour data processing and sections for PT. Indonesia Adventure Sport at Nihiwatu Kuta, Bali. - Concept mining infrastructure plan for PT. Bumi Suksesindo at Tujuh Bukit Mine Project, East Java.
  • 4. Page 4 of 5 Ucu Muchtarom as Cad Designer and responsible for design earthwork, roads and infrastructure area. Start from preparing concept design criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Civil 3D) for getting bulk earthwork MTO (Material Take Off). As part of civil team he active discuss with other discipline (Geotechnical Engineering, Civil Engineering) to obtain value engineering design. Nov 2008 – Jan 2011 Graha Rahadi Sarana Mekarsari Drafter, Progress Monitoring Jun 2010 – Jan 2011 Hotel Lor In - Sentul. The main components of the Project include: - Topography, Architecture, Structure and Landscape. - Monitoring schedule progress and Bill of Quantity. Ucu Muchtarom as Drafter and responsible for design structure, architecture, landscape and schedule progress. Start from preparing design landscape, structure and architecture criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Land desktop 2006) for getting bulk earthwork MTO (Material Take Off. As part of civil team he active discuss with other discipline (Architecture Engineering,Civil Engineering and Structure Engineering) to obtain value engineering design. Nov 2008 – Jun 2010 Waterpark Fruit Garden Mekarsari. The main components of the Project include: - Topography, Architecture, Structure and Landscape. - Monitoring schedule progress and Bill of Quantity. Ucu Muchtarom as Drafter and responsible for design structure, architecture, landscape and schedule progress. Start from preparing design landscape, structure and architecture criteria and comply secondary data for civil base design, he also responsible for applied all earthwork design into civil software (Land desktop 2006) for getting bulk earthwork MTO (Material Take Off. As part of civil team he active discuss with other discipline (Mechanical Electrical Engineering, Architecture Engineering,Civil Engineering and Structure Engineering) to obtain value engineering design. Jun 2008 – Sept 2008 Lumada Sapta Mitra (LSM – Visar Group) Drafter The main components of the Project include: - Topography, Surveyor Ucu Muchtarom as Drafter and responsible for topography surveyor, he also responsible for applied all design into civil software (Land desktop 2004) for topography. As part of civil team he active discuss with other discipline (Hydrology Engineering, Civil Engineering and Structure Engineering) to obtain value engineering design. Jun 2007 – May 2008 Data Top Survey Drafter The main components of the Project include: - Topography, Surveyor Ucu Muchtarom as Drafter and responsible for topography surveyor, he also responsible for applied all design into civil software (Land desktop 2004) for topography. As part of civil team he active discuss with other discipline (Hydrology Engineering, Civil Engineering and Structure Engineering) to obtain value engineering design.
  • 5. Page 5 of 5 LANGUAGE CAPABILITY Indonesian : Mother tongue English : Spoken – fair; written – fair; reading – fair