ABDUL QADER YOUSEF ABDUL QADER KHALED
Email: abdulqader1961@yahoo.com
Cell No: + 966 569258683
+966 541168300
+ 962 799307791
Date of Birth: July 30, 1961
Nationality: Jordanian
Education:
Bachelor of Civil Engineering – Salah Aldeen – Iraq –(1983)
Memberships:
 Member Saudi Council of Engineers
 Jordan Engineers Association (JEA)
 IraqiEngineers Association
Professional Experience:
AssadSaid for contracting- KSA :July,2011 Till Date
Position: Project Manager
Project : Jeddah Islamic SeaPort Projects
Al-Fawzani &Partners for Contracting – KSA : May, 2007 – July, 2011
Position : Project Manager
Project: SWCC Housing Project – Shaqiq, KSA
Project Description:
The Project consists of 22 Three Floors Residential Buildings with total floor
area of 33000m², in addition to site works. Theproject value is 110,000,000
Saudi Riyals.
 Leading a Crew of 10 Engineers (Civil, Mechanical, Electrical &
Architectural), as well as 350 works force.
 Overallmanagement of the projectactivities and resources including
Sub-Contractors to meet Projectrequirements. (Safely, time, quality
& cost)
 Coordination with the Consultantand the Owner.
 Review of material and shop drawings submittals.
 Resolving site technical problems.
 Preparation of monthly installed quantities and invoices.
 Attending Weekly & Monthly meetings with the owner and
Consultant
 Administration of contract and maintaining projectdocumentation.
 Preparation of projectschedules (overall, monthly and weekly)
 Coordination of subcontractors works.
Al-Fawzani &Partners for Contracting – KSA
Position: South West AreaRegionCoordinator
Project: NewSatellite Plants Project ( Al Lith, Qunfuda, Farasan )
Duties Description:
 Responsiblefor the south region satellite plants
 Conducting regular site walk through with the Construction
Managers to monitor the construction performance with regards to
schedule, safety, cost, quality and conformance with the project
contract
 Assist in managing and maximizing project margins.
 Advisemanagement of risks that may affect project profit, costs,
 schedules and client relations
Abdul Qader Contracting Enterprise –Jordan : 1991 – 2007
Position: Project Manager &Contractor
Project:Various projects, as listedhere below:
Projects description:
Marwan Abdallat Housing Company:
1-building in North Marka 6 Floors (1800 m²)
2-building in Al Rabia 9 Floors (4200 m²)
3-building in Al Sabia Circle 5 Floors (2700 m²)
4-building in Dirgibar 5 Floors (2700 m²)
Mohammed Oda Housing Company:
1-building in Swafya 5 Floors (2800 m²)
2-building in Al Shamsani 6 Floors (3300 m²)
3-building in Dirgibar 5 Floors (2750 m²)
4-building in Al Sabia Circle 5 Floors (2700 m²)
Frating Housing Company:
1-building in Dirgibar 5 Floors (2100 m²)
2-buidling in Al Shamsani 6 Floors (2500 m²)
3-building in Al Sabia Circle 6 Floors (2450 m²)
Al Salwos Housing Company:
1-ThreeSmall Villas in Al Rabia area (750 m²) for each one.
2-Abig Villa in Abdon Area (1300 m²) with internal swimming pool and
sauna.
Other Miscellaneous Works:
1-AlDbass Commercial Complex 7 Floors (7000 m²)
2-Mnko Commercial Complex 5 Floors (2200 m²)
3-Khalid Nasr Commercial Complex 5 Floors (2000 m²)
4-Shamalia Om zina building 5 Floors (2000 m²) luxury building
ground floor with inside Swimming pool and Sauna.
5-A big Luxury Palace belongs to a Mashoor Akash Al Zain including
different elevation of Gardens around the palace, outside swimming pool
and guest’s shelters (2000 m²).
Duties Description:
 Work administration, the Agreements, Supervision to Subcontractors
and following Procurement, Surveying Works and quantities account,
Financial invoices all this under supervision of Consultant.
EssaRazeqAl Masri Company – Iraq (1989-1991)
Position:Civil works manager
Project:Tikrit Water Treatment Plant
Project Description:
140 Million dollar River Water Treatment Project in Tikrit, consists of
Intake, Sedimentation Basins, Chemical treatment basins in addition to
ground and elevated tanks. Ductile Pie network 30 km from plant to Tikrit
city.
Duties Description:
 Responsible and Coordinate with Civil Site Engineers, Mech, Elect,
starting by Excavation and pouring Concrete by high quality for
Water Tanks.
Jordan Education Ministry Buildings Department, Jordan : 1987-1989
Position:Site Manager (WithClient)
Project Description:
SevenFloors EducationBuilding – Tafila (5000 m²)
Duties Description:
 Supervision of Contractors and checking their works, also preparing
Financial Invoices.
Farhan AbuHamdan, Jordan: 1986-1987
Position: Site Manager
Project Description:
Sun shades and asphaltyards in Al Umary Customs Terminal.
Jordan Army Airport Engineering Department, Jordan1984-1986
Position:Site Engineer (Witharmy)
Project Description:
Maintenance of runways and construction of a Royal Squadron Pilots
Building in Amman Air Base
Barodi-AwadJoint Venture – Iraq: 1983-1984
Position: Site Engineer
Project Description:
Baghdad sewage Project which consists of three hug Sewage Pumping
Stations and huge Network of Pipes using all techniques including Pipe
Jacking under the Supervision of the British Consultant John Haste.
Duties Description:
 Responsible of Establishment of one of Pump Stations, and
Management of all Works with Subcontractors and labors, surveying
works and quantities calculations, in addition to follow up of all
works with Consultant. Under controlling of site manage

C.V. Eng. Abdulqader 10-8-2015

  • 1.
    ABDUL QADER YOUSEFABDUL QADER KHALED Email: abdulqader1961@yahoo.com Cell No: + 966 569258683 +966 541168300 + 962 799307791 Date of Birth: July 30, 1961 Nationality: Jordanian Education: Bachelor of Civil Engineering – Salah Aldeen – Iraq –(1983) Memberships:  Member Saudi Council of Engineers  Jordan Engineers Association (JEA)  IraqiEngineers Association Professional Experience: AssadSaid for contracting- KSA :July,2011 Till Date Position: Project Manager Project : Jeddah Islamic SeaPort Projects
  • 2.
    Al-Fawzani &Partners forContracting – KSA : May, 2007 – July, 2011 Position : Project Manager Project: SWCC Housing Project – Shaqiq, KSA Project Description: The Project consists of 22 Three Floors Residential Buildings with total floor area of 33000m², in addition to site works. Theproject value is 110,000,000 Saudi Riyals.  Leading a Crew of 10 Engineers (Civil, Mechanical, Electrical & Architectural), as well as 350 works force.  Overallmanagement of the projectactivities and resources including Sub-Contractors to meet Projectrequirements. (Safely, time, quality & cost)  Coordination with the Consultantand the Owner.  Review of material and shop drawings submittals.  Resolving site technical problems.  Preparation of monthly installed quantities and invoices.  Attending Weekly & Monthly meetings with the owner and Consultant  Administration of contract and maintaining projectdocumentation.  Preparation of projectschedules (overall, monthly and weekly)  Coordination of subcontractors works.
  • 3.
    Al-Fawzani &Partners forContracting – KSA Position: South West AreaRegionCoordinator Project: NewSatellite Plants Project ( Al Lith, Qunfuda, Farasan ) Duties Description:  Responsiblefor the south region satellite plants  Conducting regular site walk through with the Construction Managers to monitor the construction performance with regards to schedule, safety, cost, quality and conformance with the project contract  Assist in managing and maximizing project margins.  Advisemanagement of risks that may affect project profit, costs,  schedules and client relations Abdul Qader Contracting Enterprise –Jordan : 1991 – 2007 Position: Project Manager &Contractor Project:Various projects, as listedhere below: Projects description: Marwan Abdallat Housing Company: 1-building in North Marka 6 Floors (1800 m²) 2-building in Al Rabia 9 Floors (4200 m²) 3-building in Al Sabia Circle 5 Floors (2700 m²) 4-building in Dirgibar 5 Floors (2700 m²) Mohammed Oda Housing Company:
  • 4.
    1-building in Swafya5 Floors (2800 m²) 2-building in Al Shamsani 6 Floors (3300 m²) 3-building in Dirgibar 5 Floors (2750 m²) 4-building in Al Sabia Circle 5 Floors (2700 m²) Frating Housing Company: 1-building in Dirgibar 5 Floors (2100 m²) 2-buidling in Al Shamsani 6 Floors (2500 m²) 3-building in Al Sabia Circle 6 Floors (2450 m²) Al Salwos Housing Company: 1-ThreeSmall Villas in Al Rabia area (750 m²) for each one. 2-Abig Villa in Abdon Area (1300 m²) with internal swimming pool and sauna. Other Miscellaneous Works: 1-AlDbass Commercial Complex 7 Floors (7000 m²) 2-Mnko Commercial Complex 5 Floors (2200 m²) 3-Khalid Nasr Commercial Complex 5 Floors (2000 m²) 4-Shamalia Om zina building 5 Floors (2000 m²) luxury building ground floor with inside Swimming pool and Sauna. 5-A big Luxury Palace belongs to a Mashoor Akash Al Zain including different elevation of Gardens around the palace, outside swimming pool and guest’s shelters (2000 m²).
  • 5.
    Duties Description:  Workadministration, the Agreements, Supervision to Subcontractors and following Procurement, Surveying Works and quantities account, Financial invoices all this under supervision of Consultant. EssaRazeqAl Masri Company – Iraq (1989-1991) Position:Civil works manager Project:Tikrit Water Treatment Plant Project Description: 140 Million dollar River Water Treatment Project in Tikrit, consists of Intake, Sedimentation Basins, Chemical treatment basins in addition to ground and elevated tanks. Ductile Pie network 30 km from plant to Tikrit city. Duties Description:  Responsible and Coordinate with Civil Site Engineers, Mech, Elect, starting by Excavation and pouring Concrete by high quality for Water Tanks.
  • 6.
    Jordan Education MinistryBuildings Department, Jordan : 1987-1989 Position:Site Manager (WithClient) Project Description: SevenFloors EducationBuilding – Tafila (5000 m²) Duties Description:  Supervision of Contractors and checking their works, also preparing Financial Invoices. Farhan AbuHamdan, Jordan: 1986-1987 Position: Site Manager Project Description: Sun shades and asphaltyards in Al Umary Customs Terminal. Jordan Army Airport Engineering Department, Jordan1984-1986 Position:Site Engineer (Witharmy) Project Description: Maintenance of runways and construction of a Royal Squadron Pilots Building in Amman Air Base
  • 7.
    Barodi-AwadJoint Venture –Iraq: 1983-1984 Position: Site Engineer Project Description: Baghdad sewage Project which consists of three hug Sewage Pumping Stations and huge Network of Pipes using all techniques including Pipe Jacking under the Supervision of the British Consultant John Haste. Duties Description:  Responsible of Establishment of one of Pump Stations, and Management of all Works with Subcontractors and labors, surveying works and quantities calculations, in addition to follow up of all works with Consultant. Under controlling of site manage