VINOTH KUMAR CIVIL ENGINEER
SUMMARY
Experienced professional with 8 Years of experience &
Vast knowledge in Construction of Underground Metro
Stations with Top Down / Cut & cover methodologies.
PROFESSIONAL TRAITS
CIVIL
Station Construction – Pilling, Diaphragm wall,
structural members, Deep excavations, Slabs, walls &
Columns, Steel Structure fabrication & erections,
Concrete, Waterproofing & injection grouting, Shotcrete &
Rock Bolting, Anchoring, Geo-technical Instrumentation.
Utility & Road Work – Trail Trench, Station water supply,
Sewer and storm water Drainage system, Manhole
construction, Backfilling and Landscaping.
EMPLOYMENT HISTORY
 CONSTRUCTION OF RESIDENTIAL AND
COMMERCIAL BUILDING PROJECTS.
Employer : MSK Builders Pvt Ltd. – Sirkazhi, India.
Designation : Senior site Engineer.
Duration : Since Sep 2018.
Work Responsibilities
 Executing and monitoring of all structural and Non-
structural activities of Residential, apartments and
commercial buildings.
 Planning, Arrangement & follow up of construction
work resources for project requirements.
 Co-ordination with contractors and client for project
specification, quality and safety work.
 Giving solutions for continuous progress, Ensure
projects within budget & finish the work on time.
Phone: +974 33419113
+91 6383143358
E-Mail: gvinoth288@gmail.com
Marital Status: Married
Nationality : Indian
Qatar Driving License No.28735642410
EDUCATION
 B.E., Civil [2008-2011]-70%
Easwari Engineering college
Anna University, Chennai,
TN, India
 D.C.E Diploma[2006-2008]-91.4%
AVC Polytechnic college,
Mannampandhal.
TN, India
 Higher school certificate[2006]-72%
State Board Of Tamil nadu
 Secondary School Leaving
Certificate [2006]-85.6%
State Board Of Tamil nadu
 DESIGN AND BUILD OF ALKHOR EXPRESSWAY
PROJECT
Employer : ALJABER ENGINEERING WLL-QATAR.
Designation : Site Engineer.
Duration : Since 1 Feb 2018 – Aug 2018.
Work Responsibilities
 Executing work for foul sewer line, culvert, swale
excavation
 Structural activities for Manholes, Catch Basin,
Treated sewer effluent chambers (isolated valve
chambers, Air valve chambers, Air valve chambers,
washout valve Chambers & flow meter chambers).
 Execution of Precast work for Manholes, catch Basin
and Rectangular Channel
 Daily progress report and status of above mentioned
structural activities.
 QATAR INTEGRATED RAIL PROJECT
Doha Metro – Gold Line Under Ground Metro Project
Employer : ALYSJ –JV Qatar
Designation : Site Engineer
Duration : Since 14 Jun 2014 - Nov 2017
Work Responsibilities
 Executing work for the construction of under ground
structural building – Station & stabling yard (Bottom-
up Method)
 Executing water proofing works on the base slab,
External wall & Backfill activities
 ELS – Earth lateral support activities
 Finishing works
 Erection of pilling activities
ACCOMPLISHMENTS
Honors & Awards
 R2- Good Performer
AFCONS Infrastructure Ltd.
2013
 Student Secretary
National level symposium
EEC 2010
 National Service Scheme(NSS)
Team Leader 2005
Certifications
Formwork system & Scaffold training-
PERI & TMS
Temporary work supervisor
Health & Safety in the workplace
Charted Institute of Environmental Health
OHSA-Occupational Safety and Health
Administration
General Industry Safety and Health
 CHENNAI METRO RAIL PROJECT,
Contract UAA-01, Phase 1, India
Employer : AFCONS Infrastructure Limited
Designation : Engineer Execution
Duration : Since June 2011 – June 2014
Work Responsibilities
 Executing the construction of diaphragm wall for the length of
2000m (2km) & Plunge column in grade 1 rock.
 Executing top down excavation for the construction of roof
slab concourse slab and base slab
 Executing water proofing works on the roof slab and base
 slab
 Executing strut erection work for the construction of base
slab
 execution of diaphragm wall repair works (TAM grouting,
Slurry work)
 Construction of internal rooms, block work inside concourse
slab
 Construction of confinement wall and blind wall for TBM in
and out
 Execution of all instrument installation work at strait (GSM,
BSM, Inclinometer, Tilt meter, Crack meter, Vibrating wire
piezometer)
 UTILITY IDENTIFICATION- Identification of all underground
utilities i.e., TNEB (HT, LT&SC cables), Sewerage pipe line
metro water line and communication cables.
 Utility mapping and Diversion Works
 Construction of storm water pipeline and gravity sewer
pipeline
SKILLS
Personal
 Proactive, Team Player, Optimist,
Listener & Leader
 Good proficiency in MS-Office Tools
 Able to work independently with minimal
supervision
 Good communicating and Reporting skill
 Able to work in challenging environment
and strive for excellence
Software
 MS Office
 Auto CADD-2D & 3D
 Revit
Linguistic
 English
 Tamil
 Hindi

Resume vinoth kumar

  • 1.
    VINOTH KUMAR CIVILENGINEER SUMMARY Experienced professional with 8 Years of experience & Vast knowledge in Construction of Underground Metro Stations with Top Down / Cut & cover methodologies. PROFESSIONAL TRAITS CIVIL Station Construction – Pilling, Diaphragm wall, structural members, Deep excavations, Slabs, walls & Columns, Steel Structure fabrication & erections, Concrete, Waterproofing & injection grouting, Shotcrete & Rock Bolting, Anchoring, Geo-technical Instrumentation. Utility & Road Work – Trail Trench, Station water supply, Sewer and storm water Drainage system, Manhole construction, Backfilling and Landscaping. EMPLOYMENT HISTORY  CONSTRUCTION OF RESIDENTIAL AND COMMERCIAL BUILDING PROJECTS. Employer : MSK Builders Pvt Ltd. – Sirkazhi, India. Designation : Senior site Engineer. Duration : Since Sep 2018. Work Responsibilities  Executing and monitoring of all structural and Non- structural activities of Residential, apartments and commercial buildings.  Planning, Arrangement & follow up of construction work resources for project requirements.  Co-ordination with contractors and client for project specification, quality and safety work.  Giving solutions for continuous progress, Ensure projects within budget & finish the work on time. Phone: +974 33419113 +91 6383143358 E-Mail: gvinoth288@gmail.com Marital Status: Married Nationality : Indian Qatar Driving License No.28735642410 EDUCATION  B.E., Civil [2008-2011]-70% Easwari Engineering college Anna University, Chennai, TN, India  D.C.E Diploma[2006-2008]-91.4% AVC Polytechnic college, Mannampandhal. TN, India  Higher school certificate[2006]-72% State Board Of Tamil nadu  Secondary School Leaving Certificate [2006]-85.6% State Board Of Tamil nadu
  • 2.
     DESIGN ANDBUILD OF ALKHOR EXPRESSWAY PROJECT Employer : ALJABER ENGINEERING WLL-QATAR. Designation : Site Engineer. Duration : Since 1 Feb 2018 – Aug 2018. Work Responsibilities  Executing work for foul sewer line, culvert, swale excavation  Structural activities for Manholes, Catch Basin, Treated sewer effluent chambers (isolated valve chambers, Air valve chambers, Air valve chambers, washout valve Chambers & flow meter chambers).  Execution of Precast work for Manholes, catch Basin and Rectangular Channel  Daily progress report and status of above mentioned structural activities.  QATAR INTEGRATED RAIL PROJECT Doha Metro – Gold Line Under Ground Metro Project Employer : ALYSJ –JV Qatar Designation : Site Engineer Duration : Since 14 Jun 2014 - Nov 2017 Work Responsibilities  Executing work for the construction of under ground structural building – Station & stabling yard (Bottom- up Method)  Executing water proofing works on the base slab, External wall & Backfill activities  ELS – Earth lateral support activities  Finishing works  Erection of pilling activities ACCOMPLISHMENTS Honors & Awards  R2- Good Performer AFCONS Infrastructure Ltd. 2013  Student Secretary National level symposium EEC 2010  National Service Scheme(NSS) Team Leader 2005 Certifications Formwork system & Scaffold training- PERI & TMS Temporary work supervisor Health & Safety in the workplace Charted Institute of Environmental Health OHSA-Occupational Safety and Health Administration General Industry Safety and Health
  • 3.
     CHENNAI METRORAIL PROJECT, Contract UAA-01, Phase 1, India Employer : AFCONS Infrastructure Limited Designation : Engineer Execution Duration : Since June 2011 – June 2014 Work Responsibilities  Executing the construction of diaphragm wall for the length of 2000m (2km) & Plunge column in grade 1 rock.  Executing top down excavation for the construction of roof slab concourse slab and base slab  Executing water proofing works on the roof slab and base  slab  Executing strut erection work for the construction of base slab  execution of diaphragm wall repair works (TAM grouting, Slurry work)  Construction of internal rooms, block work inside concourse slab  Construction of confinement wall and blind wall for TBM in and out  Execution of all instrument installation work at strait (GSM, BSM, Inclinometer, Tilt meter, Crack meter, Vibrating wire piezometer)  UTILITY IDENTIFICATION- Identification of all underground utilities i.e., TNEB (HT, LT&SC cables), Sewerage pipe line metro water line and communication cables.  Utility mapping and Diversion Works  Construction of storm water pipeline and gravity sewer pipeline SKILLS Personal  Proactive, Team Player, Optimist, Listener & Leader  Good proficiency in MS-Office Tools  Able to work independently with minimal supervision  Good communicating and Reporting skill  Able to work in challenging environment and strive for excellence Software  MS Office  Auto CADD-2D & 3D  Revit Linguistic  English  Tamil  Hindi