1. (20pts)Nikko Cruz made the following remarks:
His [project manager’s] staff should be qualified to provide personal
administrative and technical support. he should have sufficient authority to increase or
decrease his staff as necessary throughout the life of the project. This authorization
should include selective augmentation for varying periods of time from the supporting
functional areas.
Question: Do you agree or disagree with these statements? Should the type of project
or type of organization play a dominant role in your answer? Justify your answer
Yes, in terms of providing a personal administrative and technical support, I would
agree because that is the designated functional role for them. But in terms of
authorizing a project manager’s staff to increase and decrease an employee, I would
disagree. They may have the power to manage and lead the team and heard the
insights and knowledge of the members that will be helpful for the project, but they are
also have a limitation to the management.
In times like the life-cycle of the project is on-going, the making of each progress
would be affected. It’s because adding and removing an employee is a crucial part of
the management. It makes the project management force a way of an unwanted
decision making that will be a regret for the company later on. And a project manager or
even the staffs have at least a team spirit to coordinate with the situation as the project
goes on by trying the team members to match to the work that they are capable to
achieve the best performance. And yes, it plays a dominant role in my answer, a project
manager’s staff should act according to their roles and direct the action of others to
achieve the proper objectives.
2. (10pts)Charles Dela Cruz is the most knowledgeable piping engineer in the
company. For five years, the company has turned down his application for
transfer to project engineering and project management, stating that he is too
valuable to the company in his current position. If you were a project manager,
would you want this individual as part of your functional team? how should an
organization cope with this situation?
No, I don’t think for Charles to be enough to take the position. First, is that being a
Piping Engineer is too different from the scope of Project Engineering and Project
Management. If I were a project manager, he should met the skills that are required to
be capable. I don’t think I am wanting for this, he may be fitted because of his expertise
unless there is an equally skilled involve that is capable for Charles to lead an
engineering project. Second, it is not that easy to take over the position because it is too
general for the company and it involves a critical knowledge to become one of it. If I
were the project manager, there are some difficulties and consequences applying the
“change” for the company. There would be a lack of understanding and implementation
of transferring Charles from being the best piping engineer to project engineering and
management. Being too valuable doesn’t mean you are capable to be fitted on that
position because there are many fundamental changes needed to learn for the sake of
the company.
3. (10pts) A major utility company is worried about the project manager’s upgrading
functional employees. On an eight-month project that employs four hundred full-
time project employees, the department managers have set up “check” people
whose responsibility is to see that functional employees do not have
unauthorized (i.e., not approved by the functional manager) work assignments
above their current grade level. Can this system work? What if the work is at a
position below their grade level?
In my own understanding, this system may be able to work. Job leveling is a
systematic method in which you would check and assign people to their job position
according to their value within the organization. In this case, it may be possible to
upgrade their current level but in my own understanding, it is much better to select from
400 employee who will be appropriate. If we are looking for the advantage of the
situation, this system would be possible because it would give opportunity to the HR
management to see the potential in framework and to understand the concrete things
they need to focus on. With the right job leveling structure in place, you can create an
environment that fosters the success of employees within your organization. The more
your job leveling is informed by market comparisons, hiring managers, and
employee feedback, the more it will be catered to the needs of your specific company
and create a more equitable workplace.

More Related Content

What's hot

ONKUSH BANERJEE RESUME
ONKUSH BANERJEE RESUMEONKUSH BANERJEE RESUME
ONKUSH BANERJEE RESUME
ONKUSH BANERJEE
 
AS08 Final Project Afreen Khalid
AS08 Final Project Afreen KhalidAS08 Final Project Afreen Khalid
AS08 Final Project Afreen Khalid
Afreen Khalid
 
HBO - Job Design & Goal Setting
HBO - Job Design & Goal SettingHBO - Job Design & Goal Setting
HBO - Job Design & Goal Setting
Laguna State Polytechnic University
 
Job design fahad
Job design fahadJob design fahad
Job design fahad
FahadAlo
 
R3. Recommendation-Vinay-RAZIQ YAQUB
R3. Recommendation-Vinay-RAZIQ YAQUBR3. Recommendation-Vinay-RAZIQ YAQUB
R3. Recommendation-Vinay-RAZIQ YAQUB
Dr. Raziq Yaqub (dr.raziq@gmail.com)
 
Presentation on job design
Presentation on job designPresentation on job design
Presentation on job design
SANDEEP KUMAR
 

What's hot (6)

ONKUSH BANERJEE RESUME
ONKUSH BANERJEE RESUMEONKUSH BANERJEE RESUME
ONKUSH BANERJEE RESUME
 
AS08 Final Project Afreen Khalid
AS08 Final Project Afreen KhalidAS08 Final Project Afreen Khalid
AS08 Final Project Afreen Khalid
 
HBO - Job Design & Goal Setting
HBO - Job Design & Goal SettingHBO - Job Design & Goal Setting
HBO - Job Design & Goal Setting
 
Job design fahad
Job design fahadJob design fahad
Job design fahad
 
R3. Recommendation-Vinay-RAZIQ YAQUB
R3. Recommendation-Vinay-RAZIQ YAQUBR3. Recommendation-Vinay-RAZIQ YAQUB
R3. Recommendation-Vinay-RAZIQ YAQUB
 
Presentation on job design
Presentation on job designPresentation on job design
Presentation on job design
 

Similar to Critical Analysis on Project Management

Matrix organization structure project final,fab 1
Matrix organization structure project final,fab 1Matrix organization structure project final,fab 1
Matrix organization structure project final,fab 1
ojay710
 
Strategic Management Overview
Strategic Management OverviewStrategic Management Overview
Strategic Management Overview
Jo Balucanag - Bitonio
 
Project management
Project managementProject management
Project management
smumbahelp
 
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
Lviv Startup Club
 
Anjuman i-islam
Anjuman i-islamAnjuman i-islam
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
Shree Swami atmanand saraswati inst. of technology, surat
 
Success and failure of od
Success and failure of odSuccess and failure of od
Success and failure of od
DjKaesh
 
Konekme
KonekmeKonekme
Konekme
lylekeith
 
Foundation of Organization Design (MGMT673)Reading Materia.docx
Foundation of Organization Design (MGMT673)Reading Materia.docxFoundation of Organization Design (MGMT673)Reading Materia.docx
Foundation of Organization Design (MGMT673)Reading Materia.docx
VannaJoy20
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
Betsy Booboo
 
Dhrm lecture 1 manpower planning
Dhrm lecture 1 manpower planningDhrm lecture 1 manpower planning
Dhrm lecture 1 manpower planning
lucasjoseph
 
5-1Implementing Organizational Change Theory into Practice.docx
5-1Implementing Organizational Change Theory into Practice.docx5-1Implementing Organizational Change Theory into Practice.docx
5-1Implementing Organizational Change Theory into Practice.docx
alinainglis
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docx
wellesleyterresa
 
Assignment 2 hrm - qatar 2018
Assignment 2   hrm - qatar 2018Assignment 2   hrm - qatar 2018
Assignment 2 hrm - qatar 2018
smumbahelp
 
Assignment 2 hrm - qatar 2018
Assignment 2   hrm - qatar 2018Assignment 2   hrm - qatar 2018
Assignment 2 hrm - qatar 2018
smumbahelp
 
Co mpetency jd
Co mpetency jdCo mpetency jd
Co mpetency jd
amittmaddkar
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
reddvise
 
BLOG #1Tylor’s Scientific Management theory has two diff.docx
BLOG #1Tylor’s Scientific Management theory has two diff.docxBLOG #1Tylor’s Scientific Management theory has two diff.docx
BLOG #1Tylor’s Scientific Management theory has two diff.docx
AASTHA76
 
6 case studytahira longusuniversity of
6 case studytahira longusuniversity of 6 case studytahira longusuniversity of
6 case studytahira longusuniversity of
ssusera34210
 
Ch 2-The Role of the Project Manager-1.pptx
Ch 2-The Role of the Project Manager-1.pptxCh 2-The Role of the Project Manager-1.pptx
Ch 2-The Role of the Project Manager-1.pptx
SumayoAdan
 

Similar to Critical Analysis on Project Management (20)

Matrix organization structure project final,fab 1
Matrix organization structure project final,fab 1Matrix organization structure project final,fab 1
Matrix organization structure project final,fab 1
 
Strategic Management Overview
Strategic Management OverviewStrategic Management Overview
Strategic Management Overview
 
Project management
Project managementProject management
Project management
 
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
Andriy Tatchyn: Структура компанії та місце ПМО в ній (UA)
 
Anjuman i-islam
Anjuman i-islamAnjuman i-islam
Anjuman i-islam
 
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
 
Success and failure of od
Success and failure of odSuccess and failure of od
Success and failure of od
 
Konekme
KonekmeKonekme
Konekme
 
Foundation of Organization Design (MGMT673)Reading Materia.docx
Foundation of Organization Design (MGMT673)Reading Materia.docxFoundation of Organization Design (MGMT673)Reading Materia.docx
Foundation of Organization Design (MGMT673)Reading Materia.docx
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
Dhrm lecture 1 manpower planning
Dhrm lecture 1 manpower planningDhrm lecture 1 manpower planning
Dhrm lecture 1 manpower planning
 
5-1Implementing Organizational Change Theory into Practice.docx
5-1Implementing Organizational Change Theory into Practice.docx5-1Implementing Organizational Change Theory into Practice.docx
5-1Implementing Organizational Change Theory into Practice.docx
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docx
 
Assignment 2 hrm - qatar 2018
Assignment 2   hrm - qatar 2018Assignment 2   hrm - qatar 2018
Assignment 2 hrm - qatar 2018
 
Assignment 2 hrm - qatar 2018
Assignment 2   hrm - qatar 2018Assignment 2   hrm - qatar 2018
Assignment 2 hrm - qatar 2018
 
Co mpetency jd
Co mpetency jdCo mpetency jd
Co mpetency jd
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
BLOG #1Tylor’s Scientific Management theory has two diff.docx
BLOG #1Tylor’s Scientific Management theory has two diff.docxBLOG #1Tylor’s Scientific Management theory has two diff.docx
BLOG #1Tylor’s Scientific Management theory has two diff.docx
 
6 case studytahira longusuniversity of
6 case studytahira longusuniversity of 6 case studytahira longusuniversity of
6 case studytahira longusuniversity of
 
Ch 2-The Role of the Project Manager-1.pptx
Ch 2-The Role of the Project Manager-1.pptxCh 2-The Role of the Project Manager-1.pptx
Ch 2-The Role of the Project Manager-1.pptx
 

More from Ianne Loretizo

Case study Customer Centric Materials Management
Case study Customer Centric Materials ManagementCase study Customer Centric Materials Management
Case study Customer Centric Materials Management
Ianne Loretizo
 
3 phases of Human Resource Management
3 phases of Human Resource Management3 phases of Human Resource Management
3 phases of Human Resource Management
Ianne Loretizo
 
Case study Inventory Management
Case study Inventory ManagementCase study Inventory Management
Case study Inventory Management
Ianne Loretizo
 
Logistics management
Logistics managementLogistics management
Logistics management
Ianne Loretizo
 
Advanced Swimming
Advanced SwimmingAdvanced Swimming
Advanced Swimming
Ianne Loretizo
 
Least Cost Method
Least Cost MethodLeast Cost Method
Least Cost Method
Ianne Loretizo
 
Fur Trade
Fur TradeFur Trade
Fur Trade
Ianne Loretizo
 
Transportation model
Transportation modelTransportation model
Transportation model
Ianne Loretizo
 

More from Ianne Loretizo (8)

Case study Customer Centric Materials Management
Case study Customer Centric Materials ManagementCase study Customer Centric Materials Management
Case study Customer Centric Materials Management
 
3 phases of Human Resource Management
3 phases of Human Resource Management3 phases of Human Resource Management
3 phases of Human Resource Management
 
Case study Inventory Management
Case study Inventory ManagementCase study Inventory Management
Case study Inventory Management
 
Logistics management
Logistics managementLogistics management
Logistics management
 
Advanced Swimming
Advanced SwimmingAdvanced Swimming
Advanced Swimming
 
Least Cost Method
Least Cost MethodLeast Cost Method
Least Cost Method
 
Fur Trade
Fur TradeFur Trade
Fur Trade
 
Transportation model
Transportation modelTransportation model
Transportation model
 

Recently uploaded

How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
➑➌➋➑➒➎➑➑➊➍
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
Any kyc Account
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
SalesTown
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 

Recently uploaded (20)

How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 

Critical Analysis on Project Management

  • 1. Critical Analysis in Project Management 1. (20pts)Nikko Cruz made the following remarks: His [project manager’s] staff should be qualified to provide personal administrative and technical support. he should have sufficient authority to increase or decrease his staff as necessary throughout the life of the project. This authorization should include selective augmentation for varying periods of time from the supporting functional areas. Question: Do you agree or disagree with these statements? Should the type of project or type of organization play a dominant role in your answer? Justify your answer Yes, in terms of providing a personal administrative and technical support, I would agree because that is the designated functional role for them. But in terms of authorizing a project manager’s staff to increase and decrease an employee, I would disagree. They may have the power to manage and lead the team and heard the insights and knowledge of the members that will be helpful for the project, but they are also have a limitation to the management. In times like the life-cycle of the project is on-going, the making of each progress would be affected. It’s because adding and removing an employee is a crucial part of the management. It makes the project management force a way of an unwanted decision making that will be a regret for the company later on. And a project manager or even the staffs have at least a team spirit to coordinate with the situation as the project goes on by trying the team members to match to the work that they are capable to achieve the best performance. And yes, it plays a dominant role in my answer, a project manager’s staff should act according to their roles and direct the action of others to achieve the proper objectives. 2. (10pts)Charles Dela Cruz is the most knowledgeable piping engineer in the company. For five years, the company has turned down his application for transfer to project engineering and project management, stating that he is too valuable to the company in his current position. If you were a project manager, would you want this individual as part of your functional team? how should an organization cope with this situation? No, I don’t think for Charles to be enough to take the position. First, is that being a Piping Engineer is too different from the scope of Project Engineering and Project
  • 2. Management. If I were a project manager, he should met the skills that are required to be capable. I don’t think I am wanting for this, he may be fitted because of his expertise unless there is an equally skilled involve that is capable for Charles to lead an engineering project. Second, it is not that easy to take over the position because it is too general for the company and it involves a critical knowledge to become one of it. If I were the project manager, there are some difficulties and consequences applying the “change” for the company. There would be a lack of understanding and implementation of transferring Charles from being the best piping engineer to project engineering and management. Being too valuable doesn’t mean you are capable to be fitted on that position because there are many fundamental changes needed to learn for the sake of the company. 3. (10pts) A major utility company is worried about the project manager’s upgrading functional employees. On an eight-month project that employs four hundred full- time project employees, the department managers have set up “check” people whose responsibility is to see that functional employees do not have unauthorized (i.e., not approved by the functional manager) work assignments above their current grade level. Can this system work? What if the work is at a position below their grade level? In my own understanding, this system may be able to work. Job leveling is a systematic method in which you would check and assign people to their job position according to their value within the organization. In this case, it may be possible to upgrade their current level but in my own understanding, it is much better to select from 400 employee who will be appropriate. If we are looking for the advantage of the situation, this system would be possible because it would give opportunity to the HR management to see the potential in framework and to understand the concrete things they need to focus on. With the right job leveling structure in place, you can create an environment that fosters the success of employees within your organization. The more your job leveling is informed by market comparisons, hiring managers, and employee feedback, the more it will be catered to the needs of your specific company and create a more equitable workplace.