1
Cory Gardiner
Professional Resume to April 2016.
#1 Edge Close,
Red Deer, Alberta, Canada T4R 1X5
Residence 403-356-0075
Cellular 403-506-2400
Education and Qualifications:
 Master Electrician (Certified in Alberta)
 3rd Year Instrument Mechanic
 National Construction Safety Officer
 Electrical Safety Codes Officer Group A
 Project Leadership Certificate (working towards PMP designation) from NAIT
 Leadership In Safety Excellence – Supervisory course
 Studon Supervisors’ Academy University accredited management course
 C.S.T.S. Construction safety course
 Qualified fire alarm installer ticket
 Grade 12 – Frank Maddock High School.
Safety Courses:
 Leadership in Safety Excellence
 C.S.T.S.
 H2S Alive
 Level 1 First Aid
 Manlift training (up to 120’)
 Transportation of Dangerous Goods
 WHMIS
 Level 2 Ground Disturbance certified
 Fall Arrest Training
Work Experience:
December 2015 to Present
E/I Superintendent at CNRL Horizon for Froth Upgrade project. Supervising
construction, safety, QAQC, Commissioning and Turnover for CNRL major projects
2
July 2015 to December 2015
Transcanada E/I and Pipeline inspector and consultant. This included inspection
services for large and small scale gas compression projects throughout Alberta.
August 2014 to June 2015: Willbros E/I Canadian Division
E/I Superintendent of 200 men for construction of Kinder Morgan Edmonton Rail
Terminal in Sherwood Park, AB
April 2014 to July 2014: Pyramid Electrical Contractors
Supervised E/I construction of Access Pipelines valve/Pumping station at MEG
Energy, Christina Lake site, including main site and various satellite valve stations
September 2013 to April 2014: Nexen Canada
Facilities Electrical/Instrumentation Consultant, Ft. Liard Gas projects, Northern
BC. Supervised construction of all facilities including Gas Plant, Communications Tower,
Off site valve stations as well as construction of all buildings by vendors
September 2012 to August 2013: NEP Canada
Construction coordinator/Project Manager for installation of Flexpipe liners,
pipeline installations, pipeline discontinuations and abandonments.
August 2011 to September 2012: Northern Blizzard Resources Inc.
Construction Coordinator/Project Manager/Ground Disturbance Coordinator for
Electrifications, Pipeline installations, liner installations, varied facility work including
tank and treater inspection and coating and installation of process equipment.
February 2011 to August 2011: Flint Infrastructure
General Foreman Suncor Firebag on 200 man Instrumentation and EHT installation
project. Including daily accountability to Senior Construction and Project manager
regarding cost controls, manpower, safety controls, lodging and flights, D&A program, and
project execution.
September 2005 to February 2011: Studon Electric and Controls Inc.
Superintendent, Foreman, and Lead Hand positions in many different Oil and Gas
projects
2004 to 2005: Collicutt Hanover
 Instrument mechanic/Steamfitter building gas compressors.
2003 to 2004: Crimtech Services
 Electrical/Instrumentation installation on Separator packages
2001 to 2003: Ram Electric and Controls
 Residential and Commercial installations in the Red Deer area including multi-
million dollar Mall renovations and various commercial projects throughout the city
of Red Deer.
3
1999 to 2001: Accord Electric
 Various commercial installations in the Calgary area
1992 to 1999
 Various pipelining and oilfield work, including pipefitting, welders helper, pipeline
foreman. Companies worked for include: Parkland Oilfield Construction, OG
Construction, and Berretta Construction.
References
Pyramid Corporation Ryan Richard
Supervisor
Phone 1(780)919-9815
Email: ryan.richard@pyramidcorporation.com
Pyramid Corporation Cameron Tietz
Supervisor
Phone 1(970)685-2809

Cory_Gardiner_Resume_April_2016

  • 1.
    1 Cory Gardiner Professional Resumeto April 2016. #1 Edge Close, Red Deer, Alberta, Canada T4R 1X5 Residence 403-356-0075 Cellular 403-506-2400 Education and Qualifications:  Master Electrician (Certified in Alberta)  3rd Year Instrument Mechanic  National Construction Safety Officer  Electrical Safety Codes Officer Group A  Project Leadership Certificate (working towards PMP designation) from NAIT  Leadership In Safety Excellence – Supervisory course  Studon Supervisors’ Academy University accredited management course  C.S.T.S. Construction safety course  Qualified fire alarm installer ticket  Grade 12 – Frank Maddock High School. Safety Courses:  Leadership in Safety Excellence  C.S.T.S.  H2S Alive  Level 1 First Aid  Manlift training (up to 120’)  Transportation of Dangerous Goods  WHMIS  Level 2 Ground Disturbance certified  Fall Arrest Training Work Experience: December 2015 to Present E/I Superintendent at CNRL Horizon for Froth Upgrade project. Supervising construction, safety, QAQC, Commissioning and Turnover for CNRL major projects
  • 2.
    2 July 2015 toDecember 2015 Transcanada E/I and Pipeline inspector and consultant. This included inspection services for large and small scale gas compression projects throughout Alberta. August 2014 to June 2015: Willbros E/I Canadian Division E/I Superintendent of 200 men for construction of Kinder Morgan Edmonton Rail Terminal in Sherwood Park, AB April 2014 to July 2014: Pyramid Electrical Contractors Supervised E/I construction of Access Pipelines valve/Pumping station at MEG Energy, Christina Lake site, including main site and various satellite valve stations September 2013 to April 2014: Nexen Canada Facilities Electrical/Instrumentation Consultant, Ft. Liard Gas projects, Northern BC. Supervised construction of all facilities including Gas Plant, Communications Tower, Off site valve stations as well as construction of all buildings by vendors September 2012 to August 2013: NEP Canada Construction coordinator/Project Manager for installation of Flexpipe liners, pipeline installations, pipeline discontinuations and abandonments. August 2011 to September 2012: Northern Blizzard Resources Inc. Construction Coordinator/Project Manager/Ground Disturbance Coordinator for Electrifications, Pipeline installations, liner installations, varied facility work including tank and treater inspection and coating and installation of process equipment. February 2011 to August 2011: Flint Infrastructure General Foreman Suncor Firebag on 200 man Instrumentation and EHT installation project. Including daily accountability to Senior Construction and Project manager regarding cost controls, manpower, safety controls, lodging and flights, D&A program, and project execution. September 2005 to February 2011: Studon Electric and Controls Inc. Superintendent, Foreman, and Lead Hand positions in many different Oil and Gas projects 2004 to 2005: Collicutt Hanover  Instrument mechanic/Steamfitter building gas compressors. 2003 to 2004: Crimtech Services  Electrical/Instrumentation installation on Separator packages 2001 to 2003: Ram Electric and Controls  Residential and Commercial installations in the Red Deer area including multi- million dollar Mall renovations and various commercial projects throughout the city of Red Deer.
  • 3.
    3 1999 to 2001:Accord Electric  Various commercial installations in the Calgary area 1992 to 1999  Various pipelining and oilfield work, including pipefitting, welders helper, pipeline foreman. Companies worked for include: Parkland Oilfield Construction, OG Construction, and Berretta Construction. References Pyramid Corporation Ryan Richard Supervisor Phone 1(780)919-9815 Email: ryan.richard@pyramidcorporation.com Pyramid Corporation Cameron Tietz Supervisor Phone 1(970)685-2809