The document summarizes details of an intake well constructed between 1964-1966 with a capacity of 25 MLD. It originally had 3 pumps with a total rated capacity of 441 m3/hr, but now only one pump operates for 15 hours per day. The intake well is an RCC structure 8m in diameter and 24.5m tall, with an 18-inch CI pipeline connecting it to the water treatment plant. The well needs to be upgraded to have backup capacity and supply a new paper machine.