This document provides formulas and information relevant to earthwork construction, site layout, equipment production rates, scheduling, temporary structures, worker safety, and concrete mix design and quality control. Key formulas include calculations for volume of excavation using the prismoidal method, density and specific gravity of soils, production rates for equipment like dozers and loaders, critical path method for scheduling, lateral pressure of concrete in formwork, and OSHA incident and fatality rates for safety statistics.