Who is Smarter Grid Solutions?
• Successful smart grids manage large volumes of fast-changing data. The traditional
operator-in-the-loop approach won’t cut it anymore. To resolve the grid challenges of a low
carbon world, we need real-time, autonomous, deterministic control technology. That’s why
we exist.
• Founded in 2008
• 7,000 sqft HQ in Glasgow with development and test infrastructure
• Offices in New York and London
• Over 50 engineers dedicated to the development and deployment of Active Network Management
• Over 10 years in development in collaboration with utility customers and one of Europe’s leading
power systems universities (University of Strathclyde)
4
Timeline
5
Researchproject
commences
Fieldtrialofautonomous
generationcontrol
Companyfounded
UK’sfirstfullyoperational
smartgrid–OrkneyRPZ
KeyroleinDGforsecurityof
supply,demandresponse
andEVintegration
Firstprojectinmainland
Europe
BloombergNewEnergy
FinancePioneer,secured
majornewprojectswithUK
PowerNetworksandSSEPD
andfirstmajorprojectwith
SPEnergyNetworks
FirstprojectswithWestern
PowerDistributionand
NorthernPowergrid
FirstprojectswithCon
EdisonandSouthern
Company.LaunchofNYC
office.Firstframework
contractwinforANMroll-out
withSSEPD
What we do
6
Products
Consultancy, Analysis,
Tools and Training
Systems Integration and
Support
Active Network
Management software
• Strategic Consultancy
• Power systems analysis
• ANM system design
• Online capacity analysis
tool
• Desktop capacity analysis
tool
• ANM planning and
operational training
• Services to support the
deployment of Active
Network Management
• Ongoing support and
maintenance of
operational systems
Project Lifecycle
7
Active Network Management
Active Network Management
8
What is Active Network Management? What it is not…..
• A part-distributed control technology to manage
distributed energy resources.
• Delivering real-time autonomous deterministic
control providing guaranteed repeatability and time-
bounding of end to end control actions.
• To enable second by second control of distributed
energy resources and grid devices to deliver smart
grid functionality.
• Typical applications include real and reactive power
control, voltage management and energy
balancing.
• SCADA or DMS. However, ANM complements such
systems integrating easily via standard industry protocols
and can further enhance network visibility and grid control.
• Distributed Energy Resource Management System.
ANM complements such systems by providing a robust,
reliable and secure device integration and interaction layer.
• Substation Automation. ANM extends beyond the
substation into the field but leverages existing substation
equipment and communications where possible.
• Distribution Automation. ANM tends to be focused on
power systems constraint problems rather than reliability
improvements but can sometimes be considered a new
type of Distribution Automation application.
A unique perspective on grid management (1)
9
A new form of grid management
- Combining the key attributes of SCADA / DMS and protection / substation automation to deliver autonomous
deterministic real-time control over a geographic area of grid, ANM delivers second by second control of
Distributed Energy Resources for new smart grid applications.
Peace of mind
- Our ANM technology was developed in collaboration with the planning, control room and protection teams of a
major utility meaning that we understand all of the concerns that any utility may have in adopting smart grid
technology. Our guaranteed response times, guaranteed repeatability, fail to safe mechanisms and cyber security
credentials ensure peace of mind for ANM adopters.
Applications for constraint management
- Within distribution networks the traditional approach has been to build or upgrade the grid to allow passive
operation and avoid constraints; Active Network Management provides constraint management options to reduce
connection costs, time to connect to the grid and avoid or postpone network reinforcement.
A unique perspective on grid management (2)
10
Fit to connections planning process
- Our own unique range of online and desktop planning tools complement existing connections processes and
connection agreements with grid capacity analysis and ANM feasibility assessment allowing ANM to be easily
adopted into business operations.
- We have simplified the problem of linking DERs to power systems problems through associative relationships
rather than complex mathematical optimisation techniques or use of the connected network model.
Operational experience
- With over 5 years of operational experience and a number of deployed systems with multiple DSOs we understand
the practical, operational and power systems challenge that you are likely to face and we know how to address
them cost effectively and robust technically.
Where does it take you
- Our products have been developed, and will continue to evolve, to provide the platform for the future DSO. ANM
provides the platform to offer new grid services to TSOs, new and improved services to connecting customers and
enable easy integration of new technologies (e.g. energy storage and microgrids).
Typical DER challenges across the voltage levels
11
Grid Supply Point
- Thermal congestion on distribution or
transmission assets
- Voltage rise and step change
- Providing voltage support and other
responses to the TSO
Substation
- Thermal congestion
- Reverse power flows
- Voltage rise
Generation
Transmission
Network
Distribution
Network
Distributed Generation
Demand
Generation
LV Network
Micro-
generation
Primary
Other DER
Other DER
Grid Edge / Device
- Voltage rise
- Site overplanting
• Three products – one
targeted at each layer in the
grid to provide multiple entry
points to ANM depending on
power systems problem.
• The products share the
same underlying technology
and principles.
• Can be deployed
independently or integrated
together.
ANM100ANM50Connect+
Products
Our ANM products to address DER integration
challenges
12
 Real power control for thermal
constraints
 Real power control for upper
voltage limits
 Demand Response and Peak
Reduction
 Real and reactive power control and
AVC scheme coordination
 Voltage limit (high and low) and
power flow constraints
 Real power control for thermal or
voltage constraints
 Real power control to maximise
connection
ANM100
ANM50
Connect+
 Aimed at GSP and 10’s or 100’s of
MWs of managed capacity
 Aimed at primary substation and
10’s of MWs of capacity
 Aimed at Grid Edge devices and
entry point to ANM
Technology
13
ANM Platform Software Components
Application container to host autonomous ANM applications sharing a real time data manager
with sgs comms hub. Typically runs on commodity servers with hot failover redundancy (one as
Main and the other as Standby).
A modular, easy to integrate communications hub performing all data handling and processing
for sgs core via a range of standard industry protocols. Typically runs on commodity servers
(one as Main and the other as Standby)
A distributed software component located at each controlled device providing an interface to and
control of the grid edge device. Implements autonomous fail to safe mechanisms in the event of
non-compliance, loss of communications or abnormal operation.
ANM Software Applications using the Platform
Our ANM products use a combination of the ANM platform and software applications to deliver
specific functionality.
14
Benefits
Benefits of our products
15
Commercial
Increased financial return from existing assets
– Increased Use of System revenue through greater asset
utilisation
– Increased connection charges for more connected
customers
Maximise grid utilisation – increase distributed
generation hosting capacity by up to 3x
– Avoid or defer capital expenditure and grid upgrades
– Reduce network charges to demand customers for
distributed generation reinforcement
Improved customer service
– New connection options to reduce connection times and cost
Technical
Easy to adopt
– Products fit with existing connections process and
agreements
Reduce total cost of ownership
– Autonomous operations and simple to use configurability
within a single platform
Reduced complexity and quick to deploy
– Associative relationships, sensitivity factorisation, timers and
deadbands remove the need for the connected network
model and complex mathematical optimisation techniques
Secure, safe and reliable
– Time bounded control loops and repeatability coupled with
fail to safe mechanisms provide peace of mind to control
room operators and protection engineers
16
Example scenarios
Example scenario 1
17
Product: ANM 100
Scenario:
Distributed generation causes power flow
overloads on overhead lines and grid
transformers.
Operation:
• Current monitoring at the locations
where the overload occurs
• ANM 100 calculates the capacity and
any required curtailment
• The ANM generators are curtailed per
their connection agreement or agreed
contractual terms when the power flow
limit is breached
• Generators are associated with multiple
constraints (e.g. control zone A and C)
Generator
Primary
Substation 1
Control Zone A
Generator
i v
Generator
Primary
Substation 2
Control Zone B
Generator
i
Generator
Generator
Grid Substation
Control Zone C
i i
SCADA / DMS
Transmission
Network
Generator
Generator
Existing
generation
outside of ANM
system
ANM enabled
generator
within control
of ANM system
ANM 100
ANM 100
Example scenario 2
18
Product: ANM 50
Scenario:
Generation export of real power raises
voltage at point of connection and along the
feeder resulting in AVC scheme operation
and low voltage measurements on parallel
feeders.
Operation:
• Real-time monitoring at PCC, end of line
voltage on lowest voltage feeder and at
the substation.
• Curtail real-power when beyond voltage
design limits
• Regulate the production or absorption of
reactive power
• Adjust the target voltage of the on load
tap change controller
Primary
Substation 1
SCADA / DMS
Generator
Generator
Existing
generation
outside of ANM
system
ANM enabled
generator
within control
of ANM system
i v i v
Generator
Generator
i v
Generator
i v
v
ANM 50
Generator
i v
Generator
i v
AVC
Scheme
ANM 50
Example scenario 3
19
Product: Connect+
Scenario:
Generator exporting real power, sometimes
exceeds voltage at the PCC or at the
substation.
Operation:
• Delivers real-time monitoring at PCC
and if necessary at the substation
• Curtail real-power when beyond voltage
design limits
• Can be integrated in the future to ANM
50 or ANM 100
• Can be integrated back to SCADA /
DMS or without centralised monitoring.
Substation SCADA / DMS
Generator
Generator
Existing
generation
outside of ANM
system
ANM enabled
generator
within control
of ANM system
i v
Generator
Generator
i v
ANM 50
ANM 100
Example scenario 4
20
Product: ANM 100 with energy storage
control module.
Scenario:
Load Growth Results in a Peak Power Flow
that Exceeds Capacity at primary
substations and grid substation.
Operation:
• Real-time monitoring of power flow at
primary and grid substations
experiencing peak power capacity
constraint.
• Curtail real-power set-points for
connected devices when thresholds are
breached
• Regulate the second by second
production or consumption of energy
from Distributed Energy Resources
Primary
Substation 1
Non-ANM
Generator
Generator
Primary
Substation 3
Variable
Load Generator
Energy
Storage
System
Primary
Substation 2
Generator
Variable
Load
i v i v
i vi v
SCADA / DMS
ANM 100
Storage Module
21
Delivering ANM
Example implementation options
22
Enterprise
• ANM 100 with hot failover redundancy between central platform components
• Server grade IT systems installed in a SCADA server room or centralised location
• Managing large number of objects and MWs with telecontrol or data link to SCADA / DMS / DERMS
• Centralised management and support of deployed schemes
Substation
• ANM 50 with no redundancy between central platform components
• Ruggedised server grade hardware installed in substation environment
• Managing significant but reduced number of objects and MWs with telecontrol or data link to SCADA /
DMS / DERMS
Grid Edge / Device
• Connect+ managing two constraints (one locally and one remotely) located at the generator site
• IP55 rated panel with micro-RTU, existing RTU or other weather protected hardware supporting IEC61131
or capable of hosting a deterministic software component
Example deployment process
23
Gated deployment with
decision to proceed
milestones
Proven fast deployment
Weeks per Phase (Total)
4
Feasibility Study
2
Detailed Design
3
Requirements
Specification
DesignSpecification
TestSpecification
FeasibilityStudy
Report
ConfigureAnalysis
Tool
Build
Installation and
Commissioning
HardwareBuild
SoftwareInstallation
FactoryAcceptance
Testing
Installation
SiteAcceptance
Testing
5
GoLive
System In Service
SGS Support
SystemExpansion
SoftwareUpgradesand
Patching
10 (10) 10 (20) 8 (28) 52 (86)
6
RenewSupport
Project Phase
Design
Freeze
Ship
Products
1
6 (34)
Benefits
Case
Products are supported by Tools and Services
24
Tools
All products have been designed to integrate
with the connections process for DERs
– We provide a suite of tools to model real-time
capacity, understand how an ANM connection will
operate and to specify the configuration of the
ANM products.
Capacity analysis tools available for network and
connections planning teams to model ANM
connections:
– Online - for first pass or customer self-service
– Desktop - for DSO planners (with DigSilent)
– Internal - for more complex analysis
Services
Our team of analysts and engineers are experts
with connections processes, connection
agreements, customer engagement,
reinforcement options, power systems analysis,
capacity analysis and benefits case
development.
Example services:
– Strategic Planning
– Smart Grid innovation
– Power System Analysis
– Capacity Analysis
– Power Systems, Smart Grid and ANM Training
Case studies
Orkney
26
Challenge
SSEPD seeking cost effective alternative to grid upgrades to
provide connections for renewable generators: network already at
‘full capacity’. Technical challenge is multiple thermal overloads
on various overhead and subsea cables.
Solution
Non-firm actively managed grid connections for distributed
generation using ANM 100 with an energy storage control
module.
Delivered Benefits
 Operational since November 2009
 Connected 24 MW of new renewable generation capacity to
33 kV grid previously considered to be full
 103% of electricity demand met by renewables in 2013
 Estimated saving of at least £30million
The Orkney Isles are located off the
north cost of Scotland and
interconnected to the main UK
transmission system.
Orkney Isles Background Information
• 70 islands with 20 inhabited
• ~1000 sq km and 21,000 inhabitants
• Winter peak demand of 31 MW
• Summer peak demand of 6 MW
• Installed background generation of 46 MW
• Annual average temperature 80C
• Industry mainly agricultural, fishing and tourism
Orkney – The customer experience
27
Generator
ID
Size
(MW)
Production Factor
after Curtailment
1 0.9 37.06%
2 2.3 47.70%
4 4.5 45.35%
5 0.9 37.22%
6 0.9 40.08%
7 0.9 40.77%
9 0.9 31.76%
10 0.9 34.03%
Customer website to see live status of ANM system ANM generation export after curtailment
http://anm.ssepd.co.uk/
Orkney – The operator experience
28
Autonomous curtailment event showing Measurement Point reading and corresponding wind generator output
Cambridgeshire
29
Challenge
Increase grid capacity, reduce time to connect and cost of
connection for distributed generation in Cambridgeshire.
Technical challenges include thermal overloads and
localised voltage rise constraints.
Solution
 Non-firm actively managed grid connections for distributed
generation using ANM 100.
 Integration with Dynamic Line Rating relays and Quad
Booster Control System.
Delivered Benefits
• 9 generators (39 MW) accepted ANM connection offers
out of the 24 connection offers made
• Reduction of CAPEX in connection offers of 75-95% to
individual generators
• Aggregate saving of £23.9m.
EPN licence area heat map for DG
connections
Cambridgeshire ANM area Norwich ANM
area launched
Dec 2014
following
success of
Cambridgeshire
Cambridgeshire
30
High level schematic of Cambridgeshire solutionConnection costs and estimated curtailment levels for
normal connection versus ANM connection
DLR
AVC
M
M
M
M
M
Power Flow
Constraint B
AVC
Client
RTU
Client
RTU
Power Flow
Constraint C
Voltage
Constraint B
Voltage
Constraint A
SCADA
(Control Room)
Generator 1
Generator 3
Generator 4
Generator 2
Generator 5
Power Flow
Constraint A
RF MeshIEC 61850
IEC 61850
IEC 61850
IEC 61850
IEC 61850
IEC 61850
Skegness and Corby
31
Challenge
Roll-out ANM connections for DG customers within 6 months.
Technical challenges include thermal and voltage constraints
for wind and PV developments.
Solution
• Non-firm actively managed grid connections for distributed
generation using ANM 100.
• ANM 100 delivered and operational within 3 months.
• Consultancy services, capacity analysis and training to
build internal knowledge and capability.
Delivered Benefits
• Skegness: 5 offers accepted totalling 49 MW, further 14
offers issued totalling 45.5 MW.
• Corby: 2 offers accepted totalling 58 MW, further 7 offers
issued totalling 80 MW.
SGS and WPD engineers commissioning the
Skegness ANM system
Skegness and Corby
32
Single line diagram of the Skegness network
showing ANM connecting generation with
current and voltage constraint locations.
London
33
Challenge
Demonstrate how ANM can be used to increase visibility of
distributed generation, improve security of supply, manage
different Distributed Energy Resources and avoid demand
driven reinforcement.
Solution
• ANM 100 configured to second by second manage
export and import of distributed generation (20+ MWs
from CHP), demand aggregators (3 aggregators) and EV
charging (50 charge points totaling 600 kW).
Delivered Benefits
• A third more distributed energy plants to export power to
urban networks
• £43m of savings identified through the visibility and
contribution of Distributed Generation to security of
supply. Example trace of ANM delivering autonomous demand response
London
34
Technical overview of the ANM trials
EHV
HV
DG Control
System
Primary User
Interface
RTU Measurement
Points
Primary Substation
Local Demand
Response Site
Central ANM Controller
M M M Central Demand Response
Control Centre
Low Carbon London
Operational Data Store
UKPN
SCADA
Modbus/IP
(VPN)
TCP/IP
TCP/IP
various
DNP3/IP
ANM Data Historian
GPRS
Electric Vehicle
Charging Network
Operator
Electric Vehicle
Charging
Infrastructure
Modbus/IP
(VPN)
DG Control
System
Local Distributed Generation Site
various
GPRS
Power
Current
HV/LV Network
South East of Scotland
35
Challenge
 To increase the speed and cost of connection for DG projects
(e.g. PV, wind and thermal) in the South East of Scotland.
 Reduce wasted engineering effort in connection quotations
which are not accepted (currently >90%)
 Technical challenges include thermal overloads and voltage.
Solution
 ANM-enable grid supply points with ANM 100 to manage
distribution and transmission constraints
 Deliver an online capacity analysis tool for distributed
generation customers to screen connections before applying
Status
 Customer portal in trial and being rolled out across the area
by April 2015
 3 grid supply points ANM-enabled and integrated to existing
communications and SCADA ready for distributed generator
connections
Available Capacity
Limited capacity
No capacity
ANM enabled area
Project area and constrained circuits for distributed generation
connections
Online capacity analysis tool
36
Online customer self-service planning tool
Example results page from the customer self-service tool
showing benefits of an ANM connection
Shetland Isles
37
Challenge
Develop and manage the non-interconnected island grid
more efficiently and increase role of renewable energy in
meeting future energy needs.
Technical challenge includes stability, primary reserve,
network operation and thermal overload constraints.
Solution
• Actively manage new generator output against dynamic
stability constraints and schedule new controllable
demand to reduce renewables curtailment and enhance
system operation
• Distributed Energy Resources integrated include domestic
demand (including 2 MW of electrical demand and 16
MWh of energy storage); several MW of new renewable
generation and battery energy storage.
Delivered Benefits
• 5 generators accepted ANM connections (8.5MW)
Population ~23,000
Demand 11 – 47 MW
Diesel generation at Lerwick Power Station (50+
MW)
• BUT reaching end of life and requires
replacing
Back-up and frequency response from Sullom
Voe Oil Terminal
• BUT mainly there to serve local load and
cannot be guaranteed for the long term
Platform and
application
components used
to deliver the
Shetland ANM
system
Shetland Isles
38
ANM Functions
• Forecasting of network constraints based on load and
generation forecasts
• System balancing by calculating day ahead
schedules for all controlled devices with an objective
of maximising renewable contribution
• Real time (second by second) balancing to calculate
and issue override signals to respond to unforeseen
events, changes in conditions and short term
variations
• Management of system stability to identify
configurations that may result in unacceptable
oscillatory behaviour and set operating limits,
including frequency response characteristics
Battery storage
configuration
and user screen
Domestic
demand side
management
scheduling and
set up screen

More Related Content

What's hot

RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab OPAL-RT TECHNOLOGIES
 
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilecRick Case, PMP, P.E.
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimetRick Case, PMP, P.E.
 
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation Series
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation SeriesSMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation Series
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation SeriesRick Case, PMP, P.E.
 
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...OPAL-RT TECHNOLOGIES
 
Jps will smart grid investments prevent blackouts
Jps   will smart grid investments prevent blackoutsJps   will smart grid investments prevent blackouts
Jps will smart grid investments prevent blackoutsRick Case, PMP, P.E.
 
Smart grid technologies across the globe
Smart grid technologies across the globeSmart grid technologies across the globe
Smart grid technologies across the globeSchneider Electric
 
UNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationUNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationSayak Chakraborty
 
How Schneider Electric sees Ethernet in the Industrial Environment - Part II
How Schneider Electric sees Ethernet in the Industrial Environment - Part IIHow Schneider Electric sees Ethernet in the Industrial Environment - Part II
How Schneider Electric sees Ethernet in the Industrial Environment - Part IISchneider Electric
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRick Case, PMP, P.E.
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power SystemP K Agarwal
 
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesDigital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesMoustafa Shahin
 
From fit&forget to #IoT driven distribution grids in @dream_smartgrid
From fit&forget to #IoT driven distribution grids in @dream_smartgridFrom fit&forget to #IoT driven distribution grids in @dream_smartgrid
From fit&forget to #IoT driven distribution grids in @dream_smartgridGaspard Lebel
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
RT15 Berkeley | OPAL-RT Solutions for Microgrid Applications
RT15 Berkeley | OPAL-RT Solutions for Microgrid ApplicationsRT15 Berkeley | OPAL-RT Solutions for Microgrid Applications
RT15 Berkeley | OPAL-RT Solutions for Microgrid ApplicationsOPAL-RT TECHNOLOGIES
 

What's hot (20)

RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
 
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilec
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimet
 
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation Series
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation SeriesSMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation Series
SMARTER Grid Initiatives & Grid Modernization - CAREC Energy Presentation Series
 
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
 
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
 
Jps will smart grid investments prevent blackouts
Jps   will smart grid investments prevent blackoutsJps   will smart grid investments prevent blackouts
Jps will smart grid investments prevent blackouts
 
Smart grid technologies across the globe
Smart grid technologies across the globeSmart grid technologies across the globe
Smart grid technologies across the globe
 
UNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationUNMESH 2015 modified Presentation
UNMESH 2015 modified Presentation
 
Smart grid
Smart gridSmart grid
Smart grid
 
2.3_SPIDERS Lessons and Observations_Sanborn_EPRI/SNL Microgrid
2.3_SPIDERS Lessons and Observations_Sanborn_EPRI/SNL Microgrid2.3_SPIDERS Lessons and Observations_Sanborn_EPRI/SNL Microgrid
2.3_SPIDERS Lessons and Observations_Sanborn_EPRI/SNL Microgrid
 
How Schneider Electric sees Ethernet in the Industrial Environment - Part II
How Schneider Electric sees Ethernet in the Industrial Environment - Part IIHow Schneider Electric sees Ethernet in the Industrial Environment - Part II
How Schneider Electric sees Ethernet in the Industrial Environment - Part II
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disaster
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power System
 
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesDigital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
 
Smart metering infrastructure Architecture and analytics
Smart metering infrastructure Architecture and analyticsSmart metering infrastructure Architecture and analytics
Smart metering infrastructure Architecture and analytics
 
From fit&forget to #IoT driven distribution grids in @dream_smartgrid
From fit&forget to #IoT driven distribution grids in @dream_smartgridFrom fit&forget to #IoT driven distribution grids in @dream_smartgrid
From fit&forget to #IoT driven distribution grids in @dream_smartgrid
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot
 
RT15 Berkeley | OPAL-RT Solutions for Microgrid Applications
RT15 Berkeley | OPAL-RT Solutions for Microgrid ApplicationsRT15 Berkeley | OPAL-RT Solutions for Microgrid Applications
RT15 Berkeley | OPAL-RT Solutions for Microgrid Applications
 

Viewers also liked

Approaches to the Integration and Management of Distributed Energy Resources
Approaches to the Integration and Management of Distributed Energy ResourcesApproaches to the Integration and Management of Distributed Energy Resources
Approaches to the Integration and Management of Distributed Energy ResourcesSmarter Grid Solutions
 
Active network management for electrical distribution systems: problem formul...
Active network management for electrical distribution systems: problem formul...Active network management for electrical distribution systems: problem formul...
Active network management for electrical distribution systems: problem formul...Quentin Gemine
 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547michaeljmack
 
Distributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaDistributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaIEEEP Karachi
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3Naresh Thakur
 
An interview presentation that lands senior-level jobs
An interview presentation that lands senior-level jobsAn interview presentation that lands senior-level jobs
An interview presentation that lands senior-level jobspsymar
 

Viewers also liked (7)

Approaches to the Integration and Management of Distributed Energy Resources
Approaches to the Integration and Management of Distributed Energy ResourcesApproaches to the Integration and Management of Distributed Energy Resources
Approaches to the Integration and Management of Distributed Energy Resources
 
Active network management for electrical distribution systems: problem formul...
Active network management for electrical distribution systems: problem formul...Active network management for electrical distribution systems: problem formul...
Active network management for electrical distribution systems: problem formul...
 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547
 
Distributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaDistributed Generation By Roland Desouza
Distributed Generation By Roland Desouza
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3
 
Distributed Generation
Distributed Generation Distributed Generation
Distributed Generation
 
An interview presentation that lands senior-level jobs
An interview presentation that lands senior-level jobsAn interview presentation that lands senior-level jobs
An interview presentation that lands senior-level jobs
 

Similar to Smarter Grid Solutions Company Overview

Smart grid communications
Smart grid communicationsSmart grid communications
Smart grid communicationssrikanth reddy
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)Schneider Electric
 
IoT and Smart Grids II
IoT and Smart Grids IIIoT and Smart Grids II
IoT and Smart Grids IIJustin Hayward
 
Grid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesGrid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesIPPAI
 
3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4guestec6b92bb
 
CloudComputing_UNIT5.pdf
CloudComputing_UNIT5.pdfCloudComputing_UNIT5.pdf
CloudComputing_UNIT5.pdfkhan593595
 
High Scalability Network Monitoring for Communications Service Providers
High Scalability Network Monitoring for Communications Service ProvidersHigh Scalability Network Monitoring for Communications Service Providers
High Scalability Network Monitoring for Communications Service ProvidersCA Technologies
 
SMART GRID BY BITAN DAS
SMART GRID BY BITAN DASSMART GRID BY BITAN DAS
SMART GRID BY BITAN DASBitan Das
 
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_ENNokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_ENJuan Boggiano
 
Smart grid control
Smart grid controlSmart grid control
Smart grid controlyhckelvin
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09liangflying
 
6 lte-a challenges and evolving lte network architecture
6 lte-a challenges and evolving lte network architecture6 lte-a challenges and evolving lte network architecture
6 lte-a challenges and evolving lte network architectureCPqD
 
WM Siemens IEC 61850 Flyer 081914
WM Siemens IEC 61850 Flyer 081914WM Siemens IEC 61850 Flyer 081914
WM Siemens IEC 61850 Flyer 081914Ryan Bolduc, PE
 
EasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfEasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfShantieHarunAlRosyid
 
SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitorashwini reliserv
 
The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)Schneider Electric
 

Similar to Smarter Grid Solutions Company Overview (20)

Smart grid communications
Smart grid communicationsSmart grid communications
Smart grid communications
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)
 
IoT and Smart Grids II
IoT and Smart Grids IIIoT and Smart Grids II
IoT and Smart Grids II
 
GEA15019
GEA15019GEA15019
GEA15019
 
Smart Grid & SCADA Systems
Smart Grid & SCADA SystemsSmart Grid & SCADA Systems
Smart Grid & SCADA Systems
 
Grid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesGrid Protection Systems - New Technologies
Grid Protection Systems - New Technologies
 
3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4
 
CloudComputing_UNIT5.pdf
CloudComputing_UNIT5.pdfCloudComputing_UNIT5.pdf
CloudComputing_UNIT5.pdf
 
High Scalability Network Monitoring for Communications Service Providers
High Scalability Network Monitoring for Communications Service ProvidersHigh Scalability Network Monitoring for Communications Service Providers
High Scalability Network Monitoring for Communications Service Providers
 
SMART GRID BY BITAN DAS
SMART GRID BY BITAN DASSMART GRID BY BITAN DAS
SMART GRID BY BITAN DAS
 
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_ENNokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
 
Intelli grid
Intelli gridIntelli grid
Intelli grid
 
Smart grid control
Smart grid controlSmart grid control
Smart grid control
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09
 
6 lte-a challenges and evolving lte network architecture
6 lte-a challenges and evolving lte network architecture6 lte-a challenges and evolving lte network architecture
6 lte-a challenges and evolving lte network architecture
 
Schneider plc
Schneider plcSchneider plc
Schneider plc
 
WM Siemens IEC 61850 Flyer 081914
WM Siemens IEC 61850 Flyer 081914WM Siemens IEC 61850 Flyer 081914
WM Siemens IEC 61850 Flyer 081914
 
EasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfEasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdf
 
SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitor
 
The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)
 

Recently uploaded

Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - InfographicHr365.us smith
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...soniya singh
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Andreas Granig
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsAhmed Mohamed
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfPower Karaoke
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 

Recently uploaded (20)

Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - Infographic
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML Diagrams
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 

Smarter Grid Solutions Company Overview

  • 1. Company and ANM Overview By Alan Gooding February 2015
  • 2. Contents • Company Overview • Active Network Management • Benefits • Example Scenarios • Delivering Active Network Management • Case Studies 2
  • 4. Who is Smarter Grid Solutions? • Successful smart grids manage large volumes of fast-changing data. The traditional operator-in-the-loop approach won’t cut it anymore. To resolve the grid challenges of a low carbon world, we need real-time, autonomous, deterministic control technology. That’s why we exist. • Founded in 2008 • 7,000 sqft HQ in Glasgow with development and test infrastructure • Offices in New York and London • Over 50 engineers dedicated to the development and deployment of Active Network Management • Over 10 years in development in collaboration with utility customers and one of Europe’s leading power systems universities (University of Strathclyde) 4
  • 6. What we do 6 Products Consultancy, Analysis, Tools and Training Systems Integration and Support Active Network Management software • Strategic Consultancy • Power systems analysis • ANM system design • Online capacity analysis tool • Desktop capacity analysis tool • ANM planning and operational training • Services to support the deployment of Active Network Management • Ongoing support and maintenance of operational systems Project Lifecycle
  • 8. Active Network Management 8 What is Active Network Management? What it is not….. • A part-distributed control technology to manage distributed energy resources. • Delivering real-time autonomous deterministic control providing guaranteed repeatability and time- bounding of end to end control actions. • To enable second by second control of distributed energy resources and grid devices to deliver smart grid functionality. • Typical applications include real and reactive power control, voltage management and energy balancing. • SCADA or DMS. However, ANM complements such systems integrating easily via standard industry protocols and can further enhance network visibility and grid control. • Distributed Energy Resource Management System. ANM complements such systems by providing a robust, reliable and secure device integration and interaction layer. • Substation Automation. ANM extends beyond the substation into the field but leverages existing substation equipment and communications where possible. • Distribution Automation. ANM tends to be focused on power systems constraint problems rather than reliability improvements but can sometimes be considered a new type of Distribution Automation application.
  • 9. A unique perspective on grid management (1) 9 A new form of grid management - Combining the key attributes of SCADA / DMS and protection / substation automation to deliver autonomous deterministic real-time control over a geographic area of grid, ANM delivers second by second control of Distributed Energy Resources for new smart grid applications. Peace of mind - Our ANM technology was developed in collaboration with the planning, control room and protection teams of a major utility meaning that we understand all of the concerns that any utility may have in adopting smart grid technology. Our guaranteed response times, guaranteed repeatability, fail to safe mechanisms and cyber security credentials ensure peace of mind for ANM adopters. Applications for constraint management - Within distribution networks the traditional approach has been to build or upgrade the grid to allow passive operation and avoid constraints; Active Network Management provides constraint management options to reduce connection costs, time to connect to the grid and avoid or postpone network reinforcement.
  • 10. A unique perspective on grid management (2) 10 Fit to connections planning process - Our own unique range of online and desktop planning tools complement existing connections processes and connection agreements with grid capacity analysis and ANM feasibility assessment allowing ANM to be easily adopted into business operations. - We have simplified the problem of linking DERs to power systems problems through associative relationships rather than complex mathematical optimisation techniques or use of the connected network model. Operational experience - With over 5 years of operational experience and a number of deployed systems with multiple DSOs we understand the practical, operational and power systems challenge that you are likely to face and we know how to address them cost effectively and robust technically. Where does it take you - Our products have been developed, and will continue to evolve, to provide the platform for the future DSO. ANM provides the platform to offer new grid services to TSOs, new and improved services to connecting customers and enable easy integration of new technologies (e.g. energy storage and microgrids).
  • 11. Typical DER challenges across the voltage levels 11 Grid Supply Point - Thermal congestion on distribution or transmission assets - Voltage rise and step change - Providing voltage support and other responses to the TSO Substation - Thermal congestion - Reverse power flows - Voltage rise Generation Transmission Network Distribution Network Distributed Generation Demand Generation LV Network Micro- generation Primary Other DER Other DER Grid Edge / Device - Voltage rise - Site overplanting • Three products – one targeted at each layer in the grid to provide multiple entry points to ANM depending on power systems problem. • The products share the same underlying technology and principles. • Can be deployed independently or integrated together. ANM100ANM50Connect+ Products
  • 12. Our ANM products to address DER integration challenges 12  Real power control for thermal constraints  Real power control for upper voltage limits  Demand Response and Peak Reduction  Real and reactive power control and AVC scheme coordination  Voltage limit (high and low) and power flow constraints  Real power control for thermal or voltage constraints  Real power control to maximise connection ANM100 ANM50 Connect+  Aimed at GSP and 10’s or 100’s of MWs of managed capacity  Aimed at primary substation and 10’s of MWs of capacity  Aimed at Grid Edge devices and entry point to ANM
  • 13. Technology 13 ANM Platform Software Components Application container to host autonomous ANM applications sharing a real time data manager with sgs comms hub. Typically runs on commodity servers with hot failover redundancy (one as Main and the other as Standby). A modular, easy to integrate communications hub performing all data handling and processing for sgs core via a range of standard industry protocols. Typically runs on commodity servers (one as Main and the other as Standby) A distributed software component located at each controlled device providing an interface to and control of the grid edge device. Implements autonomous fail to safe mechanisms in the event of non-compliance, loss of communications or abnormal operation. ANM Software Applications using the Platform Our ANM products use a combination of the ANM platform and software applications to deliver specific functionality.
  • 15. Benefits of our products 15 Commercial Increased financial return from existing assets – Increased Use of System revenue through greater asset utilisation – Increased connection charges for more connected customers Maximise grid utilisation – increase distributed generation hosting capacity by up to 3x – Avoid or defer capital expenditure and grid upgrades – Reduce network charges to demand customers for distributed generation reinforcement Improved customer service – New connection options to reduce connection times and cost Technical Easy to adopt – Products fit with existing connections process and agreements Reduce total cost of ownership – Autonomous operations and simple to use configurability within a single platform Reduced complexity and quick to deploy – Associative relationships, sensitivity factorisation, timers and deadbands remove the need for the connected network model and complex mathematical optimisation techniques Secure, safe and reliable – Time bounded control loops and repeatability coupled with fail to safe mechanisms provide peace of mind to control room operators and protection engineers
  • 17. Example scenario 1 17 Product: ANM 100 Scenario: Distributed generation causes power flow overloads on overhead lines and grid transformers. Operation: • Current monitoring at the locations where the overload occurs • ANM 100 calculates the capacity and any required curtailment • The ANM generators are curtailed per their connection agreement or agreed contractual terms when the power flow limit is breached • Generators are associated with multiple constraints (e.g. control zone A and C) Generator Primary Substation 1 Control Zone A Generator i v Generator Primary Substation 2 Control Zone B Generator i Generator Generator Grid Substation Control Zone C i i SCADA / DMS Transmission Network Generator Generator Existing generation outside of ANM system ANM enabled generator within control of ANM system ANM 100 ANM 100
  • 18. Example scenario 2 18 Product: ANM 50 Scenario: Generation export of real power raises voltage at point of connection and along the feeder resulting in AVC scheme operation and low voltage measurements on parallel feeders. Operation: • Real-time monitoring at PCC, end of line voltage on lowest voltage feeder and at the substation. • Curtail real-power when beyond voltage design limits • Regulate the production or absorption of reactive power • Adjust the target voltage of the on load tap change controller Primary Substation 1 SCADA / DMS Generator Generator Existing generation outside of ANM system ANM enabled generator within control of ANM system i v i v Generator Generator i v Generator i v v ANM 50 Generator i v Generator i v AVC Scheme ANM 50
  • 19. Example scenario 3 19 Product: Connect+ Scenario: Generator exporting real power, sometimes exceeds voltage at the PCC or at the substation. Operation: • Delivers real-time monitoring at PCC and if necessary at the substation • Curtail real-power when beyond voltage design limits • Can be integrated in the future to ANM 50 or ANM 100 • Can be integrated back to SCADA / DMS or without centralised monitoring. Substation SCADA / DMS Generator Generator Existing generation outside of ANM system ANM enabled generator within control of ANM system i v Generator Generator i v ANM 50 ANM 100
  • 20. Example scenario 4 20 Product: ANM 100 with energy storage control module. Scenario: Load Growth Results in a Peak Power Flow that Exceeds Capacity at primary substations and grid substation. Operation: • Real-time monitoring of power flow at primary and grid substations experiencing peak power capacity constraint. • Curtail real-power set-points for connected devices when thresholds are breached • Regulate the second by second production or consumption of energy from Distributed Energy Resources Primary Substation 1 Non-ANM Generator Generator Primary Substation 3 Variable Load Generator Energy Storage System Primary Substation 2 Generator Variable Load i v i v i vi v SCADA / DMS ANM 100 Storage Module
  • 22. Example implementation options 22 Enterprise • ANM 100 with hot failover redundancy between central platform components • Server grade IT systems installed in a SCADA server room or centralised location • Managing large number of objects and MWs with telecontrol or data link to SCADA / DMS / DERMS • Centralised management and support of deployed schemes Substation • ANM 50 with no redundancy between central platform components • Ruggedised server grade hardware installed in substation environment • Managing significant but reduced number of objects and MWs with telecontrol or data link to SCADA / DMS / DERMS Grid Edge / Device • Connect+ managing two constraints (one locally and one remotely) located at the generator site • IP55 rated panel with micro-RTU, existing RTU or other weather protected hardware supporting IEC61131 or capable of hosting a deterministic software component
  • 23. Example deployment process 23 Gated deployment with decision to proceed milestones Proven fast deployment Weeks per Phase (Total) 4 Feasibility Study 2 Detailed Design 3 Requirements Specification DesignSpecification TestSpecification FeasibilityStudy Report ConfigureAnalysis Tool Build Installation and Commissioning HardwareBuild SoftwareInstallation FactoryAcceptance Testing Installation SiteAcceptance Testing 5 GoLive System In Service SGS Support SystemExpansion SoftwareUpgradesand Patching 10 (10) 10 (20) 8 (28) 52 (86) 6 RenewSupport Project Phase Design Freeze Ship Products 1 6 (34) Benefits Case
  • 24. Products are supported by Tools and Services 24 Tools All products have been designed to integrate with the connections process for DERs – We provide a suite of tools to model real-time capacity, understand how an ANM connection will operate and to specify the configuration of the ANM products. Capacity analysis tools available for network and connections planning teams to model ANM connections: – Online - for first pass or customer self-service – Desktop - for DSO planners (with DigSilent) – Internal - for more complex analysis Services Our team of analysts and engineers are experts with connections processes, connection agreements, customer engagement, reinforcement options, power systems analysis, capacity analysis and benefits case development. Example services: – Strategic Planning – Smart Grid innovation – Power System Analysis – Capacity Analysis – Power Systems, Smart Grid and ANM Training
  • 26. Orkney 26 Challenge SSEPD seeking cost effective alternative to grid upgrades to provide connections for renewable generators: network already at ‘full capacity’. Technical challenge is multiple thermal overloads on various overhead and subsea cables. Solution Non-firm actively managed grid connections for distributed generation using ANM 100 with an energy storage control module. Delivered Benefits  Operational since November 2009  Connected 24 MW of new renewable generation capacity to 33 kV grid previously considered to be full  103% of electricity demand met by renewables in 2013  Estimated saving of at least £30million The Orkney Isles are located off the north cost of Scotland and interconnected to the main UK transmission system. Orkney Isles Background Information • 70 islands with 20 inhabited • ~1000 sq km and 21,000 inhabitants • Winter peak demand of 31 MW • Summer peak demand of 6 MW • Installed background generation of 46 MW • Annual average temperature 80C • Industry mainly agricultural, fishing and tourism
  • 27. Orkney – The customer experience 27 Generator ID Size (MW) Production Factor after Curtailment 1 0.9 37.06% 2 2.3 47.70% 4 4.5 45.35% 5 0.9 37.22% 6 0.9 40.08% 7 0.9 40.77% 9 0.9 31.76% 10 0.9 34.03% Customer website to see live status of ANM system ANM generation export after curtailment http://anm.ssepd.co.uk/
  • 28. Orkney – The operator experience 28 Autonomous curtailment event showing Measurement Point reading and corresponding wind generator output
  • 29. Cambridgeshire 29 Challenge Increase grid capacity, reduce time to connect and cost of connection for distributed generation in Cambridgeshire. Technical challenges include thermal overloads and localised voltage rise constraints. Solution  Non-firm actively managed grid connections for distributed generation using ANM 100.  Integration with Dynamic Line Rating relays and Quad Booster Control System. Delivered Benefits • 9 generators (39 MW) accepted ANM connection offers out of the 24 connection offers made • Reduction of CAPEX in connection offers of 75-95% to individual generators • Aggregate saving of £23.9m. EPN licence area heat map for DG connections Cambridgeshire ANM area Norwich ANM area launched Dec 2014 following success of Cambridgeshire
  • 30. Cambridgeshire 30 High level schematic of Cambridgeshire solutionConnection costs and estimated curtailment levels for normal connection versus ANM connection DLR AVC M M M M M Power Flow Constraint B AVC Client RTU Client RTU Power Flow Constraint C Voltage Constraint B Voltage Constraint A SCADA (Control Room) Generator 1 Generator 3 Generator 4 Generator 2 Generator 5 Power Flow Constraint A RF MeshIEC 61850 IEC 61850 IEC 61850 IEC 61850 IEC 61850 IEC 61850
  • 31. Skegness and Corby 31 Challenge Roll-out ANM connections for DG customers within 6 months. Technical challenges include thermal and voltage constraints for wind and PV developments. Solution • Non-firm actively managed grid connections for distributed generation using ANM 100. • ANM 100 delivered and operational within 3 months. • Consultancy services, capacity analysis and training to build internal knowledge and capability. Delivered Benefits • Skegness: 5 offers accepted totalling 49 MW, further 14 offers issued totalling 45.5 MW. • Corby: 2 offers accepted totalling 58 MW, further 7 offers issued totalling 80 MW. SGS and WPD engineers commissioning the Skegness ANM system
  • 32. Skegness and Corby 32 Single line diagram of the Skegness network showing ANM connecting generation with current and voltage constraint locations.
  • 33. London 33 Challenge Demonstrate how ANM can be used to increase visibility of distributed generation, improve security of supply, manage different Distributed Energy Resources and avoid demand driven reinforcement. Solution • ANM 100 configured to second by second manage export and import of distributed generation (20+ MWs from CHP), demand aggregators (3 aggregators) and EV charging (50 charge points totaling 600 kW). Delivered Benefits • A third more distributed energy plants to export power to urban networks • £43m of savings identified through the visibility and contribution of Distributed Generation to security of supply. Example trace of ANM delivering autonomous demand response
  • 34. London 34 Technical overview of the ANM trials EHV HV DG Control System Primary User Interface RTU Measurement Points Primary Substation Local Demand Response Site Central ANM Controller M M M Central Demand Response Control Centre Low Carbon London Operational Data Store UKPN SCADA Modbus/IP (VPN) TCP/IP TCP/IP various DNP3/IP ANM Data Historian GPRS Electric Vehicle Charging Network Operator Electric Vehicle Charging Infrastructure Modbus/IP (VPN) DG Control System Local Distributed Generation Site various GPRS Power Current HV/LV Network
  • 35. South East of Scotland 35 Challenge  To increase the speed and cost of connection for DG projects (e.g. PV, wind and thermal) in the South East of Scotland.  Reduce wasted engineering effort in connection quotations which are not accepted (currently >90%)  Technical challenges include thermal overloads and voltage. Solution  ANM-enable grid supply points with ANM 100 to manage distribution and transmission constraints  Deliver an online capacity analysis tool for distributed generation customers to screen connections before applying Status  Customer portal in trial and being rolled out across the area by April 2015  3 grid supply points ANM-enabled and integrated to existing communications and SCADA ready for distributed generator connections Available Capacity Limited capacity No capacity ANM enabled area Project area and constrained circuits for distributed generation connections
  • 36. Online capacity analysis tool 36 Online customer self-service planning tool Example results page from the customer self-service tool showing benefits of an ANM connection
  • 37. Shetland Isles 37 Challenge Develop and manage the non-interconnected island grid more efficiently and increase role of renewable energy in meeting future energy needs. Technical challenge includes stability, primary reserve, network operation and thermal overload constraints. Solution • Actively manage new generator output against dynamic stability constraints and schedule new controllable demand to reduce renewables curtailment and enhance system operation • Distributed Energy Resources integrated include domestic demand (including 2 MW of electrical demand and 16 MWh of energy storage); several MW of new renewable generation and battery energy storage. Delivered Benefits • 5 generators accepted ANM connections (8.5MW) Population ~23,000 Demand 11 – 47 MW Diesel generation at Lerwick Power Station (50+ MW) • BUT reaching end of life and requires replacing Back-up and frequency response from Sullom Voe Oil Terminal • BUT mainly there to serve local load and cannot be guaranteed for the long term Platform and application components used to deliver the Shetland ANM system
  • 38. Shetland Isles 38 ANM Functions • Forecasting of network constraints based on load and generation forecasts • System balancing by calculating day ahead schedules for all controlled devices with an objective of maximising renewable contribution • Real time (second by second) balancing to calculate and issue override signals to respond to unforeseen events, changes in conditions and short term variations • Management of system stability to identify configurations that may result in unacceptable oscillatory behaviour and set operating limits, including frequency response characteristics Battery storage configuration and user screen Domestic demand side management scheduling and set up screen