Commercial Building
Disclosure (CBD)
Scheme
Introduction
•   What is the CBD Scheme, and when does it apply?

•   What do you need to do to comply?

•   About NABERS & Tenancy Lighting Assessments?

•   What are the issues facing facilities and property managers?

•   Questions?
What is the CBD?
•   National program to encourage building energy efficiency.
    The program is managed by the Commercial Building
    Disclosure Team
•   Why ?
          Address the split incentives (owner vs tenant)
          Provide consistent and credible information about
           building energy efficiency.
          Commercial buildings account for 10% of Australia’s
           greenhouse gas emissions, and it is one of the
           quickest and cheapest ways to reduce greenhouse
           gas emissions.
When does CBD Apply?
•   Compulsory Building Disclosure (CBD) Scheme requires a
    Building Energy Efficiency Certificate (BEEC) to be prepared
    for the following situations:
           The sale of commercial (more than 75% of NLA is
            class 5) buildings over 2000 m2.
           The lease of office (class 5) space over 2000 m2 for
            more than 12 months.

•   Must advertise NABERS rating in any advertisement of lease
    or sale of property

•   The full scheme commences November 1, 2011.
•   A BEEC consists of:
         NABERS Energy Rating
         Assessment of tenancy lighting
        efficiency.
         Generic energy efficiency
        guidance.
CBD - Exemptions?
•   Exemptions include:
      New buildings - less than 2 years old.
      Major refurbishment.
      Extension of an existing lease or option to renew leases.
      Strata titled, Class 5 Buildings.
      Special exemptions: Police or security operations.
                              Unoccupied for >1-2 years.
                              Un-rateable.

•   An owner can apply for exemptions from disclosure
    requirements with the assistance of a CBD assessor.
Who can prepare a BEEC?

•   From November 1, 2011 only CBD Accredited Assessors can
    prepare BEECs.

•   CBD Assessors are required to retain all data and records
    relating to BEEC for seven years.
What do you need to do to comply?
•    Before selling a commercial building :

       Obtain NABERS Office Energy Rating (this must be on all
        advertising).
       Obtain tenant lighting assessment for the whole building.

•    Before leasing out a space of more than 2 000 m2 for more
     than 12 months:

       Obtain NABERS Office Energy Rating.
       Obtain tenant lighting only in the areas to be leased.
About the NABERS Assessment

•   The BEEC requires a:

•   NABERS Base Building Office Energy Rating or if this is not
    possible;

•   A NABERS Whole Building Office Energy Rating
NABERS Success




V.I.P
NABERS Success (Continued)
• Operation & Management

  The Warren Centre LEHR Project identified that:

       • Insourced or partially insourced management can
         contribute 1.3 NABERS stars
       • Buildings with efficiency training perform approx.
         0.5 NABERS stars better.
       • Buildings with managers with a high level of
         experience and competence perform
         approximately 1.3 stars better.
NABERS Success (Continued)
• Maintenance

  The Warren Centre LEHR Project identified that:


       • Buildings where incremental investments are made
         on energy efficiency perform on average, 0.5
         NABERS stars better than the average building.
About the Tenancy Lighting
                Assessment
•   Is a survey of the general lighting system installed in a tenant
    office space of a building.
•   The survey only assesses the lighting energy use, not the
    light output or suitability or adequacy.
•   The CBD Tenancy Lighting Assessment assesses two
    aspects of a lighting system:
      – Nominal light power density and;
      – Level and standard of control
About the Tenancy Lighting
           Assessment (Cont.)
•   NLPD ratings:




•   Note: Methods include: Grid Method / Representative Area
    Method / or Proposed.
About the Tenancy Lighting
           Assessment (Cont.)
•   Lighting Control Ratings:
About the Tenancy Lighting
            Assessment (Cont.)
 •   There can be some difficulties in certain situations:

           Opaque diffusers covering lamps.

           T5 adaptors installed in T8 fittings.

           Sealed luminaires.


It really helps if you understand, and have an excellent record of, the
lighting system in your building………..
Issues for Facilities/Property Managers

  Plan ahead – Creation of a BEEC can take at least 8-12
   weeks.


  NABERS
                                    BEEC
    Current?


 CBD Lighting                        Current?
 Assessment

    Current?
Issues for Facilities/Property Managers
                  (cont.)

  Keep good records of:
     Energy bills
     Current Surveys
     Current Lease agreements
     Base building /fit out lighting layout – ‘as built’ drawings
     Up to date single line diagrams and switchboard
      layouts.
     Luminaire data sheets
Issues for Facilities/Property Managers
                  (cont.)

  Inform tenants of the information gathering powers under
   the BEED Act.

  Tenancy guides. Specify minimum lighting performance
   requirements.

  Make good clauses.
Summary
Takes 8-12 weeks to prepare a BEEC. We suggest:

Review Lease expiry dates, and plan BEEC
requirements well in advance.

Decide on best approach – keep NABERS rating
current, and carry out TLAs and BEECS as required?

Carry out TLAs across the board to make sure there
are no problems on your sites.

Keep all records up to date, and well organised.
Further Information
          Contact:
         Sean Rapley
  NABERS & CBD Assessor
Northrop Consulting Engineers
           Pty Ltd

  Level 1, 60 Hickson Road
     Sydney NSW 2000
    www.northrop.com.au
      T 02 9241 4188
      F 02 9241 4324
  E sean@northrop.com.au

More Related Content

What's hot

CEEG - Case Study (Restaurant) - Earls - BC
CEEG - Case Study (Restaurant) - Earls - BCCEEG - Case Study (Restaurant) - Earls - BC
CEEG - Case Study (Restaurant) - Earls - BC
Shawn Brown
 
Smart Construction by Leopardo
Smart Construction by LeopardoSmart Construction by Leopardo
Smart Construction by Leopardo
leobuild
 
CleanEdison LEED EBOM Overview
CleanEdison LEED EBOM OverviewCleanEdison LEED EBOM Overview
CleanEdison LEED EBOM Overview
CleanEdison
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
Illinois ASHRAE
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
Illinois ASHRAE
 
Session 2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
Session  2 - LED Budget Breaker or Project Maker - Presented by: Jeff CoddSession  2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
Session 2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
Cindy Foster-Warthen
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentation
charliel50
 
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Ryan Slack
 
Herriards Project
Herriards ProjectHerriards Project
Herriards Project
masanori
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
John Gantz
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
Diana Nash
 
Estidama
EstidamaEstidama
Estidama
Sherif Mostafa
 
Breeam+vs+leed
Breeam+vs+leedBreeam+vs+leed
Breeam+vs+leed
Frank Deluca
 
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew PlattenLow Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
School of the Built Environment - University of Salford
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
IES VE
 
Module 2 - Understanding BCA's Performance Requirements
Module 2 - Understanding BCA's Performance RequirementsModule 2 - Understanding BCA's Performance Requirements
Module 2 - Understanding BCA's Performance Requirements
Michael Farrugia
 
Module 1 - Introduction to the BCA
Module 1 - Introduction to the BCAModule 1 - Introduction to the BCA
Module 1 - Introduction to the BCA
Michael Farrugia
 

What's hot (18)

CEEG - Case Study (Restaurant) - Earls - BC
CEEG - Case Study (Restaurant) - Earls - BCCEEG - Case Study (Restaurant) - Earls - BC
CEEG - Case Study (Restaurant) - Earls - BC
 
Smart Construction by Leopardo
Smart Construction by LeopardoSmart Construction by Leopardo
Smart Construction by Leopardo
 
CleanEdison LEED EBOM Overview
CleanEdison LEED EBOM OverviewCleanEdison LEED EBOM Overview
CleanEdison LEED EBOM Overview
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
 
Session 2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
Session  2 - LED Budget Breaker or Project Maker - Presented by: Jeff CoddSession  2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
Session 2 - LED Budget Breaker or Project Maker - Presented by: Jeff Codd
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentation
 
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
 
Herriards Project
Herriards ProjectHerriards Project
Herriards Project
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
Estidama
EstidamaEstidama
Estidama
 
Breeam+vs+leed
Breeam+vs+leedBreeam+vs+leed
Breeam+vs+leed
 
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew PlattenLow Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Module 2 - Understanding BCA's Performance Requirements
Module 2 - Understanding BCA's Performance RequirementsModule 2 - Understanding BCA's Performance Requirements
Module 2 - Understanding BCA's Performance Requirements
 
Module 1 - Introduction to the BCA
Module 1 - Introduction to the BCAModule 1 - Introduction to the BCA
Module 1 - Introduction to the BCA
 

Viewers also liked

Slide Show On Old Lahore
Slide Show On Old LahoreSlide Show On Old Lahore
Slide Show On Old Lahore
thespian
 
Use Them or Lose Them: Old buildings with new purposes
Use Them or Lose Them: Old buildings with new purposesUse Them or Lose Them: Old buildings with new purposes
Use Them or Lose Them: Old buildings with new purposes
JonathanFoyle1
 
Dinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial PresentationDinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial Presentation
dinosbuilding
 
ACME Ozone Mall Thane
ACME Ozone Mall ThaneACME Ozone Mall Thane
ACME Ozone Mall Thane
arrisarchitects
 
Commercial complex andheri_e_mumbai
Commercial complex andheri_e_mumbaiCommercial complex andheri_e_mumbai
Commercial complex andheri_e_mumbai
RAAJESH SHETH
 
Presentation about commercial building
Presentation about commercial buildingPresentation about commercial building
Presentation about commercial building
Yuwita Killua
 

Viewers also liked (6)

Slide Show On Old Lahore
Slide Show On Old LahoreSlide Show On Old Lahore
Slide Show On Old Lahore
 
Use Them or Lose Them: Old buildings with new purposes
Use Them or Lose Them: Old buildings with new purposesUse Them or Lose Them: Old buildings with new purposes
Use Them or Lose Them: Old buildings with new purposes
 
Dinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial PresentationDinos Building Ltd Commercial Presentation
Dinos Building Ltd Commercial Presentation
 
ACME Ozone Mall Thane
ACME Ozone Mall ThaneACME Ozone Mall Thane
ACME Ozone Mall Thane
 
Commercial complex andheri_e_mumbai
Commercial complex andheri_e_mumbaiCommercial complex andheri_e_mumbai
Commercial complex andheri_e_mumbai
 
Presentation about commercial building
Presentation about commercial buildingPresentation about commercial building
Presentation about commercial building
 

Similar to Commercial Building Disclosure Scheme Presentation

Linkedin Presentation
Linkedin PresentationLinkedin Presentation
Linkedin Presentation
macdowallk
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
Rakhi Ghosh
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...
constprod99
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
Shanti Pless
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1
mattvaughn33
 
Cli Grp
Cli GrpCli Grp
National Energy Code for Buildings
National Energy Code for BuildingsNational Energy Code for Buildings
National Energy Code for Buildings
Toronto 2030 District
 
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
IES VE
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
Sandro Suzart
 
Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
 Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod... Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
Cindy Foster-Warthen
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Shanti Pless
 
Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...
OECD Environment
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Shanti Pless
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
SayeedHvac
 
Creating a workplace to support the Millennials (Part One)
Creating a workplace to support the Millennials (Part One)Creating a workplace to support the Millennials (Part One)
Creating a workplace to support the Millennials (Part One)
Nicky Thompson
 
The ASHRAE Building Energy Labeling Program
The ASHRAE Building Energy Labeling ProgramThe ASHRAE Building Energy Labeling Program
The ASHRAE Building Energy Labeling Program
Don Doherty
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
SunshineBeats
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
Center for Sustainable Energy
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
jeff_ranson
 
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPTAUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
ssuser3bfeec
 

Similar to Commercial Building Disclosure Scheme Presentation (20)

Linkedin Presentation
Linkedin PresentationLinkedin Presentation
Linkedin Presentation
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
National Energy Code for Buildings
National Energy Code for BuildingsNational Energy Code for Buildings
National Energy Code for Buildings
 
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 
Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
 Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod... Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
Session 5 - LEDucation 8 - Navigating the Shifting Landscape of Lighting Cod...
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
 
Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
 
Creating a workplace to support the Millennials (Part One)
Creating a workplace to support the Millennials (Part One)Creating a workplace to support the Millennials (Part One)
Creating a workplace to support the Millennials (Part One)
 
The ASHRAE Building Energy Labeling Program
The ASHRAE Building Energy Labeling ProgramThe ASHRAE Building Energy Labeling Program
The ASHRAE Building Energy Labeling Program
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
 
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPTAUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
 

Commercial Building Disclosure Scheme Presentation

  • 2. Introduction • What is the CBD Scheme, and when does it apply? • What do you need to do to comply? • About NABERS & Tenancy Lighting Assessments? • What are the issues facing facilities and property managers? • Questions?
  • 3. What is the CBD? • National program to encourage building energy efficiency. The program is managed by the Commercial Building Disclosure Team • Why ?  Address the split incentives (owner vs tenant)  Provide consistent and credible information about building energy efficiency.  Commercial buildings account for 10% of Australia’s greenhouse gas emissions, and it is one of the quickest and cheapest ways to reduce greenhouse gas emissions.
  • 4. When does CBD Apply? • Compulsory Building Disclosure (CBD) Scheme requires a Building Energy Efficiency Certificate (BEEC) to be prepared for the following situations:  The sale of commercial (more than 75% of NLA is class 5) buildings over 2000 m2.  The lease of office (class 5) space over 2000 m2 for more than 12 months. • Must advertise NABERS rating in any advertisement of lease or sale of property • The full scheme commences November 1, 2011.
  • 5. A BEEC consists of:  NABERS Energy Rating  Assessment of tenancy lighting efficiency.  Generic energy efficiency guidance.
  • 6. CBD - Exemptions? • Exemptions include:  New buildings - less than 2 years old.  Major refurbishment.  Extension of an existing lease or option to renew leases.  Strata titled, Class 5 Buildings.  Special exemptions: Police or security operations. Unoccupied for >1-2 years. Un-rateable. • An owner can apply for exemptions from disclosure requirements with the assistance of a CBD assessor.
  • 7. Who can prepare a BEEC? • From November 1, 2011 only CBD Accredited Assessors can prepare BEECs. • CBD Assessors are required to retain all data and records relating to BEEC for seven years.
  • 8. What do you need to do to comply? • Before selling a commercial building :  Obtain NABERS Office Energy Rating (this must be on all advertising).  Obtain tenant lighting assessment for the whole building. • Before leasing out a space of more than 2 000 m2 for more than 12 months:  Obtain NABERS Office Energy Rating.  Obtain tenant lighting only in the areas to be leased.
  • 9. About the NABERS Assessment • The BEEC requires a: • NABERS Base Building Office Energy Rating or if this is not possible; • A NABERS Whole Building Office Energy Rating
  • 11. NABERS Success (Continued) • Operation & Management The Warren Centre LEHR Project identified that: • Insourced or partially insourced management can contribute 1.3 NABERS stars • Buildings with efficiency training perform approx. 0.5 NABERS stars better. • Buildings with managers with a high level of experience and competence perform approximately 1.3 stars better.
  • 12. NABERS Success (Continued) • Maintenance The Warren Centre LEHR Project identified that: • Buildings where incremental investments are made on energy efficiency perform on average, 0.5 NABERS stars better than the average building.
  • 13. About the Tenancy Lighting Assessment • Is a survey of the general lighting system installed in a tenant office space of a building. • The survey only assesses the lighting energy use, not the light output or suitability or adequacy. • The CBD Tenancy Lighting Assessment assesses two aspects of a lighting system: – Nominal light power density and; – Level and standard of control
  • 14. About the Tenancy Lighting Assessment (Cont.) • NLPD ratings: • Note: Methods include: Grid Method / Representative Area Method / or Proposed.
  • 15. About the Tenancy Lighting Assessment (Cont.) • Lighting Control Ratings:
  • 16. About the Tenancy Lighting Assessment (Cont.) • There can be some difficulties in certain situations:  Opaque diffusers covering lamps.  T5 adaptors installed in T8 fittings.  Sealed luminaires. It really helps if you understand, and have an excellent record of, the lighting system in your building………..
  • 17. Issues for Facilities/Property Managers  Plan ahead – Creation of a BEEC can take at least 8-12 weeks. NABERS BEEC Current? CBD Lighting Current? Assessment Current?
  • 18. Issues for Facilities/Property Managers (cont.)  Keep good records of:  Energy bills  Current Surveys  Current Lease agreements  Base building /fit out lighting layout – ‘as built’ drawings  Up to date single line diagrams and switchboard layouts.  Luminaire data sheets
  • 19. Issues for Facilities/Property Managers (cont.)  Inform tenants of the information gathering powers under the BEED Act.  Tenancy guides. Specify minimum lighting performance requirements.  Make good clauses.
  • 20. Summary Takes 8-12 weeks to prepare a BEEC. We suggest: Review Lease expiry dates, and plan BEEC requirements well in advance. Decide on best approach – keep NABERS rating current, and carry out TLAs and BEECS as required? Carry out TLAs across the board to make sure there are no problems on your sites. Keep all records up to date, and well organised.
  • 21. Further Information Contact: Sean Rapley NABERS & CBD Assessor Northrop Consulting Engineers Pty Ltd Level 1, 60 Hickson Road Sydney NSW 2000 www.northrop.com.au T 02 9241 4188 F 02 9241 4324 E sean@northrop.com.au