CITY HALL CONSTRUCTION MANAGER AT RISK
SELECTION
THURSDAY, OCTOBER 25, 2018
OVERVIEW
 Project overview
 Benefits of Construction Manager at Risk (CMAR) project delivery method
 CMAR selection process
 CMAR selection
 CMAR qualifications
 Recommendation
PROJECT OVERVIEW
 New City Hall
 Current location
 Centered on property facing Texas Ave.
 Removal of existing facilities
 Approximately 66,000 SQ FT
 Kirksey Architecture – Project Design
 $24M available for construction costs
 $33M total project cost
 Project Schedule
 Currently in design
 Site Dedication – November 8, 2018
 Groundbreaking scheduled for fall 2019
BENEFITS OF CMAR PROJECT DELIVERY METHOD
 Approval of Construction Manager at Risk project delivery method
 Police Department project
 CMAR delivery method
 Early involvement of the construction manager / contractor
 Participate in the design process and provide pre-construction services
 Feedback on constructability, availability of materials, factors in the labor markets, considerations on the O&M
 Completes the construction phase of the project
 Provides consistency and total project accountability
 Transfer some of the risk from the Owner to the Construction Manager
 Guaranteed Maximum Price (GMP)
 Less change orders due to early involvement
OTHER PROJECT DELIVERY METHODS
 Many other project delivery methods available
 Invitation to Bid and Competitive Sealed Proposal
 Invitation to Bid –
 low bid
 drawings are complete prior to contractor selection
 no design input
 often higher number of change orders
 more owner risk
 CSP - Price is taken into consideration as a percentage and then contractors are evaluated on qualifications
 drawings complete
 no design input
 often higher number of change orders
 more owner risk
BENEFITS OF CMAR PROJECT DELIVERY METHOD
 CMAR
 Cost
 Pre-Construction Fee, General Conditions, CMAR Fee
 Emphasis placed on company and staff qualifications, previous project experience, project management approach, safety,
quality control, etc.
 Early and complete design input – constructability, system and material selection
 Work hand-in-hand with Design Team
 Less chances for change orders
 Less risk to the Owner
 GMP
 Great success with this delivery method
 Widely used by TAMUS
CMAR SELECTION PROCESS
 Request For Proposals (RFP) for a Construction Manager
at Risk was issued
 Mandatory pre-proposal meeting held
 Opportunity for CMAR firms to ask questions and learn about
the project
 Received 12 proposals from Construction Management
firms
 Cost portion of the proposals publically read
 All 12 proposals were evaluated, rated and ranked by the
selection committee according to the predetermined
scoring matrix
 Scoring matrix – as stated in the RFP
 30% Score - Proposed Fees
 General Conditions, CMAR fee, Pre-Construction Services
 70% Score – Qualifications and Experience
 Project Staff Experience and Qualifications 25%
 Contractor Experience and Qualifications 25%
 Project Management Approach and Approach to Quality Control 10%
 Contractor Safety Program and Record 10%
 12 Proposals Received
 Acklam Construction
 Bartlett Cocke
 Brookstone
 CORE Construction
 Dudley Construction
 Flintco, LLC
 JaCody Construction
 JE Dunn Construction
 Pogue Construction
 SpawGlass
 Vaughn Construction
 Webber Commercial
CMAR SELECTION PROCESS
 4 firms were selected for an interview based on the results of the scoring matrix
 Interview process – presentation and questions
 Opportunity to expand on the information in the proposal
 Introduction of key project personnel
 Relevant experience
 Pre-construction services
 Project related technology and software
 Anticipated project challenges
 Approach to project management and quality control
 Approach to adjacent neighborhood and community relations
 Selection committee reviewed interview presentations and information, and ranked the interviewed firms
 Purchasing contacted and verified references for the top ranked firm
CMAR SELECTION / QUALIFICATIONS
 Based on the process mentioned, the selection committee recommends CORE Construction as the
Construction Manager at Risk for the new City Hall building
 CORE Construction
 81 years in business nationwide, with over 30 years in Texas
 18 Offices in 8 states with the headquarters in Frisco
 Completed municipal projects in: Dallas, Coppell, Garland, Frisco, Richardson, Marana, Houston, Plano, and many more
 Portfolio includes 470 municipalities nationwide
 Currently hosting 8 Texas A&M University Construction Science Department interns
 750 CMAR projects
 500 Municipal projects
 Police/Public Safety/Training Facilities, Courts Administrative Building, Fire & EMS/Training Stations, City Halls, City Library
 70 public safety related projects
 Cumulative Municipal Project Revenue of $1.2 Billion
CORE CONSTRUCTION - QUALIFICATIONS
 Seven dedicated, experienced, project staff members
 Project Director, 2 Pre-Construction Managers, Sr. Project Manager, Virtual Construction Manager,
Superintendent, QC/Safety
 Ability to self perform some work
 Community and neighborhood relations
 CORE App for mobile devices to provide live project updates
 Develop ways to communicate and provide information to the community and staff about upcoming construction
related events and disruptions
 Explore sound baffle walls around the job site to reduce construction related noise and provide a visual barrier,
especially for the part of the site adjacent to the neighborhood
 Local subcontractor and vendor outreach workshop to create awareness and excitement about the project
 Partner with local education programs to provide job site tours and construction related education to local
students
CORE CONSTRUCTION - QUALIFICATIONS
 Pre-construction and construction related technology
 Software: Drone Deploy, Assemble, Autodesk Revit, Autodesk Navisworks, Lumion, Bluebeam, Bim 360, FARO
Scene, Fuzor, SIM Lab
 In-house expertise in visualization, high-resolution renderings, animations, virtual reality and augmented reality
 Drone Deploy: Drone imaging and droning the site
 Assemble – 3D takeoff program offering the highest detailed estimate early on in the design phase of the project
 Option Studies – analyze upfront cost, maintenance cost, durability and constructability
 Quality Control – Clash Detection, Audio Visual Verification, Laser Scanning
 Scheduling – 4D modeling
RECOMMENDATION
 Staff recommends the approval of CORE
Construction as the Construction Manager
at Risk for the new City Hall building, as they
provide the best value to the city and the
project, as outlined in this presentation.

More Related Content

Similar to City Hall Construction Manager at Risk

Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
Robert Retsch
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
Amit Ghule
 
Proj 523_Risk Management Vapi City Mall
Proj 523_Risk Management  Vapi City MallProj 523_Risk Management  Vapi City Mall
Proj 523_Risk Management Vapi City Mall
shilparch04
 
Lekia P Ross resume
Lekia P Ross resumeLekia P Ross resume
Lekia P Ross resume
Lekia Ross
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Abd~el Hakim mohamed izran
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
rias ahamed
 
Bridging Gt Apr09
Bridging Gt Apr09Bridging Gt Apr09
Bridging Gt Apr09
Jeff Hendrick
 
Amit Bharti_CV
Amit Bharti_CVAmit Bharti_CV
Amit Bharti_CV
AMIT KUMAR BHARTI
 
Lekia Ross Resume_2016
Lekia Ross Resume_2016Lekia Ross Resume_2016
Lekia Ross Resume_2016
Lekia Ross
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
AWC|WEST
 
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdfAnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
ANIL SUBHAS
 
thampi CV
thampi CVthampi CV
thampi CV
thampi kochumala
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
Rudresh K V
 
copy Pres-MSRDC-General-15062002.ppt
copy Pres-MSRDC-General-15062002.pptcopy Pres-MSRDC-General-15062002.ppt
copy Pres-MSRDC-General-15062002.ppt
UdayanAwasthi4
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Aconex
 
Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09
diane_raeder
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
Implementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction ProgramImplementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction Program
heilmann
 

Similar to City Hall Construction Manager at Risk (20)

Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
Proj 523_Risk Management Vapi City Mall
Proj 523_Risk Management  Vapi City MallProj 523_Risk Management  Vapi City Mall
Proj 523_Risk Management Vapi City Mall
 
Lekia P Ross resume
Lekia P Ross resumeLekia P Ross resume
Lekia P Ross resume
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
Bridging Gt Apr09
Bridging Gt Apr09Bridging Gt Apr09
Bridging Gt Apr09
 
Amit Bharti_CV
Amit Bharti_CVAmit Bharti_CV
Amit Bharti_CV
 
Lekia Ross Resume_2016
Lekia Ross Resume_2016Lekia Ross Resume_2016
Lekia Ross Resume_2016
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
 
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdfAnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
 
thampi CV
thampi CVthampi CV
thampi CV
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
 
copy Pres-MSRDC-General-15062002.ppt
copy Pres-MSRDC-General-15062002.pptcopy Pres-MSRDC-General-15062002.ppt
copy Pres-MSRDC-General-15062002.ppt
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 
Implementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction ProgramImplementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction Program
 

More from City of College Station

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
City of College Station
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
City of College Station
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
City of College Station
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
City of College Station
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
City of College Station
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
City of College Station
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
City of College Station
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
City of College Station
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
City of College Station
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
City of College Station
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
City of College Station
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
City of College Station
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
City of College Station
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
City of College Station
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
City of College Station
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
City of College Station
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
City of College Station
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
City of College Station
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
City of College Station
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
City of College Station
 

More from City of College Station (20)

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
 

Recently uploaded

World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 

Recently uploaded (20)

World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 

City Hall Construction Manager at Risk

  • 1. CITY HALL CONSTRUCTION MANAGER AT RISK SELECTION THURSDAY, OCTOBER 25, 2018
  • 2. OVERVIEW  Project overview  Benefits of Construction Manager at Risk (CMAR) project delivery method  CMAR selection process  CMAR selection  CMAR qualifications  Recommendation
  • 3. PROJECT OVERVIEW  New City Hall  Current location  Centered on property facing Texas Ave.  Removal of existing facilities  Approximately 66,000 SQ FT  Kirksey Architecture – Project Design  $24M available for construction costs  $33M total project cost  Project Schedule  Currently in design  Site Dedication – November 8, 2018  Groundbreaking scheduled for fall 2019
  • 4. BENEFITS OF CMAR PROJECT DELIVERY METHOD  Approval of Construction Manager at Risk project delivery method  Police Department project  CMAR delivery method  Early involvement of the construction manager / contractor  Participate in the design process and provide pre-construction services  Feedback on constructability, availability of materials, factors in the labor markets, considerations on the O&M  Completes the construction phase of the project  Provides consistency and total project accountability  Transfer some of the risk from the Owner to the Construction Manager  Guaranteed Maximum Price (GMP)  Less change orders due to early involvement
  • 5. OTHER PROJECT DELIVERY METHODS  Many other project delivery methods available  Invitation to Bid and Competitive Sealed Proposal  Invitation to Bid –  low bid  drawings are complete prior to contractor selection  no design input  often higher number of change orders  more owner risk  CSP - Price is taken into consideration as a percentage and then contractors are evaluated on qualifications  drawings complete  no design input  often higher number of change orders  more owner risk
  • 6. BENEFITS OF CMAR PROJECT DELIVERY METHOD  CMAR  Cost  Pre-Construction Fee, General Conditions, CMAR Fee  Emphasis placed on company and staff qualifications, previous project experience, project management approach, safety, quality control, etc.  Early and complete design input – constructability, system and material selection  Work hand-in-hand with Design Team  Less chances for change orders  Less risk to the Owner  GMP  Great success with this delivery method  Widely used by TAMUS
  • 7. CMAR SELECTION PROCESS  Request For Proposals (RFP) for a Construction Manager at Risk was issued  Mandatory pre-proposal meeting held  Opportunity for CMAR firms to ask questions and learn about the project  Received 12 proposals from Construction Management firms  Cost portion of the proposals publically read  All 12 proposals were evaluated, rated and ranked by the selection committee according to the predetermined scoring matrix  Scoring matrix – as stated in the RFP  30% Score - Proposed Fees  General Conditions, CMAR fee, Pre-Construction Services  70% Score – Qualifications and Experience  Project Staff Experience and Qualifications 25%  Contractor Experience and Qualifications 25%  Project Management Approach and Approach to Quality Control 10%  Contractor Safety Program and Record 10%  12 Proposals Received  Acklam Construction  Bartlett Cocke  Brookstone  CORE Construction  Dudley Construction  Flintco, LLC  JaCody Construction  JE Dunn Construction  Pogue Construction  SpawGlass  Vaughn Construction  Webber Commercial
  • 8. CMAR SELECTION PROCESS  4 firms were selected for an interview based on the results of the scoring matrix  Interview process – presentation and questions  Opportunity to expand on the information in the proposal  Introduction of key project personnel  Relevant experience  Pre-construction services  Project related technology and software  Anticipated project challenges  Approach to project management and quality control  Approach to adjacent neighborhood and community relations  Selection committee reviewed interview presentations and information, and ranked the interviewed firms  Purchasing contacted and verified references for the top ranked firm
  • 9. CMAR SELECTION / QUALIFICATIONS  Based on the process mentioned, the selection committee recommends CORE Construction as the Construction Manager at Risk for the new City Hall building  CORE Construction  81 years in business nationwide, with over 30 years in Texas  18 Offices in 8 states with the headquarters in Frisco  Completed municipal projects in: Dallas, Coppell, Garland, Frisco, Richardson, Marana, Houston, Plano, and many more  Portfolio includes 470 municipalities nationwide  Currently hosting 8 Texas A&M University Construction Science Department interns  750 CMAR projects  500 Municipal projects  Police/Public Safety/Training Facilities, Courts Administrative Building, Fire & EMS/Training Stations, City Halls, City Library  70 public safety related projects  Cumulative Municipal Project Revenue of $1.2 Billion
  • 10. CORE CONSTRUCTION - QUALIFICATIONS  Seven dedicated, experienced, project staff members  Project Director, 2 Pre-Construction Managers, Sr. Project Manager, Virtual Construction Manager, Superintendent, QC/Safety  Ability to self perform some work  Community and neighborhood relations  CORE App for mobile devices to provide live project updates  Develop ways to communicate and provide information to the community and staff about upcoming construction related events and disruptions  Explore sound baffle walls around the job site to reduce construction related noise and provide a visual barrier, especially for the part of the site adjacent to the neighborhood  Local subcontractor and vendor outreach workshop to create awareness and excitement about the project  Partner with local education programs to provide job site tours and construction related education to local students
  • 11. CORE CONSTRUCTION - QUALIFICATIONS  Pre-construction and construction related technology  Software: Drone Deploy, Assemble, Autodesk Revit, Autodesk Navisworks, Lumion, Bluebeam, Bim 360, FARO Scene, Fuzor, SIM Lab  In-house expertise in visualization, high-resolution renderings, animations, virtual reality and augmented reality  Drone Deploy: Drone imaging and droning the site  Assemble – 3D takeoff program offering the highest detailed estimate early on in the design phase of the project  Option Studies – analyze upfront cost, maintenance cost, durability and constructability  Quality Control – Clash Detection, Audio Visual Verification, Laser Scanning  Scheduling – 4D modeling
  • 12. RECOMMENDATION  Staff recommends the approval of CORE Construction as the Construction Manager at Risk for the new City Hall building, as they provide the best value to the city and the project, as outlined in this presentation.