Chevy Chase Community Center
Agenda
Overview of the main ingredients to be addressed
Project Schedule
01
Efforts to date
Project Challenges Progress
02
Review two schemes prepared
Blocking & Stacking
03
Upcoming deliverables and timeframes
Next Steps
04
Please hold questions until the end
Q & A / Discussion
05
Chevy Chase Community Center
Expectations for tonight:
 Design Process – Meeting is part of progress
 Focus on blocking & stacking
 Draft concept submission will provide more information
 Design contingent on community feedback
Agenda
Chevy Chase Community Center
Desired feedback for tonight:
 Locations of spaces?
 Activities / spaces visible to public?
 Visitor arrival experience?
 Which design scheme makes the most sense?
Agenda
Chevy Chase Community Center
Schedule
ImplementGoalsAssessmentStart
Not a straight line, but regardless all four challenges will need to be addressed
Select Team for Assessment
Allocate resources for
preliminary phases
Perform building assessment
Develop list of
improvements
Historic Eligibility
AHJ Regulations
Assess cost of present
operations & maintenance
Client Resource Evaluation
Key Stakeholder Interviews
Community Meetings
Concept Design
Define Goals
Establish Targets
Itemize Wants & Needs
Research Options
Establish Budget
Master Plan Report
Implement Master Plan
Chevy Chase Community Center
KEY MILESTONES
 Notice to Proceed Oct 04 2019
 Mtg02 - Community Mtg - Listening & Vis Pref Fall 2019
 Mtg03 - DPR Programming Workshop Fall 2019
 Findings & Recommendations Prs (Mtg04) Fall 2019
 Recommendations Review & Approval Fall 2019
 Mtg05 - Community Mtg - Blocking & Stacking Today
 Draft Concept Submission Late Dec 2019
 Master Plan Submission Winter 2020
 Mtg08 - Community Mtg - Mst Plan Prs Winter 2020
Schedule
Chevy Chase Community Center
Project Challenges
ZONING REGULATIONS
Regulatory constraints &
opportunities to guide the design
 FAR limitation
 Special Exception (4 months)
 Map Amendment (8-10 months)
HISTORIC ELIGIBILITY
Evidence based process
 Documentation of Site
 HPO Determination
EXISTING CONDITIONS
Physical constraints
 Lidar Scan
 Limitations of Precast Structure
 Geotech Report
PROGRAM
Understanding needs & goals
 Questionnaires
 Programming
 Technical Requirements
 Blocking & Stacking
 Concept Design
Chevy Chase Community Center
Project Challenges
uncertainty | patterns | insights clarity| focus
postoccupancy
programming
concept
design
completion
construction
ZONING REGULATIONS
 FAR Limitation
 Special Exception
 Map Amendment
HISTORIC ELIGIBILITY
 DOE Reports
 HPO Determination
EXISTING CONDITIONS
 Lidar Scan
 Limitations of Precast
Structure
 Geotech Report
PROGRAM
 Questionnaires
 Programming
 Technical Rqmts
 Blocking & Stacking
 Concept Design
Chevy Chase Community Center
Project Challenges
Regulations
 Multiple zones
 MU-3A & R-1-B (most restrictive)
 FAR capacity is near max
 Existing aggregate area:
Library 19,630 gsf
Comm Cntr 24,867 gsf
Total 44,497 gsf
 FAR 48,171 gsf
 3,600 sf of increase allowed
MU-3A
(39,800 sf)
R-1-B
(33,590 sf)
Chevy Chase Community Center
ZONING EXISTING MU-3A R-1-B
Height 32 ft (+/-) 40 ft + 15 ft penthouse 45 ft + 18 ft penthouse
Stories 2 + cellar + penthouse 3 + cellar + 2 story penthouse 3 + cellar + 1 story penthouse
FAR n/a 1.0 Rec: 1.8* FAR (C-1604.3)
Lib: Not Prescribed
Max. Bldg Area 44,497 gsf 73,390 gsf 132,100 gsf
Rec Center 24,867 gsf 48,000 gsf -
Library 19,630 gsf 25,000 gsf -
Lot Occupancy 28.4 % 60% 40 %* max (C-1603.7)
Pervious Surface Not calculated - 30% (C-1609.1)
Green Area Ratio
(GAR)
- 0.3 -
Project Challenges
Regulations
Chevy Chase Community Center
Project Challenges
Historic Eligibility
 CCPL is recommended
 CCCC is not recommended
 DOEs submitted to HPO
 HPO to determine eligibility
Chevy Chase Community Center
Project Challenges
Program
 ANC Report
 DPR Stakeholder Questionnaires
 Development of ‘Rec Spec’
Chevy Chase Community Center
Project Challenges
Program
 ANC Report Findings:
Program Area Net Area
Administration / Common 2,330 sf
Auditorium 4,000 sf
Gymnasium 7,200 sf
Classrooms / Meeting Rooms 17,400 sf
Support Facilities 1,720 sf
Total Net Program 32,550 sf
Gross Scale Factor 1.4
Total Gross Area 45,570 sf
Existing Gross Area 32,734 sf (-12,800 sf)
Chevy Chase Community Center
What We’ve Heard:
Community would like a structure that:
 Fits within the context and scale of the neighborhood.
 ‘Village’ feel for the building.
 Wood and glass materials are preferred.
 Keep the outdoor spaces.
 ‘Town Center’
Concept Design
Chevy Chase Community Center
Concept Design
Basketball
Avalon
Theater
Parking
26 spaces
2 ADA
McKinley Street NWMcKinley Street NW
Northampton Street NW
Playground
Commons
Waste
Chevy Chase Community Center
Concept Design
Chevy Chase Community Center
Concept Design
Chevy Chase Community Center
Concept Design
Basketball
Parking
26 spaces
2 ADA
Avalon
Theater
McKinley Street NWMcKinley Street NW
Northampton Street NW
Playground
Commons
Waste
Chevy Chase Community Center
Concept Design
Chevy Chase Community Center
Concept Design
Chevy Chase Community Center
Concept Design
Program of Community Center
 Fitness center with equipment
 Lecture/performance hall with
about 125 seats
 Meeting/games/party rooms
 Half-court gymnasium
 Childcare area with an indoor
play area
 Kitchen
 Quiet lounge
 Activity/tech lounge
 Dance/yoga/Pilates studio
 Fencing/exercise room
 Pottery area
 Arts and crafts space
 Offices
 Rooftop amenities such as a
garden, greenhouse, and/or
outdoor lounge.
Chevy Chase Community Center
Concept Design
Community Center Blocking & Stacking
Program Goals:
 Single point of entry
 Engage urban context
 Shared spaces
Form dependent on three key spaces:
 Main Entry / Lobby
 Gymnasium
 Auditorium
Chevy Chase Community Center
Concept Design – Scheme B
Scheme BScheme AExisting
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Concept Design
Existing Community Center
 32,734 gsf
 2 story + cellar + penthouse
 32 ft (+/-)
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Summary
 48,000 gsf
 3 story + penthouse
 40 ft + 18 ft penthouse
 Main entry on Commons
Concept Design – Scheme A
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Lower Level
 1.01 2-story Lobby
 4.01 Gymnasium
 2.01 Auditorium
Concept Design – Scheme A
1.01
3.04
2.01
4.01
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Ground Floor
 1.01 Main Entry & 2-story Lobby
 3.06 Active Lounge
 3.08 Senior Lounge
 3.10 Game Room
 3.12 Preschool
Concept Design – Scheme A
3.12
1.01
3.08
3.06
3.10
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Second Floor
 3.02 Fitness Center
 3.03 Tech Room
 3.04 Arts & Crafts
 3.15 Performing Arts Studio
 3.17 Fencing Studio
 3.20 Makerspace
Concept Design – Scheme A
3.04
3.02
3.17
3.15
3.20
3.03
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Penthouse + Rooftop
 1.05 Café
 1.06 Outdoor Lounge
 1.07 Rooftop Garden
 3.01 Meeting Room
 3.18 Kitchen
Concept Design – Scheme A
1.05
1.06 1.07
3.18
3.01
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Summary
 48,000 gsf
 3 story + penthouse
 40 ft + 18 ft penthouse
 Enter from Connecticut Ave +
Commons
Concept Design – Scheme B
Summary
 48,000 gsf
 3 story + penthouse
 40 ft + 18 ft penthouse
 Main entry on Connecticut Ave
+ Commons
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Ground Level
 1.01 2-story Lobby
 2.01 Auditorium
 3.01 Meeting Room
 3.03 Tech Room
 3.04 Arts & Crafts
 3.06 Active Lounge
 3.20 Makerspace
Concept Design – Scheme B
3.06
1.01
2.01
3.03
3.20
3.04
3.01
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
First Floor
 1.01 2-story Lobby
 3.08 Senior Lounge
 3.10 Game Room
 3.12 Preschool
 3.15 Performing Arts Studio
Concept Design – Scheme B
3.12
3.15
3.06
3.08
1.01
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Concept Design – Scheme B
Second Level
 3.02 Fitness Center
 3.17 Fencing Studio
 4.01 Gymnasium
4.01
3.02
3.17
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Penthouse + Rooftop
 1.05 Café
 1.06 Outdoor Lounge
 1.07 Rooftop Garden
 3.01 Meeting Room
 3.18 Kitchen
Concept Design – Scheme B
1.05
1.06
1.07
3.18
3.01
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Concept Design – Scheme B
Scheme BScheme AExisting
Meeting Spaces Common Spaces GymAuditorium Mechanical
Chevy Chase Community Center
Next Steps
uncertainty | patterns | insights clarity| focus
postoccupancy
programming
concept
design
completion
construction
ZONING REGULATIONS
 FAR Limitation
 Special Exception
 Map Amendment
HISTORIC ELIGIBILITY
 DOE Reports
 HPO Determination
EXISTING CONDITIONS
 Lidar Scan
 Limitations of Precast
Structure
 Geotech Report
PROGRAM
 Questionnaires
 Programming
 Technical Rqmts
 Blocking & Stacking
 Concept Design
Chevy Chase Community Center
1. Community Meeting
 Focus on Blocking & Stacking (2 schemes)
 Community & taskforce review & feedback (2 weeks)
2. Draft Concept Submission
 Focus on individual space needs
 Community & taskforce review & feedback (2 weeks)
 Program managers: please confirm Rec Spec
3. BELL to develop Master Plan
 Concept design
 Materials
 Concept budget
4. Next community meeting February (Date TBD)
 Present Master Plan
Next Steps
Chevy Chase Community Center
The design is contingent on your feedback!
Q&A Discussion
Chevy Chase Community Center
Department of General Services
John Stokes, Associate Director - External Affairs
john.stokes@dc.gov
Department of Parks and Recreation
Brent Sisco, Landscape Architect
brent.sisco@dc.gov
Project Website
https://dgs.dc.gov/page/chevy-chase-community-center-0
Points of Contact

More Related Content

Similar to Chevy chase comm mtg03

Arboretum community meeting 01.22.19 final
Arboretum community meeting   01.22.19   finalArboretum community meeting   01.22.19   final
Arboretum community meeting 01.22.19 final
RamaChilamkurthy
 
Statement of qualifications for STC
Statement of qualifications for STC Statement of qualifications for STC
Statement of qualifications for STC
tapllc
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentation
sbettencourt
 
Planning at Eye Level: Form and Function
Planning at Eye Level: Form and FunctionPlanning at Eye Level: Form and Function
Planning at Eye Level: Form and Function
Alexandria M. Stankovich
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project Presentation
Steve Schneider
 
Assignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docxAssignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docx
edmondpburgess27164
 
Thinking The Unthinkable: Introduction
Thinking The Unthinkable: IntroductionThinking The Unthinkable: Introduction
Thinking The Unthinkable: Introduction
lisbk
 
final_workshop_report_springfield
final_workshop_report_springfieldfinal_workshop_report_springfield
final_workshop_report_springfield
Camron Adibi
 
9th Lorton Community Center Steering Committee Meeting 2-11-2019
9th Lorton Community Center Steering Committee Meeting 2-11-20199th Lorton Community Center Steering Committee Meeting 2-11-2019
9th Lorton Community Center Steering Committee Meeting 2-11-2019
Fairfax County
 
Concept Sketches
Concept SketchesConcept Sketches
Concept Sketches
Kim Mitchell
 
Lorton Community Center Steering Committee Meeting 8-30-18
Lorton Community Center Steering Committee Meeting 8-30-18Lorton Community Center Steering Committee Meeting 8-30-18
Lorton Community Center Steering Committee Meeting 8-30-18
Fairfax County
 
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the VisionWheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
OHM Advisors
 
Staff presentation on Austin Comprehensive Plan RFQ process
Staff presentation on Austin Comprehensive Plan RFQ processStaff presentation on Austin Comprehensive Plan RFQ process
Staff presentation on Austin Comprehensive Plan RFQ process
gclaxton
 
Chapter 3-2.pptx
Chapter 3-2.pptxChapter 3-2.pptx
Chapter 3-2.pptx
KarimHadi8
 
REEP[1]
REEP[1]REEP[1]
Lean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based DesginLean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based Desgin
Eric Peabody
 
Webinar: How to Manage Your Project to Completion Using the Project Builder
Webinar: How to Manage Your Project to Completion Using the Project BuilderWebinar: How to Manage Your Project to Completion Using the Project Builder
Webinar: How to Manage Your Project to Completion Using the Project Builder
GoLeanSixSigma.com
 
Evo conf - Designing SharePoint Solutions
Evo conf  - Designing SharePoint SolutionsEvo conf  - Designing SharePoint Solutions
Evo conf - Designing SharePoint Solutions
Mark Stokes
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
The Design Partnership
 
Design brief bank redesign 2015
Design brief bank redesign 2015Design brief bank redesign 2015
Design brief bank redesign 2015
Inspace Architects
 

Similar to Chevy chase comm mtg03 (20)

Arboretum community meeting 01.22.19 final
Arboretum community meeting   01.22.19   finalArboretum community meeting   01.22.19   final
Arboretum community meeting 01.22.19 final
 
Statement of qualifications for STC
Statement of qualifications for STC Statement of qualifications for STC
Statement of qualifications for STC
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentation
 
Planning at Eye Level: Form and Function
Planning at Eye Level: Form and FunctionPlanning at Eye Level: Form and Function
Planning at Eye Level: Form and Function
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project Presentation
 
Assignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docxAssignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docx
 
Thinking The Unthinkable: Introduction
Thinking The Unthinkable: IntroductionThinking The Unthinkable: Introduction
Thinking The Unthinkable: Introduction
 
final_workshop_report_springfield
final_workshop_report_springfieldfinal_workshop_report_springfield
final_workshop_report_springfield
 
9th Lorton Community Center Steering Committee Meeting 2-11-2019
9th Lorton Community Center Steering Committee Meeting 2-11-20199th Lorton Community Center Steering Committee Meeting 2-11-2019
9th Lorton Community Center Steering Committee Meeting 2-11-2019
 
Concept Sketches
Concept SketchesConcept Sketches
Concept Sketches
 
Lorton Community Center Steering Committee Meeting 8-30-18
Lorton Community Center Steering Committee Meeting 8-30-18Lorton Community Center Steering Committee Meeting 8-30-18
Lorton Community Center Steering Committee Meeting 8-30-18
 
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the VisionWheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
 
Staff presentation on Austin Comprehensive Plan RFQ process
Staff presentation on Austin Comprehensive Plan RFQ processStaff presentation on Austin Comprehensive Plan RFQ process
Staff presentation on Austin Comprehensive Plan RFQ process
 
Chapter 3-2.pptx
Chapter 3-2.pptxChapter 3-2.pptx
Chapter 3-2.pptx
 
REEP[1]
REEP[1]REEP[1]
REEP[1]
 
Lean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based DesginLean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based Desgin
 
Webinar: How to Manage Your Project to Completion Using the Project Builder
Webinar: How to Manage Your Project to Completion Using the Project BuilderWebinar: How to Manage Your Project to Completion Using the Project Builder
Webinar: How to Manage Your Project to Completion Using the Project Builder
 
Evo conf - Designing SharePoint Solutions
Evo conf  - Designing SharePoint SolutionsEvo conf  - Designing SharePoint Solutions
Evo conf - Designing SharePoint Solutions
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
 
Design brief bank redesign 2015
Design brief bank redesign 2015Design brief bank redesign 2015
Design brief bank redesign 2015
 

More from RamaChilamkurthy

Carolina park cm presentation 2020-07-15
Carolina park cm presentation 2020-07-15Carolina park cm presentation 2020-07-15
Carolina park cm presentation 2020-07-15
RamaChilamkurthy
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020
RamaChilamkurthy
 
Joy evans center july 30 presentation final
Joy evans center july 30 presentation finalJoy evans center july 30 presentation final
Joy evans center july 30 presentation final
RamaChilamkurthy
 
Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020
RamaChilamkurthy
 
19th and lamont community meeting presentation 07-16-2020
19th and lamont community meeting presentation 07-16-202019th and lamont community meeting presentation 07-16-2020
19th and lamont community meeting presentation 07-16-2020
RamaChilamkurthy
 
Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020
RamaChilamkurthy
 
Ketcham anc presentation july 7, 2020
Ketcham anc presentation july 7, 2020Ketcham anc presentation july 7, 2020
Ketcham anc presentation july 7, 2020
RamaChilamkurthy
 
Tr community center june 30 presentation
Tr community center june 30 presentation Tr community center june 30 presentation
Tr community center june 30 presentation
RamaChilamkurthy
 
Lincoln hagans community meeting presentation june 16_final
Lincoln hagans  community meeting presentation june 16_finalLincoln hagans  community meeting presentation june 16_final
Lincoln hagans community meeting presentation june 16_final
RamaChilamkurthy
 
2020 06-09 arboretum community meeting final
2020 06-09 arboretum community meeting final 2020 06-09 arboretum community meeting final
2020 06-09 arboretum community meeting final
RamaChilamkurthy
 
19th lamont may 21 presenation final
19th  lamont  may 21 presenation final19th  lamont  may 21 presenation final
19th lamont may 21 presenation final
RamaChilamkurthy
 
Park at le droit may 20 presenation final
Park at le droit  may 20 presenation finalPark at le droit  may 20 presenation final
Park at le droit may 20 presenation final
RamaChilamkurthy
 
Lansburgh park community meeting february 25, 2020
Lansburgh park  community meeting february 25, 2020Lansburgh park  community meeting february 25, 2020
Lansburgh park community meeting february 25, 2020
RamaChilamkurthy
 
Newyork ave playground community meeting jan 28, 2020 final
Newyork ave playground community meeting jan 28, 2020 finalNewyork ave playground community meeting jan 28, 2020 final
Newyork ave playground community meeting jan 28, 2020 final
RamaChilamkurthy
 
16th st playground community meeting presentation 03052020
16th st playground community meeting presentation 0305202016th st playground community meeting presentation 03052020
16th st playground community meeting presentation 03052020
RamaChilamkurthy
 
Benning park community meeting march 2020
Benning park  community meeting  march 2020Benning park  community meeting  march 2020
Benning park community meeting march 2020
RamaChilamkurthy
 
W street community meeting
W street  community meetingW street  community meeting
W street community meeting
RamaChilamkurthy
 
Crestwood cm presentation feb.2020
Crestwood cm presentation feb.2020Crestwood cm presentation feb.2020
Crestwood cm presentation feb.2020
RamaChilamkurthy
 
Cobb park community meeting presentation 01-30-2020
Cobb park community meeting presentation   01-30-2020 Cobb park community meeting presentation   01-30-2020
Cobb park community meeting presentation 01-30-2020
RamaChilamkurthy
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 

More from RamaChilamkurthy (20)

Carolina park cm presentation 2020-07-15
Carolina park cm presentation 2020-07-15Carolina park cm presentation 2020-07-15
Carolina park cm presentation 2020-07-15
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020
 
Joy evans center july 30 presentation final
Joy evans center july 30 presentation finalJoy evans center july 30 presentation final
Joy evans center july 30 presentation final
 
Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020
 
19th and lamont community meeting presentation 07-16-2020
19th and lamont community meeting presentation 07-16-202019th and lamont community meeting presentation 07-16-2020
19th and lamont community meeting presentation 07-16-2020
 
Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020
 
Ketcham anc presentation july 7, 2020
Ketcham anc presentation july 7, 2020Ketcham anc presentation july 7, 2020
Ketcham anc presentation july 7, 2020
 
Tr community center june 30 presentation
Tr community center june 30 presentation Tr community center june 30 presentation
Tr community center june 30 presentation
 
Lincoln hagans community meeting presentation june 16_final
Lincoln hagans  community meeting presentation june 16_finalLincoln hagans  community meeting presentation june 16_final
Lincoln hagans community meeting presentation june 16_final
 
2020 06-09 arboretum community meeting final
2020 06-09 arboretum community meeting final 2020 06-09 arboretum community meeting final
2020 06-09 arboretum community meeting final
 
19th lamont may 21 presenation final
19th  lamont  may 21 presenation final19th  lamont  may 21 presenation final
19th lamont may 21 presenation final
 
Park at le droit may 20 presenation final
Park at le droit  may 20 presenation finalPark at le droit  may 20 presenation final
Park at le droit may 20 presenation final
 
Lansburgh park community meeting february 25, 2020
Lansburgh park  community meeting february 25, 2020Lansburgh park  community meeting february 25, 2020
Lansburgh park community meeting february 25, 2020
 
Newyork ave playground community meeting jan 28, 2020 final
Newyork ave playground community meeting jan 28, 2020 finalNewyork ave playground community meeting jan 28, 2020 final
Newyork ave playground community meeting jan 28, 2020 final
 
16th st playground community meeting presentation 03052020
16th st playground community meeting presentation 0305202016th st playground community meeting presentation 03052020
16th st playground community meeting presentation 03052020
 
Benning park community meeting march 2020
Benning park  community meeting  march 2020Benning park  community meeting  march 2020
Benning park community meeting march 2020
 
W street community meeting
W street  community meetingW street  community meeting
W street community meeting
 
Crestwood cm presentation feb.2020
Crestwood cm presentation feb.2020Crestwood cm presentation feb.2020
Crestwood cm presentation feb.2020
 
Cobb park community meeting presentation 01-30-2020
Cobb park community meeting presentation   01-30-2020 Cobb park community meeting presentation   01-30-2020
Cobb park community meeting presentation 01-30-2020
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 

Recently uploaded

PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
afsebu
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
3woawyyl
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 

Recently uploaded (20)

PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 

Chevy chase comm mtg03

  • 1. Chevy Chase Community Center Chevy Chase Community Center Community Meeting 02 18 December 2019
  • 2. Chevy Chase Community Center Agenda Overview of the main ingredients to be addressed Project Schedule 01 Efforts to date Project Challenges Progress 02 Review two schemes prepared Blocking & Stacking 03 Upcoming deliverables and timeframes Next Steps 04 Please hold questions until the end Q & A / Discussion 05
  • 3. Chevy Chase Community Center Expectations for tonight:  Design Process – Meeting is part of progress  Focus on blocking & stacking  Draft concept submission will provide more information  Design contingent on community feedback Agenda
  • 4. Chevy Chase Community Center Desired feedback for tonight:  Locations of spaces?  Activities / spaces visible to public?  Visitor arrival experience?  Which design scheme makes the most sense? Agenda
  • 5. Chevy Chase Community Center Schedule ImplementGoalsAssessmentStart Not a straight line, but regardless all four challenges will need to be addressed Select Team for Assessment Allocate resources for preliminary phases Perform building assessment Develop list of improvements Historic Eligibility AHJ Regulations Assess cost of present operations & maintenance Client Resource Evaluation Key Stakeholder Interviews Community Meetings Concept Design Define Goals Establish Targets Itemize Wants & Needs Research Options Establish Budget Master Plan Report Implement Master Plan
  • 6. Chevy Chase Community Center KEY MILESTONES  Notice to Proceed Oct 04 2019  Mtg02 - Community Mtg - Listening & Vis Pref Fall 2019  Mtg03 - DPR Programming Workshop Fall 2019  Findings & Recommendations Prs (Mtg04) Fall 2019  Recommendations Review & Approval Fall 2019  Mtg05 - Community Mtg - Blocking & Stacking Today  Draft Concept Submission Late Dec 2019  Master Plan Submission Winter 2020  Mtg08 - Community Mtg - Mst Plan Prs Winter 2020 Schedule
  • 7. Chevy Chase Community Center Project Challenges ZONING REGULATIONS Regulatory constraints & opportunities to guide the design  FAR limitation  Special Exception (4 months)  Map Amendment (8-10 months) HISTORIC ELIGIBILITY Evidence based process  Documentation of Site  HPO Determination EXISTING CONDITIONS Physical constraints  Lidar Scan  Limitations of Precast Structure  Geotech Report PROGRAM Understanding needs & goals  Questionnaires  Programming  Technical Requirements  Blocking & Stacking  Concept Design
  • 8. Chevy Chase Community Center Project Challenges uncertainty | patterns | insights clarity| focus postoccupancy programming concept design completion construction ZONING REGULATIONS  FAR Limitation  Special Exception  Map Amendment HISTORIC ELIGIBILITY  DOE Reports  HPO Determination EXISTING CONDITIONS  Lidar Scan  Limitations of Precast Structure  Geotech Report PROGRAM  Questionnaires  Programming  Technical Rqmts  Blocking & Stacking  Concept Design
  • 9. Chevy Chase Community Center Project Challenges Regulations  Multiple zones  MU-3A & R-1-B (most restrictive)  FAR capacity is near max  Existing aggregate area: Library 19,630 gsf Comm Cntr 24,867 gsf Total 44,497 gsf  FAR 48,171 gsf  3,600 sf of increase allowed MU-3A (39,800 sf) R-1-B (33,590 sf)
  • 10. Chevy Chase Community Center ZONING EXISTING MU-3A R-1-B Height 32 ft (+/-) 40 ft + 15 ft penthouse 45 ft + 18 ft penthouse Stories 2 + cellar + penthouse 3 + cellar + 2 story penthouse 3 + cellar + 1 story penthouse FAR n/a 1.0 Rec: 1.8* FAR (C-1604.3) Lib: Not Prescribed Max. Bldg Area 44,497 gsf 73,390 gsf 132,100 gsf Rec Center 24,867 gsf 48,000 gsf - Library 19,630 gsf 25,000 gsf - Lot Occupancy 28.4 % 60% 40 %* max (C-1603.7) Pervious Surface Not calculated - 30% (C-1609.1) Green Area Ratio (GAR) - 0.3 - Project Challenges Regulations
  • 11. Chevy Chase Community Center Project Challenges Historic Eligibility  CCPL is recommended  CCCC is not recommended  DOEs submitted to HPO  HPO to determine eligibility
  • 12. Chevy Chase Community Center Project Challenges Program  ANC Report  DPR Stakeholder Questionnaires  Development of ‘Rec Spec’
  • 13. Chevy Chase Community Center Project Challenges Program  ANC Report Findings: Program Area Net Area Administration / Common 2,330 sf Auditorium 4,000 sf Gymnasium 7,200 sf Classrooms / Meeting Rooms 17,400 sf Support Facilities 1,720 sf Total Net Program 32,550 sf Gross Scale Factor 1.4 Total Gross Area 45,570 sf Existing Gross Area 32,734 sf (-12,800 sf)
  • 14. Chevy Chase Community Center What We’ve Heard: Community would like a structure that:  Fits within the context and scale of the neighborhood.  ‘Village’ feel for the building.  Wood and glass materials are preferred.  Keep the outdoor spaces.  ‘Town Center’ Concept Design
  • 15. Chevy Chase Community Center Concept Design Basketball Avalon Theater Parking 26 spaces 2 ADA McKinley Street NWMcKinley Street NW Northampton Street NW Playground Commons Waste
  • 16. Chevy Chase Community Center Concept Design
  • 17. Chevy Chase Community Center Concept Design
  • 18. Chevy Chase Community Center Concept Design Basketball Parking 26 spaces 2 ADA Avalon Theater McKinley Street NWMcKinley Street NW Northampton Street NW Playground Commons Waste
  • 19. Chevy Chase Community Center Concept Design
  • 20. Chevy Chase Community Center Concept Design
  • 21. Chevy Chase Community Center Concept Design Program of Community Center  Fitness center with equipment  Lecture/performance hall with about 125 seats  Meeting/games/party rooms  Half-court gymnasium  Childcare area with an indoor play area  Kitchen  Quiet lounge  Activity/tech lounge  Dance/yoga/Pilates studio  Fencing/exercise room  Pottery area  Arts and crafts space  Offices  Rooftop amenities such as a garden, greenhouse, and/or outdoor lounge.
  • 22. Chevy Chase Community Center Concept Design Community Center Blocking & Stacking Program Goals:  Single point of entry  Engage urban context  Shared spaces Form dependent on three key spaces:  Main Entry / Lobby  Gymnasium  Auditorium
  • 23. Chevy Chase Community Center Concept Design – Scheme B Scheme BScheme AExisting Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 24. Chevy Chase Community Center Concept Design Existing Community Center  32,734 gsf  2 story + cellar + penthouse  32 ft (+/-) Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 25. Chevy Chase Community Center Summary  48,000 gsf  3 story + penthouse  40 ft + 18 ft penthouse  Main entry on Commons Concept Design – Scheme A Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 26. Chevy Chase Community Center Lower Level  1.01 2-story Lobby  4.01 Gymnasium  2.01 Auditorium Concept Design – Scheme A 1.01 3.04 2.01 4.01 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 27. Chevy Chase Community Center Ground Floor  1.01 Main Entry & 2-story Lobby  3.06 Active Lounge  3.08 Senior Lounge  3.10 Game Room  3.12 Preschool Concept Design – Scheme A 3.12 1.01 3.08 3.06 3.10 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 28. Chevy Chase Community Center Second Floor  3.02 Fitness Center  3.03 Tech Room  3.04 Arts & Crafts  3.15 Performing Arts Studio  3.17 Fencing Studio  3.20 Makerspace Concept Design – Scheme A 3.04 3.02 3.17 3.15 3.20 3.03 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 29. Chevy Chase Community Center Penthouse + Rooftop  1.05 Café  1.06 Outdoor Lounge  1.07 Rooftop Garden  3.01 Meeting Room  3.18 Kitchen Concept Design – Scheme A 1.05 1.06 1.07 3.18 3.01 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 30. Chevy Chase Community Center Summary  48,000 gsf  3 story + penthouse  40 ft + 18 ft penthouse  Enter from Connecticut Ave + Commons Concept Design – Scheme B Summary  48,000 gsf  3 story + penthouse  40 ft + 18 ft penthouse  Main entry on Connecticut Ave + Commons Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 31. Chevy Chase Community Center Ground Level  1.01 2-story Lobby  2.01 Auditorium  3.01 Meeting Room  3.03 Tech Room  3.04 Arts & Crafts  3.06 Active Lounge  3.20 Makerspace Concept Design – Scheme B 3.06 1.01 2.01 3.03 3.20 3.04 3.01 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 32. Chevy Chase Community Center First Floor  1.01 2-story Lobby  3.08 Senior Lounge  3.10 Game Room  3.12 Preschool  3.15 Performing Arts Studio Concept Design – Scheme B 3.12 3.15 3.06 3.08 1.01 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 33. Chevy Chase Community Center Concept Design – Scheme B Second Level  3.02 Fitness Center  3.17 Fencing Studio  4.01 Gymnasium 4.01 3.02 3.17 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 34. Chevy Chase Community Center Penthouse + Rooftop  1.05 Café  1.06 Outdoor Lounge  1.07 Rooftop Garden  3.01 Meeting Room  3.18 Kitchen Concept Design – Scheme B 1.05 1.06 1.07 3.18 3.01 Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 35. Chevy Chase Community Center Concept Design – Scheme B Scheme BScheme AExisting Meeting Spaces Common Spaces GymAuditorium Mechanical
  • 36. Chevy Chase Community Center Next Steps uncertainty | patterns | insights clarity| focus postoccupancy programming concept design completion construction ZONING REGULATIONS  FAR Limitation  Special Exception  Map Amendment HISTORIC ELIGIBILITY  DOE Reports  HPO Determination EXISTING CONDITIONS  Lidar Scan  Limitations of Precast Structure  Geotech Report PROGRAM  Questionnaires  Programming  Technical Rqmts  Blocking & Stacking  Concept Design
  • 37. Chevy Chase Community Center 1. Community Meeting  Focus on Blocking & Stacking (2 schemes)  Community & taskforce review & feedback (2 weeks) 2. Draft Concept Submission  Focus on individual space needs  Community & taskforce review & feedback (2 weeks)  Program managers: please confirm Rec Spec 3. BELL to develop Master Plan  Concept design  Materials  Concept budget 4. Next community meeting February (Date TBD)  Present Master Plan Next Steps
  • 38. Chevy Chase Community Center The design is contingent on your feedback! Q&A Discussion
  • 39. Chevy Chase Community Center Department of General Services John Stokes, Associate Director - External Affairs john.stokes@dc.gov Department of Parks and Recreation Brent Sisco, Landscape Architect brent.sisco@dc.gov Project Website https://dgs.dc.gov/page/chevy-chase-community-center-0 Points of Contact