Learning Objectives (1 of 2)
1. Explain the challenges involved in the entrepreneur’s role
as a leader and what it takes to be a successful leader.
2. Describe the importance of hiring the right employees
and how to avoid making hiring mistakes.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Learning Objectives (2 of 2)
3. Explain how to create a company culture that encourages
employee retention.
4. Describe the steps in developing a management
succession plan for a growing business that allows a
smooth transition of leadership to the next generation.
5. Explain the exit strategies available to entrepreneurs.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Leadership
• Leadership:
– The process of influencing and inspiring others to work
to achieve a common goal and then giving them the
power and the freedom to achieve it.
• Entrepreneurs must take on many roles in their
companies, but none is more important than that of leader.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Business Leaders
• Business leaders should be:
– Innovative
– Passionate
– Willing to take risks
– Adaptable
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Effective Leaders (1 of 4)
• Effective leaders:
– Create a set of values and beliefs for employees and
passionately pursue them.
– Establish a culture of ethics.
– Define and then constantly reinforce the vision they
have for the company.
– Develop a strategic plan that gives the company a
competitive advantage.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Effective Leaders (2 of 4)
– Respect and support their employees.
– Set the example for their employees.
– Create a climate of trust in the organization.
– Build credibility with their employees.
– Are authentic.
– Focus employees’ efforts on challenging and driving
toward those goals.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Effective Leaders (3 of 4)
– Provide the resources employees need to achieve their
goals.
– Communicate with their employees.
– Value the diversity of their workers.
– Celebrate their workers’ successes.
– Are willing to take risks.
– Encourage creativity among their workers.
– Maintain a sense of humor.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Effective Leaders (4 of 4)
– Create an environment in which people have the
motivation, the training, and the freedom to achieve the
goals they have set.
– Create a work climate that encourages maximum
performance.
– Become a catalyst for change when change is needed.
– Develop leadership talent.
– Keep their eyes on the horizon.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Questions Every Leader Should Address (1 of 3)
• Do we want to build a great company, and are we
committed to doing the things that are required to make
our company great?
• Do we have the right people on the bus and in the key
seats?
• What are the brutal facts?
• What are we best at, and what do we have an unbounded
passion for?
– Company hedgehog
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Company Hedgehog
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Questions Every Leader Should Address (2 of 3)
• What is our company’s 20-Mile March, and are we hitting
it?
• Where do empirical data tell is that we should be placing
our big bets?
• What are the core values and core purpose on which we
want to build this enterprise over the next 100 years?
• What is our 15- to 25-year BHAG?
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Questions Every Leader Should Address (3 of 3)
• What could kill our company, and how can we protect our
flanks?
• What should we stop doing to increase our discipline and
focus?
• How can we increase our luck?
• Are we becoming a Level 5 leadership and cultivating a
Level 5 management culture?
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Servant Leadership
• There is no one single “best” style of leadership.
• Many workers respond well to servant leadership:
– A leader takes on the role of servant first and leader
second.
 What do people need?
 How can I help them get it?
 What does my organization need to do?
 How can I help my organization do it?
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Three Vital Tasks of a Leader
1. Hire the right employees and constantly improve their
skills.
2. Create a culture for retaining employees.
3. Plan for “passing the torch” to the next generation of
leadership.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Building an Entrepreneurial Team
• Study: 80% of employee turnover is caused by bad hiring
decisions.
• Most common causes of poor hiring decisions:
– Relying on candidate’s description of themselves.
– Failing to follow a consistent, evidence-based selection
process.
– Failing to provide candidates with sufficient information
about the job.
– Succumbing to pressure to fill a job quickly.
– Failing to check candidates’ references.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Figure 17.2 Annual Growth Rate in the U.S.
Workforce by Decade
Source: Bureau of Labor Statistics, 2012.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Reduce Employee Turnover Rates
• Provide rewarding, challenging work.
• Pay employees fairly.
• Provide training opportunities and mentoring relationships.
• Offer flexible work schedules.
• Provide simple (and inexpensive) rewards such as thank-
you notes for extra effort or “good job” notes for jobs well
done.
• Conduct exit interviews when employees leave to
determine areas that require improvement.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Hire Winners (1 of 2)
• Commit to hire the best talent.
• Elevate recruiting to a strategic position.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Strategic Recruiting (1 of 2)
• Look inside the company first.
• Look for employees with whom your customers can
identify.
• Make employment advertisements stand out.
• Use multiple channels to recruit talent.
• Encourage employee referrals.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Strategic Recruiting (2 of 2)
• Recruit on campus.
• Forge relationships with schools and other sources of
workers.
• Recruit “retired” workers.
• Consider using offbeat recruiting techniques.
• Offer what workers want.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Table 17.3 Affordable Alternative Benefits
Although small companies typically cannot match their larger rivals on the employee benefits packages
they offer, with some creativity, entrepreneurs can provide less expensive options that increase
employee retention, motivation, and morale.
Perhaps You Cannot Offer . . . But You Might . . .
Tuition reimbursement for
college classes
Implement a flex-time schedule that allows employees to attend
classes at a nearby college or university
Paid leave Use job sharing so that two part-time employees share one full-time job
Comprehensive health
insurance
Hold a wellness day in which a local health care provider performs
basic health screens for employees
An onsite fitness center Set up a basketball goal in a corner of the parking lot or a ping-pong
table in the office or negotiate a reduced fee for employees at the local
YMCA
401(k) retirement plan with
employer match
Invite a local investment adviser to provide financial counseling and
retirement advice to employees
Counseling services Allow employees to bring their dogs to work; research shows that
allowing pets in the workplace reduces stress and increases job
satisfaction
Childcare subsidies Negotiate discounts at a local preschool for employees’ children or
allow employees to telecommute from home several days a week
Sources: Based on Paula Andruss, “Affordable Alternatives,” Entrepreneur, May 2012, p. 57; “Pets at Work Keep Workers
Happy,” U.S. News and World Report, April 2, 2012, http://health.usnews.com/health-news/news/articles/2012/04/02/pets-
at-work-keep-workers-happy.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Hire Winners (2 of 2)
• Commit to hire the best talent.
• Elevate recruiting to a strategic position.
• Create practical job descriptions and job specifications.
– Job analysis
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Conducting a Job Analysis (1 of 2)
Step 1:
• Create a job description:
– A written statement of the duties, responsibilities,
reporting relationships, working conditions, and
materials and equipment used in a job.
 Handy tool: Dictionary of Occupational Titles
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Sample Job Description
Worm Picker – gathers worms to be used as fish bait; walks
about grassy areas, such as gardens, parks, and golf
courses and picks up earthworms (commonly called dew
worms and nightcrawlers). Sprinkles chlorinated water on
lawn to cause worms to come to the surface and locates
worms by use of lantern or flashlight. Counts worms, sorts
them, and packs them into containers for shipment.
(# 413.687-014 in D.O.T)
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Conducting a Job Analysis (2 of 2)
• Step 2:
– Create a job specification:
 Written statement of the qualifications and
characteristics needed for a job, stated in terms
such as education, skills, and experience.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Table 17.5 Linking Tasks from a Job Description to
the Traits Necessary to Perform a Job Successfully
Job Task Trait or Characteristic
Generate and close new sales “Outgoing”; persuasive; friendly
Make 15 “cold calls” per week “Self-starter”; determined; optimistic;
independent; confident
Analyze customers’ needs and
recommend proper equipment
Good listener; patient; empathetic
Counsel customers about options and
features needed
Organized; polished speaker; “other
oriented”
Prepare and explain financing
methods
Honest; “numbers oriented”;
comfortable with computers and
spreadsheets
Retain existing customers Customer oriented; relationship builder
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Hire Winners (1 of 3)
• Commit to hire the best talent.
• Elevate recruiting to a strategic position.
• Create practical job descriptions and job specifications.
• Plan an effective interview.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Planning an Effective Interview (1 of 2)
• Involve others in the interview process.
• Develop a series of core questions and ask them of every
job candidate.
• Ask open-ended questions rather than questions calling for
“yes or no” answers.
• Create hypothetical situations candidates would encounter
on the job and ask how they would handle them.
– Situational interviews
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Planning an Effective Interview (2 of 2)
• Probe for specific examples in the candidate’s work history
that demonstrate the necessary traits and characteristics.
• Ask candidates to describe a recent success and a recent
failure and how they dealt with them.
• Arrange a “non-interview” setting that allows others to
observe the candidate in an informal setting.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Sample Interview Questions
Table 17.6 Interview Questions for Candidates for a Sales
Representative Position
Trait or Characteristic Question
Outgoing; persuasive; friendly; self-
starter; determined; optimistic;
independent; confident
How do you persuade reluctant prospects to buy?
Good listener; patient; empathetic;
organized; polished speaker; “other”
oriented
What would you say to a fellow salesperson who was getting
more than his share of rejections and was having difficulty
getting appointments?
Honest; customer oriented; relationship
builder
How do you feel when someone questions the truth of what
you say? What do you do in such situations?
Other questions: If you owned a company, why would you hire yourself?
If you were head of your department, what would you do
differently?
How do you recognize the contributions of others in your
department?
If you weren’t in sales, what other job would you be in?
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Hire Winners (2 of 3)
• Commit to hire the best talent.
• Elevate recruiting to a strategic position.
• Create practical job descriptions and job specifications.
• Plan an effective interview.
• Conduct the interview.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Conducting an Effective Interview
• Break the ice.
– Goal: diffuse nervous tension.
• Ask questions.
– Puzzle interviews.
– Remember the 25/75 Rule.
– Be respectful and keep it legal!
• Sell the candidate on the company.
– The best candidate will have other job offers.
– Convince the best candidate that your company is a
great place to work.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
How to Hire Winners (3 of 3)
• Commit to hire the best talent.
• Elevate recruiting to a strategic position.
• Create practical job descriptions and job specifications.
• Plan an effective interview.
• Conduct the interview.
• Contact references and conduct a background check.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Checking References
• Checking an applicant’s references is an important part of
protecting a company against making a “bad hire.”
• Is it really necessary? Yes!
– According to a recent survey, 77% of hiring
professionals have detected false information or
exaggerations on candidates’ résumés
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Figure 17.3 Why Hiring Managers Reject Job
Candidates after Checking their Social Media
Profiles
Source: Based on “Number of Employers Using Social Media to Screen Candidates Has Increased 500
Percent over Last Decade,” Career-Builder, April 28, 2016,
www.careerbuilder.com/share/aboutus/pressreleasesdetail.aspx?ed=12/31/2016&id=pr945&sd=4/28/2016
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Company Culture
• Culture:
– Distinctive, unwritten, informal code of conduct that
governs the behavior, attitudes, relationships, and style
of an organization.
– “The way we do things around here.”
• In small companies, culture plays a important part in
gaining a competitive edge a strategy does.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Characteristics of a Positive Culture (1 of 3)
• Hiring for cultural fit
• Respect for work and life balance
• Sense of purpose
• Sense of fun
• Engagement
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Figure 17.5 Drivers of Employee Engagement,
Engagement Outcomes, and Business Outcomes
Source: 2017 Trends in Global Employee Engagement, Aon Hewitt, 2017, p. 2.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Characteristics of a Positive Culture (2 of 3)
• Respect for work and life balance
• Sense of purpose
• Sense of fun
• Engagement
• Diversity
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Figure 17.6 Composition of the U.S. Workforce
Sources: Based on Crosby Burns, Kimberly Barton, and Sophia Kerby, “The State of Diversity in Today’s Workforce,”
Center for American Progress, July 12, 2012, p. 4; Steve H. Murdock, “Population Change in the United States:
Implications for Education, the Labor Force, and Economic Development,” Hobby Center for the Study of Texas at Rice
University, November 10, 2011, p. 59.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Characteristics of a Positive Culture (3 of 3)
• Respect for work and life balance
• Sense of purpose
• Sense of fun
• Engagement
• Diversity
• Integrity
• Participative management
• Learning environment
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Job Design Strategies (1 of 4)
• Job simplification:
– Breaks work down into its simplest form and
standardizes each task.
• Job enlargement (horizontal job loading):
– Adds more tasks to a job to broaden its scope.
• Job rotation:
– Cross-trains workers so they can move from one job in
a company to others, giving them a greater number
and variety of tasks to perform. Often used with a skill-
based pay system.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Job Design Strategies (2 of 4)
• Job enrichment (vertical job loading):
– Builds motivators into a job by increasing the planning,
decision making, organizing and controlling functions
(traditional managerial tasks).
– Five core characteristics:
 Skill variety
 Task identity
 Task significance
 Autonomy
 Feedback
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Job Design Strategies (3 of 4)
• Flextime:
– An arrangement under which employees build their
work schedules around a set of “core hours” – such as
11 a.m. to 2 p.m. – but have flexibility about when they
start and stop work.
• Job sharing:
– A work arrangement in which two or more people share
a single full-time job.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Job Design Strategies (4 of 4)
• Flex place:
– A work arrangement in which employees work at a
place other than the traditional office, such as a
satellite branch closer to their homes or, in some
cases, at home.
• Telecommuting:
– An arrangement in which employees have employees
working from their homes use modern communications
equipment to hook up to their workplaces.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Rewards and Compensation
• The key to using rewards to motivate workers is tailoring
them to the needs and characteristics of individual
workers.
• Money is an effective motivator …up to a point.
– Pay-for-performance systems
– Profit-sharing plans
– Open book management
– Cafeteria benefit plan
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Intangible Rewards
• Intangible rewards can be powerful, yet inexpensive,
motivators.
– Praise
– Recognition
– Celebrations
• Entrepreneurs tend to rely on non-monetary rewards.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Family Businesses
• Family businesses:
– Account for 90% of all U.S. businesses.
– Account for 70–90% of global GDP.
– Employ 62% of private sector work force.
– Comprise 35% of the Fortune 500 companies.
– Created 78% of the U.S. economy’s net new jobs over
the last two decades.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Passing the Torch
• Unfortunately, only 30% of first-generation businesses
survive into the second generation.
• Of those that do survive to the second generation, only
12% make it to the third generation.
• Only 3% make it to the fourth generation and beyond.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Why is Management Succession so
Difficult?
• Primary causes of lack of continuity among family
businesses:
– Inadequate estate planning.
– Failure to create a management succession plan.
– Lack of funds to pay estate taxes.
– Sibling rivalries and personality conflicts.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Figure 17.7 Eight Characteristics of Successful
Family Businesses
Source: Worldwide Inheritance and Estate Tax Guide, EY, 2016. p. v.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Developing a Management Succession Plan
Step 1: Select the successor.
Step 2: Create a survival kit for the successor.
Step 3: Groom the successor.
Step 4: Promote an environment of trust and respect.
Step 5: Cope with the financial realities of estate and gift
taxes.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Table 17.9 Changes in the Estate and Gift Taxes
Year Estate Tax Exemption Gift Tax Exemption Maximum Tax Rate
2001 $675,000 $675,000 55%
2002 $1 million $1 million 50%
2003 $1 million $1 million 49%
2004 $1.5 million $1 million 48%
2005 $1.5 million $1 million 47%
2006 $2 million $1 million 46%
2007 $2 million $1 million 45%
2008 $2 million $1 million 45%
2009 $3.5 million $1 million 45%
2010 Tax repealed $1 million 35% (gifts only)
2011 $5 million $1 million 55%
2012 $5.12 million $5.12 million 35%
2013 $5.25 million $5.25 million 40%
2014 $5.34 million $5.34 million 40%
2015 $5.43 million $5.43 million 40%
2016 $5.45 million $5.45 million 40%
2017 $5.49 million $5.49 million 40%
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Coping with Estate Taxes
• Buy/Sell agreement
• Lifetime gifting
• Setting up a trust
– Revocable trust
– Irrevocable trust
– Irrevocable life insurance trust
– Irrevocable asset trust
– Grantor Retained Annuity Trust (GRAT)
• Estate freeze
• Family Limited Partnership (FLP)
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Exit Strategies
• Entrepreneurs planning to retire often use two exit
strategies:
– Sell to outsiders
– Sell to insiders
 Leveraged buyout (LBO)
 Employee Stock Ownership Plan (ESOP)
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Conclusion
• Leadership is the process of influencing and inspiring
others.
• Leadership shapes company culture.
• A succession plan is a crucial element in transferring
leadership.
• An exit plan allows entrepreneurs to step down and benefit
most from the sale of the company.
Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved.
Copyright

Chapter ppt_17.pptx

  • 1.
    Section 4: Putting theBusiness Plan to Work Copyright © 2019, 2016, 2014 Pearson Education, Inc. All Rights Reserved
  • 2.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Essentials of Entrepreneurship and Small Business Management Ninth Edition Chapter 17 Building a New Venture Team and Planning for the Next Generation
  • 3.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Learning Objectives (1 of 2) 1. Explain the challenges involved in the entrepreneur’s role as a leader and what it takes to be a successful leader. 2. Describe the importance of hiring the right employees and how to avoid making hiring mistakes.
  • 4.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Learning Objectives (2 of 2) 3. Explain how to create a company culture that encourages employee retention. 4. Describe the steps in developing a management succession plan for a growing business that allows a smooth transition of leadership to the next generation. 5. Explain the exit strategies available to entrepreneurs.
  • 5.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Leadership • Leadership: – The process of influencing and inspiring others to work to achieve a common goal and then giving them the power and the freedom to achieve it. • Entrepreneurs must take on many roles in their companies, but none is more important than that of leader.
  • 6.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Business Leaders • Business leaders should be: – Innovative – Passionate – Willing to take risks – Adaptable
  • 7.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Effective Leaders (1 of 4) • Effective leaders: – Create a set of values and beliefs for employees and passionately pursue them. – Establish a culture of ethics. – Define and then constantly reinforce the vision they have for the company. – Develop a strategic plan that gives the company a competitive advantage.
  • 8.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Effective Leaders (2 of 4) – Respect and support their employees. – Set the example for their employees. – Create a climate of trust in the organization. – Build credibility with their employees. – Are authentic. – Focus employees’ efforts on challenging and driving toward those goals.
  • 9.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Effective Leaders (3 of 4) – Provide the resources employees need to achieve their goals. – Communicate with their employees. – Value the diversity of their workers. – Celebrate their workers’ successes. – Are willing to take risks. – Encourage creativity among their workers. – Maintain a sense of humor.
  • 10.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Effective Leaders (4 of 4) – Create an environment in which people have the motivation, the training, and the freedom to achieve the goals they have set. – Create a work climate that encourages maximum performance. – Become a catalyst for change when change is needed. – Develop leadership talent. – Keep their eyes on the horizon.
  • 11.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Questions Every Leader Should Address (1 of 3) • Do we want to build a great company, and are we committed to doing the things that are required to make our company great? • Do we have the right people on the bus and in the key seats? • What are the brutal facts? • What are we best at, and what do we have an unbounded passion for? – Company hedgehog
  • 12.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Company Hedgehog
  • 13.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Questions Every Leader Should Address (2 of 3) • What is our company’s 20-Mile March, and are we hitting it? • Where do empirical data tell is that we should be placing our big bets? • What are the core values and core purpose on which we want to build this enterprise over the next 100 years? • What is our 15- to 25-year BHAG?
  • 14.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Questions Every Leader Should Address (3 of 3) • What could kill our company, and how can we protect our flanks? • What should we stop doing to increase our discipline and focus? • How can we increase our luck? • Are we becoming a Level 5 leadership and cultivating a Level 5 management culture?
  • 15.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Servant Leadership • There is no one single “best” style of leadership. • Many workers respond well to servant leadership: – A leader takes on the role of servant first and leader second.  What do people need?  How can I help them get it?  What does my organization need to do?  How can I help my organization do it?
  • 16.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Three Vital Tasks of a Leader 1. Hire the right employees and constantly improve their skills. 2. Create a culture for retaining employees. 3. Plan for “passing the torch” to the next generation of leadership.
  • 17.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Building an Entrepreneurial Team • Study: 80% of employee turnover is caused by bad hiring decisions. • Most common causes of poor hiring decisions: – Relying on candidate’s description of themselves. – Failing to follow a consistent, evidence-based selection process. – Failing to provide candidates with sufficient information about the job. – Succumbing to pressure to fill a job quickly. – Failing to check candidates’ references.
  • 18.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Figure 17.2 Annual Growth Rate in the U.S. Workforce by Decade Source: Bureau of Labor Statistics, 2012.
  • 19.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Reduce Employee Turnover Rates • Provide rewarding, challenging work. • Pay employees fairly. • Provide training opportunities and mentoring relationships. • Offer flexible work schedules. • Provide simple (and inexpensive) rewards such as thank- you notes for extra effort or “good job” notes for jobs well done. • Conduct exit interviews when employees leave to determine areas that require improvement.
  • 20.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Hire Winners (1 of 2) • Commit to hire the best talent. • Elevate recruiting to a strategic position.
  • 21.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Strategic Recruiting (1 of 2) • Look inside the company first. • Look for employees with whom your customers can identify. • Make employment advertisements stand out. • Use multiple channels to recruit talent. • Encourage employee referrals.
  • 22.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Strategic Recruiting (2 of 2) • Recruit on campus. • Forge relationships with schools and other sources of workers. • Recruit “retired” workers. • Consider using offbeat recruiting techniques. • Offer what workers want.
  • 23.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Table 17.3 Affordable Alternative Benefits Although small companies typically cannot match their larger rivals on the employee benefits packages they offer, with some creativity, entrepreneurs can provide less expensive options that increase employee retention, motivation, and morale. Perhaps You Cannot Offer . . . But You Might . . . Tuition reimbursement for college classes Implement a flex-time schedule that allows employees to attend classes at a nearby college or university Paid leave Use job sharing so that two part-time employees share one full-time job Comprehensive health insurance Hold a wellness day in which a local health care provider performs basic health screens for employees An onsite fitness center Set up a basketball goal in a corner of the parking lot or a ping-pong table in the office or negotiate a reduced fee for employees at the local YMCA 401(k) retirement plan with employer match Invite a local investment adviser to provide financial counseling and retirement advice to employees Counseling services Allow employees to bring their dogs to work; research shows that allowing pets in the workplace reduces stress and increases job satisfaction Childcare subsidies Negotiate discounts at a local preschool for employees’ children or allow employees to telecommute from home several days a week Sources: Based on Paula Andruss, “Affordable Alternatives,” Entrepreneur, May 2012, p. 57; “Pets at Work Keep Workers Happy,” U.S. News and World Report, April 2, 2012, http://health.usnews.com/health-news/news/articles/2012/04/02/pets- at-work-keep-workers-happy.
  • 24.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Hire Winners (2 of 2) • Commit to hire the best talent. • Elevate recruiting to a strategic position. • Create practical job descriptions and job specifications. – Job analysis
  • 25.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Conducting a Job Analysis (1 of 2) Step 1: • Create a job description: – A written statement of the duties, responsibilities, reporting relationships, working conditions, and materials and equipment used in a job.  Handy tool: Dictionary of Occupational Titles
  • 26.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Sample Job Description Worm Picker – gathers worms to be used as fish bait; walks about grassy areas, such as gardens, parks, and golf courses and picks up earthworms (commonly called dew worms and nightcrawlers). Sprinkles chlorinated water on lawn to cause worms to come to the surface and locates worms by use of lantern or flashlight. Counts worms, sorts them, and packs them into containers for shipment. (# 413.687-014 in D.O.T)
  • 27.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Conducting a Job Analysis (2 of 2) • Step 2: – Create a job specification:  Written statement of the qualifications and characteristics needed for a job, stated in terms such as education, skills, and experience.
  • 28.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Table 17.5 Linking Tasks from a Job Description to the Traits Necessary to Perform a Job Successfully Job Task Trait or Characteristic Generate and close new sales “Outgoing”; persuasive; friendly Make 15 “cold calls” per week “Self-starter”; determined; optimistic; independent; confident Analyze customers’ needs and recommend proper equipment Good listener; patient; empathetic Counsel customers about options and features needed Organized; polished speaker; “other oriented” Prepare and explain financing methods Honest; “numbers oriented”; comfortable with computers and spreadsheets Retain existing customers Customer oriented; relationship builder
  • 29.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Hire Winners (1 of 3) • Commit to hire the best talent. • Elevate recruiting to a strategic position. • Create practical job descriptions and job specifications. • Plan an effective interview.
  • 30.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Planning an Effective Interview (1 of 2) • Involve others in the interview process. • Develop a series of core questions and ask them of every job candidate. • Ask open-ended questions rather than questions calling for “yes or no” answers. • Create hypothetical situations candidates would encounter on the job and ask how they would handle them. – Situational interviews
  • 31.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Planning an Effective Interview (2 of 2) • Probe for specific examples in the candidate’s work history that demonstrate the necessary traits and characteristics. • Ask candidates to describe a recent success and a recent failure and how they dealt with them. • Arrange a “non-interview” setting that allows others to observe the candidate in an informal setting.
  • 32.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Sample Interview Questions Table 17.6 Interview Questions for Candidates for a Sales Representative Position Trait or Characteristic Question Outgoing; persuasive; friendly; self- starter; determined; optimistic; independent; confident How do you persuade reluctant prospects to buy? Good listener; patient; empathetic; organized; polished speaker; “other” oriented What would you say to a fellow salesperson who was getting more than his share of rejections and was having difficulty getting appointments? Honest; customer oriented; relationship builder How do you feel when someone questions the truth of what you say? What do you do in such situations? Other questions: If you owned a company, why would you hire yourself? If you were head of your department, what would you do differently? How do you recognize the contributions of others in your department? If you weren’t in sales, what other job would you be in?
  • 33.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Hire Winners (2 of 3) • Commit to hire the best talent. • Elevate recruiting to a strategic position. • Create practical job descriptions and job specifications. • Plan an effective interview. • Conduct the interview.
  • 34.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Conducting an Effective Interview • Break the ice. – Goal: diffuse nervous tension. • Ask questions. – Puzzle interviews. – Remember the 25/75 Rule. – Be respectful and keep it legal! • Sell the candidate on the company. – The best candidate will have other job offers. – Convince the best candidate that your company is a great place to work.
  • 35.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. How to Hire Winners (3 of 3) • Commit to hire the best talent. • Elevate recruiting to a strategic position. • Create practical job descriptions and job specifications. • Plan an effective interview. • Conduct the interview. • Contact references and conduct a background check.
  • 36.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Checking References • Checking an applicant’s references is an important part of protecting a company against making a “bad hire.” • Is it really necessary? Yes! – According to a recent survey, 77% of hiring professionals have detected false information or exaggerations on candidates’ résumés
  • 37.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Figure 17.3 Why Hiring Managers Reject Job Candidates after Checking their Social Media Profiles Source: Based on “Number of Employers Using Social Media to Screen Candidates Has Increased 500 Percent over Last Decade,” Career-Builder, April 28, 2016, www.careerbuilder.com/share/aboutus/pressreleasesdetail.aspx?ed=12/31/2016&id=pr945&sd=4/28/2016
  • 38.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Company Culture • Culture: – Distinctive, unwritten, informal code of conduct that governs the behavior, attitudes, relationships, and style of an organization. – “The way we do things around here.” • In small companies, culture plays a important part in gaining a competitive edge a strategy does.
  • 39.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Characteristics of a Positive Culture (1 of 3) • Hiring for cultural fit • Respect for work and life balance • Sense of purpose • Sense of fun • Engagement
  • 40.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Figure 17.5 Drivers of Employee Engagement, Engagement Outcomes, and Business Outcomes Source: 2017 Trends in Global Employee Engagement, Aon Hewitt, 2017, p. 2.
  • 41.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Characteristics of a Positive Culture (2 of 3) • Respect for work and life balance • Sense of purpose • Sense of fun • Engagement • Diversity
  • 42.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Figure 17.6 Composition of the U.S. Workforce Sources: Based on Crosby Burns, Kimberly Barton, and Sophia Kerby, “The State of Diversity in Today’s Workforce,” Center for American Progress, July 12, 2012, p. 4; Steve H. Murdock, “Population Change in the United States: Implications for Education, the Labor Force, and Economic Development,” Hobby Center for the Study of Texas at Rice University, November 10, 2011, p. 59.
  • 43.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Characteristics of a Positive Culture (3 of 3) • Respect for work and life balance • Sense of purpose • Sense of fun • Engagement • Diversity • Integrity • Participative management • Learning environment
  • 44.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Job Design Strategies (1 of 4) • Job simplification: – Breaks work down into its simplest form and standardizes each task. • Job enlargement (horizontal job loading): – Adds more tasks to a job to broaden its scope. • Job rotation: – Cross-trains workers so they can move from one job in a company to others, giving them a greater number and variety of tasks to perform. Often used with a skill- based pay system.
  • 45.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Job Design Strategies (2 of 4) • Job enrichment (vertical job loading): – Builds motivators into a job by increasing the planning, decision making, organizing and controlling functions (traditional managerial tasks). – Five core characteristics:  Skill variety  Task identity  Task significance  Autonomy  Feedback
  • 46.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Job Design Strategies (3 of 4) • Flextime: – An arrangement under which employees build their work schedules around a set of “core hours” – such as 11 a.m. to 2 p.m. – but have flexibility about when they start and stop work. • Job sharing: – A work arrangement in which two or more people share a single full-time job.
  • 47.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Job Design Strategies (4 of 4) • Flex place: – A work arrangement in which employees work at a place other than the traditional office, such as a satellite branch closer to their homes or, in some cases, at home. • Telecommuting: – An arrangement in which employees have employees working from their homes use modern communications equipment to hook up to their workplaces.
  • 48.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Rewards and Compensation • The key to using rewards to motivate workers is tailoring them to the needs and characteristics of individual workers. • Money is an effective motivator …up to a point. – Pay-for-performance systems – Profit-sharing plans – Open book management – Cafeteria benefit plan
  • 49.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Intangible Rewards • Intangible rewards can be powerful, yet inexpensive, motivators. – Praise – Recognition – Celebrations • Entrepreneurs tend to rely on non-monetary rewards.
  • 50.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Family Businesses • Family businesses: – Account for 90% of all U.S. businesses. – Account for 70–90% of global GDP. – Employ 62% of private sector work force. – Comprise 35% of the Fortune 500 companies. – Created 78% of the U.S. economy’s net new jobs over the last two decades.
  • 51.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Passing the Torch • Unfortunately, only 30% of first-generation businesses survive into the second generation. • Of those that do survive to the second generation, only 12% make it to the third generation. • Only 3% make it to the fourth generation and beyond.
  • 52.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Why is Management Succession so Difficult? • Primary causes of lack of continuity among family businesses: – Inadequate estate planning. – Failure to create a management succession plan. – Lack of funds to pay estate taxes. – Sibling rivalries and personality conflicts.
  • 53.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Figure 17.7 Eight Characteristics of Successful Family Businesses Source: Worldwide Inheritance and Estate Tax Guide, EY, 2016. p. v.
  • 54.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Developing a Management Succession Plan Step 1: Select the successor. Step 2: Create a survival kit for the successor. Step 3: Groom the successor. Step 4: Promote an environment of trust and respect. Step 5: Cope with the financial realities of estate and gift taxes.
  • 55.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Table 17.9 Changes in the Estate and Gift Taxes Year Estate Tax Exemption Gift Tax Exemption Maximum Tax Rate 2001 $675,000 $675,000 55% 2002 $1 million $1 million 50% 2003 $1 million $1 million 49% 2004 $1.5 million $1 million 48% 2005 $1.5 million $1 million 47% 2006 $2 million $1 million 46% 2007 $2 million $1 million 45% 2008 $2 million $1 million 45% 2009 $3.5 million $1 million 45% 2010 Tax repealed $1 million 35% (gifts only) 2011 $5 million $1 million 55% 2012 $5.12 million $5.12 million 35% 2013 $5.25 million $5.25 million 40% 2014 $5.34 million $5.34 million 40% 2015 $5.43 million $5.43 million 40% 2016 $5.45 million $5.45 million 40% 2017 $5.49 million $5.49 million 40%
  • 56.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Coping with Estate Taxes • Buy/Sell agreement • Lifetime gifting • Setting up a trust – Revocable trust – Irrevocable trust – Irrevocable life insurance trust – Irrevocable asset trust – Grantor Retained Annuity Trust (GRAT) • Estate freeze • Family Limited Partnership (FLP)
  • 57.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Exit Strategies • Entrepreneurs planning to retire often use two exit strategies: – Sell to outsiders – Sell to insiders  Leveraged buyout (LBO)  Employee Stock Ownership Plan (ESOP)
  • 58.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Conclusion • Leadership is the process of influencing and inspiring others. • Leadership shapes company culture. • A succession plan is a crucial element in transferring leadership. • An exit plan allows entrepreneurs to step down and benefit most from the sale of the company.
  • 59.
    Copyright © 2019,2016, 2014 Pearson Education, Inc. All Rights Reserved. Copyright

Editor's Notes

  • #2 If this PowerPoint presentation contains mathematical equations, you may need to check that your computer has the following installed: 1) MathType Plugin 2) Math Player (free versions available) 3) NVDA Reader (free versions available)
  • #4 In this chapter, you will: 1. Explain the challenges involved in the entrepreneur’s role as a leader and what it takes to be a successful leader. 2. Describe the importance of hiring the right employees and how to avoid making hiring mistakes.
  • #5 In addition, you will: 3. Explain how to create a company culture that encourages employee retention. 4. Describe the steps in developing a management succession plan for a growing business that allows a smooth transition of leadership to the next generation. 5. Explain the exit strategies available to entrepreneurs.
  • #6 To be successful, an entrepreneur must assume a wide range of roles, tasks, and responsibilities, but none is more important than the role of leader. Some entrepreneurs are uncomfortable assuming this role, but they must learn to be effective leaders if their companies are to grow and reach their potential.
  • #7 Today’s successful entrepreneur is like the leader of a jazz band, which is known for its improvisation, innovation, creativity, and freewheeling style.
  • #8  Leadership is especially important for companies in the growth phase, when entrepreneurs are hiring employees (often for the first time) and must keep the company and everyone in it focused on its mission as growth tests every seam in the organizational structure.
  • #12 Here are 12 questions leaders should address if they want their companies to excel.
  • #16  Servant leaders are servants first and leaders second, putting their employees and their employees’ needs ahead of their own. They are concerned more about empowering others in the organization than about enhancing their own power bases.
  • #17 An entrepreneurial leader must perform many important tasks, including these.
  • #18 Hiring mistakes are incredibly expensive, and no company, especially small ones, can afford too many of them. The higher the position is in an organization and the longer the tenure of the person who holds that position, the higher the cost associated with replacing a bad hire.
  • #19 As crucial as finding good employees is to a small company’s future, it is no easy task because entrepreneurs face a labor shortage, particularly among knowledge-based workers.
  • #20 Companies can try these strategies to help reduce employee turnover rates.
  • #21 The following guidelines can help entrepreneurs become employers of choice and to hire winners as they build their team of employees.
  • #22 Attracting a pool of qualified job candidates requires not only constant attention but also creativity, especially among smaller companies that often find it difficult to match the more generous offers large companies make. With a sound recruiting strategy and a willingness to look in new places, however, smaller companies can hire and retain high-caliber employees.
  • #24 This table provides examples of affordable alternative benefits that small businesses can offer employees.
  • #26 Business owners must recognize that what they do before they interview candidates for a position determines to a great extent how successful they will be at hiring winners. The first step is to perform a job analysis, the process by which a firm determines the duties and nature of the jobs to be filled and the skills and experience required of the people who are to fill them.
  • #27 This table provides an example of the description drawn from the Dictionary of Occupational Titles for an unusual job, a worm picker.
  • #28 A job specification shows the small business manager the kind of person to recruit and establishes the standards an applicant must meet to be hired. In essence, it is a written “success profile” of the ideal employee.
  • #29 This table provides an example that links the tasks for a sales representative’s job (drawn from the job description) to the traits or characteristics an entrepreneur identified as necessary to succeed in that job. These traits become the foundation for writing the job specification.
  • #31 Once an entrepreneur knows what to look for in a job candidate, he or she can develop a plan for conducting an informative job interview. Research shows that planned interviews produce much more reliable hiring results than unstructured interviews, in which interviewers “freewheel” the questions they ask candidates.
  • #33 This table shows an example of some interview questions one business owner uses to uncover the traits and characteristics he seeks in a top-performing sales representative.
  • #35 An effective interview contains three phases: breaking the ice, asking questions, and selling the candidate on the company.
  • #37 Entrepreneurs should take the time to conduct background checks and contact candidates’ references. Conducting background checks costs a little money but can save companies many thousands of dollars by identifying red flags in candidates’ backgrounds and helping avoid expensive hiring mistakes.
  • #38 Checking potential employees’ social networking pages on Facebook, Twitter, and LinkedIn also can provide a revealing look at their character.
  • #39  The companies that rank consistently in the “great places to work” lists have unique cultures that support and amplify their competitive strategies.
  • #40 Modern organizational culture relies on several principles that are fundamental to creating a productive, fun workplace that enables employees and the company to excel.
  • #41 This figure shows the factors that drive employee engagement and the positive business outcomes that high levels of employee engagement produce.
  • #43 Companies with appealing cultures not only accept cultural diversity in their workforces but embrace it, actively seeking out workers with different backgrounds. Today, businesses must recognize that a workforce that has a rich mix of cultural diversity gives the company more talent, skills, and abilities from which to draw.
  • #45 Over the years, managers have learned that the job itself and the way it is designed is an important factor in a company’s ability to attract and retain quality workers.
  • #49 Entrepreneurs must base rewards and compensation on what is really important to their employees.
  • #50  For many workers, the most meaningful motivational factors are the simplest ones – recognition, praise, feedback, job security, promotions, and so on – things that any small business, no matter how limited its budget, can provide.
  • #51 More than 80% of all companies in the world are family owned, and their contributions to the global economy are significant.
  • #52 The stumbling block for most family businesses is management succession. Family businesses are most vulnerable when they are ready to make the transition from one generation of leaders to the next.
  • #53  The best way to avoid deadly turf battles and conflicts is to develop a succession plan for the company. Numerous studies have found a positive relationship between the existence of a management succession plan and the longevity of family businesses.
  • #54 This figure shows the eight characteristics that successful family businesses exhibit, including planning for the next generation, managing taxes, sustaining a supportive culture, and creating a mechanism for family governance.
  • #55 Creating a succession plan involves these steps.
  • #56  Currently, without proper estate planning, an entrepreneur’s family members incur a painful tax bite that can be as high as 40% (or more, if the state also imposes an estate tax) when they inherit the business.
  • #57 One of the most popular estate planning techniques is the buy–sell agreement. A buy–sell agreement is a contract that co-owners often rely on to ensure the continuity of a business. The owner of a successful business may transfer money to his or her children (or other recipients) from the estate throughout his or her life. A trust is a contract between a grantor (the company founder) and a trustee (generally a bank officer or an attorney) in which the grantor gives to the trustee legal title to assets (e.g., stock in the company) that the trustee agrees to hold for the beneficiaries (the founder’s children). An estate freeze minimizes estate taxes by having family members create two classes of stock for the business: (1) preferred voting stock for the parents and (2) nonvoting common stock for the children. Creating a family limited partnership (FLP) allows business-owning parents to transfer their company to their children and lower their estate taxes while still retaining control over it for themselves.
  • #58 Most family business founders want their companies to stay within their families, but in some cases, maintaining family control is not practical.