SlideShare a Scribd company logo
1 of 2
Download to read offline
For more information 
call 1300 CEMENT (1300 236 368) 
or visit www.cementaustralia.com.au 
Cement Australia Rapid Set Concrete is 
manufactured using cement, sand and 
selected aggregates and additives and is 
formulated to harden rapidly without mixing. 
Part of the ‘Just Add Water’ range, Rapid 
Set Concrete product is suitable for fixing 
fence and pergola posts, clothes lines and 
letterboxes. 
APPLICATIONS 
Rapid Set Concrete is designed for use in 
fixing fence and pergola posts and is ideal 
for permanently securing clothes lines 
and letter boxes and numerous other uses 
around the home and garden, as well as 
various similar commercial applications. 
AVAILABILITY 
Product available in 20kg bags. 
FEATURES AND BENEFITS 
• Rapid Set Concrete will harden in 15 minutes when used as directed, 
within desired temperature range 
• It requires no mixing on site and is ready to use with the addition of 
clean water 
• Reduces required job time 
• Good for small jobs 
• Convenient & easy to use 
• Helps when job site accessibility is an issue 
• Eliminates use of wheel barrows & mixing tools 
DIRECTIONS FOR USE 
1. Pre-soak the hole with clean water to limit the absorption of the 
water. 
2. Sandy and/or fast draining soils may require a plastic lining to 
prevent seepage of the water into the ground. 
3. Place the post or pole in the hole and provide support so that it does 
not fall over. 
4. Accurately measure out 2.5 litres of water and pour into the hole. 
5. Pour in half the bag of Rapid Set Concrete making sure it is evenly 
distributed around the post or pole without delay. 
6. Tamp the product using a rod or stick then add the remaining half 
bag of product and tamp again. 
7. Only if needed add additional water to achieve a workable mix. 
Too much water ruins good concrete. 
8. Immediately repeat the process with 2.5 litres more water and 
another bag of product for larger holes. 
9. Supports may be removed after 1 hour, depending on the ambient 
temperature. It is advisable to test the stability of the post before 
removing the supports. 
PDS RSC Revision 3.0 Issued 17/02/12
Cement Australia Pty Ltd 
ABN 75 104 053 474 
12 Station Avenue Darra QLD 4076 
1300 CEMENT (1300 236 368) 
www.cementaustralia.com.au 
LIMITATIONS 
• Rapid Set Concrete is not designed for 
use in any structural application. 
• Extreme temperatures will impact 
set time of Rapid Set Concrete. Not 
recommended for use below 10 degrees 
Centigrade. 
• Do not add additional cement, sand, 
other aggregates or admixtures to the 
mix. 
• The use of concrete mixers or tools to 
mix the material should be avoided as 
this product hardens quickly. 
• Rapid Set Concrete is not recommended 
for use with Aluminium posts or poles 
unless these are primed or sealed 
according to the post manufacturers’ 
recommendation. 
• When Rapid Set Concrete is used in 
playground applications, it is only 
recommended for use below ground 
level and when covered with a ‘soft fall’ 
material. 
RECOMMENDED WATER 
ADDITION RATIO 
One 20kg bag of Rapid Set Concrete 
requires approximately 2.5 litres of clean 
drinking water to provide a workable mix. 
Too much water ruins good concrete. 
STORAGE, HANDLING & SAFETY 
• Care should be taken when lifting bagged products as personal injury may 
occur. It is suggested that when handling bagged materials, the load is shared 
with another person. 
• Rapid Set Concrete contains cement powder which when damp, becomes 
alkaline and may be harmful to the skin. Avoid breathing the dust and avoid 
contact with skin and eyes. Suitable protective clothing should be worn at all 
times including eye protection and gloves. 
• Rapid Set Concrete should be stored and protected in a dry place off the 
ground. 
• The recommended shelf life of cement products is approximately 6 
months from date of manufacture. This is provided the product is stored as 
recommended above. 
Once opened, the bag should be used that day. 
FURTHER HINTS & TIPS 
• For higher compressive strength results, Cement Australia recommends using 
Cement Australia Concrete Mix. 
• Excess water will reduce the ultimate strength performance of this product. 
THINGS YOU MIGHT NEED 
• Long handled shovel 
• Access to clean drinking water 
• Steel rod 
• Spirit level 
• Stopwatch 
PDS RSC Revision 3.0 Issued 17/02/12 
NOTE: 
The Rapid Set Concrete Material Safety Data Sheet (MSDS) is available at www.cementaustralia.com.au 
PRODUCT DISCLAIMER 
Recommendations regarding the use of this product are to be taken as a guide only. If in doubt contact Cement Australia Pty Limited (“Cement Australia”) 
or seek professional advice. To the extent permitted by law, Cement Australia excludes all implied warranties, conditions and guarantees imposed by 
legislation. Cement Australia excludes all liability for loss, damage or injury arising from use of the product (i) otherwise than in accordance with the 
recommendations or (ii) for purposes other than those for which it is ordinarily acquired. For all other loss, damage or injury arising from the use of this 
product, to the extent permitted by law Cement Australia’s liability is limited, at its discretion, to refunding the cost of the product or resupplying the product 
or equivalent product.

More Related Content

What's hot

Non metallic floor hardener - arda india
Non metallic floor hardener - arda indiaNon metallic floor hardener - arda india
Non metallic floor hardener - arda indiaJames Brown
 
Prime flex 900_mv_tds
Prime flex 900_mv_tdsPrime flex 900_mv_tds
Prime flex 900_mv_tdsprimeresins
 
Gentoo presentation international version 3 9-16
Gentoo presentation international version 3 9-16Gentoo presentation international version 3 9-16
Gentoo presentation international version 3 9-16Syed Uzair
 
Industrial Mechanical Seal by Leak - End Engineers, Mumbai
Industrial Mechanical Seal by Leak - End Engineers, MumbaiIndustrial Mechanical Seal by Leak - End Engineers, Mumbai
Industrial Mechanical Seal by Leak - End Engineers, MumbaiIndiaMART InterMESH Limited
 
RIW Cementfill WP Datasheet
RIW Cementfill WP Datasheet RIW Cementfill WP Datasheet
RIW Cementfill WP Datasheet RIW Ltd
 
Polyurethane coating on tiled roof
Polyurethane coating on tiled roofPolyurethane coating on tiled roof
Polyurethane coating on tiled roofAnanda Theertha
 
Integral waterproofing liquid for Concrete & Plaster
Integral waterproofing liquid for Concrete & PlasterIntegral waterproofing liquid for Concrete & Plaster
Integral waterproofing liquid for Concrete & PlasterDevrajsinh Gohil
 
Fly Ash - Product Data Sheet
Fly Ash - Product Data SheetFly Ash - Product Data Sheet
Fly Ash - Product Data SheetLilyShubina
 
Terrace Water Proofing
Terrace Water ProofingTerrace Water Proofing
Terrace Water ProofingD K Associates
 
valve maintenance-packing-replacement
valve maintenance-packing-replacementvalve maintenance-packing-replacement
valve maintenance-packing-replacementIzzuwan Yusoff
 
Manufacturing of Stuffing box
Manufacturing of Stuffing boxManufacturing of Stuffing box
Manufacturing of Stuffing boxGyanendra Awasthi
 
LiquiTube.trifold.new
LiquiTube.trifold.newLiquiTube.trifold.new
LiquiTube.trifold.newRobert Davido
 
Types of mechanical seals
Types of mechanical sealsTypes of mechanical seals
Types of mechanical sealsJohnson_Albert
 

What's hot (19)

Non metallic floor hardener - arda india
Non metallic floor hardener - arda indiaNon metallic floor hardener - arda india
Non metallic floor hardener - arda india
 
Prime flex 900_mv_tds
Prime flex 900_mv_tdsPrime flex 900_mv_tds
Prime flex 900_mv_tds
 
Gentoo presentation international version 3 9-16
Gentoo presentation international version 3 9-16Gentoo presentation international version 3 9-16
Gentoo presentation international version 3 9-16
 
Industrial Mechanical Seal by Leak - End Engineers, Mumbai
Industrial Mechanical Seal by Leak - End Engineers, MumbaiIndustrial Mechanical Seal by Leak - End Engineers, Mumbai
Industrial Mechanical Seal by Leak - End Engineers, Mumbai
 
Waterguard a
Waterguard aWaterguard a
Waterguard a
 
Waterguard a
Waterguard aWaterguard a
Waterguard a
 
RIW Cementfill WP Datasheet
RIW Cementfill WP Datasheet RIW Cementfill WP Datasheet
RIW Cementfill WP Datasheet
 
Tds tobust injuction spu 10
Tds tobust  injuction spu 10Tds tobust  injuction spu 10
Tds tobust injuction spu 10
 
Polyurethane coating on tiled roof
Polyurethane coating on tiled roofPolyurethane coating on tiled roof
Polyurethane coating on tiled roof
 
AquaTight Stain Protection Installation Best Practices
AquaTight Stain Protection Installation Best PracticesAquaTight Stain Protection Installation Best Practices
AquaTight Stain Protection Installation Best Practices
 
Integral waterproofing liquid for Concrete & Plaster
Integral waterproofing liquid for Concrete & PlasterIntegral waterproofing liquid for Concrete & Plaster
Integral waterproofing liquid for Concrete & Plaster
 
Fly Ash - Product Data Sheet
Fly Ash - Product Data SheetFly Ash - Product Data Sheet
Fly Ash - Product Data Sheet
 
Machine designs
Machine designsMachine designs
Machine designs
 
Terrace Water Proofing
Terrace Water ProofingTerrace Water Proofing
Terrace Water Proofing
 
valve maintenance-packing-replacement
valve maintenance-packing-replacementvalve maintenance-packing-replacement
valve maintenance-packing-replacement
 
Manufacturing of Stuffing box
Manufacturing of Stuffing boxManufacturing of Stuffing box
Manufacturing of Stuffing box
 
LiquiTube.trifold.new
LiquiTube.trifold.newLiquiTube.trifold.new
LiquiTube.trifold.new
 
Types of mechanical seals
Types of mechanical sealsTypes of mechanical seals
Types of mechanical seals
 
Turn key plants
Turn key plantsTurn key plants
Turn key plants
 

Viewers also liked

Personal symbol
Personal symbolPersonal symbol
Personal symbolheidy1122
 
63 ( puy de dôme) 2013
63 ( puy de dôme) 201363 ( puy de dôme) 2013
63 ( puy de dôme) 2013CCDH75
 
¿Qué demandan las personas con diabetes?
¿Qué demandan las personas con diabetes?¿Qué demandan las personas con diabetes?
¿Qué demandan las personas con diabetes?Joaquin Mateos
 
Question 2,4 & 5 Evaluation
Question 2,4 & 5 EvaluationQuestion 2,4 & 5 Evaluation
Question 2,4 & 5 Evaluationshanay11230
 
Fast50 basin bulteni
Fast50 basin bulteniFast50 basin bulteni
Fast50 basin bultenicaglare
 
Rapport 2013 meuse
Rapport 2013 meuseRapport 2013 meuse
Rapport 2013 meuseCCDH75
 
Ansarana e taghoot_iqsam_wa_ehkaam_pdf
Ansarana e taghoot_iqsam_wa_ehkaam_pdfAnsarana e taghoot_iqsam_wa_ehkaam_pdf
Ansarana e taghoot_iqsam_wa_ehkaam_pdfMurabitoon
 
Unused pics and why
Unused pics and whyUnused pics and why
Unused pics and whyshanay11230
 
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...Describing him, describing her: Linguistic biases in crowdsourced metadata fo...
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...KNOWeSCAPE2014
 
Hora nacional 18nov
Hora nacional 18novHora nacional 18nov
Hora nacional 18novDiPa92
 
Novas da Xustiza nº 1040
Novas da Xustiza nº 1040Novas da Xustiza nº 1040
Novas da Xustiza nº 1040CCOOXustiza
 
Chiacchiere Sportive 14^giornata
Chiacchiere Sportive 14^giornataChiacchiere Sportive 14^giornata
Chiacchiere Sportive 14^giornataAntonio Grosso
 
Prioridad6
Prioridad6Prioridad6
Prioridad6Ce DCyT
 

Viewers also liked (19)

Personal symbol
Personal symbolPersonal symbol
Personal symbol
 
Storyboards
StoryboardsStoryboards
Storyboards
 
63 ( puy de dôme) 2013
63 ( puy de dôme) 201363 ( puy de dôme) 2013
63 ( puy de dôme) 2013
 
Forum des Jeunes des Premières Nations
Forum des Jeunes des Premières NationsForum des Jeunes des Premières Nations
Forum des Jeunes des Premières Nations
 
¿Qué demandan las personas con diabetes?
¿Qué demandan las personas con diabetes?¿Qué demandan las personas con diabetes?
¿Qué demandan las personas con diabetes?
 
Presentación guia
Presentación guiaPresentación guia
Presentación guia
 
Question 2,4 & 5 Evaluation
Question 2,4 & 5 EvaluationQuestion 2,4 & 5 Evaluation
Question 2,4 & 5 Evaluation
 
Fast50 basin bulteni
Fast50 basin bulteniFast50 basin bulteni
Fast50 basin bulteni
 
Rapport 2013 meuse
Rapport 2013 meuseRapport 2013 meuse
Rapport 2013 meuse
 
kerajaan singhasari 2
kerajaan singhasari 2kerajaan singhasari 2
kerajaan singhasari 2
 
Ansarana e taghoot_iqsam_wa_ehkaam_pdf
Ansarana e taghoot_iqsam_wa_ehkaam_pdfAnsarana e taghoot_iqsam_wa_ehkaam_pdf
Ansarana e taghoot_iqsam_wa_ehkaam_pdf
 
Unused pics and why
Unused pics and whyUnused pics and why
Unused pics and why
 
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...Describing him, describing her: Linguistic biases in crowdsourced metadata fo...
Describing him, describing her: Linguistic biases in crowdsourced metadata fo...
 
Tropical Elegance
Tropical EleganceTropical Elegance
Tropical Elegance
 
diplomado en intervención terapéutica en ADICCIONES - UNSA 2013
diplomado en intervención terapéutica en ADICCIONES - UNSA 2013 diplomado en intervención terapéutica en ADICCIONES - UNSA 2013
diplomado en intervención terapéutica en ADICCIONES - UNSA 2013
 
Hora nacional 18nov
Hora nacional 18novHora nacional 18nov
Hora nacional 18nov
 
Novas da Xustiza nº 1040
Novas da Xustiza nº 1040Novas da Xustiza nº 1040
Novas da Xustiza nº 1040
 
Chiacchiere Sportive 14^giornata
Chiacchiere Sportive 14^giornataChiacchiere Sportive 14^giornata
Chiacchiere Sportive 14^giornata
 
Prioridad6
Prioridad6Prioridad6
Prioridad6
 

Similar to Cement Australia rapid set concrete

Cement Australia white cement
Cement Australia white cementCement Australia white cement
Cement Australia white cementcementaustralia
 
Cement Australia plasterers grey cement
Cement Australia plasterers grey cementCement Australia plasterers grey cement
Cement Australia plasterers grey cementcementaustralia
 
Cement Australia render it™ multisurface grey
Cement Australia render it™ multisurface greyCement Australia render it™ multisurface grey
Cement Australia render it™ multisurface greycementaustralia
 
Plasterers Grey Cement - Product Data Sheet
Plasterers Grey Cement - Product Data SheetPlasterers Grey Cement - Product Data Sheet
Plasterers Grey Cement - Product Data SheetLilyShubina
 
Cement Australia oxide pigments
Cement Australia oxide pigmentsCement Australia oxide pigments
Cement Australia oxide pigmentscementaustralia
 
Max Portfolio 2.compressed
Max Portfolio 2.compressedMax Portfolio 2.compressed
Max Portfolio 2.compressedMaxine Jacobs
 
Signature bridge pdf
Signature bridge pdfSignature bridge pdf
Signature bridge pdfBhismo Dev
 
Curing of concrete Amit payal
Curing of concrete  Amit payalCuring of concrete  Amit payal
Curing of concrete Amit payalAMIT PAYAL
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1Luke D'Arcy
 
Cement Australia - General Purpose Cement Data Sheet
Cement Australia - General Purpose Cement Data SheetCement Australia - General Purpose Cement Data Sheet
Cement Australia - General Purpose Cement Data Sheetgirlfoster10
 
Ultralit_catalog_2016_EN
Ultralit_catalog_2016_ENUltralit_catalog_2016_EN
Ultralit_catalog_2016_ENAlexey Velikant
 
US Grout Ultrafine Cementitious Grout Type SD— Data Sheet
US Grout Ultrafine Cementitious Grout Type SD— Data SheetUS Grout Ultrafine Cementitious Grout Type SD— Data Sheet
US Grout Ultrafine Cementitious Grout Type SD— Data SheetHess Pumice Products
 
Tutor mortars ppt 1a
Tutor mortars ppt 1aTutor mortars ppt 1a
Tutor mortars ppt 1aLuke D'Arcy
 
Module on admixture , polymer and exposy resins
Module on admixture , polymer and exposy resinsModule on admixture , polymer and exposy resins
Module on admixture , polymer and exposy resinsErankajKumar
 
Cement Australia - General Purpose Cement Information Sheet
Cement Australia - General Purpose Cement Information SheetCement Australia - General Purpose Cement Information Sheet
Cement Australia - General Purpose Cement Information Sheetgirlfoster10
 
Mix It Like a Pro - Pro Mix Tough Product Data Sheet
Mix It Like a Pro - Pro Mix Tough Product Data SheetMix It Like a Pro - Pro Mix Tough Product Data Sheet
Mix It Like a Pro - Pro Mix Tough Product Data Sheetbooks3dry
 
Blended Cement - Cement Australia
Blended Cement - Cement AustraliaBlended Cement - Cement Australia
Blended Cement - Cement AustraliaSteveDRodgers16
 
CALUMEX-QXP
CALUMEX-QXPCALUMEX-QXP
CALUMEX-QXPcaltraus
 
Hot weather-guidelines-3
Hot weather-guidelines-3Hot weather-guidelines-3
Hot weather-guidelines-3mojeed bolaji
 
New microsoft office word document (3)
New microsoft office word document (3)New microsoft office word document (3)
New microsoft office word document (3)rajs_78
 

Similar to Cement Australia rapid set concrete (20)

Cement Australia white cement
Cement Australia white cementCement Australia white cement
Cement Australia white cement
 
Cement Australia plasterers grey cement
Cement Australia plasterers grey cementCement Australia plasterers grey cement
Cement Australia plasterers grey cement
 
Cement Australia render it™ multisurface grey
Cement Australia render it™ multisurface greyCement Australia render it™ multisurface grey
Cement Australia render it™ multisurface grey
 
Plasterers Grey Cement - Product Data Sheet
Plasterers Grey Cement - Product Data SheetPlasterers Grey Cement - Product Data Sheet
Plasterers Grey Cement - Product Data Sheet
 
Cement Australia oxide pigments
Cement Australia oxide pigmentsCement Australia oxide pigments
Cement Australia oxide pigments
 
Max Portfolio 2.compressed
Max Portfolio 2.compressedMax Portfolio 2.compressed
Max Portfolio 2.compressed
 
Signature bridge pdf
Signature bridge pdfSignature bridge pdf
Signature bridge pdf
 
Curing of concrete Amit payal
Curing of concrete  Amit payalCuring of concrete  Amit payal
Curing of concrete Amit payal
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1
 
Cement Australia - General Purpose Cement Data Sheet
Cement Australia - General Purpose Cement Data SheetCement Australia - General Purpose Cement Data Sheet
Cement Australia - General Purpose Cement Data Sheet
 
Ultralit_catalog_2016_EN
Ultralit_catalog_2016_ENUltralit_catalog_2016_EN
Ultralit_catalog_2016_EN
 
US Grout Ultrafine Cementitious Grout Type SD— Data Sheet
US Grout Ultrafine Cementitious Grout Type SD— Data SheetUS Grout Ultrafine Cementitious Grout Type SD— Data Sheet
US Grout Ultrafine Cementitious Grout Type SD— Data Sheet
 
Tutor mortars ppt 1a
Tutor mortars ppt 1aTutor mortars ppt 1a
Tutor mortars ppt 1a
 
Module on admixture , polymer and exposy resins
Module on admixture , polymer and exposy resinsModule on admixture , polymer and exposy resins
Module on admixture , polymer and exposy resins
 
Cement Australia - General Purpose Cement Information Sheet
Cement Australia - General Purpose Cement Information SheetCement Australia - General Purpose Cement Information Sheet
Cement Australia - General Purpose Cement Information Sheet
 
Mix It Like a Pro - Pro Mix Tough Product Data Sheet
Mix It Like a Pro - Pro Mix Tough Product Data SheetMix It Like a Pro - Pro Mix Tough Product Data Sheet
Mix It Like a Pro - Pro Mix Tough Product Data Sheet
 
Blended Cement - Cement Australia
Blended Cement - Cement AustraliaBlended Cement - Cement Australia
Blended Cement - Cement Australia
 
CALUMEX-QXP
CALUMEX-QXPCALUMEX-QXP
CALUMEX-QXP
 
Hot weather-guidelines-3
Hot weather-guidelines-3Hot weather-guidelines-3
Hot weather-guidelines-3
 
New microsoft office word document (3)
New microsoft office word document (3)New microsoft office word document (3)
New microsoft office word document (3)
 

Recently uploaded

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 

Recently uploaded (20)

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 

Cement Australia rapid set concrete

  • 1. For more information call 1300 CEMENT (1300 236 368) or visit www.cementaustralia.com.au Cement Australia Rapid Set Concrete is manufactured using cement, sand and selected aggregates and additives and is formulated to harden rapidly without mixing. Part of the ‘Just Add Water’ range, Rapid Set Concrete product is suitable for fixing fence and pergola posts, clothes lines and letterboxes. APPLICATIONS Rapid Set Concrete is designed for use in fixing fence and pergola posts and is ideal for permanently securing clothes lines and letter boxes and numerous other uses around the home and garden, as well as various similar commercial applications. AVAILABILITY Product available in 20kg bags. FEATURES AND BENEFITS • Rapid Set Concrete will harden in 15 minutes when used as directed, within desired temperature range • It requires no mixing on site and is ready to use with the addition of clean water • Reduces required job time • Good for small jobs • Convenient & easy to use • Helps when job site accessibility is an issue • Eliminates use of wheel barrows & mixing tools DIRECTIONS FOR USE 1. Pre-soak the hole with clean water to limit the absorption of the water. 2. Sandy and/or fast draining soils may require a plastic lining to prevent seepage of the water into the ground. 3. Place the post or pole in the hole and provide support so that it does not fall over. 4. Accurately measure out 2.5 litres of water and pour into the hole. 5. Pour in half the bag of Rapid Set Concrete making sure it is evenly distributed around the post or pole without delay. 6. Tamp the product using a rod or stick then add the remaining half bag of product and tamp again. 7. Only if needed add additional water to achieve a workable mix. Too much water ruins good concrete. 8. Immediately repeat the process with 2.5 litres more water and another bag of product for larger holes. 9. Supports may be removed after 1 hour, depending on the ambient temperature. It is advisable to test the stability of the post before removing the supports. PDS RSC Revision 3.0 Issued 17/02/12
  • 2. Cement Australia Pty Ltd ABN 75 104 053 474 12 Station Avenue Darra QLD 4076 1300 CEMENT (1300 236 368) www.cementaustralia.com.au LIMITATIONS • Rapid Set Concrete is not designed for use in any structural application. • Extreme temperatures will impact set time of Rapid Set Concrete. Not recommended for use below 10 degrees Centigrade. • Do not add additional cement, sand, other aggregates or admixtures to the mix. • The use of concrete mixers or tools to mix the material should be avoided as this product hardens quickly. • Rapid Set Concrete is not recommended for use with Aluminium posts or poles unless these are primed or sealed according to the post manufacturers’ recommendation. • When Rapid Set Concrete is used in playground applications, it is only recommended for use below ground level and when covered with a ‘soft fall’ material. RECOMMENDED WATER ADDITION RATIO One 20kg bag of Rapid Set Concrete requires approximately 2.5 litres of clean drinking water to provide a workable mix. Too much water ruins good concrete. STORAGE, HANDLING & SAFETY • Care should be taken when lifting bagged products as personal injury may occur. It is suggested that when handling bagged materials, the load is shared with another person. • Rapid Set Concrete contains cement powder which when damp, becomes alkaline and may be harmful to the skin. Avoid breathing the dust and avoid contact with skin and eyes. Suitable protective clothing should be worn at all times including eye protection and gloves. • Rapid Set Concrete should be stored and protected in a dry place off the ground. • The recommended shelf life of cement products is approximately 6 months from date of manufacture. This is provided the product is stored as recommended above. Once opened, the bag should be used that day. FURTHER HINTS & TIPS • For higher compressive strength results, Cement Australia recommends using Cement Australia Concrete Mix. • Excess water will reduce the ultimate strength performance of this product. THINGS YOU MIGHT NEED • Long handled shovel • Access to clean drinking water • Steel rod • Spirit level • Stopwatch PDS RSC Revision 3.0 Issued 17/02/12 NOTE: The Rapid Set Concrete Material Safety Data Sheet (MSDS) is available at www.cementaustralia.com.au PRODUCT DISCLAIMER Recommendations regarding the use of this product are to be taken as a guide only. If in doubt contact Cement Australia Pty Limited (“Cement Australia”) or seek professional advice. To the extent permitted by law, Cement Australia excludes all implied warranties, conditions and guarantees imposed by legislation. Cement Australia excludes all liability for loss, damage or injury arising from use of the product (i) otherwise than in accordance with the recommendations or (ii) for purposes other than those for which it is ordinarily acquired. For all other loss, damage or injury arising from the use of this product, to the extent permitted by law Cement Australia’s liability is limited, at its discretion, to refunding the cost of the product or resupplying the product or equivalent product.