Phase 1 Objectives : (i) assist 25 CBOs in 5 districts to access
credit for expansion of their existing supplies; and (ii)
support 20 CBOs in 2 districts to achieve CBO – commercial
partnerships for service expansion and improvement.
Outputs from phase 1: 21 CBOs obtained loans totaling
$225,000 for expansion of 3,108 connections;
2 CBOs signed build-lease-transfer investment contracts and
2 CBOs signed annual service/management contracts with
local contractors.




                                                             2
What we learned from Phase 1

Credit model unwieldy – IndII MoU with Bank; IndII grant
held in escrow; only kabupaten banks interested;
CBOs preferred grants – PDAMs get hibah, why do CBOs
have to borrow ??
Strong demand from CBOs to expand.
IndII program generated interest at LG and Province.
CBOs not interested in ceding control – no PPP, but build
lease transfer (BLT) contracts for expansion acceptable
CBOs not interested in multi user service contracts.



                                                            3
Summary of the Phase 2 CBO Project
• Phase 2 CBO program uses the on-granting mechanism.
• Phase 2 program increases the role and responsibility of the local
  governments >> mainstreaming and scaling up by GoI.
• CBO 2 will align with Pamsimas and only go to non Pamsimas LG
• The LGs will be responsible for preparation of CBO proposals for expansion.
• Local governments will be compensated by a grant for successful
  preparation of CBO proposals – on acceptance in the CBO grant program
• An IndII oversight consultant will assist the GoI implementing agency in the
  assessment the proposals.
• WSP parallel Capacity Development Program will support institutional
  strengthening and capacity development at CBO and LG.
• The CBOs will implement the expansions using an output based grant model
  requiring counterpart funding from LG and the CBOs.
• The grant is anticipated to cover approximately 60% of the cost of the
  expansion.
• CBOs may leverage the grant by borrowing from banks but this is optional.


                                                                            4
Summary of the Phase 2 CBO Project
• Phase 2 CBO program uses the on-granting mechanism.
• Phase 2 program increases the role and responsibility of the local
  governments >> mainstreaming and scaling up by GoI.
• CBO 2 will align with Pamsimas and only go to non Pamsimas LG
• The LGs will be responsible for preparation of CBO proposals for expansion.
• Local governments will be compensated by a grant for successful
  preparation of CBO proposals – on acceptance in the CBO grant program
• An IndII oversight consultant will assist the GoI implementing agency in the
  assessment the proposals.
• WSP parallel Capacity Development Program will support institutional
  strengthening and capacity development at CBO and LG.
• The CBOs will implement the expansions using an output based grant model
  requiring counterpart funding from LG and the CBOs.
• The grant is anticipated to cover approximately 60% of the cost of the
  expansion.
• CBOs may leverage the grant by borrowing from banks but this is optional.


                                                                            5
Summary of the Phase 2 CBO Project
• Phase 2 CBO program uses the on-granting mechanism.
• Phase 2 program increases the role and responsibility of the local
  governments >> mainstreaming and scaling up by GoI.
• CBO 2 will align with Pamsimas and only go to non Pamsimas LG
• The LGs will be responsible for preparation of CBO proposals for expansion.
• Local governments will be compensated by a grant for successful
  preparation of CBO proposals – on acceptance in the CBO grant program
• An IndII oversight consultant will assist the GoI implementing agency in the
  assessment the proposals.
• WSP parallel Capacity Development Program will support institutional
  strengthening and capacity development at CBO and LG.
• The CBOs will implement the expansions using an output based grant model
  requiring counterpart funding from LG and the CBOs.
• The grant is anticipated to cover approximately 60% of the cost of the
  expansion.
• CBOs may leverage the grant by borrowing from banks but this is optional.


                                                                            6
More Lessons from Phase 1

• Many cases of investment to upgrade ‘overextended’
  systems – yielded few new connections but upgraded
  connections to ‘normal’ service.

Description                                    Before               After
                                      Actual        Theoritical     After
Investment Costs           IDR               -                     163,375,000
Connection                 unit              742             353           793
New Connection             unit              -                              51
Production Capacity       l/sec            1.53                           3.53
Water Consumption     m3/unit/month        3.00             9.00          9.00




                                                                            7
Design Point
Capacity / Consumption




                              Supply Capacity




                                                         d
                                                    m an
                                            d   e
                                      t ive
                              m   ul a
                         Cu



                                                             Connections
Design Point
Capacity / Consumption




                                   Supply Capacity



                         Consumption per
                           connection
                                                              d
                                                         m an
                                                 d   e
                                           t ive
                                   m   ul a
                              Cu
                                                                                 BASELINE


                                                                  Connections
Actual New

                                                                                                  Apparent
                                                                                                    New




                                                                 Design Point
Capacity / Consumption




                                   Supply Capacity


                                                                           Upgrade Supply
                         Consumption per
                           connection
                                                             d
                                                        m an
                                                d   e
                                          t ive
                                   m   ula
                              Cu



                                                                 Connections
More Lessons from Phase 1

• Many cases of investment to upgrade ‘overextended’
  systems – yielded few new connections but upgraded
  connections to ‘normal’ service.
Description                                    Before               After
                                      Actual        Theoritical     After
Investment Costs           IDR               -                     163,375,000
Connection                 unit              742             353           793
New Connection             unit              -                              51
Production Capacity       l/sec            1.53                           3.53
Water Consumption     m3/unit/month        3.00             9.00          9.00




                                                                                 11
Formulating the “output based”
            Component
• Separate New and Expansion costs:
  – Expansion $160 /hh
  – Upgrading $50/hh


• Preparation of CBO projects supported by LG:
  – $50,000 / CBO grant for preparation
• Expansion Financing: Average cost/CBO $25,000
  – Grant 15,000; LG 8,000; CBO 2,000




                                                  12
Anticipated Output


• 40 local governments
• 1,300 CBOs upgraded – 650,000 hh
• 20 New CBO built – 4,000 hh
• Total benefiting population approximately 2,600,000




                                                        13
Alignment with Pamsimas 2




                            14
ANNEXE – Assumptions and Costs



Number of LGs                   40
Number of CBOs/LG               30
Number of CBOs                 1,200
Number of HH/CBO                500
Total HH                      600,000


                                                           AU $
                                                LG         CBO         Grant
Preparation Cost/LG           100,000         50,000                  50,000
Preparation Cost             4,000,000       2,000,000               2,000,000


Investment cost/CBO           25,000          2,000       8,000       15,000
Investment cost/LG            750,000         60,000     240,000      450,000

Total Investment             30,000,000      2,400,000   9,600,000   18,000,000




                                                                                  15
Next Steps
• Feedback and finalise Concept Note
• AusAID Peer Review CN
• Parallel start on CBO PDD – in collaboartion with BoI and
  WSP
• GoI advance selection of Kabupaten and longlist of Desa
• Complete PDD May 2013.




                                                         16

More Related Content

What's hot

Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
Vanea Chiprianov
 
Output-Based Aid: Introduction, Lessons and Challenges
Output-Based Aid: Introduction, Lessons and ChallengesOutput-Based Aid: Introduction, Lessons and Challenges
Output-Based Aid: Introduction, Lessons and Challenges
Global Partnership on Output-Based Aid
 
Dan Sugarman Sustainable City Network Webinar
Dan Sugarman Sustainable City Network WebinarDan Sugarman Sustainable City Network Webinar
Dan Sugarman Sustainable City Network Webinar
unitedwaterslides
 
Chevron Gid Communications Office Procedures 2008
Chevron Gid Communications Office Procedures 2008Chevron Gid Communications Office Procedures 2008
Chevron Gid Communications Office Procedures 2008
Pambie
 
Emperor Corporate Reporting Portfolio
Emperor Corporate Reporting PortfolioEmperor Corporate Reporting Portfolio
Emperor Corporate Reporting Portfolio
NadaZbirek
 
Construction%20 Update%20 October%202009
Construction%20 Update%20 October%202009Construction%20 Update%20 October%202009
Construction%20 Update%20 October%202009
QBE European Operations
 
Expo Canitec 2010, Shift Happens, Cisco
Expo Canitec 2010, Shift Happens, CiscoExpo Canitec 2010, Shift Happens, Cisco
Expo Canitec 2010, Shift Happens, Cisco
Expo Canitec
 
Planning and Facilitating Project Outcomes: CPWF Case Studies
Planning and Facilitating Project Outcomes: CPWF Case StudiesPlanning and Facilitating Project Outcomes: CPWF Case Studies
Planning and Facilitating Project Outcomes: CPWF Case Studies
International Water Management Institute (IWMI)
 
Enhance Returns With Synthetic Structures
Enhance Returns With Synthetic StructuresEnhance Returns With Synthetic Structures
Enhance Returns With Synthetic Structures
davidlandis
 
RIF Verco - Developing the evidence base
RIF Verco - Developing the evidence baseRIF Verco - Developing the evidence base
RIF Verco - Developing the evidence base
SustainabilityEast
 
visionCHANGE
visionCHANGEvisionCHANGE
visionCHANGE
bmatysiewicz
 
Jennifer Dixon: Managing financial risk in the NHS
Jennifer Dixon: Managing financial risk in the NHSJennifer Dixon: Managing financial risk in the NHS
Jennifer Dixon: Managing financial risk in the NHS
Nuffield Trust
 
Green Deal Overview
Green Deal OverviewGreen Deal Overview
Ec elim purch
Ec elim purchEc elim purch
Ec elim purch
Onkar Sule
 

What's hot (14)

Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
Towards Semantic Interoperability of Graphical DSMLs for Telecommunications S...
 
Output-Based Aid: Introduction, Lessons and Challenges
Output-Based Aid: Introduction, Lessons and ChallengesOutput-Based Aid: Introduction, Lessons and Challenges
Output-Based Aid: Introduction, Lessons and Challenges
 
Dan Sugarman Sustainable City Network Webinar
Dan Sugarman Sustainable City Network WebinarDan Sugarman Sustainable City Network Webinar
Dan Sugarman Sustainable City Network Webinar
 
Chevron Gid Communications Office Procedures 2008
Chevron Gid Communications Office Procedures 2008Chevron Gid Communications Office Procedures 2008
Chevron Gid Communications Office Procedures 2008
 
Emperor Corporate Reporting Portfolio
Emperor Corporate Reporting PortfolioEmperor Corporate Reporting Portfolio
Emperor Corporate Reporting Portfolio
 
Construction%20 Update%20 October%202009
Construction%20 Update%20 October%202009Construction%20 Update%20 October%202009
Construction%20 Update%20 October%202009
 
Expo Canitec 2010, Shift Happens, Cisco
Expo Canitec 2010, Shift Happens, CiscoExpo Canitec 2010, Shift Happens, Cisco
Expo Canitec 2010, Shift Happens, Cisco
 
Planning and Facilitating Project Outcomes: CPWF Case Studies
Planning and Facilitating Project Outcomes: CPWF Case StudiesPlanning and Facilitating Project Outcomes: CPWF Case Studies
Planning and Facilitating Project Outcomes: CPWF Case Studies
 
Enhance Returns With Synthetic Structures
Enhance Returns With Synthetic StructuresEnhance Returns With Synthetic Structures
Enhance Returns With Synthetic Structures
 
RIF Verco - Developing the evidence base
RIF Verco - Developing the evidence baseRIF Verco - Developing the evidence base
RIF Verco - Developing the evidence base
 
visionCHANGE
visionCHANGEvisionCHANGE
visionCHANGE
 
Jennifer Dixon: Managing financial risk in the NHS
Jennifer Dixon: Managing financial risk in the NHSJennifer Dixon: Managing financial risk in the NHS
Jennifer Dixon: Managing financial risk in the NHS
 
Green Deal Overview
Green Deal OverviewGreen Deal Overview
Green Deal Overview
 
Ec elim purch
Ec elim purchEc elim purch
Ec elim purch
 

Viewers also liked

Gas infrastructure john bowers (formatted)
Gas infrastructure   john bowers (formatted)Gas infrastructure   john bowers (formatted)
Gas infrastructure john bowers (formatted)
Indonesia Infrastructure Initiative
 
Vwde dglt presentation r10w o eqx may 2011
Vwde dglt presentation r10w o eqx may 2011Vwde dglt presentation r10w o eqx may 2011
Vwde dglt presentation r10w o eqx may 2011
Indonesia Infrastructure Initiative
 
Summary
SummarySummary
Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011
Indonesia Infrastructure Initiative
 
Presentation fgd
Presentation fgdPresentation fgd
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
Indonesia Infrastructure Initiative
 
Blackspot 1 demak 12.5
Blackspot 1   demak 12.5Blackspot 1   demak 12.5
Blackspot 1 demak 12.5
Indonesia Infrastructure Initiative
 
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenas
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenasPaparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenas
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenasIndonesia Infrastructure Initiative
 
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1Indonesia Infrastructure Initiative
 
naufal yahya - dirlantas jateng
naufal yahya - dirlantas jatengnaufal yahya - dirlantas jateng
naufal yahya - dirlantas jateng
Indonesia Infrastructure Initiative
 
5 intersection safety
5 intersection safety5 intersection safety
Rambu marka-delineasi-sby-30mei12
Rambu marka-delineasi-sby-30mei12Rambu marka-delineasi-sby-30mei12
Rambu marka-delineasi-sby-30mei12
Indonesia Infrastructure Initiative
 
2 the blackspot investigation process
2 the blackspot investigation process2 the blackspot investigation process
2 the blackspot investigation process
Indonesia Infrastructure Initiative
 
Day 1 development scenarios english final
Day 1 development scenarios   english finalDay 1 development scenarios   english final
Day 1 development scenarios english final
Indonesia Infrastructure Initiative
 

Viewers also liked (19)

Gas infrastructure john bowers (formatted)
Gas infrastructure   john bowers (formatted)Gas infrastructure   john bowers (formatted)
Gas infrastructure john bowers (formatted)
 
Konsinyering bogor kebijakan dan sasaran kinerja - 8 mei 2014
Konsinyering bogor   kebijakan dan sasaran kinerja - 8 mei 2014Konsinyering bogor   kebijakan dan sasaran kinerja - 8 mei 2014
Konsinyering bogor kebijakan dan sasaran kinerja - 8 mei 2014
 
Vwde dglt presentation r10w o eqx may 2011
Vwde dglt presentation r10w o eqx may 2011Vwde dglt presentation r10w o eqx may 2011
Vwde dglt presentation r10w o eqx may 2011
 
Summary
SummarySummary
Summary
 
2 the blackspot investigation process indonesia
2 the blackspot investigation process indonesia2 the blackspot investigation process indonesia
2 the blackspot investigation process indonesia
 
Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011
 
Meeting wamen renstra 301013 (1)
Meeting wamen renstra 301013 (1)Meeting wamen renstra 301013 (1)
Meeting wamen renstra 301013 (1)
 
Presentation fgd
Presentation fgdPresentation fgd
Presentation fgd
 
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
 
Blackspot 1 demak 12.5
Blackspot 1   demak 12.5Blackspot 1   demak 12.5
Blackspot 1 demak 12.5
 
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenas
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenasPaparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenas
Paparan rapat sosialisasi teknokratik rpjmn 14 januari 2014 adi bappenas
 
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1
Paparan dir. bipran renstra & rpjp ditjen. bina marga fixdeal rev1
 
naufal yahya - dirlantas jateng
naufal yahya - dirlantas jatengnaufal yahya - dirlantas jateng
naufal yahya - dirlantas jateng
 
5 intersection safety
5 intersection safety5 intersection safety
5 intersection safety
 
Rambu marka-delineasi-sby-30mei12
Rambu marka-delineasi-sby-30mei12Rambu marka-delineasi-sby-30mei12
Rambu marka-delineasi-sby-30mei12
 
Konsinyering rpjm sektor ka bogor 080514 rustam
Konsinyering rpjm sektor ka  bogor 080514 rustamKonsinyering rpjm sektor ka  bogor 080514 rustam
Konsinyering rpjm sektor ka bogor 080514 rustam
 
2 the blackspot investigation process
2 the blackspot investigation process2 the blackspot investigation process
2 the blackspot investigation process
 
Arah pemb transportasi jangka panjang pu240112
Arah pemb transportasi jangka panjang   pu240112Arah pemb transportasi jangka panjang   pu240112
Arah pemb transportasi jangka panjang pu240112
 
Day 1 development scenarios english final
Day 1 development scenarios   english finalDay 1 development scenarios   english final
Day 1 development scenarios english final
 

Similar to Cbo ind ii 2 presentation to ausaid 31january 2013

Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
Ngy Ea
 
Mejorando la experiencia del usuario desde el kilómetro cero telesemana sep...
Mejorando la experiencia del usuario desde el kilómetro cero   telesemana sep...Mejorando la experiencia del usuario desde el kilómetro cero   telesemana sep...
Mejorando la experiencia del usuario desde el kilómetro cero telesemana sep...
Rafael Junquera
 
7: Financing Options for Water and Energy Efficiency Projects
7: Financing Options for Water and Energy Efficiency Projects7: Financing Options for Water and Energy Efficiency Projects
7: Financing Options for Water and Energy Efficiency Projects
Alliance To Save Energy
 
CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012
crifcambs
 
SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209
KernTax
 
HB&C Workshop Summary
HB&C Workshop Summary HB&C Workshop Summary
HB&C Workshop Summary
HarcourtBrownEF
 
Windows azure for SME's
Windows azure for SME'sWindows azure for SME's
Windows azure for SME's
Lee Stott
 
Hb&c workshop summary final
Hb&c workshop summary finalHb&c workshop summary final
Hb&c workshop summary final
HarcourtBrownEF
 
variable data publishing
variable data publishingvariable data publishing
variable data publishing
Newgen Software Technologies Limited
 
Guideline for the Preparation of a Concept Note
Guideline for the Preparation of a Concept NoteGuideline for the Preparation of a Concept Note
Guideline for the Preparation of a Concept Note
EEP Mekong
 
Envision charlotte information session
Envision charlotte information sessionEnvision charlotte information session
Envision charlotte information session
cpfeiler
 
Annual report
Annual reportAnnual report
Annual report
sandeepnpti
 
IWSM 2008 - Portfolio €ontrol
IWSM 2008 - Portfolio €ontrolIWSM 2008 - Portfolio €ontrol
IWSM 2008 - Portfolio €ontrol
Frank Vogelezang
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program
RCREEE
 
Rate Designs for Changing Times
Rate Designs for Changing TimesRate Designs for Changing Times
Rate Designs for Changing Times
John Wolfram
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
Schneider Electric
 
Engelman ccse financing workshop - San Diego Home Energy Upgrade
Engelman ccse financing workshop - San Diego Home Energy UpgradeEngelman ccse financing workshop - San Diego Home Energy Upgrade
Engelman ccse financing workshop - San Diego Home Energy Upgrade
Center for Sustainable Energy
 
Vsil Is Power And Utility Process Design In Sap Aditi Interra It
Vsil   Is Power And Utility Process Design In Sap  Aditi Interra ItVsil   Is Power And Utility Process Design In Sap  Aditi Interra It
Vsil Is Power And Utility Process Design In Sap Aditi Interra It
Aditi Tarafdar
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentation
rfenner
 
Flevy.com - Wireless Spend Sourcing Framework
Flevy.com - Wireless Spend Sourcing FrameworkFlevy.com - Wireless Spend Sourcing Framework
Flevy.com - Wireless Spend Sourcing Framework
David Tracy
 

Similar to Cbo ind ii 2 presentation to ausaid 31january 2013 (20)

Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
Mejorando la experiencia del usuario desde el kilómetro cero telesemana sep...
Mejorando la experiencia del usuario desde el kilómetro cero   telesemana sep...Mejorando la experiencia del usuario desde el kilómetro cero   telesemana sep...
Mejorando la experiencia del usuario desde el kilómetro cero telesemana sep...
 
7: Financing Options for Water and Energy Efficiency Projects
7: Financing Options for Water and Energy Efficiency Projects7: Financing Options for Water and Energy Efficiency Projects
7: Financing Options for Water and Energy Efficiency Projects
 
CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012
 
SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209
 
HB&C Workshop Summary
HB&C Workshop Summary HB&C Workshop Summary
HB&C Workshop Summary
 
Windows azure for SME's
Windows azure for SME'sWindows azure for SME's
Windows azure for SME's
 
Hb&c workshop summary final
Hb&c workshop summary finalHb&c workshop summary final
Hb&c workshop summary final
 
variable data publishing
variable data publishingvariable data publishing
variable data publishing
 
Guideline for the Preparation of a Concept Note
Guideline for the Preparation of a Concept NoteGuideline for the Preparation of a Concept Note
Guideline for the Preparation of a Concept Note
 
Envision charlotte information session
Envision charlotte information sessionEnvision charlotte information session
Envision charlotte information session
 
Annual report
Annual reportAnnual report
Annual report
 
IWSM 2008 - Portfolio €ontrol
IWSM 2008 - Portfolio €ontrolIWSM 2008 - Portfolio €ontrol
IWSM 2008 - Portfolio €ontrol
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program
 
Rate Designs for Changing Times
Rate Designs for Changing TimesRate Designs for Changing Times
Rate Designs for Changing Times
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 
Engelman ccse financing workshop - San Diego Home Energy Upgrade
Engelman ccse financing workshop - San Diego Home Energy UpgradeEngelman ccse financing workshop - San Diego Home Energy Upgrade
Engelman ccse financing workshop - San Diego Home Energy Upgrade
 
Vsil Is Power And Utility Process Design In Sap Aditi Interra It
Vsil   Is Power And Utility Process Design In Sap  Aditi Interra ItVsil   Is Power And Utility Process Design In Sap  Aditi Interra It
Vsil Is Power And Utility Process Design In Sap Aditi Interra It
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentation
 
Flevy.com - Wireless Spend Sourcing Framework
Flevy.com - Wireless Spend Sourcing FrameworkFlevy.com - Wireless Spend Sourcing Framework
Flevy.com - Wireless Spend Sourcing Framework
 

More from Indonesia Infrastructure Initiative

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
Indonesia Infrastructure Initiative
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
Indonesia Infrastructure Initiative
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
Indonesia Infrastructure Initiative
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesia Infrastructure Initiative
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
Indonesia Infrastructure Initiative
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
Indonesia Infrastructure Initiative
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
Indonesia Infrastructure Initiative
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
Indonesia Infrastructure Initiative
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
Indonesia Infrastructure Initiative
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
Indonesia Infrastructure Initiative
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
Indonesia Infrastructure Initiative
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
Indonesia Infrastructure Initiative
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
Indonesia Infrastructure Initiative
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
Indonesia Infrastructure Initiative
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 me
Ws3 meWs3 me
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
Indonesia Infrastructure Initiative
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
Indonesia Infrastructure Initiative
 
Ws2 introduction
Ws2 introductionWs2 introduction
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
Indonesia Infrastructure Initiative
 

More from Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Cbo ind ii 2 presentation to ausaid 31january 2013

  • 1. CBO Program IndII 2 – Outline Concept 31 January 2013 IndII Ratu Plaza Tower
  • 2. Review of Phase 1 Project Phase 1 Objectives : (i) assist 25 CBOs in 5 districts to access credit for expansion of their existing supplies; and (ii) support 20 CBOs in 2 districts to achieve CBO – commercial partnerships for service expansion and improvement. Outputs from phase 1: 21 CBOs obtained loans totaling $225,000 for expansion of 3,108 connections; 2 CBOs signed build-lease-transfer investment contracts and 2 CBOs signed annual service/management contracts with local contractors. 2
  • 3. What we learned from Phase 1 Credit model unwieldy – IndII MoU with Bank; IndII grant held in escrow; only kabupaten banks interested; CBOs preferred grants – PDAMs get hibah, why do CBOs have to borrow ?? Strong demand from CBOs to expand. IndII program generated interest at LG and Province. CBOs not interested in ceding control – no PPP, but build lease transfer (BLT) contracts for expansion acceptable CBOs not interested in multi user service contracts. 3
  • 4. Summary of the Phase 2 CBO Project • Phase 2 CBO program uses the on-granting mechanism. • Phase 2 program increases the role and responsibility of the local governments >> mainstreaming and scaling up by GoI. • CBO 2 will align with Pamsimas and only go to non Pamsimas LG • The LGs will be responsible for preparation of CBO proposals for expansion. • Local governments will be compensated by a grant for successful preparation of CBO proposals – on acceptance in the CBO grant program • An IndII oversight consultant will assist the GoI implementing agency in the assessment the proposals. • WSP parallel Capacity Development Program will support institutional strengthening and capacity development at CBO and LG. • The CBOs will implement the expansions using an output based grant model requiring counterpart funding from LG and the CBOs. • The grant is anticipated to cover approximately 60% of the cost of the expansion. • CBOs may leverage the grant by borrowing from banks but this is optional. 4
  • 5. Summary of the Phase 2 CBO Project • Phase 2 CBO program uses the on-granting mechanism. • Phase 2 program increases the role and responsibility of the local governments >> mainstreaming and scaling up by GoI. • CBO 2 will align with Pamsimas and only go to non Pamsimas LG • The LGs will be responsible for preparation of CBO proposals for expansion. • Local governments will be compensated by a grant for successful preparation of CBO proposals – on acceptance in the CBO grant program • An IndII oversight consultant will assist the GoI implementing agency in the assessment the proposals. • WSP parallel Capacity Development Program will support institutional strengthening and capacity development at CBO and LG. • The CBOs will implement the expansions using an output based grant model requiring counterpart funding from LG and the CBOs. • The grant is anticipated to cover approximately 60% of the cost of the expansion. • CBOs may leverage the grant by borrowing from banks but this is optional. 5
  • 6. Summary of the Phase 2 CBO Project • Phase 2 CBO program uses the on-granting mechanism. • Phase 2 program increases the role and responsibility of the local governments >> mainstreaming and scaling up by GoI. • CBO 2 will align with Pamsimas and only go to non Pamsimas LG • The LGs will be responsible for preparation of CBO proposals for expansion. • Local governments will be compensated by a grant for successful preparation of CBO proposals – on acceptance in the CBO grant program • An IndII oversight consultant will assist the GoI implementing agency in the assessment the proposals. • WSP parallel Capacity Development Program will support institutional strengthening and capacity development at CBO and LG. • The CBOs will implement the expansions using an output based grant model requiring counterpart funding from LG and the CBOs. • The grant is anticipated to cover approximately 60% of the cost of the expansion. • CBOs may leverage the grant by borrowing from banks but this is optional. 6
  • 7. More Lessons from Phase 1 • Many cases of investment to upgrade ‘overextended’ systems – yielded few new connections but upgraded connections to ‘normal’ service. Description Before After Actual Theoritical After Investment Costs IDR - 163,375,000 Connection unit 742 353 793 New Connection unit - 51 Production Capacity l/sec 1.53 3.53 Water Consumption m3/unit/month 3.00 9.00 9.00 7
  • 8. Design Point Capacity / Consumption Supply Capacity d m an d e t ive m ul a Cu Connections
  • 9. Design Point Capacity / Consumption Supply Capacity Consumption per connection d m an d e t ive m ul a Cu BASELINE Connections
  • 10. Actual New Apparent New Design Point Capacity / Consumption Supply Capacity Upgrade Supply Consumption per connection d m an d e t ive m ula Cu Connections
  • 11. More Lessons from Phase 1 • Many cases of investment to upgrade ‘overextended’ systems – yielded few new connections but upgraded connections to ‘normal’ service. Description Before After Actual Theoritical After Investment Costs IDR - 163,375,000 Connection unit 742 353 793 New Connection unit - 51 Production Capacity l/sec 1.53 3.53 Water Consumption m3/unit/month 3.00 9.00 9.00 11
  • 12. Formulating the “output based” Component • Separate New and Expansion costs: – Expansion $160 /hh – Upgrading $50/hh • Preparation of CBO projects supported by LG: – $50,000 / CBO grant for preparation • Expansion Financing: Average cost/CBO $25,000 – Grant 15,000; LG 8,000; CBO 2,000 12
  • 13. Anticipated Output • 40 local governments • 1,300 CBOs upgraded – 650,000 hh • 20 New CBO built – 4,000 hh • Total benefiting population approximately 2,600,000 13
  • 15. ANNEXE – Assumptions and Costs Number of LGs 40 Number of CBOs/LG 30 Number of CBOs 1,200 Number of HH/CBO 500 Total HH 600,000 AU $ LG CBO Grant Preparation Cost/LG 100,000 50,000 50,000 Preparation Cost 4,000,000 2,000,000 2,000,000 Investment cost/CBO 25,000 2,000 8,000 15,000 Investment cost/LG 750,000 60,000 240,000 450,000 Total Investment 30,000,000 2,400,000 9,600,000 18,000,000 15
  • 16. Next Steps • Feedback and finalise Concept Note • AusAID Peer Review CN • Parallel start on CBO PDD – in collaboartion with BoI and WSP • GoI advance selection of Kabupaten and longlist of Desa • Complete PDD May 2013. 16