CAVING BEHAVIOUR AND ESTIMATION OF LOAD IN
                 LONGWALL FACES OF SCCL – A CASE STUDY

                                            ABSTRACT

With the ever-increasing demand of power, it is expected that the demand for coal is to increase
proportionately. It is envisaged to double the present installed coal based power generation capacity
of 60,000 MW by the end of XII Five-Year Plan. To have 6% growth rate in the GDP it is required to
increase the installed capacity by a rate of 7%. These above figures call for increase in the installed
capacity of coal based power plants by about 5000 MW per year, in turn the coal demand will
increase by about 20 Million Tonnes per year(1). With the fast liquidation of shallow coal reserves by
opencast methods, it is forced on the Indian mining industry to extract coal reserves from deeper
horizons. Further, with ever increasing environmental awareness, it is becoming increasingly
difficult to envisage opencast projects. Longwall mining technology is an established technology
world over for extraction of coal from deeper horizons and it is only alternative for safer bulk
production. Especially in case of the Singareni Collieries Company Limited, with limited shallow
reserves, longwall mining appears the only alternative to mine coal from depths beyond 300m.
Though Longwall Technology is not new to Singareni Collieries Company most ambitious longwall
projects were shelved because of severe reservation expressed by policy makers on the basis of
evidences of failures. Most of failures in longwalls are attributed to failure of supports selected.
Hence, the estimation of support capacity become a topic of serious concern and requires in depth
study. An attempt is made to correctly understand the caving behaviour of roof rock in longwall
faces for selection of powered roof support capacity.

Plate theory of failure of roof rock is adopted to estimate the caving behaviour of roof rock over
longwall faces and caving distances are calculated. Principles of bending of plates and beams is
utilised to evaluate the effect of interaction of beds over the longwall face. Three case studies
comprising of three longwall mines of SCCL are selected and the methodology is applied for
estimation of required support capacities and a brief estimate of support load with face advance is
also presented. This will benefit the mining industry at large for mining of deep coal deposits with
high capital intensive coal mining projects.
1.0    INTRODUCTION

Longwall mining is an established underground coal mining system worldwide. The current world wide
trends proved that longwall mining offers the most promising and profitable technological option for
under ground coal exploitation. It is proved beyond doubt that longwall mining is the best option for
mining coal which occur at greater depth. According to coal statistics about 50% of total coal
production in the world accounted from longwall mining technology.

Introduction of longwall mining dates back to 1906-07. But only in late sixties there was longwall
mining with coal cutting machines. In between 1970-82 around 38 longwall faces were worked in
Jharia and Raniganj Coal fieds. In 1978 first mechanised longwall face was introduced in Moonidih
Colliery. In between 1978 and 1985 many longwall faces were introduced in both Coal India Limited
and Singareni Collieries. Presently lthe latest type of longwall supports and shearers are available in
Kottadih and Jhanjra of ECL and at GDK-10A and Padmavathikhani of SCCL.

The success of any longwall depends on the proper selection of powered roof support to suit to the
caving conditions available. It is clear from the experience of past longwall faces that the failure of any
longwall project invariably is linked to the improper selection of powered roof support or failure of
support system. The history of Longwall faces of Churcha Colliery of Coal India Limited and GDK-9
incline and GDK-11A incline of Singareni Collieries stand as witness to the above fact. Hence, it is can
be concluded that support system selected on the basis of reliable theories supported by field
investigations would go a long way in smooth running of longwall faces.

2.0    LONGWALL MINING METHOD

Longwall mining method includes drivage of two long roadways of about 1.0 km length in coal and
joining them by 150m long drivage perpendicular to them at the end of the above drivages.
Hydraulically powered chock shield supports are installed in 150m connecting roadway, called face
(Ref.Fig.No.1). Powered shearers are deployed for coal cutting and the cut coal is transported over
Armoured face conveyor (AFC) in face and series of belt conveyors to surface.

Cut after cut, shear after shear the AFC and subsequently chock shields supports will be advanced. As
soon as these supports are advanced immediate roof rock above caves in. As the retreat further proceeds
substantial area of main roof rock forms a plate and caves in. During this caving, load is imposed on the
supports which is known as main weighting. Once the main roof breaks in, the roof rock does not
behave like a plate. It behaves like a cantilever-imposing load on the supports with the deflection of
beam. With the further advance of the face, the rock cantilever hanging over the rear of the chock shield
support caves in imposing load of the support which is known as periodic weighting. All falls
subsequent to main fall are less in magnitude and impact with regard to loading on the support. This is
because of filling of goaf after the main fall and load sharing by the goaf waste. Unlike in tunneling and
other mining excavations, caving of roof rocks is an essential requirement for the smooth running of
longwall face without any strata related problems. A correct estimation of caving behaviour is very
much essential for calculating the load being imposed on the chock shields supports. The paper deals
with one such method of estimating the caving behaviour and the load that is being imposed on the
supports. The process of first weighting and subsequent periodic weightings during longwall retreat and
the mechanism of imposing load are presented in Fig. No.2.

3.0 THE PLATE THEORY

Estimation of caving and support load in longwall faces is an interesting topic of study at present and it
is one of the most seriously studied topic for the survival of mining industry in long run. In the past
many theories were developed to estimate the support load. The support resistance required depends
largely on the cavability of strata above the longwall face. La basse's approach, Wilson’s approach,
American approach and Peng and Chiang approach are few approaches (2) to mention. These methods
range from purely empirical to theoretical approaches.
As explained above, in the past many theories were developed to explain the caving behaviour and to
estimate the load on support in longwall faces. These models have their limitations too. Qian Ming –
GAO(3) et al, after careful study of insitu conditions and analysis on physical models in laboratory
concluded that the main roof above the extracted area can be treated as a plate supported and clamped by
the elastic foundation in different boundary conditions. Mechanical model can be formed for analysing
the main roof weighting span, and fracture capacity.

It is assumed that the breaking of plate structure is due to the bending stress in plate attaining the tensile
strength of bed. The breaking process of the plate is given by

       M      =        f(a/b) x w x b2   ………….. (1)
       where,
       f(a/b) =        coefficient of bending moment for the face
                               advance of ‘a’
       w               =       weight per unit thickness of bed
       b               =       face length

Qian Ming and others after study gave a graph from which f(a/b) can be obtained for different a/b ratios,
where ‘a’ is the face advance. Hence from the equation 1, bending moment can be calculated. And
knowing the cross section of bed, the bending stress developed can be calculated. If the difference of
this bending stress and calculated horizontal stress is greater than the tensile strength, then the bed is
expected to fail

4.0 CASE STUDIES

Singareni Collieries Company is one of the leading coal companies of India and longwall mining was
accepted method of mining and at present there are six longwall faces at VK-7 inc., Padmavathikhani,
JK-5 inc., GDK-9inc and GDK-10Ainc. Singareni is planning in a big way to start longwall faces in
Deep shaft blocks of Godavari coal fields.

The above theory of failure is utilised to calculate the caving distances and the load to which the
supports are subjected to is evaluated for three cases(4). In two cases the data is compared with the
available field data and in the third case a support capacity suitable to the caving conditions is suggested.

3.1    CASE STUDY - I

The following Table No.1 will give the calculated values for Padmavathikhani mine(4).
Refer figure :fig (3.1,3.2, & 3.3)
                                   TABLE No 1
 Sl.      Parameter                                   Calculated      Remarks
 No.                                                  value
 1        Caving height above coal seam (m)           13.305          Bulking factor of individual bed
                                                                      is taken into consideration
 2        Number of Beds identified within the 3
          caving height
 3        Details of Beds
      a) Thickness of Immediate roof (m)              3.48
      b) Thickness of Bed 1 & 2 (m)                   7.43 & 2.40
      c) Density of Bed 1 & 2 (T/M3)                  2.12 & 2.14
      d) Depth of Bed 1 & 2 (m)                       85.78 & 78.35
      e) Density of roof above Bed 2 (T/M3)           2.02
Sl.      Parameter                                    Calculated      Remarks
No.                                                   value

      f) Dept of Roof Bed 2 (m)                       75.95
      g) Young's Modulus of Bed (kg/cm2)              0.44 x 105 &
                                                      0.51 x 105
  h) Tensile Strength of Bed 1 & 2 (MPA)              1.04 & 1.30
   i) Face length & working section (m)               150 & 3.0
4     Caving Distances (1), (3)
  a) Theoretical Main Fall
      i) Bed 1 (m)                                    55
      ii) Bed 2 (m)                                   30
  b) Theoretical Periodical Fall
      i) Bed 1 (m)                                    11
      ii) Bed 2 (m)                                   7
5     Interaction of Beds
  A) For Main fall
                                                 a) After comparing deflections of both beds and
                                                    equating deflections it was found that an additional
                                                    load of 4.4 T/Sq.m. is being imposed by Bed 2 on
                                                    Bed 1.
                                                 b) With revised values of load on beds the revised
                                                    values of main fall of Bed 1 is 45 meters
                                                 c) Further, whenever Bed 1 collapses Bed 2 will also
                                                    cave in.
    B) For Periodic Fall
                                              a) Analysing the failure of Bed 1 & 2 as cantilever,
                                                 due to effect of failure of Bed 2 on Bed 1, the
                                                 periodic failure distance of Bed 1 reduces to 9 mtrs.
                                              b) Further, whenever the Bed 1 fails periodically Bed
                                                 2 will also fail along with it.
6     Minimum setting load required to induce 307 T& 69 T            The setting load of support is 620
      caving at rear of support for Bed 1 & Bed                      T. Hence, breakage will occur at
      2                                                              rear of support
7.    Estimation of support resistance required
   A) At Main Fall
      i) At the time of failure                  2013 T (*)
      ii) When the secondary break occurs        771 T (*)
      iii) When the Block rests on goaf waste    300 T
   B) At Periodical Fall
      i) At the time of failure                  700 T (*)


         ii) When the rear of cantilever beam rests   183 T (@)
         on goaf
         (*) Taking moments about face
              line, Momentary load
         (@) Taking moments about goaf
              line
8        Comparison
                                                      Calculated      Data from field
                                                      value
      i) First fall                                   45m             45m
     ii) Periodic Fall                                9m              6 to 7m
    iii) Bleeding of supports at weighting            Very less       Very less
3.2    CASE STUDY – 2

The following table no. 2 gives the calculated values for GDK-10A incline(4).
Refer figure :fig (3.4 ,3.5 & 3.6)
                                                TABLE No 2
          Sl.      Parameter                                                 Calculated value
          No.
          1        Caving Height (m)                                         19.6
          2        Number of beds identified with in the caving height       4
          3        Details of Beds
               a) Thickness of Immediate roof (m)                            3.08
               b) Thickness of Bed 1,                                        1.08
                                Bed 2 and                                    7.00
                                Bed 3 (m)                                    8.50
               c) Density of Bed 1,                                          2.03
                                Bed 2 and                                    2.03
                                Bed 3 (T/m3)                                 2.16
               d) Depth of        Bed 1,                                     157.08
                                Bed 2 and                                    156.00
                                Bed 3 (m)                                    149.00
               e) Depth of roof above Bed 3 (m)                              140.50
               f) Density of roof above Bed (T/m3)                           2.02
               g) Young’s Modulus of Bed 1                                   0.27x105
                                       Bed 2                                 0.27x105
                                       Bed 3 (Kg/cm2)                        0.197x105
               h) Tensile strength of Bed 1                                  0.704
                                       Bed 2                                 0.704
                                       Bed 3 (MPa)                           1.475
               i) Face length & working section (m)                          150 & 3.3
          4        Caving distances
               a) Theoretical Main Fall
                   i) Bed 1 Distance (m)                                     25
                   ii) Bed 2 Distance (m)                                    50
                   iii) Bed 3 Distance (m)                                   60
               b) Theoretical Periodic Fall
                   i) Bed 1 Distance (m)                                     3.5
                   ii) Bed 2 Distance (m)                                    9.0
                   iii) Bed 3 Distance (m)                                   13.5
          5        Interaction of Beds
              A) For Main Fall                                               Nil
              B) For Periodic Fall
                      a) After comparing the defection of beams at periodic weighting of bed
                           1 and 2, it can be concluded that bed 2 will impose a load of 0.417 T
                           on beam of bed 1 hence when ever beam of bed 2 collapses bed 1
                           also fails and comes down along with bed 2.
                      b) After comparing the deflection of beams of periodic weighting at bed
                           2 and 3, it can be concluded that bed 2 offers a resistive force of 270
                           T on bed 3 and it can be concluded that bed 2 offers a resistive force
                           of 270 T on bed 3 and it reduces bending moment in bed 3 and
                           whenever bed 3 fails bed 2 will also fail
Sl.        Parameter                                               Calculated value
          No.

          6    Minimum support resistance to induce breaking at 18.25 T, 235.5T &
               rear of support for bed 1, bed 2 and bed 3.      428.0T (The setting
                                                                load lof support is
                                                                640 T hence the
                                                                break will occur at
                                                                rear of support
          7    Estimation of support resistance required
            A) At Main Fall
               I) For Bed 1
                  i) At time of failure                         81 T
               II) For Bed 2
                   i) At time of failure                        1409T (*)
                  ii) When the secondary break occurs           600T (*)
                  iii) When the block rests on goaf             211T (@)
               III) For Bed 3
                    i) At time of failure (no secondary break)  2895 T (*)
                   ii) When the block rests on goaf             691 T (@)

              B) At periodic weighting
                 I) For Bed 1
                    i) At time of failure                                    50T (*)
                 II) For Bed 2
                     i) At time of failure                                   478T (*)
                    ii) When the block rests on goaf                         131T (@)
                 III) For Bed 3
                     i) At time of failure                                   1255T (*)
                    ii) When the block rests on goaf                         290T (@)
                 (*) Taking moments about face line
                     (Momentary load)
                 (@) Taking moments about goaf line

          8          Comparison
                     Parameter                  Calculated Value             Data from field
                i)   Local fall                 25m                          30m
               ii)   Major fall                 50m                          50-55m
              iii)   Periodic fall              13.5m                        15m
              iv)    Bleeding of support 4 x    less                         less
                     800T


3.3    CASE STUDY – 3

The following table no. 3 gives the calculated values for 11A Incline (4).
Refer figure :fig (3.7 & 3.8)
TABLE No 3
Sl.        Parameter                                               Calculated value
No.
1          Caving Height (m)                                        18.26
2          Number of beds identified with in the caving height      4
3          Details of Beds
      a)   Thickness of Immediate roof (m)                          1.00
      b)   Thickness of Bed 1,                                      5.06
                        Bed 2 and                                   9.62
                        Bed 3 (m)                                   2.58
      c)   Density of Bed 1,                                        2.56
                        Bed 2 and                                   2.33
                        Bed 3 (T/m3)                                2.43
      d)   Depth of      Bed 1,                                     204.76
                        Bed 2 and                                   199.70
                        Bed 3 (m)                                   190.08
      e)   Depth of Bed 1, Bed 2 & Bed 3 (m)                        187.50
      f)   Density of roof above Bed (T/m3)                         2.22
      g)   Young' s Modulus of Bed 1                                0.27x105
                              Bed 2                                 0.32x105
                                            2
                              Bed 3 (Kg/cm )                        0.2x105
      h)   Tensile strength of Bed 1                                0.616
                              Bed 2                                 0.780
                              Bed 3 (MPa)                           0.846
      i)   Face length & working section (m)                        150 & 3.0
4          Caving distances
      a)   Theoretical Main Fall
           i) Bed 1 Distance (m)                                    45
           ii) Bed 2 Distance (m)                                   65
           iii) Bed 3 Distance (m)                                  30
      b)   Theoretical Periodic Fall
           i) Bed 1 Distance (m)                                    6
           ii) Bed 2 Distance (m)                                   10
           iii) Bed 3 Distance (m)                                  5.5
5          Interaction of Beds
    A)     For Main Fall                                            Nil
           a) Bed 3 is caving at a distance shorter than Bed 2. After comparing
           deflection, it can be concluded that Bed 3 imposes additional load lof
           6T.Sq.m. With this additional load, Bed 2 will cave at a caving distance of
           60m and whenever Bed 2 fails Bed 3 will also fail.
    B)     For Periodic Fall
              a) Bed 3 which failing periodically at a distance of 5.5 imposes
                  additional load on Bed 2 and this load reduces periodic failure of Bed
                  2 to 8 m.
              b) After comparing the deflection of beams of Bed 1 & Bed 2 a, it can be
                  concluded that bed 1 offers a resistive force of 61 T on bed 2. This
                  will not be able to prevent breakage in Bed 2. While calculating load
                  complex situation is considered when the three beds collapse at once.
6          Minimum support resistance to induce breaking at 160, 412 & 73T
           rear of support for bed 1, bed 2 and bed 3.
Sl.    Parameter                                                   Calculated value
          No.
          7      Estimation of support resistance required
              A) At Main Fall
                 I) For Bed 1
                    i) At time of failure                                    1106 T(*)
                   ii) When secondary break occurs                           437 T (*)
                  iii) When the block rests on goaf                          227 T(@)
                 II) For Bed 2 & 3
                     i) At time of failure                                   4470T (*)
                    ii) When the secondary break occurs                      1674T (*)
                    iii) When the block rests on goaf                        704T (@)

                   At periodic weighting

                   I) For Bed 1
                      i) At time of failure                                  234T (*)
                   II) For Bed 2 & 3
                       i) At time of failure                                 830T (*)
                      ii) When the block rests on goaf                       179T (@)
                   (*) Taking moments about face line
                       (Momentary load)
                   (@) Taking moments about goaf line


8      Support Capacity Required

A close look at load to which the supports are subjected to clearly indicate that the load is around 704T.
With a support of around 700T yielding load, the longwall face can be run with slight difficulty. But if
support of around 800T is selected, better control of roof can be achieved. With such capacity support
periodic weighting load can also be handled easily.

5.0 CONCLUSION

In this paper a study has been done to estimate caving and support load to which the supports are
subjected. This gives a methodology for selection of longwall powered roof supports. In the first two
cases studied , a caparison is made on the theoretical estimate and actual practical situation and in the
third case an estimate is made . It is clear from first two case studies that the supports selected were
slightly over rated but as the coal companies need high reliability and ease at operation, it is logical to go
for a slightly higher capacity though it costs a bit more. This methodology will help in deciding support
capacities for future longwall projects. A complete computer programme is developed by the Centre for
longwall mine mechanisation ,Indian School of Mines ,Dhanbad, to meet the needs of the users.

It is clear from the results obtained through calculations that horizontal stress plays a significant role in
calculation of caving distances, and hence determination of horizontal stress for different coalfields is
required to be done.

6.0 ACKNOWLEDGEMENTS

The authors express their sincere thanks to Sri P. Vasudeva Rao Director( operations) Sri G N Sarma
Director (P P) and G M (HRD) S C CL for their permission to present this paper and for their constant
encouragement. Our thanks are due to Prof S N Mukherjee Head ,Centre for longwall mine
mechanisation , I S M , Dhandbad and Dr D N Sarma Supdt Geologist , Exploration Department ,S C
CL . The views expressed by the authors are of their own, and thus does need not necessarily depict their
official position.
7.0 REFERENCES

1)   "Challenges of mining Industry in Globalised economy " R N Singh , E D, I I C M, pp 17-19,C
     M T M ,Vol 7 , No 7, July 2002.
2)   Longwall Machinery and Mechanisation Vol.I, Powered Support, Prof. S.N. Mukherjee, A.M.
     Publishers, Dhanbad, 1993, pp. 13-80 & 301-334
3)   "The behaviour of the main roof in longwall mining weighting span, fracture and disturbances".
     Ming Gao Q and H. Fullian, Journal of Mines, Metals & Fuels, July, 1989, pp.240 – 244
4)   Estimation of caving and support load in Longwall faces with special relevance to SCCL,
     LOLLA. Sudhakar, M.Tech, Thesis, Indian School of Mines, Dhanbad, 1996, pp 63-222.


                                             *****

More Related Content

What's hot

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and DevelopmentAnurag Jha
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsSafdar Ali
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerSafdar Ali
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface minesSafdar Ali
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder pptAMIT SAHU
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Flame safety lamp fsl
Flame safety lamp fslFlame safety lamp fsl
Flame safety lamp fslSathwik Sunny
 
DIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MININGDIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MININGMohammadIrshadKhanMe
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Heat & humidity
Heat & humidityHeat & humidity
Heat & humiditySafdar Ali
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Explosives and blasting in underground coal mining
Explosives and blasting in underground coal mining Explosives and blasting in underground coal mining
Explosives and blasting in underground coal mining Volvo Group
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal minesSafdar Ali
 

What's hot (20)

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sections
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous miner
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Flame safety lamp fsl
Flame safety lamp fslFlame safety lamp fsl
Flame safety lamp fsl
 
DIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MININGDIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MINING
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 
Pillar design
Pillar designPillar design
Pillar design
 
Heat & humidity
Heat & humidityHeat & humidity
Heat & humidity
 
Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Explosives and blasting in underground coal mining
Explosives and blasting in underground coal mining Explosives and blasting in underground coal mining
Explosives and blasting in underground coal mining
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 

Viewers also liked

goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidenceVR M
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in IndiaVR M
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
 
Longwall Top Coal Caving Method
Longwall Top Coal Caving MethodLongwall Top Coal Caving Method
Longwall Top Coal Caving MethodAnil Kilania
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCLUlimella Siva Sankar
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound minesUlimella Siva Sankar
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 
Underground coal mining in india
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in indiaMD.Suresh Kumar
 

Viewers also liked (8)

goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidence
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in India
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
 
Longwall Top Coal Caving Method
Longwall Top Coal Caving MethodLongwall Top Coal Caving Method
Longwall Top Coal Caving Method
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound mines
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Underground coal mining in india
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in india
 

Similar to Caving behaviour in Longwall

Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case studyTIKESHWAR MAHTO
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall miningBoeut Sophea
 
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITY
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITYAN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITY
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITYIRJET Journal
 
A Theoretical Study on Strata Behaviour and Ground Control in Coal Mines
A Theoretical Study on Strata Behaviour and Ground Control in Coal MinesA Theoretical Study on Strata Behaviour and Ground Control in Coal Mines
A Theoretical Study on Strata Behaviour and Ground Control in Coal MinesIRJET Journal
 
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET Journal
 
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfSupport system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfpraanyakishore
 
4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecturegefyra-rion
 
2010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug20102010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug2010Matt Stockwell
 
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) dams
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) damsReservoir hydrostatic pressure effect on roller compacted concrete (rcc) dams
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) damsRamin Vaghei
 
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...nhandoan10
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OCAbdul Mujeeb
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineAbdul Mujeeb
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.pptkarsapersada
 

Similar to Caving behaviour in Longwall (20)

Pillar design
Pillar designPillar design
Pillar design
 
Pillar design
Pillar designPillar design
Pillar design
 
Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case study
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall mining
 
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITY
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITYAN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITY
AN INVESTIGATION ON MINE OVERBURDEN DUMP SLOPE STABILITY
 
A Theoretical Study on Strata Behaviour and Ground Control in Coal Mines
A Theoretical Study on Strata Behaviour and Ground Control in Coal MinesA Theoretical Study on Strata Behaviour and Ground Control in Coal Mines
A Theoretical Study on Strata Behaviour and Ground Control in Coal Mines
 
Research paper
Research paperResearch paper
Research paper
 
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
 
Pillar design
Pillar designPillar design
Pillar design
 
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfSupport system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
 
4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecture
 
2010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug20102010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug2010
 
WCL_March
WCL_MarchWCL_March
WCL_March
 
WCL_March
WCL_MarchWCL_March
WCL_March
 
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) dams
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) damsReservoir hydrostatic pressure effect on roller compacted concrete (rcc) dams
Reservoir hydrostatic pressure effect on roller compacted concrete (rcc) dams
 
1. Tunnelling.pptx
1. Tunnelling.pptx1. Tunnelling.pptx
1. Tunnelling.pptx
 
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...
A THEORETICAL STUDY ON COLLAPSE MECHANISM AND STRUCTURAL BEHAVIOR OF MULTI-ST...
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OC
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast Mine
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.ppt
 

More from VR M

Dragline Planning
Dragline PlanningDragline Planning
Dragline PlanningVR M
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)VR M
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mineVR M
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01VR M
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design FundasVR M
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineVR M
 
Top ten in world
Top ten in worldTop ten in world
Top ten in worldVR M
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetmsVR M
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road aheadVR M
 

More from VR M (20)

Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mine
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Haul road design
Haul road designHaul road design
Haul road design
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design Fundas
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mine
 
Top ten in world
Top ten in worldTop ten in world
Top ten in world
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetms
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road ahead
 

Recently uploaded

Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

Caving behaviour in Longwall

  • 1. CAVING BEHAVIOUR AND ESTIMATION OF LOAD IN LONGWALL FACES OF SCCL – A CASE STUDY ABSTRACT With the ever-increasing demand of power, it is expected that the demand for coal is to increase proportionately. It is envisaged to double the present installed coal based power generation capacity of 60,000 MW by the end of XII Five-Year Plan. To have 6% growth rate in the GDP it is required to increase the installed capacity by a rate of 7%. These above figures call for increase in the installed capacity of coal based power plants by about 5000 MW per year, in turn the coal demand will increase by about 20 Million Tonnes per year(1). With the fast liquidation of shallow coal reserves by opencast methods, it is forced on the Indian mining industry to extract coal reserves from deeper horizons. Further, with ever increasing environmental awareness, it is becoming increasingly difficult to envisage opencast projects. Longwall mining technology is an established technology world over for extraction of coal from deeper horizons and it is only alternative for safer bulk production. Especially in case of the Singareni Collieries Company Limited, with limited shallow reserves, longwall mining appears the only alternative to mine coal from depths beyond 300m. Though Longwall Technology is not new to Singareni Collieries Company most ambitious longwall projects were shelved because of severe reservation expressed by policy makers on the basis of evidences of failures. Most of failures in longwalls are attributed to failure of supports selected. Hence, the estimation of support capacity become a topic of serious concern and requires in depth study. An attempt is made to correctly understand the caving behaviour of roof rock in longwall faces for selection of powered roof support capacity. Plate theory of failure of roof rock is adopted to estimate the caving behaviour of roof rock over longwall faces and caving distances are calculated. Principles of bending of plates and beams is utilised to evaluate the effect of interaction of beds over the longwall face. Three case studies comprising of three longwall mines of SCCL are selected and the methodology is applied for estimation of required support capacities and a brief estimate of support load with face advance is also presented. This will benefit the mining industry at large for mining of deep coal deposits with high capital intensive coal mining projects.
  • 2. 1.0 INTRODUCTION Longwall mining is an established underground coal mining system worldwide. The current world wide trends proved that longwall mining offers the most promising and profitable technological option for under ground coal exploitation. It is proved beyond doubt that longwall mining is the best option for mining coal which occur at greater depth. According to coal statistics about 50% of total coal production in the world accounted from longwall mining technology. Introduction of longwall mining dates back to 1906-07. But only in late sixties there was longwall mining with coal cutting machines. In between 1970-82 around 38 longwall faces were worked in Jharia and Raniganj Coal fieds. In 1978 first mechanised longwall face was introduced in Moonidih Colliery. In between 1978 and 1985 many longwall faces were introduced in both Coal India Limited and Singareni Collieries. Presently lthe latest type of longwall supports and shearers are available in Kottadih and Jhanjra of ECL and at GDK-10A and Padmavathikhani of SCCL. The success of any longwall depends on the proper selection of powered roof support to suit to the caving conditions available. It is clear from the experience of past longwall faces that the failure of any longwall project invariably is linked to the improper selection of powered roof support or failure of support system. The history of Longwall faces of Churcha Colliery of Coal India Limited and GDK-9 incline and GDK-11A incline of Singareni Collieries stand as witness to the above fact. Hence, it is can be concluded that support system selected on the basis of reliable theories supported by field investigations would go a long way in smooth running of longwall faces. 2.0 LONGWALL MINING METHOD Longwall mining method includes drivage of two long roadways of about 1.0 km length in coal and joining them by 150m long drivage perpendicular to them at the end of the above drivages. Hydraulically powered chock shield supports are installed in 150m connecting roadway, called face (Ref.Fig.No.1). Powered shearers are deployed for coal cutting and the cut coal is transported over Armoured face conveyor (AFC) in face and series of belt conveyors to surface. Cut after cut, shear after shear the AFC and subsequently chock shields supports will be advanced. As soon as these supports are advanced immediate roof rock above caves in. As the retreat further proceeds substantial area of main roof rock forms a plate and caves in. During this caving, load is imposed on the supports which is known as main weighting. Once the main roof breaks in, the roof rock does not behave like a plate. It behaves like a cantilever-imposing load on the supports with the deflection of beam. With the further advance of the face, the rock cantilever hanging over the rear of the chock shield support caves in imposing load of the support which is known as periodic weighting. All falls subsequent to main fall are less in magnitude and impact with regard to loading on the support. This is because of filling of goaf after the main fall and load sharing by the goaf waste. Unlike in tunneling and other mining excavations, caving of roof rocks is an essential requirement for the smooth running of longwall face without any strata related problems. A correct estimation of caving behaviour is very much essential for calculating the load being imposed on the chock shields supports. The paper deals with one such method of estimating the caving behaviour and the load that is being imposed on the supports. The process of first weighting and subsequent periodic weightings during longwall retreat and the mechanism of imposing load are presented in Fig. No.2. 3.0 THE PLATE THEORY Estimation of caving and support load in longwall faces is an interesting topic of study at present and it is one of the most seriously studied topic for the survival of mining industry in long run. In the past many theories were developed to estimate the support load. The support resistance required depends largely on the cavability of strata above the longwall face. La basse's approach, Wilson’s approach, American approach and Peng and Chiang approach are few approaches (2) to mention. These methods range from purely empirical to theoretical approaches.
  • 3. As explained above, in the past many theories were developed to explain the caving behaviour and to estimate the load on support in longwall faces. These models have their limitations too. Qian Ming – GAO(3) et al, after careful study of insitu conditions and analysis on physical models in laboratory concluded that the main roof above the extracted area can be treated as a plate supported and clamped by the elastic foundation in different boundary conditions. Mechanical model can be formed for analysing the main roof weighting span, and fracture capacity. It is assumed that the breaking of plate structure is due to the bending stress in plate attaining the tensile strength of bed. The breaking process of the plate is given by M = f(a/b) x w x b2 ………….. (1) where, f(a/b) = coefficient of bending moment for the face advance of ‘a’ w = weight per unit thickness of bed b = face length Qian Ming and others after study gave a graph from which f(a/b) can be obtained for different a/b ratios, where ‘a’ is the face advance. Hence from the equation 1, bending moment can be calculated. And knowing the cross section of bed, the bending stress developed can be calculated. If the difference of this bending stress and calculated horizontal stress is greater than the tensile strength, then the bed is expected to fail 4.0 CASE STUDIES Singareni Collieries Company is one of the leading coal companies of India and longwall mining was accepted method of mining and at present there are six longwall faces at VK-7 inc., Padmavathikhani, JK-5 inc., GDK-9inc and GDK-10Ainc. Singareni is planning in a big way to start longwall faces in Deep shaft blocks of Godavari coal fields. The above theory of failure is utilised to calculate the caving distances and the load to which the supports are subjected to is evaluated for three cases(4). In two cases the data is compared with the available field data and in the third case a support capacity suitable to the caving conditions is suggested. 3.1 CASE STUDY - I The following Table No.1 will give the calculated values for Padmavathikhani mine(4). Refer figure :fig (3.1,3.2, & 3.3) TABLE No 1 Sl. Parameter Calculated Remarks No. value 1 Caving height above coal seam (m) 13.305 Bulking factor of individual bed is taken into consideration 2 Number of Beds identified within the 3 caving height 3 Details of Beds a) Thickness of Immediate roof (m) 3.48 b) Thickness of Bed 1 & 2 (m) 7.43 & 2.40 c) Density of Bed 1 & 2 (T/M3) 2.12 & 2.14 d) Depth of Bed 1 & 2 (m) 85.78 & 78.35 e) Density of roof above Bed 2 (T/M3) 2.02
  • 4. Sl. Parameter Calculated Remarks No. value f) Dept of Roof Bed 2 (m) 75.95 g) Young's Modulus of Bed (kg/cm2) 0.44 x 105 & 0.51 x 105 h) Tensile Strength of Bed 1 & 2 (MPA) 1.04 & 1.30 i) Face length & working section (m) 150 & 3.0 4 Caving Distances (1), (3) a) Theoretical Main Fall i) Bed 1 (m) 55 ii) Bed 2 (m) 30 b) Theoretical Periodical Fall i) Bed 1 (m) 11 ii) Bed 2 (m) 7 5 Interaction of Beds A) For Main fall a) After comparing deflections of both beds and equating deflections it was found that an additional load of 4.4 T/Sq.m. is being imposed by Bed 2 on Bed 1. b) With revised values of load on beds the revised values of main fall of Bed 1 is 45 meters c) Further, whenever Bed 1 collapses Bed 2 will also cave in. B) For Periodic Fall a) Analysing the failure of Bed 1 & 2 as cantilever, due to effect of failure of Bed 2 on Bed 1, the periodic failure distance of Bed 1 reduces to 9 mtrs. b) Further, whenever the Bed 1 fails periodically Bed 2 will also fail along with it. 6 Minimum setting load required to induce 307 T& 69 T The setting load of support is 620 caving at rear of support for Bed 1 & Bed T. Hence, breakage will occur at 2 rear of support 7. Estimation of support resistance required A) At Main Fall i) At the time of failure 2013 T (*) ii) When the secondary break occurs 771 T (*) iii) When the Block rests on goaf waste 300 T B) At Periodical Fall i) At the time of failure 700 T (*) ii) When the rear of cantilever beam rests 183 T (@) on goaf (*) Taking moments about face line, Momentary load (@) Taking moments about goaf line 8 Comparison Calculated Data from field value i) First fall 45m 45m ii) Periodic Fall 9m 6 to 7m iii) Bleeding of supports at weighting Very less Very less
  • 5. 3.2 CASE STUDY – 2 The following table no. 2 gives the calculated values for GDK-10A incline(4). Refer figure :fig (3.4 ,3.5 & 3.6) TABLE No 2 Sl. Parameter Calculated value No. 1 Caving Height (m) 19.6 2 Number of beds identified with in the caving height 4 3 Details of Beds a) Thickness of Immediate roof (m) 3.08 b) Thickness of Bed 1, 1.08 Bed 2 and 7.00 Bed 3 (m) 8.50 c) Density of Bed 1, 2.03 Bed 2 and 2.03 Bed 3 (T/m3) 2.16 d) Depth of Bed 1, 157.08 Bed 2 and 156.00 Bed 3 (m) 149.00 e) Depth of roof above Bed 3 (m) 140.50 f) Density of roof above Bed (T/m3) 2.02 g) Young’s Modulus of Bed 1 0.27x105 Bed 2 0.27x105 Bed 3 (Kg/cm2) 0.197x105 h) Tensile strength of Bed 1 0.704 Bed 2 0.704 Bed 3 (MPa) 1.475 i) Face length & working section (m) 150 & 3.3 4 Caving distances a) Theoretical Main Fall i) Bed 1 Distance (m) 25 ii) Bed 2 Distance (m) 50 iii) Bed 3 Distance (m) 60 b) Theoretical Periodic Fall i) Bed 1 Distance (m) 3.5 ii) Bed 2 Distance (m) 9.0 iii) Bed 3 Distance (m) 13.5 5 Interaction of Beds A) For Main Fall Nil B) For Periodic Fall a) After comparing the defection of beams at periodic weighting of bed 1 and 2, it can be concluded that bed 2 will impose a load of 0.417 T on beam of bed 1 hence when ever beam of bed 2 collapses bed 1 also fails and comes down along with bed 2. b) After comparing the deflection of beams of periodic weighting at bed 2 and 3, it can be concluded that bed 2 offers a resistive force of 270 T on bed 3 and it can be concluded that bed 2 offers a resistive force of 270 T on bed 3 and it reduces bending moment in bed 3 and whenever bed 3 fails bed 2 will also fail
  • 6. Sl. Parameter Calculated value No. 6 Minimum support resistance to induce breaking at 18.25 T, 235.5T & rear of support for bed 1, bed 2 and bed 3. 428.0T (The setting load lof support is 640 T hence the break will occur at rear of support 7 Estimation of support resistance required A) At Main Fall I) For Bed 1 i) At time of failure 81 T II) For Bed 2 i) At time of failure 1409T (*) ii) When the secondary break occurs 600T (*) iii) When the block rests on goaf 211T (@) III) For Bed 3 i) At time of failure (no secondary break) 2895 T (*) ii) When the block rests on goaf 691 T (@) B) At periodic weighting I) For Bed 1 i) At time of failure 50T (*) II) For Bed 2 i) At time of failure 478T (*) ii) When the block rests on goaf 131T (@) III) For Bed 3 i) At time of failure 1255T (*) ii) When the block rests on goaf 290T (@) (*) Taking moments about face line (Momentary load) (@) Taking moments about goaf line 8 Comparison Parameter Calculated Value Data from field i) Local fall 25m 30m ii) Major fall 50m 50-55m iii) Periodic fall 13.5m 15m iv) Bleeding of support 4 x less less 800T 3.3 CASE STUDY – 3 The following table no. 3 gives the calculated values for 11A Incline (4). Refer figure :fig (3.7 & 3.8)
  • 7. TABLE No 3 Sl. Parameter Calculated value No. 1 Caving Height (m) 18.26 2 Number of beds identified with in the caving height 4 3 Details of Beds a) Thickness of Immediate roof (m) 1.00 b) Thickness of Bed 1, 5.06 Bed 2 and 9.62 Bed 3 (m) 2.58 c) Density of Bed 1, 2.56 Bed 2 and 2.33 Bed 3 (T/m3) 2.43 d) Depth of Bed 1, 204.76 Bed 2 and 199.70 Bed 3 (m) 190.08 e) Depth of Bed 1, Bed 2 & Bed 3 (m) 187.50 f) Density of roof above Bed (T/m3) 2.22 g) Young' s Modulus of Bed 1 0.27x105 Bed 2 0.32x105 2 Bed 3 (Kg/cm ) 0.2x105 h) Tensile strength of Bed 1 0.616 Bed 2 0.780 Bed 3 (MPa) 0.846 i) Face length & working section (m) 150 & 3.0 4 Caving distances a) Theoretical Main Fall i) Bed 1 Distance (m) 45 ii) Bed 2 Distance (m) 65 iii) Bed 3 Distance (m) 30 b) Theoretical Periodic Fall i) Bed 1 Distance (m) 6 ii) Bed 2 Distance (m) 10 iii) Bed 3 Distance (m) 5.5 5 Interaction of Beds A) For Main Fall Nil a) Bed 3 is caving at a distance shorter than Bed 2. After comparing deflection, it can be concluded that Bed 3 imposes additional load lof 6T.Sq.m. With this additional load, Bed 2 will cave at a caving distance of 60m and whenever Bed 2 fails Bed 3 will also fail. B) For Periodic Fall a) Bed 3 which failing periodically at a distance of 5.5 imposes additional load on Bed 2 and this load reduces periodic failure of Bed 2 to 8 m. b) After comparing the deflection of beams of Bed 1 & Bed 2 a, it can be concluded that bed 1 offers a resistive force of 61 T on bed 2. This will not be able to prevent breakage in Bed 2. While calculating load complex situation is considered when the three beds collapse at once. 6 Minimum support resistance to induce breaking at 160, 412 & 73T rear of support for bed 1, bed 2 and bed 3.
  • 8. Sl. Parameter Calculated value No. 7 Estimation of support resistance required A) At Main Fall I) For Bed 1 i) At time of failure 1106 T(*) ii) When secondary break occurs 437 T (*) iii) When the block rests on goaf 227 T(@) II) For Bed 2 & 3 i) At time of failure 4470T (*) ii) When the secondary break occurs 1674T (*) iii) When the block rests on goaf 704T (@) At periodic weighting I) For Bed 1 i) At time of failure 234T (*) II) For Bed 2 & 3 i) At time of failure 830T (*) ii) When the block rests on goaf 179T (@) (*) Taking moments about face line (Momentary load) (@) Taking moments about goaf line 8 Support Capacity Required A close look at load to which the supports are subjected to clearly indicate that the load is around 704T. With a support of around 700T yielding load, the longwall face can be run with slight difficulty. But if support of around 800T is selected, better control of roof can be achieved. With such capacity support periodic weighting load can also be handled easily. 5.0 CONCLUSION In this paper a study has been done to estimate caving and support load to which the supports are subjected. This gives a methodology for selection of longwall powered roof supports. In the first two cases studied , a caparison is made on the theoretical estimate and actual practical situation and in the third case an estimate is made . It is clear from first two case studies that the supports selected were slightly over rated but as the coal companies need high reliability and ease at operation, it is logical to go for a slightly higher capacity though it costs a bit more. This methodology will help in deciding support capacities for future longwall projects. A complete computer programme is developed by the Centre for longwall mine mechanisation ,Indian School of Mines ,Dhanbad, to meet the needs of the users. It is clear from the results obtained through calculations that horizontal stress plays a significant role in calculation of caving distances, and hence determination of horizontal stress for different coalfields is required to be done. 6.0 ACKNOWLEDGEMENTS The authors express their sincere thanks to Sri P. Vasudeva Rao Director( operations) Sri G N Sarma Director (P P) and G M (HRD) S C CL for their permission to present this paper and for their constant encouragement. Our thanks are due to Prof S N Mukherjee Head ,Centre for longwall mine mechanisation , I S M , Dhandbad and Dr D N Sarma Supdt Geologist , Exploration Department ,S C CL . The views expressed by the authors are of their own, and thus does need not necessarily depict their official position.
  • 9. 7.0 REFERENCES 1) "Challenges of mining Industry in Globalised economy " R N Singh , E D, I I C M, pp 17-19,C M T M ,Vol 7 , No 7, July 2002. 2) Longwall Machinery and Mechanisation Vol.I, Powered Support, Prof. S.N. Mukherjee, A.M. Publishers, Dhanbad, 1993, pp. 13-80 & 301-334 3) "The behaviour of the main roof in longwall mining weighting span, fracture and disturbances". Ming Gao Q and H. Fullian, Journal of Mines, Metals & Fuels, July, 1989, pp.240 – 244 4) Estimation of caving and support load in Longwall faces with special relevance to SCCL, LOLLA. Sudhakar, M.Tech, Thesis, Indian School of Mines, Dhanbad, 1996, pp 63-222. *****