COURSE MATERIAL FOR
UCMT-MN-2102-
16.4.2020
for further interaction during the period of lockdown
SINGAM JAYANTHU, Professor, NIT-Rourkela
1. TITLE: CASE STUDIES ON DESIGN OF SUPPORTS
IN UNDERGROUND MINES
2. OBJECTIVE OF THIS CASE STUDY
To design suitable support system for roof and sides in
depillaring panels of RK-6 Incline-SCCL.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 2
3. GEOMINING CONDITIONS
Earlier 1A, 1seams were not proposed to develop due to low grade quality of coal. After
selective mining No. 1A and No.1seam are developed. No. 2B seam and No. 3 seam are partially
developed and stopped due to low thickness.
In RK6A Section, 1Aseam, depillaring is under progress with SDL machines this is done by
conventional method of mining .
No.1seam partial development; this is done by conventional method of mining. Presently part
of seam is Non-workable.
Table 1 and Fig 1 shows Strata section in Borehole number 534.
Fig 2 and 3 illustrates location of workings in panels 1AS1, 1AS2, and 1AS3.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 3
Seam 1A 1 2B 2A 2 3 4 5
Thickness(m) 3.60
-5.8
2.8-3.2 0.6-
1.2
1.5-
2.6 4.2-4.7
0.9-
1.2
1.6-
1.8 1.6-2.0
Parting(m) 18 40 11 25 35 12 11
Gradient 1 in 4
Overall quality E
Gassiness I degree
Extractable Reserves as on 01-08-2012 6 .00MT.
Panel No. No. of pillars Size of the panel
1AS1 36 400 M x 105 M
1AS2 23 225 x 145 m
1AS3 40 277 m x 175 m
Table1: Details of the strata section.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 4
Fig 1: Strata section in Borehole number 534
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
Meter age Strata
5.00 Surface soil
49.00 Brown sand stone
60.94 Grey sand stone
5.59 No.1A Seam (Proposed Panel)
13.85 Grey sand stone
3.32 No.1 Seam(Standing on pillars)
37.92 Grey sand stone
0.41 No.2B Seam(Virgin)
9.56 Grey sand stone
1.48 No.2A Seam(Standing on pillars)
26.13 Grey sand stone
4.85 No.2 Seam(Standing on pillars)
28.24 Grey sand stone
0.46 No.3 Seam(Virgin)
16.39 Grey sand stone
0.60 No.4 Seam(Virgin)
10.11 Grey sand stone
0.55 No.5 Seam(Virgin)
4.41 Grey sand stone
Surface RL 874.71 m
16-04-2020 5
3.2 Condition of the Workings
1AS3 panel of No.1A Seam having thicknesses is about 4.6 to 5.5 m dipping at 1 in 7
gradient having been developed up to 3.0m along the sand stone roof.
The number of the pillars and the size of the panel is presented in Table 2.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 6
Panel No.
Width of the
galleries
Height of the Galleries
(in m)
Size of the pillars (m) Depth of cover (m)
Max Min Avg Max Min Avg Max Min Avg Max Min Avg
1AS1 5.3 3.5 4.4 3.6 2.4 3.00 37 x 35 35X 33 35X 35 194 143 168.50
1AS2 5.3 3.5 4.4 3.6 2.4 3.0 47 x 35 37 x 35 42 x 35 187 143 165
1AS3 5.1 3.5 4.3 5.4 2.5 3.00 34 x 44 32 X 25 35 X
32
138 108 123.5
Table 2: Details of the pillars
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 7
Fig 2: Location of panels 1AS1 and 1AS2 IN RK 6 incline
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 8
Fig 3: Working plan of 1AS3 panel of 1A Seam
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 9
Manner of extraction followed in the depillaring panel (Fig 4).
Level split with 4.5 m width was used along with dip slices leaving 2 m rib.
a) Each pillar shall be split into two equal parts by driving a central level split gallery not exceeding 4.50m in width.
Each half pillar so formed shall be extracted by driving dip slice not exceeding 4.00m in width. While driving a
slice a rib of coal 2.00m to 2.50 m thickness shall be left against the goaf which shall be extracted judiciously
while retreating from the slice.
b) Number and width of the slice shall also be so adjusted that while driving the last (out by) slice, a block of coal not
less than 3m to 4.00 m thickness is left against the adjacent original gallery.
c) Driving of a slice shall not commence until extraction in the immediate in bye slice is completed and goaf edge
support erected.
d) Extraction of pillars shall commence from the dip / in bye slice and proceed systematically to rise / out by side
maintaining a diagonal line of faces and avoiding formation of V in the line of extraction.
e) A maximum area of exposure shall be limited to 130 sq.m.
f) Stooks, if any left inside the goaf shall whenever possible be knocked down before retreating from the area under
extraction in consistency with safety.
g) The advance splitting shall be limited to within two pillars from the pillar under extraction.
h) While withdrawing supports, care shall be taken to see that the withdrawal from the corresponding stook/slice in
the seam.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 10
Fig 4: Manner of extraction followed in depillaring at
1AS2/1AS3 panels, RK 6 incline
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 11
SYSTEMATIC SUPPORT RULES FOR EXTRACTION OF PILLARS
4.1 Design of Supports
Support system was designed for depillaring workings of 1AS1 based on Rock Mass Classification,
and numerical modeling. Support system was implemented in 1AS2, and 1AS3, and strata behavior
studies were conducted for evaluation of the efficacy of the support system.
Systematic Support rules were also formulated on the basis of RMR and applied to the depillaring
area in panel # 1AS2 and 1AS3 in No.1A Seam where pillars were extracted by Caving method
using Side Dump Loader sat Ravindrakhani No.6 Incline mine.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 12
Estimation of Rock Load and Design of Support System in development Working
The Rock load = B × D (1.7-0.037 × RMR + 0.0002 × RMR2)
RMR = 52
Gallery span (B, width) = 4.2 m
Height = 3m
Density (D) = 2.1t/m2
Rock load = 2.75 t/m2
Hence, rock load in galleries and splits = 2.75 t/m2
The rock load is to be supported with higher load to protect the area from the roof fall. Since the safety
factor is used in equation, therefore the roof support is designed for rock load of 2.75 t/m2. Full column
grouted bolt is used as the support system (Fig 5).
Roof bolt support = 10 t
Bolt spacing = 1.5 m
Distance between two rows of bolts = 1.5 m
No of bolts in a row= 3
Support resistance = 30 t/5.4m2 = 5.1 t/m2.
Factor of safety = 5.56 / 2.75 = 2.02 for gallery.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 13
Fig 5: Design of Support System for Galleries and Splits
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 14
Design of Support at Junctions
The junctions are unstable and experience more load when compared with galleries due
to large surface area (Fig 6).
The total area of the junction is 4.5 m x 4.5 m. Therefore the junctions are supported by
are Supported by 33% extra bolts.
Rock Load= 4.2*4.2*2.75 = 60.75 t
Support Resistance = 13*10 = 130 t
Factor of safety = 130/60.75 = 2.13
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 15
Fig 6: Design of Support System at Junctions
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 16
Estimation of Rock Load and Design of Support System in Depillaring Working
Rock load (Proof) in slice and goaf edge was estimated using NGI-Q system from the
following empirical relation:
Proof = 2/3 (Jn1/2/ Jr) x (5Q) –1/3
Where, Jn = 9, Jr = 1.5, Q = 2 for slice
and Q = 1 for goaf edge (Table 3).
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 17
Table 3: Q-System Calculation
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 18
Load in the slice is calculated to be (Proof) = 6.19 t/m2
and rock load at goaf edge is calculated to be Proof= 7.79 t/m2.
The slice and goaf edges are supported by steel props and chocks.
Slice width = 4m Rock load in slice, Proof is 6.19 t/m2 Breaker line bolt support = 8 t Chock with corner
prop support = 30 t
The support system will be three chocks with corner prop and five breaker line bolt as shown in Fig 7.
The above configuration leads to: Support resistance =130 t/12sq.m = 10.5 t/ m2
Factor of safety = 10.8/6.19 = 1.75 for slices the rock Goaf edge side will also have 3 chocks with corner
prop and5 breaker line bolts with spacing of 0.8m (Fig 8).
The other calculations are as follows:
The support resistance = 130 / 12= 10.8 t/m2
Factor of safety = Roof support / Rock load for goaf edge = 10.8 /7.79 = 1.39
It is good because goaf edge is supported for temporary period.
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 19
Fig 8: Design of Support System for Goaf Edges
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 20
Design of Support System for Sides of Galleries
Presence of 0.3 m thick clay band, 1 m above the floor of the seam reduces the stability of the
sides (Fig 8.1).
Therefore, the sides of the galleries are supported by stitching the wire ropes with the rock bolt.
Three rock bolts are installed in a row with 1 m spacing and distance between the rows is 1.5m.
Wooden lagging are provided at 1.5 m interval to increase the contact area of the stitching rope
and to provide better support
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 21
Fig 8.1: Design of Support System for Sides
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
16-04-2020 22
COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020
Thank you very much
for patient hearing and
going through the slides
sent as a rehearsal sample
of online class for our
students
I look forward for your
queries and online
interaction through
Microsoft team access as
being planned by our NITR
16-04-2020 23

More Related Content

Similar to Support system (Underground Coal Mining) by Prof. S Jayantu.pdf

Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of Bars
Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of BarsComparative Study on Flexural Strength of M20 Grade Beam with Lapping of Bars
Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of BarsIRJET Journal
 
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDS
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDSEXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDS
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDSIRJET Journal
 
Statistical analysis of various sub systems of panel production system in und...
Statistical analysis of various sub systems of panel production system in und...Statistical analysis of various sub systems of panel production system in und...
Statistical analysis of various sub systems of panel production system in und...eSAT Journals
 
Rock engineering and ground control
Rock engineering and ground controlRock engineering and ground control
Rock engineering and ground controlBhaskar Naidu
 
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...eSAT Publishing House
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdfKSLDESIGN
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...IRJET Journal
 
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...IRJET Journal
 
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...IRJET Journal
 
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET Journal
 
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...IRJET Journal
 
Effect of l b ratio of stone column on bearing capacity and relative settleme...
Effect of l b ratio of stone column on bearing capacity and relative settleme...Effect of l b ratio of stone column on bearing capacity and relative settleme...
Effect of l b ratio of stone column on bearing capacity and relative settleme...IAEME Publication
 
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...IAEME Publication
 
Structural Design
Structural DesignStructural Design
Structural DesignVj NiroSh
 
CIVE 416 report(final)
CIVE 416 report(final)CIVE 416 report(final)
CIVE 416 report(final)Monique F M
 
Tech paper guttering-case study
Tech paper guttering-case studyTech paper guttering-case study
Tech paper guttering-case studyMD.Suresh Kumar
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening mkpq pasha
 
Fire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureFire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureArshia Mousavi
 

Similar to Support system (Underground Coal Mining) by Prof. S Jayantu.pdf (20)

Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of Bars
Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of BarsComparative Study on Flexural Strength of M20 Grade Beam with Lapping of Bars
Comparative Study on Flexural Strength of M20 Grade Beam with Lapping of Bars
 
Pillar design
Pillar designPillar design
Pillar design
 
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDS
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDSEXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDS
EXPERIMENTAL STUDY OF HYBRID PAVER BLOCKS ENGULFED WITH BINARY BLENDS
 
Statistical analysis of various sub systems of panel production system in und...
Statistical analysis of various sub systems of panel production system in und...Statistical analysis of various sub systems of panel production system in und...
Statistical analysis of various sub systems of panel production system in und...
 
Rock engineering and ground control
Rock engineering and ground controlRock engineering and ground control
Rock engineering and ground control
 
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdf
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...
 
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
 
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
 
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
 
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...
IRJET - Experimental Investigation on Behaviour of Footings Subjected to Hori...
 
Effect of l b ratio of stone column on bearing capacity and relative settleme...
Effect of l b ratio of stone column on bearing capacity and relative settleme...Effect of l b ratio of stone column on bearing capacity and relative settleme...
Effect of l b ratio of stone column on bearing capacity and relative settleme...
 
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
 
Project 2b (1) (2)
Project 2b  (1) (2)Project 2b  (1) (2)
Project 2b (1) (2)
 
Structural Design
Structural DesignStructural Design
Structural Design
 
CIVE 416 report(final)
CIVE 416 report(final)CIVE 416 report(final)
CIVE 416 report(final)
 
Tech paper guttering-case study
Tech paper guttering-case studyTech paper guttering-case study
Tech paper guttering-case study
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening
 
Fire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureFire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel Structure
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 

Support system (Underground Coal Mining) by Prof. S Jayantu.pdf

  • 1. COURSE MATERIAL FOR UCMT-MN-2102- 16.4.2020 for further interaction during the period of lockdown SINGAM JAYANTHU, Professor, NIT-Rourkela
  • 2. 1. TITLE: CASE STUDIES ON DESIGN OF SUPPORTS IN UNDERGROUND MINES 2. OBJECTIVE OF THIS CASE STUDY To design suitable support system for roof and sides in depillaring panels of RK-6 Incline-SCCL. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 2
  • 3. 3. GEOMINING CONDITIONS Earlier 1A, 1seams were not proposed to develop due to low grade quality of coal. After selective mining No. 1A and No.1seam are developed. No. 2B seam and No. 3 seam are partially developed and stopped due to low thickness. In RK6A Section, 1Aseam, depillaring is under progress with SDL machines this is done by conventional method of mining . No.1seam partial development; this is done by conventional method of mining. Presently part of seam is Non-workable. Table 1 and Fig 1 shows Strata section in Borehole number 534. Fig 2 and 3 illustrates location of workings in panels 1AS1, 1AS2, and 1AS3. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 3
  • 4. Seam 1A 1 2B 2A 2 3 4 5 Thickness(m) 3.60 -5.8 2.8-3.2 0.6- 1.2 1.5- 2.6 4.2-4.7 0.9- 1.2 1.6- 1.8 1.6-2.0 Parting(m) 18 40 11 25 35 12 11 Gradient 1 in 4 Overall quality E Gassiness I degree Extractable Reserves as on 01-08-2012 6 .00MT. Panel No. No. of pillars Size of the panel 1AS1 36 400 M x 105 M 1AS2 23 225 x 145 m 1AS3 40 277 m x 175 m Table1: Details of the strata section. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 4
  • 5. Fig 1: Strata section in Borehole number 534 COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 Meter age Strata 5.00 Surface soil 49.00 Brown sand stone 60.94 Grey sand stone 5.59 No.1A Seam (Proposed Panel) 13.85 Grey sand stone 3.32 No.1 Seam(Standing on pillars) 37.92 Grey sand stone 0.41 No.2B Seam(Virgin) 9.56 Grey sand stone 1.48 No.2A Seam(Standing on pillars) 26.13 Grey sand stone 4.85 No.2 Seam(Standing on pillars) 28.24 Grey sand stone 0.46 No.3 Seam(Virgin) 16.39 Grey sand stone 0.60 No.4 Seam(Virgin) 10.11 Grey sand stone 0.55 No.5 Seam(Virgin) 4.41 Grey sand stone Surface RL 874.71 m 16-04-2020 5
  • 6. 3.2 Condition of the Workings 1AS3 panel of No.1A Seam having thicknesses is about 4.6 to 5.5 m dipping at 1 in 7 gradient having been developed up to 3.0m along the sand stone roof. The number of the pillars and the size of the panel is presented in Table 2. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 6
  • 7. Panel No. Width of the galleries Height of the Galleries (in m) Size of the pillars (m) Depth of cover (m) Max Min Avg Max Min Avg Max Min Avg Max Min Avg 1AS1 5.3 3.5 4.4 3.6 2.4 3.00 37 x 35 35X 33 35X 35 194 143 168.50 1AS2 5.3 3.5 4.4 3.6 2.4 3.0 47 x 35 37 x 35 42 x 35 187 143 165 1AS3 5.1 3.5 4.3 5.4 2.5 3.00 34 x 44 32 X 25 35 X 32 138 108 123.5 Table 2: Details of the pillars COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 7
  • 8. Fig 2: Location of panels 1AS1 and 1AS2 IN RK 6 incline COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 8
  • 9. Fig 3: Working plan of 1AS3 panel of 1A Seam COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 9
  • 10. Manner of extraction followed in the depillaring panel (Fig 4). Level split with 4.5 m width was used along with dip slices leaving 2 m rib. a) Each pillar shall be split into two equal parts by driving a central level split gallery not exceeding 4.50m in width. Each half pillar so formed shall be extracted by driving dip slice not exceeding 4.00m in width. While driving a slice a rib of coal 2.00m to 2.50 m thickness shall be left against the goaf which shall be extracted judiciously while retreating from the slice. b) Number and width of the slice shall also be so adjusted that while driving the last (out by) slice, a block of coal not less than 3m to 4.00 m thickness is left against the adjacent original gallery. c) Driving of a slice shall not commence until extraction in the immediate in bye slice is completed and goaf edge support erected. d) Extraction of pillars shall commence from the dip / in bye slice and proceed systematically to rise / out by side maintaining a diagonal line of faces and avoiding formation of V in the line of extraction. e) A maximum area of exposure shall be limited to 130 sq.m. f) Stooks, if any left inside the goaf shall whenever possible be knocked down before retreating from the area under extraction in consistency with safety. g) The advance splitting shall be limited to within two pillars from the pillar under extraction. h) While withdrawing supports, care shall be taken to see that the withdrawal from the corresponding stook/slice in the seam. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 10
  • 11. Fig 4: Manner of extraction followed in depillaring at 1AS2/1AS3 panels, RK 6 incline COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 11
  • 12. SYSTEMATIC SUPPORT RULES FOR EXTRACTION OF PILLARS 4.1 Design of Supports Support system was designed for depillaring workings of 1AS1 based on Rock Mass Classification, and numerical modeling. Support system was implemented in 1AS2, and 1AS3, and strata behavior studies were conducted for evaluation of the efficacy of the support system. Systematic Support rules were also formulated on the basis of RMR and applied to the depillaring area in panel # 1AS2 and 1AS3 in No.1A Seam where pillars were extracted by Caving method using Side Dump Loader sat Ravindrakhani No.6 Incline mine. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 12
  • 13. Estimation of Rock Load and Design of Support System in development Working The Rock load = B × D (1.7-0.037 × RMR + 0.0002 × RMR2) RMR = 52 Gallery span (B, width) = 4.2 m Height = 3m Density (D) = 2.1t/m2 Rock load = 2.75 t/m2 Hence, rock load in galleries and splits = 2.75 t/m2 The rock load is to be supported with higher load to protect the area from the roof fall. Since the safety factor is used in equation, therefore the roof support is designed for rock load of 2.75 t/m2. Full column grouted bolt is used as the support system (Fig 5). Roof bolt support = 10 t Bolt spacing = 1.5 m Distance between two rows of bolts = 1.5 m No of bolts in a row= 3 Support resistance = 30 t/5.4m2 = 5.1 t/m2. Factor of safety = 5.56 / 2.75 = 2.02 for gallery. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 13
  • 14. Fig 5: Design of Support System for Galleries and Splits COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 14
  • 15. Design of Support at Junctions The junctions are unstable and experience more load when compared with galleries due to large surface area (Fig 6). The total area of the junction is 4.5 m x 4.5 m. Therefore the junctions are supported by are Supported by 33% extra bolts. Rock Load= 4.2*4.2*2.75 = 60.75 t Support Resistance = 13*10 = 130 t Factor of safety = 130/60.75 = 2.13 COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 15
  • 16. Fig 6: Design of Support System at Junctions COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 16
  • 17. Estimation of Rock Load and Design of Support System in Depillaring Working Rock load (Proof) in slice and goaf edge was estimated using NGI-Q system from the following empirical relation: Proof = 2/3 (Jn1/2/ Jr) x (5Q) –1/3 Where, Jn = 9, Jr = 1.5, Q = 2 for slice and Q = 1 for goaf edge (Table 3). COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 17
  • 18. Table 3: Q-System Calculation COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 18
  • 19. Load in the slice is calculated to be (Proof) = 6.19 t/m2 and rock load at goaf edge is calculated to be Proof= 7.79 t/m2. The slice and goaf edges are supported by steel props and chocks. Slice width = 4m Rock load in slice, Proof is 6.19 t/m2 Breaker line bolt support = 8 t Chock with corner prop support = 30 t The support system will be three chocks with corner prop and five breaker line bolt as shown in Fig 7. The above configuration leads to: Support resistance =130 t/12sq.m = 10.5 t/ m2 Factor of safety = 10.8/6.19 = 1.75 for slices the rock Goaf edge side will also have 3 chocks with corner prop and5 breaker line bolts with spacing of 0.8m (Fig 8). The other calculations are as follows: The support resistance = 130 / 12= 10.8 t/m2 Factor of safety = Roof support / Rock load for goaf edge = 10.8 /7.79 = 1.39 It is good because goaf edge is supported for temporary period. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 19
  • 20. Fig 8: Design of Support System for Goaf Edges COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 20
  • 21. Design of Support System for Sides of Galleries Presence of 0.3 m thick clay band, 1 m above the floor of the seam reduces the stability of the sides (Fig 8.1). Therefore, the sides of the galleries are supported by stitching the wire ropes with the rock bolt. Three rock bolts are installed in a row with 1 m spacing and distance between the rows is 1.5m. Wooden lagging are provided at 1.5 m interval to increase the contact area of the stitching rope and to provide better support COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 21
  • 22. Fig 8.1: Design of Support System for Sides COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 16-04-2020 22
  • 23. COURSE MATERIAL FOR UCMT-MN-2102-on 16Apr 2020 Thank you very much for patient hearing and going through the slides sent as a rehearsal sample of online class for our students I look forward for your queries and online interaction through Microsoft team access as being planned by our NITR 16-04-2020 23