Stuart K. Roberts has over 32 years of experience in photogrammetry and laser scanning. He has led numerous laser scanning and 3D modeling projects in various industries, including oil and gas, infrastructure, and manufacturing. Roberts is skilled in using various software such as PhotoModeler, AutoCAD, Cyclone, and Plantlinx to process point cloud and photogrammetry data and develop 3D models for engineering design and analysis. He has successfully completed many projects on schedule and within budget.
Leyla Clothier has over 15 years of experience as a process engineer in water treatment, fertilizer production, oil and gas refining. She has expertise in plant design, construction, commissioning, process modeling, engineering reviews, and more. Currently she works as a manager at her own engineering consultancy, ProForte Engineering, providing services to several clients. Previously she has held process engineering roles for Origin Energy and other companies.
Kelvin Soice has over 20 years of experience as a seismic data processor for Schlumberger Technology/WesternGeco Resources. He has extensive experience processing both land and marine seismic data from initial quality control through final migration and delivery for projects in North America, South America, Africa, Europe, and Asia. His skills include using Omega, Petrel, and other processing software to perform tasks like geometry handling, noise attenuation, velocity modeling, and final output generation while meeting client needs. He also contributes to software testing and workflow development.
Core Groundwater Technical Services is a groundwater consulting company owned by J. Louis van der Walt, with over 22 years of experience. The company specializes in geohydrological investigations, groundwater modeling, monitoring, and database management. Recent projects include groundwater studies and impact assessments for sand mining, lodge development, mineral exploration, industrial development, and rural land use. Core Groundwater Technical Services captures scientific field data and utilizes specialized techniques and equipment to characterize aquifers and support water use authorizations.
Aspects of nepal's rural infrastructure project managment by bhim upadhyayaBhim Upadhyaya
The document discusses aspects of rural infrastructure project management. It defines a project and its key attributes such as objectives, time, cost, location, and teamwork. It outlines the typical project stakeholders including the client, consultant, contractor, and consumer. It then describes the common phases of a project including study, design, development, and operation. It provides examples of project management tools like the work breakdown structure, Gantt chart, and CPM. Finally, it highlights the importance of scope, time, and cost management for project success.
The document is a curriculum vitae for Sean Blanchette that summarizes his professional experience and qualifications. It details his education, survey equipment experience, software skills, and employment history working on various mining projects internationally from 1985 to the present day, including roles as a contract surveyor, senior project surveyor, and chief surveyor.
This document provides a summary of William Henry Rogers' qualifications and experience as an Electrical and Instrumentation Engineer, including his educational background, employment history, roles and responsibilities. It details over 25 years of experience in various industries such as petrochemical, mining, water treatment and manufacturing. His experience includes capital project development, instrumentation design, hazardous area inspections, process control systems design and commissioning.
This webinar was given on March 9th 2017. We covered
Inspection results
NRC Findings
Industry trends
Best Practices
Inspector Trends – what specific inspectors have identified
Compliance Matrix process and benefits
Experienced as an Intelligence Analyst (Geospatial Emphasis). Trained and experienced in Geospatial Intelligence (GEOINT), Measurement and Signature Intelligence (MASINT), Full Motion Video (FMV) and Overhead Persistent Infrared (OPIR). Specialized training in Hyperspectral and Multispectral Imagery Analysis. Fully trained in the use of the geospatial applications (ESRI ArcGIS, Socet GXP, ENVI, and Optiks). Working knowledge of MATLAB. Exceptional skills with all Microsoft Office products such as Word, PowerPoint, Excel, and Access. Past experience as field analyst, field technician, chemist, and environmental scientist. Certified Facility Security Officer.
Leyla Clothier has over 15 years of experience as a process engineer in water treatment, fertilizer production, oil and gas refining. She has expertise in plant design, construction, commissioning, process modeling, engineering reviews, and more. Currently she works as a manager at her own engineering consultancy, ProForte Engineering, providing services to several clients. Previously she has held process engineering roles for Origin Energy and other companies.
Kelvin Soice has over 20 years of experience as a seismic data processor for Schlumberger Technology/WesternGeco Resources. He has extensive experience processing both land and marine seismic data from initial quality control through final migration and delivery for projects in North America, South America, Africa, Europe, and Asia. His skills include using Omega, Petrel, and other processing software to perform tasks like geometry handling, noise attenuation, velocity modeling, and final output generation while meeting client needs. He also contributes to software testing and workflow development.
Core Groundwater Technical Services is a groundwater consulting company owned by J. Louis van der Walt, with over 22 years of experience. The company specializes in geohydrological investigations, groundwater modeling, monitoring, and database management. Recent projects include groundwater studies and impact assessments for sand mining, lodge development, mineral exploration, industrial development, and rural land use. Core Groundwater Technical Services captures scientific field data and utilizes specialized techniques and equipment to characterize aquifers and support water use authorizations.
Aspects of nepal's rural infrastructure project managment by bhim upadhyayaBhim Upadhyaya
The document discusses aspects of rural infrastructure project management. It defines a project and its key attributes such as objectives, time, cost, location, and teamwork. It outlines the typical project stakeholders including the client, consultant, contractor, and consumer. It then describes the common phases of a project including study, design, development, and operation. It provides examples of project management tools like the work breakdown structure, Gantt chart, and CPM. Finally, it highlights the importance of scope, time, and cost management for project success.
The document is a curriculum vitae for Sean Blanchette that summarizes his professional experience and qualifications. It details his education, survey equipment experience, software skills, and employment history working on various mining projects internationally from 1985 to the present day, including roles as a contract surveyor, senior project surveyor, and chief surveyor.
This document provides a summary of William Henry Rogers' qualifications and experience as an Electrical and Instrumentation Engineer, including his educational background, employment history, roles and responsibilities. It details over 25 years of experience in various industries such as petrochemical, mining, water treatment and manufacturing. His experience includes capital project development, instrumentation design, hazardous area inspections, process control systems design and commissioning.
This webinar was given on March 9th 2017. We covered
Inspection results
NRC Findings
Industry trends
Best Practices
Inspector Trends – what specific inspectors have identified
Compliance Matrix process and benefits
Experienced as an Intelligence Analyst (Geospatial Emphasis). Trained and experienced in Geospatial Intelligence (GEOINT), Measurement and Signature Intelligence (MASINT), Full Motion Video (FMV) and Overhead Persistent Infrared (OPIR). Specialized training in Hyperspectral and Multispectral Imagery Analysis. Fully trained in the use of the geospatial applications (ESRI ArcGIS, Socet GXP, ENVI, and Optiks). Working knowledge of MATLAB. Exceptional skills with all Microsoft Office products such as Word, PowerPoint, Excel, and Access. Past experience as field analyst, field technician, chemist, and environmental scientist. Certified Facility Security Officer.
The document is a 4-page curriculum vitae for David Bates, who has extensive experience in the UK nuclear industry spanning multiple organizations. It details his involvement in projects across the lifecycle of nuclear facilities, including roles such as project engineer, commissioning support engineer, safety engineer, and design lead engineer. His experience includes activities like engineering support, commissioning strategy development, contractor supervision, and risk assessment preparation for various decommissioning, waste handling, and plant upgrade projects.
The document provides a summary of Richard D. Wolf's experience and qualifications for a position. It outlines his extensive experience over 25 years in engineering management roles with companies in the HVAC and testing industries, where he specialized in project management, quality control, instrumentation design, and developing test protocols for new product types. He held positions including VP of Operations, Engineering Manager, Quality Supervisor, and Test Engineer, where he managed teams, improved testing processes, performed data analysis, and brought a business into profitability.
The document provides a summary of a senior management professional's skills and experience in project engineering, construction management, and quality assurance. Over 27 years, the professional has led numerous large-scale projects in oil/gas, power, and petrochemical industries. Notable accomplishments include managing instrumentation and control systems for multi-billion dollar projects in Abu Dhabi and Qatar. The professional's expertise includes planning, cost control, safety management, and overseeing teams across the project lifecycle.
Andrew Crookes has over 16 years of experience in mechanical engineering, most recently working as a Global Field Service Instructor for GE Oil & Gas. He has expertise in pneumatic and hydraulic systems from his background in the Royal Air Force as a mechanical systems and propulsion engineering supervisor. Crookes also worked as a Subsea Systems Field Service Engineer for GE Oil & Gas. He is seeking new opportunities and offers skills in engineering, project management, and technical instruction gained over a career spanning both military and oil & gas roles.
The Lord Howe Island Board (the Board) has engaged Jacobs as the Owner’s Engineer (OE) for the implementation of its Hybrid Renewable Energy Project (HREP) on the Island. The projects aims are to: x Reduce diesel consumption, which will help reduce future electricity tariff increases caused by fuel cost increases. x Reduce the cost of generation which will reduce the recurrent funding requirements from the NSW government.
The Board has obtained Australian Renewable Energy Agency (ARENA) and NSW Treasury funding to cover the project capital expenditure (CAPEX). The Board considered two options for the HREP. Option 11 encompasses installing wind turbines and solar PV while Option 22 involves installing only solar PV. Both options include the installation of a battery and control system. Option 1 provides the greatest diesel reduction and is preferred as it maximises the benefits of the project.
The location proposed for the installation of the wind turbines and solar PV is on the northern half of the island, north of the airport. The site, on a cleared section of Transit Hill, is elevated with north facing slopes which provides favourable characteristics for solar and wind. The site is also in close proximity to the island’s powerhouse.
Jacobs has undertaken this Technical Feasibility Study on behalf of the Board to review the technical feasibility of the two options before proceeding to the tender phase of the project. The study examines the optimal configuration, and sizing of the WTG’s, Solar PV and Battery based on potential variations in the capital cost and generation outputs of the WTG’s and Solar PV. The study does not consider alternative sources of generation such as options for wave power, etc as these have been previously examined by the Board and discounted (Powercorp, 2011).
The document discusses the challenges faced in the Mini-SAR project on India's Chandrayaan-1 mission to map the Moon's polar regions. It describes the origins of the proposal, the difficulties in obtaining funding and regulatory approvals from NASA and foreign governments, and the timeline of instrument development, testing, and integration into the Chandrayaan-1 spacecraft for launch. Some early results from Mini-SAR are also presented, showing maps of the lunar south pole and detections of unusual radar reflections that could indicate water ice on the Moon's surface.
Craig M. Moncrieff has over 35 years of experience in electrical installation, design, commissioning, and project management across various industries. He has expertise in hazardous area installations, instrumentation, control systems, telemetry systems, and permit to work systems. His experience includes roles with Jacobs Field Services, Grontmij Carlbro, Scottish Water, United Utilities, BASF Chemicals, Wexford County Council, Scottish Water Solutions, Transocean Sedco Forex, WOSWA, and Blue Circle.
This document provides an overview of a project to construct a GSM base station and tower for REGTel in Regina, Canada. The project aims to address congestion issues at two existing sites by providing additional network capacity. Key details include:
- The project team will decongest two existing sites by 30-40% and add capacity to serve an additional 9,600 customers on campus.
- The proposed site will generate $384,000 in monthly revenue and have a two year payback period.
- Work will include site surveying, permitting, civil works to construct the tower foundation and erect the tower, electrical and RF/microwave installation, testing, and commissioning.
-
Deacon Engineers is a specialist engineering firm founded in 2009 with offices in Perth and Shepparton. They have 13 staff and provide mechanical and structural engineering services to industries including mining, mineral processing, water and waste water, and maritime. Their services include feasibility studies, design, safety reviews, project management, and forensic engineering. They have expertise in areas like industrial plants, materials handling, cranes, pressure vessels, tanks, and conveying systems.
Agha Ilyas Ahsan has over 35 years of experience in engineering and management roles across various industries. He has managed numerous projects from initial sales and engineering to startup, with budgets ranging from $1 million to $35 million. Some of the projects he has led include refinery upgrades, wastewater treatment plants, offshore oil platforms, and petrochemical facilities. He is proficient in instrumentation engineering, project management, budgeting, scheduling, and client relations.
Akash Deep has over 9 years of experience in instrumentation design for oil, gas, and chemical plants. He has worked on projects for fractionation, ethane export, and carbon black and delayed coker facilities. His responsibilities included preparing instrument specifications, evaluating vendor offers, and reviewing drawings. He is proficient in instrumentation software like Smart Plant Instrumentation and AutoCAD.
This resume is for Asif Rashid, a senior planning engineer with over 12 years of experience in project planning, cost control, risk analysis, and contract management for oil, gas, petrochemical, and construction projects. He is seeking new opportunities and provides details of his work history and qualifications, including education in mechanical engineering and certification in project management. Key skills include planning, scheduling, cost estimation and control using Primavera and other software.
Donna Krupinski is an experienced mechanical and process engineer and project manager offering over 35 years of experience in engineering and project management services for domestic and international companies. She has expertise in areas such as water treatment, wastewater treatment, power generation, air pollution control and other industrial processes. She provides contract engineering and project management services through her firm Do.Kru.Solutions and has extensive experience developing process diagrams, specifications and managing projects from design through commissioning.
Peter Laing has over 30 years of experience as a planning engineer in the oil and gas industry. He has worked on numerous offshore oil and gas projects for companies such as Nexen, Shell, and BP. Laing's experience includes planning engineering work for projects involving offshore platforms, floating production vessels, and gas terminals. He is proficient in planning software such as Primavera P6, P3, and P5.
T-Rex provides safe, fast, non-destructive vacuum excavation services using hydro excavation trucks with water, air, and vacuum capabilities. They have a fleet of 21 trucks across several Texas cities and Shreveport, LA. T-Rex prioritizes safety and has a comprehensive health, safety, and environment program to ensure work is conducted safely. They offer benefits like preventing change orders, fast digging in hard ground, re-using excavated dirt for backfill, and the ability to excavate in congested or remote areas.
Peter Scott has over 30 years of experience as an instrument engineer working on projects in the oil and gas industry. He is currently working for ConocoPhillips on a DCS replacement project. Previously he has worked for ABB, Amec, and other engineering companies on projects involving control system upgrades, instrumentation design, and commissioning. He has a background as an instrument technician and holds an HNC in industrial measurement and control.
James M. Ratino has experience in engineering and physics. He received a Bachelor of Science in engineering and physics from Frostburg State University, where he double majored and concentrated in materials engineering. His experience includes designing devices to measure pressure and calibrate valves for NIST, designing and constructing an ultra-capacitor pack for battery replacement, and leading a capstone design project to create a gold ore shaker table. He is currently an engineering technician at NIST, where he has also worked as a student trainee and guest researcher.
This document contains a resume for Marlin Bostwick that summarizes his experience as an electrician working on projects throughout Alaska and remote locations. It lists his licenses, certificates, and skills including experience with Microsoft Office, health and safety committees, and the US Air Force. His work history details various roles as an electrician, quality control inspector, and project manager for companies in Alaska, Antarctica, and the Marshall Islands dating back to 1984.
The Registry of Geothermal Services and Equipment contains the "Yellow Pages" for the worldwide geothermal industry. Companies are listed with a description of their products and services. The Geothermal Resources Council provides these pages for free.
Dean Hamilton has over 30 years of experience in engineering, construction, and project cost estimating. He holds an Associate Diploma in Mechanical Engineering and is proficient in numerous cost estimating software programs. Hamilton has worked on a wide range of projects across multiple industries, including mining, infrastructure, power, oil and gas. He has extensive experience leading teams of estimators and developing cost studies for multi-billion dollar projects.
This document provides an overview of computer bus interfaces and structures. It discusses the main components of a computer bus including the bus interface, address bus, data bus, and control bus. It describes different bus architectures like parallel buses, ribbon cables, and strip connectors. The document also covers bus arbitration, synchronous and asynchronous bus timing, and examples of common computer buses like PCI and FireWire.
Grey Food Trends - Recession and "Credit Crunch Cuisine"Andre Prior
Excerpt from Grey Food Trends Study "Holistic Food". Focussing on the effect of the recession on consumer behaviour, the food industry and grocery stores. February 2009.
The document is a 4-page curriculum vitae for David Bates, who has extensive experience in the UK nuclear industry spanning multiple organizations. It details his involvement in projects across the lifecycle of nuclear facilities, including roles such as project engineer, commissioning support engineer, safety engineer, and design lead engineer. His experience includes activities like engineering support, commissioning strategy development, contractor supervision, and risk assessment preparation for various decommissioning, waste handling, and plant upgrade projects.
The document provides a summary of Richard D. Wolf's experience and qualifications for a position. It outlines his extensive experience over 25 years in engineering management roles with companies in the HVAC and testing industries, where he specialized in project management, quality control, instrumentation design, and developing test protocols for new product types. He held positions including VP of Operations, Engineering Manager, Quality Supervisor, and Test Engineer, where he managed teams, improved testing processes, performed data analysis, and brought a business into profitability.
The document provides a summary of a senior management professional's skills and experience in project engineering, construction management, and quality assurance. Over 27 years, the professional has led numerous large-scale projects in oil/gas, power, and petrochemical industries. Notable accomplishments include managing instrumentation and control systems for multi-billion dollar projects in Abu Dhabi and Qatar. The professional's expertise includes planning, cost control, safety management, and overseeing teams across the project lifecycle.
Andrew Crookes has over 16 years of experience in mechanical engineering, most recently working as a Global Field Service Instructor for GE Oil & Gas. He has expertise in pneumatic and hydraulic systems from his background in the Royal Air Force as a mechanical systems and propulsion engineering supervisor. Crookes also worked as a Subsea Systems Field Service Engineer for GE Oil & Gas. He is seeking new opportunities and offers skills in engineering, project management, and technical instruction gained over a career spanning both military and oil & gas roles.
The Lord Howe Island Board (the Board) has engaged Jacobs as the Owner’s Engineer (OE) for the implementation of its Hybrid Renewable Energy Project (HREP) on the Island. The projects aims are to: x Reduce diesel consumption, which will help reduce future electricity tariff increases caused by fuel cost increases. x Reduce the cost of generation which will reduce the recurrent funding requirements from the NSW government.
The Board has obtained Australian Renewable Energy Agency (ARENA) and NSW Treasury funding to cover the project capital expenditure (CAPEX). The Board considered two options for the HREP. Option 11 encompasses installing wind turbines and solar PV while Option 22 involves installing only solar PV. Both options include the installation of a battery and control system. Option 1 provides the greatest diesel reduction and is preferred as it maximises the benefits of the project.
The location proposed for the installation of the wind turbines and solar PV is on the northern half of the island, north of the airport. The site, on a cleared section of Transit Hill, is elevated with north facing slopes which provides favourable characteristics for solar and wind. The site is also in close proximity to the island’s powerhouse.
Jacobs has undertaken this Technical Feasibility Study on behalf of the Board to review the technical feasibility of the two options before proceeding to the tender phase of the project. The study examines the optimal configuration, and sizing of the WTG’s, Solar PV and Battery based on potential variations in the capital cost and generation outputs of the WTG’s and Solar PV. The study does not consider alternative sources of generation such as options for wave power, etc as these have been previously examined by the Board and discounted (Powercorp, 2011).
The document discusses the challenges faced in the Mini-SAR project on India's Chandrayaan-1 mission to map the Moon's polar regions. It describes the origins of the proposal, the difficulties in obtaining funding and regulatory approvals from NASA and foreign governments, and the timeline of instrument development, testing, and integration into the Chandrayaan-1 spacecraft for launch. Some early results from Mini-SAR are also presented, showing maps of the lunar south pole and detections of unusual radar reflections that could indicate water ice on the Moon's surface.
Craig M. Moncrieff has over 35 years of experience in electrical installation, design, commissioning, and project management across various industries. He has expertise in hazardous area installations, instrumentation, control systems, telemetry systems, and permit to work systems. His experience includes roles with Jacobs Field Services, Grontmij Carlbro, Scottish Water, United Utilities, BASF Chemicals, Wexford County Council, Scottish Water Solutions, Transocean Sedco Forex, WOSWA, and Blue Circle.
This document provides an overview of a project to construct a GSM base station and tower for REGTel in Regina, Canada. The project aims to address congestion issues at two existing sites by providing additional network capacity. Key details include:
- The project team will decongest two existing sites by 30-40% and add capacity to serve an additional 9,600 customers on campus.
- The proposed site will generate $384,000 in monthly revenue and have a two year payback period.
- Work will include site surveying, permitting, civil works to construct the tower foundation and erect the tower, electrical and RF/microwave installation, testing, and commissioning.
-
Deacon Engineers is a specialist engineering firm founded in 2009 with offices in Perth and Shepparton. They have 13 staff and provide mechanical and structural engineering services to industries including mining, mineral processing, water and waste water, and maritime. Their services include feasibility studies, design, safety reviews, project management, and forensic engineering. They have expertise in areas like industrial plants, materials handling, cranes, pressure vessels, tanks, and conveying systems.
Agha Ilyas Ahsan has over 35 years of experience in engineering and management roles across various industries. He has managed numerous projects from initial sales and engineering to startup, with budgets ranging from $1 million to $35 million. Some of the projects he has led include refinery upgrades, wastewater treatment plants, offshore oil platforms, and petrochemical facilities. He is proficient in instrumentation engineering, project management, budgeting, scheduling, and client relations.
Akash Deep has over 9 years of experience in instrumentation design for oil, gas, and chemical plants. He has worked on projects for fractionation, ethane export, and carbon black and delayed coker facilities. His responsibilities included preparing instrument specifications, evaluating vendor offers, and reviewing drawings. He is proficient in instrumentation software like Smart Plant Instrumentation and AutoCAD.
This resume is for Asif Rashid, a senior planning engineer with over 12 years of experience in project planning, cost control, risk analysis, and contract management for oil, gas, petrochemical, and construction projects. He is seeking new opportunities and provides details of his work history and qualifications, including education in mechanical engineering and certification in project management. Key skills include planning, scheduling, cost estimation and control using Primavera and other software.
Donna Krupinski is an experienced mechanical and process engineer and project manager offering over 35 years of experience in engineering and project management services for domestic and international companies. She has expertise in areas such as water treatment, wastewater treatment, power generation, air pollution control and other industrial processes. She provides contract engineering and project management services through her firm Do.Kru.Solutions and has extensive experience developing process diagrams, specifications and managing projects from design through commissioning.
Peter Laing has over 30 years of experience as a planning engineer in the oil and gas industry. He has worked on numerous offshore oil and gas projects for companies such as Nexen, Shell, and BP. Laing's experience includes planning engineering work for projects involving offshore platforms, floating production vessels, and gas terminals. He is proficient in planning software such as Primavera P6, P3, and P5.
T-Rex provides safe, fast, non-destructive vacuum excavation services using hydro excavation trucks with water, air, and vacuum capabilities. They have a fleet of 21 trucks across several Texas cities and Shreveport, LA. T-Rex prioritizes safety and has a comprehensive health, safety, and environment program to ensure work is conducted safely. They offer benefits like preventing change orders, fast digging in hard ground, re-using excavated dirt for backfill, and the ability to excavate in congested or remote areas.
Peter Scott has over 30 years of experience as an instrument engineer working on projects in the oil and gas industry. He is currently working for ConocoPhillips on a DCS replacement project. Previously he has worked for ABB, Amec, and other engineering companies on projects involving control system upgrades, instrumentation design, and commissioning. He has a background as an instrument technician and holds an HNC in industrial measurement and control.
James M. Ratino has experience in engineering and physics. He received a Bachelor of Science in engineering and physics from Frostburg State University, where he double majored and concentrated in materials engineering. His experience includes designing devices to measure pressure and calibrate valves for NIST, designing and constructing an ultra-capacitor pack for battery replacement, and leading a capstone design project to create a gold ore shaker table. He is currently an engineering technician at NIST, where he has also worked as a student trainee and guest researcher.
This document contains a resume for Marlin Bostwick that summarizes his experience as an electrician working on projects throughout Alaska and remote locations. It lists his licenses, certificates, and skills including experience with Microsoft Office, health and safety committees, and the US Air Force. His work history details various roles as an electrician, quality control inspector, and project manager for companies in Alaska, Antarctica, and the Marshall Islands dating back to 1984.
The Registry of Geothermal Services and Equipment contains the "Yellow Pages" for the worldwide geothermal industry. Companies are listed with a description of their products and services. The Geothermal Resources Council provides these pages for free.
Dean Hamilton has over 30 years of experience in engineering, construction, and project cost estimating. He holds an Associate Diploma in Mechanical Engineering and is proficient in numerous cost estimating software programs. Hamilton has worked on a wide range of projects across multiple industries, including mining, infrastructure, power, oil and gas. He has extensive experience leading teams of estimators and developing cost studies for multi-billion dollar projects.
This document provides an overview of computer bus interfaces and structures. It discusses the main components of a computer bus including the bus interface, address bus, data bus, and control bus. It describes different bus architectures like parallel buses, ribbon cables, and strip connectors. The document also covers bus arbitration, synchronous and asynchronous bus timing, and examples of common computer buses like PCI and FireWire.
Grey Food Trends - Recession and "Credit Crunch Cuisine"Andre Prior
Excerpt from Grey Food Trends Study "Holistic Food". Focussing on the effect of the recession on consumer behaviour, the food industry and grocery stores. February 2009.
Este documento lista as principais regiões de Santa Catarina e algumas de suas atrações, incluindo a Região Sul com o Morro dos Coveiros, a Região Norte com Joinville, o Vale do Itajaí, a Grande Florianópolis, a Serra com Bom Jardim da Serra, a Região Oeste com Chapecó e o Meio-Oeste com Joaçaba.
Selected design patterns (as part of the the PTT lecture)Ralf Laemmel
This document discusses several common design patterns, including Composite, Command, Visitor, Observer, MVC, Proxy, Object Adapter, Template Method and Abstract Factory. For each pattern, it provides a short description of the problem it addresses and its basic structure and solution. It also includes examples of how each pattern could be implemented.
The document provides information about the Islamic month of Ramadan, including the meaning and purpose of fasting during this month. It explains that fasting involves abstaining from food, drink, and sexual activity from dawn to dusk. The goals of fasting include developing self-restraint and drawing closer to God. Fasting has spiritual, physical, and social benefits such as increased empathy for the poor.
The document discusses the stages of human creation according to Islamic scripture:
1) Humans are created from nutfah, the mixed drops of male and female sexual discharge.
2) The nutfah then develops into an 'alaqah, a leech-like structure or blood clot.
3) The 'alaqah then develops into a mudghah, a chewed-like lump, before developing further in the womb over three veils of darkness.
4) Allah shapes the human in the womb and brings them out as infants, then guides their growth and development until full strength and old age.
The document discusses the life and teachings of Muhammad and provides praise and admiration from several historical non-Muslim figures. It quotes Encyclopedia Britannica describing Muhammad as an honest and upright man who gained loyalty. It then shares perspectives on Muhammad from several prominent historical figures including George Bernard Shaw, Michael H. Hart, Thomas Carlyle, Mahatma Gandhi, and Alphonse de Lamartine, who recognize Muhammad's wisdom, influence, and greatness.
Brad Wilson has over 20 years of experience in GIS survey and technical roles. He has expertise in CAD design, pipeline drafting, data processing and streamlining survey data from collection through completion. Mr. Wilson has coordinated GIS survey technicians on many pipeline projects, writing procedures to improve efficiency and remove human error. He aims to make data accurate, transparent, traceable, and complete.
Leading Naval Architectural Firm Leverages 3D to Solve Large Scale ProblemsJake Rosenbaum
Murray and Associates, based in Fort Lauderdale, FL is one of the leading naval architectural firms in the U.S. With more than
20 years of experience, they have built their reputation on providing solutions to their client’s most challenging projects, oftenwith innovative, 3D technology.
The firm began using 3D scanning technology in 1999 - they added the FARO Laser Scanner in 2014. Jake Rosenbaum,
Director of Information Systems for Murray and Associates, noted, “Prior to 2014 we primarily used the digital point cloud
as a means of capturing the hull surfaces of existing vessels for use in our 3D modeling software. That data was used to
create a surface model that could be used for conducting stability calculations, producing renderings, and planning proposed modifications to vessels.”
The document provides a summary of Mostafa Nabil El Banhawy's resume. It outlines his contact information, qualifications, work experience as a subsea inspection engineer, education, training, computer skills, personal skills, and interests. His experience includes over 800 offshore days working on inspection projects for companies like Woodside Energy, BHP Billiton, Santos, and Talisman using software like SIMS, NEXUS, and COABIS. He is a 3.4u CSWIP certified inspection engineer looking for new position opportunities.
Michael John Foreman has over 30 years of experience in piping design, project coordination, and QA/QC checking for industrial projects. He has expertise in piping design for petrochemical, refinery, oil and gas processes. Some of his responsibilities include piping design, project management, cost estimating, engineering changes, and process safety. He is proficient in various piping design software like CADWorx, PDMS, Navisworks, and SmartPlant 3D.
This document summarizes Eric Beemer's work history as a petroleum engineer since 2011. He has overseen drilling operations for over 100 wells for Sandridge Energy, drilling various well types including horizontal and multi-lateral wells. He has experience supervising rig crews and operations. Recent projects include pre-setting surface holes for horizontal Niobrara wells in Colorado and drilling horizontal wells in Kansas targeting Mississippian formations. He utilizes directional drilling software and analyzes drilling data to improve performance.
The document provides biographical information about Brad including his education and employment history. He graduated from Charles Page High School in 1988 and completed two years of engineering classes and CAD training. He has over 20 years of experience in surveying, drafting, and GIS data management for pipeline and utility projects. His current role is as a Survey Data Technician Coordinator where he oversees data processing and ensures quality control.
Tirumani Naresh is an electrical engineer seeking a challenging position applying his 3+ years of experience. He has worked on projects in design, construction, testing and commissioning. His responsibilities have included designing substations, preparing bills of materials, reviewing designs, and supporting field execution. He is proficient in AutoCAD, programming languages, and has managed projects in power distribution and installation of equipment.
• Diploma Architectural Assistantship with 10+ years of professional experience and good academic records.
• Presently working as a Sr. Survey Engineer for CGC Converse Technologies.
• Having 9+ years of surveying experience in Gulf.
• Working as Draftsman for nearly 1 year.
• Proactive and hardworking person handled tight deadlines and heavy pressure
CTS provides 3D laser scanning services to capture precise 3D representations of structures and environments. They collect over 500,000 data points per second, enabling them to accurately document construction sites, buildings, and other projects. CTS uses 3D laser scanning for applications such as as-built modeling, structural analysis, and facility management. Their services include 3D scanning, building information modeling, and the delivery of 3D models, point clouds, and other digital building representations.
CTS provides 3D laser scanning services to capture precise 3D representations of structures and environments. They collect over 500,000 data points per second to create as-built models and documentation. CTS uses laser scanning for applications like construction documentation, structural analysis, and fabrication of custom elements. Their experience with BIM and laser scanning allows for coordination between design and construction teams.
Sub-Surface Detection Ltd's newsletter summarizes their projects and activities in 2016. It discusses completing utility markouts for CPB on the State Highway 16 upgrade, conducting a GPR and GPS survey to map utilities for Bartley Consultants on East Coast Road, using UAV technology to survey utilities at Sylvia Park shopping centre for Dominion Contractors, providing training and qualifications for technicians, and expanding their team by adding new staff members Vish, Damon, and Matt.
This document provides a summary of Michael E. McCollister's qualifications and experience. He has over 30 years of experience in mechanical design and CAD modeling. Currently he works as a Senior CAD Designer for Aerojet-Rocketdyne where he supports design activities using UG NX 9 and Team Center 9. Previously he has worked for several aerospace and defense companies, including SpaceX and Orbital Sciences, where he performed 3D modeling, drafting, assembly design, and project management. He is proficient in multiple CAD software packages and has a background in mechanical engineering fundamentals.
0082010 19200 00007 C Hds Leica User Conf2006StuartRoberts
Stuart Roberts discusses how EDG, a large engineering company, uses laser scanning technology for remote projects. He outlines the benefits of laser scanning, including increased accuracy, reduced field trips, and safety. Roberts also describes how scanning has helped EDG secure more projects by helping to beat schedules and budgets. He provides an example of a successful scanning project in Angola and how scanning supports EDG's business development strategies.
With the advent of higher powered 3D scanners comes the challenge of dealing with the dense point cloud data sets. Direct Dimensions uses a wide variety of 3D scanning equipment to capture the as-built shape of existing objects. The common problem with all of these projects is the need to proces the point cloud data.
While applications fall generally into either reverse engineering and inspection, both directions present challenges for processing the large data sets efficiently, quickly, and properly. This presentation will focus on an overview of the software tools available commercially that address these problems with a comparison of the various workflows, strategies, and results that one can expect from the various solutions.
With the advent of higher powered 3D scanners comes the challenge of dealing with the dense point cloud data sets. Direct Dimensions uses a wide variety of 3D scanning equipment to capture the as-built shape of existing objects. The common problem with all of these projects is the need to proces the point cloud data.
While applications fall generally into either reverse engineering and inspection, both directions present challenges for processing the large data sets efficiently, quickly, and properly. This presentation will focus on an overview of the software tools available commercially that address these problems with a comparison of the various workflows, strategies, and results that one can expect from the various solutions.
The document is a resume for Mitra Pratt summarizing her 20 years of experience in various fields including environmental remediation, IT, GIS, land survey, project engineering and management. She has a BS in Geology/Anthropology and is proficient in software such as ArcGIS, AutoCAD, and Microsoft Office. Her professional experience includes roles as a project manager, regulatory compliance specialist, and land mapping analyst for oil and gas companies.
This document contains the resume of Dr. A. Vivekananth, who has 10 years of experience in groundwater, remote sensing, and GIS projects. He currently works as a project manager at Geofiny Technologies, where he oversees multiple projects simultaneously, coordinates project teams, and ensures projects are completed on schedule. His experience includes projects related to water resource management, geological and land use mapping using remote sensing, cadastral mapping, and lidar data processing. He has a PhD in groundwater assessment and postgraduate diplomas in GIS management.
- Troy Weiss has over 27 years of experience in mechanical piping design for offshore and onshore petrochemical projects internationally. He has extensive knowledge of piping design software like CADWorx and experience leading piping design projects in locations like Africa and South America.
- He worked as a Lead Piping Designer at Doris, Inc. from 2012-2016 where he led projects in Cameroon and Angola utilizing 3D modeling software. Previous experience includes working as a Senior Piping Designer at Maverick Engineering from 2006-2012 on projects in Texas, Alabama, and other locations.
- He is proficient in piping design, 3D modeling, coordinating multi-discipline teams, and providing on
FULL PROJECT MANAGEMENT AND CONSULTANCY
- Single-point responsability;
- Improved schedule and performance;
- Cost control and value engineering;
- Enhanced client risk management;
- Coordination of global participation.
3D LASER SCANNING
- Consistent as-built documentation for CAD specifications of the plant layout;
- Monitoring installation behavior over time;
- Prefabrication purposes;
- Deformation analysis and tridimensional positioning.
CLASH DETECTION AND REPORTING
- Clash / Inter ference check between existing conditions and new designed elements.
DIMENSION CONTROL
- Dimensional assessments for installations, equipments and structures;
- Correspondence check between CAD project and point clouds;
- Tank / vessel volumetric information;
3D MODELLING
- Complete 3D CAD models based on 3D point clouds.
2D DRAWINGS
- P&IDs, isometrics, sections, elevations, plans.
DATA CONVERSION
- Point clouds conversion to various data formats to meet client ’s requirements.
FULL PROJECT MANAGEMENT AND CONSULTANCY
- Single-point responsability;
- Improved schedule and performance;
- Cost control and value engineering;
- Enhanced client risk management;
- Coordination of global participation.
3D LASER SCANNING
- Consistent as-built documentation for CAD specifications of the plant layout;
- Monitoring installation behavior over time;
- Prefabrication purposes;
- Deformation analysis and tridimensional positioning.
CLASH DETECTION AND REPORTING
- Clash / Inter ference check between existing conditions and new designed elements.
DIMENSION CONTROL
- Dimensional assessments for installations, equipments and structures;
- Correspondence check between CAD project and point clouds;
- Tank / vessel volumetric information;
3D MODELLING
- Complete 3D CAD models based on 3D point clouds.
2D DRAWINGS
- P&IDs, isometrics, sections, elevations, plans.
DATA CONVERSION
- Point clouds conversion to various data formats to meet client ’s requirements.
1. Stuart K. Roberts
Executive Summar y
Over 32 years of experience performing photogrammetric and photo-
interpretation. 16 years of field experience working with close range
photogrammetry, construction survey, and laser scanning technology. Continues
to work multiple software to develop 3D geometry from point cloud and
photogrammetric data used for interference checking in engineering design work.
Review and verify 3rd party data for accuracy and scope completeness. Selected
to present laser scanning methodologies to peer group at Leica International
User meeting in 2006 and 2008 in San Ramon, California.
Over 6 years supporting document control and information management
department, including the daily management, archiving, retrieving and digital
imaging of client and vendor documents for oil and gas projects.
Pr ofessional Experience
Texas Surveys / EDG Consulting Engineers
Participated as a contract photogrammetrist on a turbine located in Brunei.
Collected 120 photographs from outside and inside the turbine. Analyzed all
photography using PhotoModeler 2011 within 10 days of collection with the
average RMS of 1 mm. As built 20 pigtail lines with the connecting flanges as per
initial scope and follow on with 4 and 6 inch gas distribution lines. Points were
collected in PhotoModeler exported to AutoCad and modeling was finished in
Cyclone. Final deliverable was AutoCad 2010.
Marathon / EDG Consulting Engineers
Project manager / team lead to add additional imagery a Petroleum processing
unit located at Punta Europa in Equatorial Guinea. The additional imagery was
collected in new areas of scope and before / after details. Conducted new
scanning of two offshore platforms with a connecting bridge. 500+ scans were
registered onsite. Supported drafting and engineering with Structural / Pipe
modeling that were not represented in 2D as-built drawings.
Page 1
2. Stuart K. Roberts
Bayfield Energy / EDG Consulting Engineers
Project manager / team lead to image 4 platforms and onshore tank farm located
Trinidad. Conducted over 500 high density scans of the facilities with HDS 6100
scanner in one field trip. Data was registered onsite and Truviews were issued
upon to the US. Supported drafting and engineering with structural analysis and
clash detection. Modeled existing well heads and routed new well heads to avoid
excessive cutting to the platforms.
Rick Engineering / EDG Consulting Engineers
Contract laser registration specialist of data collected externally. Registered 200+
scans in Cyclone 6.0.4. Follow on work included 400 additional scans.
Texas Surveys / EDG Consulting Engineers
Participated as a contract photogrammetrist on the Hale Boggs Bridge,
Louisiana. Collected 280 photographs from 280 ft elevations and ground stays in
2 days. Analyzed all photography using PhotoModeler 6 within 7 days of
collection with the average RMS of .3 mm. Modeled cable / plate intersection and
center point of bolts locations for verification.
Marathon / EDG Consulting Engineers
Project manager / team lead to image a Petroleum processing unit located at
Punta Europa in Equatorial Guinea. Conducted over 100 high density scans of
the facility with HDS 4500 scanner in one field trip. Data was registered onsite
and Truviews were issued upon to the US. Supported drafting and engineering
with Structural / Pipe modeling that were not represented in 2D as-built drawings.
CONFIDENTIAL CLIENT / EDG Consulting Engineers
Forensic scanning of an accident site. Conducted 60 high density scans of the
facility with HDS 6000 scanner in two field trips. Data was registered onsite and
Truviews were issued in two days. Performed three loop closures for a RMS
error of 2.6 mm.
Inovx / EDG Consulting Engineers
Contracted team lead for onshore tank farm in Southern California. Surveyed and
processed Leica 4500 scan data into LFM Registration software. Averaged 35
scans per day all tied to survey.
Page 2
3. Stuart K. Roberts
Inovx / EDG Consulting Engineers
Contracted team lead for onshore retired FCC unit. Finished scanning and
survey work (up to 250’) in 19 days. Trained new field hands in survey and
registration procedures during regular work hours. All scans registered to survey
in LFM register and QC’d data before team left site.
Poyry / EDG Consulting Engineers
Contracted team lead for revamp of chlorine plant. Surveyed and scanned in
Arctic winter-like weather for 15 day. Compiled 400 +scans and published
Truviews in 6 days of registration. Combined survey, vertex to vertex and cloud
to cloud registrations into one database with an overall RMS of 4 millimeters.
Trained 4 new designers in 3D Plantlinx software and assumed the role of
database manager.
Chevron / EDG Consulting Engineers
Project manager for laser scanning of platform in the Gulf of Mexico. Platform
was scheduled for refit and repair from Hurricane Katrina. Model was constructed
of the boat landing and below cellar deck in less than 3 weeks.
Inovx / EDG Consulting Engineers
Contracted team lead for offshore platform during an unscheduled shutdown.
Performed 27 scans in 10 hours. Data was registered and reviewed with client
present before leaving platform.
Inovx / EDG Consulting Engineers
Contracted team lead and site manager for plant relocation. Surveyed facility
sometimes using two survey instruments at once to speed data collection of
elevated structures. Assisted for 21 days of scanning / survey during the day and
performed analytics during evening hours.
BP / EDG Consulting Engineers
Managed sonar modeling project for platforms destroyed by Hurricane Katrina.
Modeling was based on multi-beam sonar data, ROV videos and 2D drawings.
Objective was to build 3D models of the downed facilities that would then be
used to generate visual work plans for divers and ROV operators who would
disassemble the facilities piece by piece so the wells could be permanently
abandoned. 3D Data was also converted for use by ROV navigation systems to
ensure ROV survivability. 10 platforms were modeled / delivered in 4 months.
Page 3
4. Stuart K. Roberts
Chevron / EDG Consulting Engineers
Project Manager for laser scanning 5 offshore platforms in West Africa.
Subsequently QA’ed all data from Africa projects, correcting registration errors
and accelerated the data stream into EDG drafting for clash detections. Assisted
other EDG offices with technical support for 3D modeling.
BP / EDG Consulting Engineers
Project lead for a “virtual engineering” project involving a damaged platform in
the Gulf of Mexico. The facility was surveyed and laser scanned. The 3D data
provided the As-Is foundation for engineering analysis of the 15 degree
compound tilt of the facility. The damaged platform was then modeled and 2D
design drawings were added to the model to verify spatial relationship of the new
adjacent support platform. 3 major clashes were found and resolved before field
construction / installation was commenced, resulting in a savings of over $5MM
as defined by the client.
Inovx / EDG Consulting Engineers
Contracted team lead and site manager for plant retrofit of a brewery to an
ethanol production facility. 500 survey shots and 110 scans in 5 days.
Chevron / EDG Consulting Engineers
Team lead on 4 offshore platforms in West Africa. Laser scan data was compiled,
registered and delivered to the client’s prime contractor on time and under
budget.
IQA Solutions / Summit Engineering / EDG Consulting Engineers
Team lead of scan team on FCC unit. Covered 850 feet of pipe rack and main
structure under unit in four days with 250 survey shots and 63 scans. Trained
support staff to operate the equipment and software. Continued to provide project
support post-demobilization via internet to complete subsequent additional
scope.
Chevron / EDG Consulting Engineers
Team lead for laser scanning on North Nemba platform in West Africa for 7 days
using a Cyra 2500. Scan data was compiled, registered and delivered to the
client in Houston on time and within budget.
Chevron / EDG Consulting Engineers
Team lead for laser scanning project on South Nemba platform in West Africa for
32 days using a Cyra 2500. Scan data was compiled and registered on location.
The team worked with the design engineer in-country to build tie-in components
and construct conceptual design. Project was completed on time, within budget.
Page 4
5. Stuart K. Roberts
Chevron / EDG Consulting Engineers
Support staff on laser scanning project in West Africa to collect 3D data on 11
offshore platforms over 65 days using a Cyra 2500. Laser data was compiled
using cloud-to-cloud registration.
INOVx Solutions
Field support for scanning project on an operational process unit. A Cyra 2500
was used (20 scans) and supplemented with photogrammetry. Processed all
data in 16 hours and delivered to client.
INOVx Solutions
Field team lead on a non-operational furnace to map 72 bolt locations using a
Cyra 2500 (16 scans) with supplemental photogrammetry. Laser data was
compiled into regions for easier access. Assisted the client with specific modeling
on request.
Marathon Engineers / INOVx Solutions
Field team lead on project to scan an operational paper machine, with associated
piping and load bearing structure using a Cyra 2500 (300+ scans) with
supplemental photogrammetry. Laser data was compiled into regions for easier
access. Assisted the client with specific modeling on request.
CDI Engineers / INOVx Solutions
Field team lead on project to scan an operational facility. Performed work in a
very hazardous environment without incident or loss of capital equipment.
Provided survey and photogrammetry support on 72 tie-in points in 2 days.
Proctor & Gamble / Lockwood Greene
Field team lead on pilot project for P&G. Multiple floors were scanned and
photographed to build a 3D PDS model. Model was initially delivered in
MicroStation. This was the largest scanning project to-date performed in Mexico
(105 scans).
Otepi Engineers / INOVx Solutions
Field team lead on the scanning and photogrammetry portion of a consortium
project to revamp of an FCC unit in a petroleum plant. Specified areas were
collected, solely using photogrammetry for high accuracy and fewer critical areas
were scanned. Coordinated model construction between two offices and three
team members. FCC unit was modeled down to two-inch lines.
Page 5
6. Stuart K. Roberts
Veco Engineers / INOVx Solutions
Field team lead on an operational hydrofluoric acid facility. Performed work in a
very hazardous environment without incident or loss of capital equipment. The
client saved 2,000 man-hours on a facility revamp without exposing personnel to
the hazardous environment. Laser data was compiled into regions for easier data
manipulation.
Shell / Fluor Daniel / INOVx Solutions
Field team lead collecting 3D data on two subsequent field trips. The client
required 1 / 8th inch accuracy to mate 72" stub vacuum lines and spools to new
structure and associated piping. All elements were milled and welded without any
excessive grinding or fill.
Dow Chemical / INOVx Solutions
Lead surveyor on process chlorine plant. The client required 1 / 8 inch accuracy
for replacing stainless steel pipe with exotic alloy pipe. Model was built using
photogrammetry for high accuracy and overall scans for obstructions.
MicroStation model was delivered within a week of returning from the field.
Syncrude / Fluor Daniel / INOVx Solutions
Lead surveyor on four different process units. Placed control survey for three
other field collection teams enabling the crews to start the following day without
wasting time placing control and ensuring that all teams had the same survey
data sets. Provided scanning and photogrammetry support once the primary task
was completed. All four units were finished in two weeks.
Six Flags / INOVx Solutions
Field team member collecting data on a roller coaster. Using the Cyrax 2500
scanner and 80 photo pairs, the model was constructed and delivered within 10
days. All data was collected in one day due to the park schedule.
Chevron / Fluor Daniel / INOVx Solutions
Field team lead for one out of three teams. Primary task was collecting data at
extreme height (380 + feet) safely and efficiently. After primary task was
completed, lead another team to finish coker unit in two weeks.
Chevron / Fluor Daniel / INOVx Solutions
Field team lead on subsequent change order to collect more data in additional
areas. Used survey control from a previous trip to save one day of effort.
Collected the two additional areas in 5 days with a three-man crew. Tie-in points
were collected 80 feet above grade to 1 / 8th inch accuracy.
Page 6
7. Stuart K. Roberts
Equilon / Fluor Daniel / INOVx Solutions
Supported two independent field teams as a floater. Assisted one team with
survey and the other team with photogrammetry. Very tight schedule as
environmental deadlines were closing.
Air Products / INOVx Solutions
Supported team lead with survey, photogrammetry and Cyra 2400 laser scanner
in a tungsten hexafluoride unit. Work was conducted over 5 days and 20 days of
modeling.
TechnoConsult / INOVx Solutions
Field team lead on pilot project to prove technology to owner / operator PDVSA.
Project was successful with a follow on project encompassing entire FCC unit
and 8 additional areas to the project.
Proctor & Gamble / Fluor Daniel
Provided detailed 3D model for revamp project using newer Magan NT data
collection software. Model was delivered in MicroStation and provided client with
as-built data for clash detection and structural locations.
Syncrude / Fluor Daniel
Field team member responsible for surveying photo control targets and
dimensional control. Completed two units with photogrammetry. Constructed
detailed model in 3 weeks. Worked in arctic conditions for two weeks.
Celanese Hoest / Fluor Daniel
Provided service and support for as-built documentation of an operating Acrylic
Acid Unit. The 3D model was used to determine the locations of multiple tie-in
points for new equipment and flanges. Also, provided interference detection for
the routing of new stainless steel piping. The project included the use of Cyrax
2400 scanning unit for long-range data acquisition and modeling.
Proctor & Gamble / Fluor Daniel
Participated in the as building of a dry laundry soap facility. Data was collected
for a rapid revamp / expansion of the existing structure, associated pipe racks
and glass pipe. Permanent survey plates were installed to speed follow-on site
visits and aid newer laser scanning registration. This project required two three-
week visits to complete data setup and capture. The project included the use of
Cyrax 2400 scanning unit for long-range data acquisition and modeling.
Page 7
8. Stuart K. Roberts
Proctor & Gamble / Fluor Daniel
Completed final fields visit to coffee facility to verify survey and completeness of
the 3D data capture. The model was used for expansion purposes and
interference detection of large bore vacuum piping. The survey was tied to
ground points and transferred up to the top of the unit (120 feet) inside the
operating hopper levels. 3D model was cut into individual floors to ensure easier
handling of data.
Newmont Gold / Kvaerner Metals
Furnished client as-built data of a steel structure used to crush gold ore for
extraction. The 3D model was delivered in MicroStation for the purpose of
studying the structural integrity of the existing unit and predicting load failure.
More than 1500 pieces of steel where surveyed for exact location.
Chevron / Bechtel / Merrick Engineers
Participated as field team photogrammetrist, operating large / medium format
cameras. Project included three two-week site visits over a two-month period.
After the site work was completed, filled an analytics and modeling position for
3D MicroStation model. At the time, it was the largest modeling project using
close range photogrammetry.
Air Products / Merrick Engineers
Performed field support functions with photography and follow on analytics
support.
Proctor & Gamble / Lockwood Greene
Performed photography and analytic support of a consumer product unit. Very
high-density stainless steel small-bore, sanitary piping. Facility was operational
throughout data collection and maintained high state cleanliness to conform to
USDA standards.
Chevron / Stone & Webster
Ethylene Plant Expansion Project. Provided field support with large format
cameras, performed analytics for one of the largest visual data base projects
using close range photogrammetry (18,000 + photos).
Proctor & Gamble / Lockwood Greene
Provided follow on data to a previous project to verify survey data and fulfill a
change order.
Page 8
9. Stuart K. Roberts
Tri-State Power / Merrick Engineers
Field team member for coal fired power generators. Performed measurements
around the operations schedule to maintain high accuracy survey and
photogrammetry. This model was provided in MicroStation for volume and
locations of main structural steel.
BASF / Merrick Engineers
Performed fieldwork in support of equipment relocation project. Data was used to
reconstruct facility after equipment and piping were moved to another country.
Data was also used by civil engineers to pre-build concrete pads before
equipment arrived.
Martin Marietta Energy Systems / Merrick Engineers
The DOE project was performed with less field time and modeling than earlier
projects due to aggressive field procedure changes. Model was used to generate
robotic simulations with IGRIP / TGRIP integration.
Idaho National Energy Laboratory / Merrick Engineers
This was the final field visit to the CPP604 facility. Successfully completed data
capture without any capital equipment losses or excessive radiation doses.
Lockheed / Merrick Engineers
Supported the proposal team with general photography and engineers with
photogrammetry of a retired processing unit. Building was later revamped for
hazardous material handling and disposal.
Los Alamos National Laboratory / Merrick Engineers
Performed tasks under strict security for material analysis. Office analysis
conformed to DOE procedures for working on nuclear information.
Los Alamos National Laboratory / Merrick Engineers
Field team member collecting data on buildings scheduled for demolition.
Information was used for material analysis and volumetric calculations of
hazardous material.
Page 9
10. Stuart K. Roberts
Education
B.A. in Geography, Louisiana Tech University, Ruston, Louisiana. 1991
Certificate, Stereo photogrammetric Operations, Ferris St. University, Big Rapids,
Michigan. 1992
Certificate, Essential MicroStation, University of Houston, Houston, Texas. 1998
Certificate, PRO600, Orthophoto and Mosaic, LH Systems (Leica), Austin, Texas
1999
United States Army, Diploma, Basic Photointerpretation, Ft.
Huachuca, Arizona. 1981
United States Air Force, Certificate, Advanced Photointerpretation, Wiesbaden,
Germany. 1981
United States Army, Certificate, AN / TYQ 11(V) 4 Majjic, Austin, Texas 1982
Page 10