Management & Behavioural
               Processes
               Vikas vadakara
Management Concept
       What is an organization?
       Group of people working together in a
        systematic manner to achieve a set of
        goals

       Understanding “Management“ from
        resource- based perspective:
       Human
       Financial
       Physical
       Information

    2                        vikas vadakara
1] Human: managerial talent and labour

2] Financial: capital used to finance
 both ongoing and long term operations.

3] Physical: raw materials, office,
 production facilities equipment

4] Information: Usable data             needed   to
 make effective decisions


3                      vikas vadakara
4   vikas vadakara
HOW DO MANAGERS COMBINE AND COORDINATE

       THE VARIOUS KINDS OF RESOURCES?




5                        vikas vadakara
Management in Organizations




Mangers engage in above activities to combine 4 resources efficiently and effectively and to
work toward achieving goals of the organization

      6                                                vikas vadakara
What is Management?

       A set of activities (including planning and
        decision making, organizing, leading, and
        controlling) directed at an organization’s
        resources (human, financial, physical, and
        informational) with the aim of achieving
        organizational goals in an efficient and effective
        manner.




    7                               vikas vadakara
Efficient Vs Effective
        Efficient                                  Effective
1.       Doing the things right                 1.    Doing the right things
                                                2.    Focuses on achieving the “end”
2.       Focuses on the process or “means”
                                                      goal.
         of doing things
                                                3.    Making right decisions and
3.       Using resources wisely in a cost             successfully implementing them
         effective way and Getting most         4.    Effectiveness involves thinking long
         output from least amount of inputs           term
4.       Efficiency restricted to the present   5.    Effectiveness is about gaining
         state                                        success
5.       Efficiency will look at avoiding       6.    Effectiveness encourages
         mistakes or errors                           innovation as it demands people to
                                                      think, the different ways they can
6.       Since efficiency is about doing              meet the desired goal.
         things right, it demands
         documentation and repetition of
         the same steps. Doing the same
         thing again and again in the same
         manner will certainly discourage
         innovation
     8                                               vikas vadakara
Who is a Manager?

       One who plans, makes decisions, organizes, leads
        and controls human, financial, physical and
        information resources.

       Helping others to do their work

       Responsible for getting things done




    9                                vikas vadakara
Other definitions…
    “Management is the accomplishment of results
     through the efforts of other people:
                                    Lawrence A Appley



    “Management is the art of getting things done
     through and with the people in formally organized
     groups”
                                              Koontz



    10                            vikas vadakara
Nature of Management
    Management is universal
Basic principles of management can be applied in all managerial
 situations regardless of size, nature and location of the organization.
 Universality of managerial tasks and principles also implies that
 managerial skills can be transferrable and managers can be trained
 and developed.


    Multidisciplinary
Because it includes knowledge, information from various disciplines like
  economics, statistics, psychology, sociology, operations research etc.
  Management integrates ideas and concepts taken from these
  disciplines and presents newer concepts which can be put in to
  practice for managing organizations.


    11                                   vikas vadakara
    Management is dynamic
Management has framed certain principles which are flexible in nature
  and change with the changes in the environment in which the
  organization exists.
According to Peter Drucker; “Managers do not wait for future, they
  make the future”
    Relative, not absolute principles
Management principles should be applied according to the need of the
 organization. A particular management principle has different
 strengths in different conditions
    Is a system of authority
A manager is supposed to get things done, rather than doing things
  himself by using authority. Authority means right to give orders and
  power to obtain objective from subordinates. It’s a rule making and
  rule entering body in an organization.


    12                                   vikas vadakara
Management Science or Art?




13                  vikas vadakara
Science
    Science is a systematic body of knowledge that is
     developed through observation and experimentation
     and can be verified
    Scientific principles establish a cause and effect
     relationship between various factors
    Mere knowledge or collection of facts does not
     qualify as science. It is only when the gathered
     knowledge is verified in different geographies and
     over a period of time it becomes science




    14                           vikas vadakara
Art
    Art is a systematic application of a skill or knowledge
     for the accomplishment of results
    It represents methods or ways of doing specific
     things to effect change and accomplish results
     through deliberate efforts.

    Science is concerned with knowing “why” and art is
     with the “how” of application




    15                             vikas vadakara
Management as an Art

    Personal Skill: Manager has to use his skill,
     knowledge to solve many complimented problems
     on day to day basis
    Practical Knowledge: Management does not merely
     mean systematic presentation of principles can be
     applied in practical to get better results
    Result Oriented: Management is concerned with
     accomplishment of objectives, it is result oriented
     and for that it leads, directs others towards attaining
     desired goals.


    16                              vikas vadakara
    Regular Practice: Effectively and effectiveness can
     be attained through regular practice. Like an artist
     manager also practices regularly so that he can work
     better and can get output in an effective and efficient
     manner
    Creativity: Any art work can be considered as a
     creative work. Like an art, management is one of the
     most creative arts as it deals with getting things done
     through others by motivating their efforts in an
     innovative manner

    17                             vikas vadakara
Management as a Science

    Systematic body of knowledge: Management is an
     organized body of knowledge built up by
     management practitioners, philosophers and
     thinkers by conducting extensive research and
     verification of the same over the years. Principles of
     management make use of scientific methods. Taylor
     applied scientific techniques like time and motion
     study, work study etc

    Cause and effect relationship: In management also
     cause and effect relationship is studied. Poor
     planning cause low productivity, lack of employee
     benefits, low salary cause high attrition, poor
     marketing cause less sales etc
    18                             vikas vadakara
    Continuous observation: Principles of management
     have been developed on the basis of continued
     observations by many theorists and practitioners
     over a period of years.
    Validity and predictability: Scientific principles
     represent basic truth and can be applied at all times
     to all situations. In management also there are
     certain fundamental principles which can be
     universally applied and repeatedly tested to verify its
     validity and predictability, reliability



    19                             vikas vadakara
Management as pure science suffers from
following limitations
    Principles of management don’t always have a
     universal application. Unity of Command, which
     means reporting to one superior. It does not mean
     that he should not report to more than one boss, if
     superiors have better understanding, know how to
     balance between the advantages and disadvantages
     of multiple commands, an employee can have more
     than one superior.

    Human beings behavior can not be predicted

    Management lack certainty about the result.
    20                           vikas vadakara
Conclusion
    management is a mixture of art and science. As an
     art it demands certain skills from its practitioner and
     as a science it provides its practitioner with a
     systematic body of knowledge comprising certain
     principles laws etc, which have been tested and
     verified.
    Management is a crude science because its
     application varies from person to person and from
     one situation to another. We can conclude that
     management is a behavioural science.



    21                              vikas vadakara
Is administration and management one
and the same?
    No universally accepted view on this point.
    American school of thought says
        Administrators think- Top level function
        Managers do- Lower level function
    British School of Thought
        Management is wider concept than administration
        Administration is a lower level function of day to day
         activities
        Management is rule making and rule enforcing activity
    There is really no clear cut distinction between
     management and administration

    22                                 vikas vadakara
Management as a profession

    Profession means an occupation backed by
     specialized knowledge, expertise and training.
    Over the past few years management has grown in
     to a distinct discipline backed by systematic body of
     knowledge. Number of process, principles,
     techniques and tools have been developed and they
     are important through formalized education and
     training
    Management also focuses on ethical behaviour and
     developed certain code of conduct to regulate
     performance of management professional.
    Like a Doctor, Managers [consultants] do charge
     fees on services rendered.
    23                            vikas vadakara
Purpose of Management
    To achieve productivity
Management is an active force which acquires uses, organizes factors
 of production, (men, material, machine, money) and coordinates
 different interdependent activities in an organization to achieve
 organizational goals effectively and efficiently. Without management
 a country’s resources main as resources only and don’t result in
 production.


    To adapt to the changes in the business environment
As an organization exists in a dynamic environment, management has
  to adapt the changes which happen in different sectors like
  technology, regulatory policies, economic policies, politics,
  demography etc and leads the organization towards excellence.


    24                                 vikas vadakara
    To compete, survive and grow
Management guides the organization to compete amongst the rivals,
 survive the threats in the external environment and achieve growth
 and prospects through continuous learning and innovation


    To meet the expectations of the stakeholders
Management has to meet expectation of various stakeholders like
 adhering to rules and regulations of the Government, maximizing
 returns to the investors, providing good working conditions and
 benefits to the employees, maintaining good relationship with
 clients/suppliers and providing quality goods and services to
 customers, meet responsibilities towards society.



    25                                vikas vadakara
Functions/Process of Management




26                  vikas vadakara
   These solid lines describe basic logic between activities
    theoretically.

   Practically, dotted arrows show that most managers
    engage in more than one activity at a time and often
    move back and forth between the activities in
    unpredictable ways. Manager is likely to be engaged in
    different activities simultaneously.

    Functions of management don’t usually occur in a tidy,
     step-by-step fashion. Managers are constantly engaged
     in many different activities. A manager may be helping a
     colleague develop goals for the next quarter-planning,
     discussing    a    proposed      company       restructuring-
     organizing, praising a subordinate for outstanding
     performance-leading, and checkingvadakara month’s sales
    27                                vikas
                                            on last
     information- controlling.
• Defining goals, establishing
Planning &      strategy, developing plans to
 Decision
  making
                coordinate activities

              • Determining what needs to be done,
                how it will be done and who is to do
Organizing      it

              • Monitoring, leading and any other
                actions involved in dealing with
 Leading        people

              • Monitoring activities to ensure that
Controlling
                they are accomplished as planned

                Lead to achieving organization’s stated goals
   28                                       vikas vadakara
    Acronym

    Created by Gulick and Urwick

    based on Henry Fayol’s 14 principles of
     management




    29                            vikas vadakara
   Planning: process of establishing goals and a
         suitable course of action for achieving those goals

        Organizing: process of arranging resources

        Staffing: selecting and training individuals for
         specific job functions and charging them with
         associated responsibilities

        Directing: process of influencing and motivating
         employees to perform essential tasks in an
         organization
30                                   vikas vadakara
   Coordinating: integration of activities of the
         separate parts of an organization to accomplish
         organizational goals

        Reporting: process of executives keeping
         superiors and subordinates informed about what
         is going on

        Budgeting: formal quantitative statement of
         resources allocated for planned activities over
         stipulated periods of time
31                                  vikas vadakara
Levels Of managers




32                   vikas vadakara
Managing at Different Levels of the organization:
Top Managers
     Small group of executives who manage the overall
      organization, the strategic level.
Middle Managers
     A large group that implement the strategies developed
      at the top.
First-Line Managers
     Supervise and coordinate the activities of operating
      employees.




33                                  vikas vadakara
Types of managers

Based on
                   Based on Scope              Based on work
Management Level
                   of Activity                 activity
Top Managers
                   Functional                 Line Managers
Middle Managers
                   General                    Staff Managers
First Line
Managers




34                            vikas vadakara
Manager/Non Manager
    Non managers receive orders, works

    follow decisions taken by managers

    Directly contribute to the production

    Report to first line managers




    35                               vikas vadakara
Managerial Roles




36                 vikas vadakara
Managerial Skills
Conceptual Skills
 Mental ability to analyze and diagnose complex
  situations
 Allow Managers to see how things fit
Human Skills
 Ability to work with, understand, mentor and motivate
  others
 Both individually and as a group
 Many managers fail in this
Technical Skills
 Ability to apply specialized knowledge or expertise
 37                            vikas vadakara
Key Characteristics to become a successful
Manager
    Education
    Experience
    Efficient time management
    Empathy
    Continuous learning
    Communication ability
    Technical Expertise
    Goal Oriented
    Risk Taking


    38                           vikas vadakara
Evolution of Management Thought
Introduction
 First known management ideas were recorded in
  5000 BC when Sumerian Traders developed written
  records for government
 The Egyptians used management functions of
  planning, organizing, and controlling when they
  constructed the pyramids.
 Roman empire and their military hierarchy, public
  administrative systems.



 39                          vikas vadakara
Management breakthroughs and practices over the last
4000 years




  40                           vikas vadakara
Early writings on Management
Sun Tzu’s The Art of War
 A book on military strategy by Chinese General Sun
  Tzu in 6th Century BC.

Highlights
 By being aware of utilizing organization’s strengths
  and utilizing them to exploit weaknesses of the
  enemy- success can be achieved
 Emphasizes importance of discipline to get things
  done through coordinated group effort


 41                             vikas vadakara
Chanakya’s Arthashastra
 Developed around 3rd Century BC
 Written by Chanakya
 Book deals with the governance of kingdom by a
  king or a leader
Highlights
 Lays down principles that should be taken in to
  consideration by a leader while making policies of
  governance and people management
 Importance of creating departments, development of
  detailed job profiles and qualifications of
  administrators who had to manage these
  departments as directors.
 42                           vikas vadakara
Evolution of Management Thought
                             Evolution of
                         management Thought

    Early Management
                                                          Modern Approaches
       Approaches
                                                    Quantitative Approach
                         Neo Classical              System Approach
                          Approaches                Contingency Approach
    Early Classical
     Approaches

Scientific Management      Human Relation Approach
Administrative Mgt         Behavioural Science
Bureaucratic               Approach
Organization



   43                                    vikas vadakara
Classical Approach
Scientific Management

                    Frederick Winslow Taylor(1856-
                   1915)

                   Graduated in science and
                   engineering through evening study

                   1878- joined as       worker   at
                   Midvale steel works.

                   1898- joined Bethlehem steel
                   company as Engineer

                   Acknowledged as Father         of
                   scientific Management


44                      vikas vadakara
Steps in Scientific Management




45                   vikas vadakara
Studied the work processes and
introduced
 One best way to do the job/work study: analyzing
  different operations performed in a work,
  eliminating unnecessary operations and finding
  one best way to the job
 Time study, motion study and fatigue study
Time study: to determine the time required for
  each movement
Motion study: study of movements of workers and
  machines to ensure performance of only
  necessary activities
Fatigue study: shows when employees are getting
  tired and when management should provide rest
  periods to increase efficiency, productivity of
  workers
    46                      vikas vadakara
    Differential wages linked to productivity

    Careful selection and training of workers

    Division of labour and distribution of work between
     management and workers

    Harmonious relationships between management and
     workers



Overall objective- efficiency of the labour

    47                                vikas vadakara
Limitations of scientific management
    It ignored human touch in an organization and
     viewed workers as machines

    Monotonous and boring job

    Exploitation device

    Harsh and difficult to perform




    48                                vikas vadakara
Administration Management
    Scientific management deals with improving
     efficiency and productivity of individual employees

    Administrative management focuses on managing
     whole organization.

    Henry Fayol [1841-1925] is the main contributor to
     this approach




    49                             vikas vadakara
Henry Fayol [1841-1925]



                    A French Industrialist

                    Regarded as “ Father
                    of Modern
                    Management Theory”




50                   vikas vadakara
Suggested conceptual framework for studying
  management by dividing industrial activities into 6
  groups
 Technical
 Financial
 Security
 Accounting
 Managerial
 Commercial




 51                             vikas vadakara
    Identified 5 managerial functions to carry out these
     activities; planning, organizing, commanding,
     coordinating and controlling.
    Fayol was the 1st management thinker to recognize
     need for management teaching
    Believed that management was an activity common
     for all organizations including government agencies
    Published a famous book named “General And
     Industrial Management”
    In his book, he presented 14 principles of
     management for running an organization efficiently.

    52                            vikas vadakara
Fayol’s 14 principles of management
1. Division of Work:
division of total task lightens the work,
  specialization[one person does only one thing]
  increases the efficiency and output.
2. Parity between Authority and responsibility:
managers should balance between both. They should
  have right to give orders and should own
  accountability for the task
3. Discipline:
Respect of authority and following rules. Clarity of
  rules, built in rewards, punishments help to maintain
  discipline
 53                            vikas vadakara
4. Unity of Command:
One should receive orders from only one superior
5. Unity of Direction:
there should be single plan and head for each
  group of activity with same objective/ direction
6. Subordination of Individual interests to general
  interests
Individuals interests should be harmonious with
  organization’s interests. Integrate the both
7. Fair remuneration to workers:
Remuneration should be based on cost of living,
  business condition. Additional works should get
 54                              vikas vadakara
  incentives. This increases morale and efficiency
8. Centralization:
Major decisions should be taken by Top Management,
  operations level decision making power can be given
  to lower level.
9. Scalar Chain:
Chain of superiors from highest to lowest ranks.
  Authority should run from top to bottom in proper
  channel
10. Order:
there should be a place for everything and every
  thing should be in its place
 55                           vikas vadakara
11. Equity:
managers should be kind and fair to their workers
12. Stability of tenure of personnel:
Try to minimize employees turnover, build long
  term commitment, a sense of belongingness
  among their subordinates. Provide job security
13. Initiative:
Managers should encourage their subordinates to
  take initiatives.
14. Esprit de corps:[ team spirit]
Management should create team spirit among
  employees for harmony and unity
 56                         vikas vadakara
Bureaucratic Management

                     Max Weber (1864-
                      1920)
                     German sociologist
                     Known as Father of
                      Modern Sociology




57                    vikas vadakara
Focuses on development and implementation of
  rational guidelines like
 organization’s structure,
 hierarchy of authority,
 rules and procedures,
 division of roles and responsibilities
for managing work in an organization.




58                          vikas vadakara
Weber’s Principles of Bureaucracy




59                       vikas vadakara
Neo Classical Approaches
Behavioural Science Approach
Unlike the classical management perspective, the
  behavioral management perspective placed
 more emphasis on individual attitudes and
  behaviors and on group processes

    recognized the importance of behavioral
     processes in the work place.



    60                         vikas vadakara
 Elton Mayo[1880-1949] and his associates
  conducted research [Hawthorne studies], a series of
  experiments that focused on behaviour in the
  workplace [ Hawthorne plant of Western Electric
  Company near Chicago.]
 First Study/Phase: Illumination Study [1924]:
 Study involved manipulating illumination for one
  group of workers and comparing their productivity
  with another group.
 But both the groups produced the same output



    61                        vikas vadakara
    11 Phase- Relay Assembly Test[1925]
The experimental group of employees were given
 Freedom to fix work schedules
 Six breaks of five minutes per shift were allowed
 Work day and week were shortened
 Work was simplified
 Financial incentives for increased production
 Friendly supervision
 These kinds of special attention and treatment enhanced
  productivity ( i.e. Hawthorne Effect)


    62                          vikas vadakara
    111 Phase: [1928] Interviewing Program

 Interviewed    21000 employees to find the reasons for
     increased productivity

 Informal   work groups and their productivity norms
     were recognized as the main causes for productivity




    63                           vikas vadakara
 1V Phase: Bank Wiring Observation Room
  Experiment[1929]
 Team work       and performance based incentives
  introduced
 Efficient workers did not pressure the others to work
  more for benefiting by incentive scheme.
 They    formed group norms to regulate the
  productivity.
 Over produced named: rate busters
 Under produced named: chiselers



    64                         vikas vadakara
   The group norms were
   Don’t turn out too much work
   Don’t turn out too little work
   Don’t tell supervisors anything that would harm a
    colleague
   Don’t be too officious-rather follow group norms


Implications of Hawthorne studies
 Suggested managing through good human relations
 Involves motivating people, team work, group
  influence etc
Consider the human factor as theyvadakarasocial beings
 65                             vikas
                                      are
Human Relation Approach
 Proposed that workers respond primarily to the social
  context of the workplace, including social conditioning,
  group norms, and interpersonal dynamics.
 Human behavior in organizations is complex
 There are two theories on how employees behave;


These theories are developed by Douglas
  McGregor
 Theory X and Theory Y




 66                               vikas vadakara
Theory X
 Here manager thinks that employees behave like this,
 they are negative, and scientific management can be
 applied

        Employees dislike
         work.
        Employees are
         irresponsible.
        Employees lack
         ambition.
        Employees resist
         change.

67                              vikas vadakara
Theory Y
 Here manager thinks that employees behave like this,
 they are positive, and human relations should can be
 improved to get more productivity


        Employees are willing to work.
        Employees are self directed.
        They accept responsibility.
        Employees are creative.
        They are self-controlled.


Douglas suggests that managers should follow Theory Y

68                                   vikas vadakara
Limitations of Neo Classical Approaches
    Focused more on group behaviour

    Human behaviour is complex in nature, so can’t
     predict the results




    69                           vikas vadakara
Modern Approaches
Quantitative Approach or Management Science
  Approach or Operations Research Approach
 During World War II, military people took some
  mathematical approaches to deploy its resources
  efficiently and effectively
 After war, Companies like DuPont, General Electric
  began to use some techniques for deploying
  employees, choosing plant location, planning
  warehouse etc.
 Concerned with applying quantitative techniques to
  management

 70                           vikas vadakara
Features
    Organizational efficiency depends upon quality of
     managerial decisions

    A problem can be expressed in the form of a
     quantitative/ mathematical model containing
     mathematical symbol and relationships

    Different variables in management can be quantified,
     expressed in the form of an equation.



    71                            vikas vadakara
Contributions
 Provided precise tools for decision making in areas
  like production, finance, costing, transportation and
  storage
 It has been widely used in planning and control


Limitations
 Fails wherever human element is involved
 Most decisions involves human judgment, Q A can
  provide only data for such decision making

Q. A can suggest best possible alternatives, hence
  quantitative techniques can be valuable
  supplements
 72                          vikas vadakara
Systems Approach
 Developed during early 1960s
 Contributors: Kenneth Boulding, Johnson and
  Bernard etc
 System: An interrelated set of elements functioning
  as a whole
 Organizations are viewed as a system
Basic types of system:
 Open System: organization that interacts with its
  environment
 Closed System: that doesn’t interact with its
  environment
    73                         vikas vadakara
The Organization as an Open System




74                     vikas vadakara
    Inputs: human, financial, materials, information
     resources from its environment

    Through technological and managerial processes
     inputs are transferred into outputs

    Outputs to environment: products, services

    Environment reacts to these outputs and provides
     feedback to the system

    75                             vikas vadakara
Sub systems
    Approach also focuses on sub systems: systems
     within a broader system
    Change in one subsystem can affect other
     subsystem
    E.g.: if purchase department does not acquire right
     quality of inputs [ raw material], production
     department will not be able to do its job efficiently

    Synergy suggests that organizational units or sub
     units may become more successful working together
     than working alone.

    76                             vikas vadakara
Example for synergy

    : Walt Disney Company’s movies, theme parks,
     television programs, other licensed programs all
     benefit one another

    Children who enjoy Walt Disney movie like Mickey
     Mouse, want to go to Disney World, see the movie
     there, buy Mickey Mouse toys, buy theme printed
     lunchbox, cloths etc, and film music generates
     additional revenue.




    77                            vikas vadakara
Entropy

    Is a normal process that leads to system decline

    When an organization does not monitor feedback
     from its environment and make appropriate
     adjustments, it may fail




    78                            vikas vadakara
Implications

    As per systems approach management should
     continuously re-energize the organization to avoid
     entropy
    Coordination of the organization’s parts is essential
     for proper functioning of the entire organization.
    Decisions and actions taken in one area of the
     organization will have an effect in other areas of the
     organization.
    Organizations are not self-contained and, therefore,
     must adapt to changes in their external environment

    79                             vikas vadakara
Contingency Approach/Situational
Approach
    Classical, neo classical and quantitative approaches
     considered universal perspectives, because they
     tried to indentify the “one best way” to manage
     organizations.

    Contingency Approach suggests there is no one best
     way of doing things under all conditions




    80                            vikas vadakara
Features
    Stresses that there is no best way of doing a thing.
     Conditions of contingency/situation will determine
     which technique would be most suitable
    Managers should prepare objectives, policies,
     procedures, rules and regulations according to
     situation of business
    Success in management depends upon the ability to
     cope with environmental demands

    Managers should sharpen their diagnostic skills to
     anticipate and comprehend environment changes

    81                            vikas vadakara
Limitations
    This approach lacks theoretical base

    Manager is required to think through all possible
     alternatives, as there is no clear cut principles to act
     upon.




    82                              vikas vadakara
Quality And Performance Excellence
    In a progressive organization management and
     employees are quality conscious
    Through continuous improvement they bring
     performance excellence in their work place

    Excellence Model
    Though there are many excellence models,
     European Foundation For Quality Management
     model is very famous



    83                          vikas vadakara
EFQM Model

    Was founded in 1988

    Started with 14 European countries, now comprises
     with over 600 companies from most Western
     European countries

    Involves nine criteria for excellence; first five are
     enablers means one should perform them first, rest
     four are results of achieving excellence



    84                             vikas vadakara
EFQM Model

              People                     People
            Management
                                       Satisfaction




Leadershi   Policies ,                  Customer      Business
                         Processes     Satisfaction
    p       Strategies                                 Results




                                         Impact on
            Resources                     Society




85                               vikas vadakara
Learning Organization

 Means an organization that has developed
  continuous capacity to adapt and change
Features:
 Systematic thinking
 Developing personal mastery
 Building share vision
 Team learning/ continuous improvement




    86                       vikas vadakara
Global Awareness
    Awareness of current happenings- national and
     international updates

    Technological challenges




    87                          vikas vadakara
21st Century Executives challenges
    Global strategies: diverse cultural, economies,
     different regulations, demography
    Technological developments
    Inspiring leaders
    Role model of ethical behaviour
    Win -Win Approach: seeking mutual benefit
    Work life balance




    88                            vikas vadakara
Social Responsibility of Managers
    Organization is a part of society

    Relationship with the community or society in which
     organizations are exist and work

    Decisions taken may affect society in different ways

    Show the concern towards society




    89                             vikas vadakara
    Economic responsibilities: produce goods and
     services required and helpful to the society
    Legal Responsibilities: follow rules and regulations,
     laws
    Environmental Responsibilities: protect environment
     and preserve ecological balance
    Ethical Responsibilities: e.g. fair and unbiased
     treatment to workers
    Discretionary Responsibilities: contribution to
     society by adopting villages to develop, donate
     books, computers to schools, free medical campaign

    90                            vikas vadakara
91   vikas vadakara

Business management

  • 1.
    Management & Behavioural Processes Vikas vadakara
  • 2.
    Management Concept  What is an organization?  Group of people working together in a systematic manner to achieve a set of goals  Understanding “Management“ from resource- based perspective:  Human  Financial  Physical  Information 2 vikas vadakara
  • 3.
    1] Human: managerialtalent and labour 2] Financial: capital used to finance both ongoing and long term operations. 3] Physical: raw materials, office, production facilities equipment 4] Information: Usable data needed to make effective decisions 3 vikas vadakara
  • 4.
    4 vikas vadakara
  • 5.
    HOW DO MANAGERSCOMBINE AND COORDINATE THE VARIOUS KINDS OF RESOURCES? 5 vikas vadakara
  • 6.
    Management in Organizations Mangersengage in above activities to combine 4 resources efficiently and effectively and to work toward achieving goals of the organization 6 vikas vadakara
  • 7.
    What is Management?  A set of activities (including planning and decision making, organizing, leading, and controlling) directed at an organization’s resources (human, financial, physical, and informational) with the aim of achieving organizational goals in an efficient and effective manner. 7 vikas vadakara
  • 8.
    Efficient Vs Effective  Efficient  Effective 1. Doing the things right 1. Doing the right things 2. Focuses on achieving the “end” 2. Focuses on the process or “means” goal. of doing things 3. Making right decisions and 3. Using resources wisely in a cost successfully implementing them effective way and Getting most 4. Effectiveness involves thinking long output from least amount of inputs term 4. Efficiency restricted to the present 5. Effectiveness is about gaining state success 5. Efficiency will look at avoiding 6. Effectiveness encourages mistakes or errors innovation as it demands people to think, the different ways they can 6. Since efficiency is about doing meet the desired goal. things right, it demands documentation and repetition of the same steps. Doing the same thing again and again in the same manner will certainly discourage innovation 8 vikas vadakara
  • 9.
    Who is aManager?  One who plans, makes decisions, organizes, leads and controls human, financial, physical and information resources.  Helping others to do their work  Responsible for getting things done 9 vikas vadakara
  • 10.
    Other definitions…  “Management is the accomplishment of results through the efforts of other people: Lawrence A Appley  “Management is the art of getting things done through and with the people in formally organized groups” Koontz 10 vikas vadakara
  • 11.
    Nature of Management  Management is universal Basic principles of management can be applied in all managerial situations regardless of size, nature and location of the organization. Universality of managerial tasks and principles also implies that managerial skills can be transferrable and managers can be trained and developed.  Multidisciplinary Because it includes knowledge, information from various disciplines like economics, statistics, psychology, sociology, operations research etc. Management integrates ideas and concepts taken from these disciplines and presents newer concepts which can be put in to practice for managing organizations. 11 vikas vadakara
  • 12.
    Management is dynamic Management has framed certain principles which are flexible in nature and change with the changes in the environment in which the organization exists. According to Peter Drucker; “Managers do not wait for future, they make the future”  Relative, not absolute principles Management principles should be applied according to the need of the organization. A particular management principle has different strengths in different conditions  Is a system of authority A manager is supposed to get things done, rather than doing things himself by using authority. Authority means right to give orders and power to obtain objective from subordinates. It’s a rule making and rule entering body in an organization. 12 vikas vadakara
  • 13.
    Management Science orArt? 13 vikas vadakara
  • 14.
    Science  Science is a systematic body of knowledge that is developed through observation and experimentation and can be verified  Scientific principles establish a cause and effect relationship between various factors  Mere knowledge or collection of facts does not qualify as science. It is only when the gathered knowledge is verified in different geographies and over a period of time it becomes science 14 vikas vadakara
  • 15.
    Art  Art is a systematic application of a skill or knowledge for the accomplishment of results  It represents methods or ways of doing specific things to effect change and accomplish results through deliberate efforts.  Science is concerned with knowing “why” and art is with the “how” of application 15 vikas vadakara
  • 16.
    Management as anArt  Personal Skill: Manager has to use his skill, knowledge to solve many complimented problems on day to day basis  Practical Knowledge: Management does not merely mean systematic presentation of principles can be applied in practical to get better results  Result Oriented: Management is concerned with accomplishment of objectives, it is result oriented and for that it leads, directs others towards attaining desired goals. 16 vikas vadakara
  • 17.
    Regular Practice: Effectively and effectiveness can be attained through regular practice. Like an artist manager also practices regularly so that he can work better and can get output in an effective and efficient manner  Creativity: Any art work can be considered as a creative work. Like an art, management is one of the most creative arts as it deals with getting things done through others by motivating their efforts in an innovative manner 17 vikas vadakara
  • 18.
    Management as aScience  Systematic body of knowledge: Management is an organized body of knowledge built up by management practitioners, philosophers and thinkers by conducting extensive research and verification of the same over the years. Principles of management make use of scientific methods. Taylor applied scientific techniques like time and motion study, work study etc  Cause and effect relationship: In management also cause and effect relationship is studied. Poor planning cause low productivity, lack of employee benefits, low salary cause high attrition, poor marketing cause less sales etc 18 vikas vadakara
  • 19.
    Continuous observation: Principles of management have been developed on the basis of continued observations by many theorists and practitioners over a period of years.  Validity and predictability: Scientific principles represent basic truth and can be applied at all times to all situations. In management also there are certain fundamental principles which can be universally applied and repeatedly tested to verify its validity and predictability, reliability 19 vikas vadakara
  • 20.
    Management as purescience suffers from following limitations  Principles of management don’t always have a universal application. Unity of Command, which means reporting to one superior. It does not mean that he should not report to more than one boss, if superiors have better understanding, know how to balance between the advantages and disadvantages of multiple commands, an employee can have more than one superior.  Human beings behavior can not be predicted  Management lack certainty about the result. 20 vikas vadakara
  • 21.
    Conclusion  management is a mixture of art and science. As an art it demands certain skills from its practitioner and as a science it provides its practitioner with a systematic body of knowledge comprising certain principles laws etc, which have been tested and verified.  Management is a crude science because its application varies from person to person and from one situation to another. We can conclude that management is a behavioural science. 21 vikas vadakara
  • 22.
    Is administration andmanagement one and the same?  No universally accepted view on this point.  American school of thought says  Administrators think- Top level function  Managers do- Lower level function  British School of Thought  Management is wider concept than administration  Administration is a lower level function of day to day activities  Management is rule making and rule enforcing activity  There is really no clear cut distinction between management and administration 22 vikas vadakara
  • 23.
    Management as aprofession  Profession means an occupation backed by specialized knowledge, expertise and training.  Over the past few years management has grown in to a distinct discipline backed by systematic body of knowledge. Number of process, principles, techniques and tools have been developed and they are important through formalized education and training  Management also focuses on ethical behaviour and developed certain code of conduct to regulate performance of management professional.  Like a Doctor, Managers [consultants] do charge fees on services rendered. 23 vikas vadakara
  • 24.
    Purpose of Management  To achieve productivity Management is an active force which acquires uses, organizes factors of production, (men, material, machine, money) and coordinates different interdependent activities in an organization to achieve organizational goals effectively and efficiently. Without management a country’s resources main as resources only and don’t result in production.  To adapt to the changes in the business environment As an organization exists in a dynamic environment, management has to adapt the changes which happen in different sectors like technology, regulatory policies, economic policies, politics, demography etc and leads the organization towards excellence. 24 vikas vadakara
  • 25.
    To compete, survive and grow Management guides the organization to compete amongst the rivals, survive the threats in the external environment and achieve growth and prospects through continuous learning and innovation  To meet the expectations of the stakeholders Management has to meet expectation of various stakeholders like adhering to rules and regulations of the Government, maximizing returns to the investors, providing good working conditions and benefits to the employees, maintaining good relationship with clients/suppliers and providing quality goods and services to customers, meet responsibilities towards society. 25 vikas vadakara
  • 26.
  • 27.
    These solid lines describe basic logic between activities theoretically.  Practically, dotted arrows show that most managers engage in more than one activity at a time and often move back and forth between the activities in unpredictable ways. Manager is likely to be engaged in different activities simultaneously.  Functions of management don’t usually occur in a tidy, step-by-step fashion. Managers are constantly engaged in many different activities. A manager may be helping a colleague develop goals for the next quarter-planning, discussing a proposed company restructuring- organizing, praising a subordinate for outstanding performance-leading, and checkingvadakara month’s sales 27 vikas on last information- controlling.
  • 28.
    • Defining goals,establishing Planning & strategy, developing plans to Decision making coordinate activities • Determining what needs to be done, how it will be done and who is to do Organizing it • Monitoring, leading and any other actions involved in dealing with Leading people • Monitoring activities to ensure that Controlling they are accomplished as planned Lead to achieving organization’s stated goals 28 vikas vadakara
  • 29.
    Acronym  Created by Gulick and Urwick  based on Henry Fayol’s 14 principles of management 29 vikas vadakara
  • 30.
    Planning: process of establishing goals and a suitable course of action for achieving those goals  Organizing: process of arranging resources  Staffing: selecting and training individuals for specific job functions and charging them with associated responsibilities  Directing: process of influencing and motivating employees to perform essential tasks in an organization 30 vikas vadakara
  • 31.
    Coordinating: integration of activities of the separate parts of an organization to accomplish organizational goals  Reporting: process of executives keeping superiors and subordinates informed about what is going on  Budgeting: formal quantitative statement of resources allocated for planned activities over stipulated periods of time 31 vikas vadakara
  • 32.
    Levels Of managers 32 vikas vadakara
  • 33.
    Managing at DifferentLevels of the organization: Top Managers  Small group of executives who manage the overall organization, the strategic level. Middle Managers  A large group that implement the strategies developed at the top. First-Line Managers  Supervise and coordinate the activities of operating employees. 33 vikas vadakara
  • 34.
    Types of managers Basedon Based on Scope Based on work Management Level of Activity activity Top Managers Functional Line Managers Middle Managers General Staff Managers First Line Managers 34 vikas vadakara
  • 35.
    Manager/Non Manager  Non managers receive orders, works  follow decisions taken by managers  Directly contribute to the production  Report to first line managers 35 vikas vadakara
  • 36.
    Managerial Roles 36 vikas vadakara
  • 37.
    Managerial Skills Conceptual Skills Mental ability to analyze and diagnose complex situations  Allow Managers to see how things fit Human Skills  Ability to work with, understand, mentor and motivate others  Both individually and as a group  Many managers fail in this Technical Skills  Ability to apply specialized knowledge or expertise 37 vikas vadakara
  • 38.
    Key Characteristics tobecome a successful Manager  Education  Experience  Efficient time management  Empathy  Continuous learning  Communication ability  Technical Expertise  Goal Oriented  Risk Taking 38 vikas vadakara
  • 39.
    Evolution of ManagementThought Introduction  First known management ideas were recorded in 5000 BC when Sumerian Traders developed written records for government  The Egyptians used management functions of planning, organizing, and controlling when they constructed the pyramids.  Roman empire and their military hierarchy, public administrative systems. 39 vikas vadakara
  • 40.
    Management breakthroughs andpractices over the last 4000 years 40 vikas vadakara
  • 41.
    Early writings onManagement Sun Tzu’s The Art of War  A book on military strategy by Chinese General Sun Tzu in 6th Century BC. Highlights  By being aware of utilizing organization’s strengths and utilizing them to exploit weaknesses of the enemy- success can be achieved  Emphasizes importance of discipline to get things done through coordinated group effort 41 vikas vadakara
  • 42.
    Chanakya’s Arthashastra  Developedaround 3rd Century BC  Written by Chanakya  Book deals with the governance of kingdom by a king or a leader Highlights  Lays down principles that should be taken in to consideration by a leader while making policies of governance and people management  Importance of creating departments, development of detailed job profiles and qualifications of administrators who had to manage these departments as directors. 42 vikas vadakara
  • 43.
    Evolution of ManagementThought Evolution of management Thought Early Management Modern Approaches Approaches Quantitative Approach Neo Classical System Approach Approaches Contingency Approach Early Classical Approaches Scientific Management Human Relation Approach Administrative Mgt Behavioural Science Bureaucratic Approach Organization 43 vikas vadakara
  • 44.
    Classical Approach Scientific Management  Frederick Winslow Taylor(1856- 1915) Graduated in science and engineering through evening study 1878- joined as worker at Midvale steel works. 1898- joined Bethlehem steel company as Engineer Acknowledged as Father of scientific Management 44 vikas vadakara
  • 45.
    Steps in ScientificManagement 45 vikas vadakara
  • 46.
    Studied the workprocesses and introduced  One best way to do the job/work study: analyzing different operations performed in a work, eliminating unnecessary operations and finding one best way to the job  Time study, motion study and fatigue study Time study: to determine the time required for each movement Motion study: study of movements of workers and machines to ensure performance of only necessary activities Fatigue study: shows when employees are getting tired and when management should provide rest periods to increase efficiency, productivity of workers 46 vikas vadakara
  • 47.
    Differential wages linked to productivity  Careful selection and training of workers  Division of labour and distribution of work between management and workers  Harmonious relationships between management and workers Overall objective- efficiency of the labour 47 vikas vadakara
  • 48.
    Limitations of scientificmanagement  It ignored human touch in an organization and viewed workers as machines  Monotonous and boring job  Exploitation device  Harsh and difficult to perform 48 vikas vadakara
  • 49.
    Administration Management  Scientific management deals with improving efficiency and productivity of individual employees  Administrative management focuses on managing whole organization.  Henry Fayol [1841-1925] is the main contributor to this approach 49 vikas vadakara
  • 50.
    Henry Fayol [1841-1925] A French Industrialist Regarded as “ Father of Modern Management Theory” 50 vikas vadakara
  • 51.
    Suggested conceptual frameworkfor studying management by dividing industrial activities into 6 groups  Technical  Financial  Security  Accounting  Managerial  Commercial 51 vikas vadakara
  • 52.
    Identified 5 managerial functions to carry out these activities; planning, organizing, commanding, coordinating and controlling.  Fayol was the 1st management thinker to recognize need for management teaching  Believed that management was an activity common for all organizations including government agencies  Published a famous book named “General And Industrial Management”  In his book, he presented 14 principles of management for running an organization efficiently. 52 vikas vadakara
  • 53.
    Fayol’s 14 principlesof management 1. Division of Work: division of total task lightens the work, specialization[one person does only one thing] increases the efficiency and output. 2. Parity between Authority and responsibility: managers should balance between both. They should have right to give orders and should own accountability for the task 3. Discipline: Respect of authority and following rules. Clarity of rules, built in rewards, punishments help to maintain discipline 53 vikas vadakara
  • 54.
    4. Unity ofCommand: One should receive orders from only one superior 5. Unity of Direction: there should be single plan and head for each group of activity with same objective/ direction 6. Subordination of Individual interests to general interests Individuals interests should be harmonious with organization’s interests. Integrate the both 7. Fair remuneration to workers: Remuneration should be based on cost of living, business condition. Additional works should get 54 vikas vadakara incentives. This increases morale and efficiency
  • 55.
    8. Centralization: Major decisionsshould be taken by Top Management, operations level decision making power can be given to lower level. 9. Scalar Chain: Chain of superiors from highest to lowest ranks. Authority should run from top to bottom in proper channel 10. Order: there should be a place for everything and every thing should be in its place 55 vikas vadakara
  • 56.
    11. Equity: managers shouldbe kind and fair to their workers 12. Stability of tenure of personnel: Try to minimize employees turnover, build long term commitment, a sense of belongingness among their subordinates. Provide job security 13. Initiative: Managers should encourage their subordinates to take initiatives. 14. Esprit de corps:[ team spirit] Management should create team spirit among employees for harmony and unity 56 vikas vadakara
  • 57.
    Bureaucratic Management  Max Weber (1864- 1920)  German sociologist  Known as Father of Modern Sociology 57 vikas vadakara
  • 58.
    Focuses on developmentand implementation of rational guidelines like  organization’s structure,  hierarchy of authority,  rules and procedures,  division of roles and responsibilities for managing work in an organization. 58 vikas vadakara
  • 59.
    Weber’s Principles ofBureaucracy 59 vikas vadakara
  • 60.
    Neo Classical Approaches BehaviouralScience Approach Unlike the classical management perspective, the behavioral management perspective placed  more emphasis on individual attitudes and behaviors and on group processes  recognized the importance of behavioral processes in the work place. 60 vikas vadakara
  • 61.
     Elton Mayo[1880-1949]and his associates conducted research [Hawthorne studies], a series of experiments that focused on behaviour in the workplace [ Hawthorne plant of Western Electric Company near Chicago.]  First Study/Phase: Illumination Study [1924]:  Study involved manipulating illumination for one group of workers and comparing their productivity with another group.  But both the groups produced the same output 61 vikas vadakara
  • 62.
    11 Phase- Relay Assembly Test[1925] The experimental group of employees were given  Freedom to fix work schedules  Six breaks of five minutes per shift were allowed  Work day and week were shortened  Work was simplified  Financial incentives for increased production  Friendly supervision  These kinds of special attention and treatment enhanced productivity ( i.e. Hawthorne Effect) 62 vikas vadakara
  • 63.
    111 Phase: [1928] Interviewing Program  Interviewed 21000 employees to find the reasons for increased productivity  Informal work groups and their productivity norms were recognized as the main causes for productivity 63 vikas vadakara
  • 64.
     1V Phase:Bank Wiring Observation Room Experiment[1929]  Team work and performance based incentives introduced  Efficient workers did not pressure the others to work more for benefiting by incentive scheme.  They formed group norms to regulate the productivity.  Over produced named: rate busters  Under produced named: chiselers 64 vikas vadakara
  • 65.
    The group norms were  Don’t turn out too much work  Don’t turn out too little work  Don’t tell supervisors anything that would harm a colleague  Don’t be too officious-rather follow group norms Implications of Hawthorne studies  Suggested managing through good human relations  Involves motivating people, team work, group influence etc Consider the human factor as theyvadakarasocial beings 65 vikas are
  • 66.
    Human Relation Approach Proposed that workers respond primarily to the social context of the workplace, including social conditioning, group norms, and interpersonal dynamics.  Human behavior in organizations is complex  There are two theories on how employees behave; These theories are developed by Douglas McGregor  Theory X and Theory Y 66 vikas vadakara
  • 67.
    Theory X Heremanager thinks that employees behave like this, they are negative, and scientific management can be applied  Employees dislike work.  Employees are irresponsible.  Employees lack ambition.  Employees resist change. 67 vikas vadakara
  • 68.
    Theory Y Heremanager thinks that employees behave like this, they are positive, and human relations should can be improved to get more productivity  Employees are willing to work.  Employees are self directed.  They accept responsibility.  Employees are creative.  They are self-controlled. Douglas suggests that managers should follow Theory Y 68 vikas vadakara
  • 69.
    Limitations of NeoClassical Approaches  Focused more on group behaviour  Human behaviour is complex in nature, so can’t predict the results 69 vikas vadakara
  • 70.
    Modern Approaches Quantitative Approachor Management Science Approach or Operations Research Approach  During World War II, military people took some mathematical approaches to deploy its resources efficiently and effectively  After war, Companies like DuPont, General Electric began to use some techniques for deploying employees, choosing plant location, planning warehouse etc.  Concerned with applying quantitative techniques to management 70 vikas vadakara
  • 71.
    Features  Organizational efficiency depends upon quality of managerial decisions  A problem can be expressed in the form of a quantitative/ mathematical model containing mathematical symbol and relationships  Different variables in management can be quantified, expressed in the form of an equation. 71 vikas vadakara
  • 72.
    Contributions  Provided precisetools for decision making in areas like production, finance, costing, transportation and storage  It has been widely used in planning and control Limitations  Fails wherever human element is involved  Most decisions involves human judgment, Q A can provide only data for such decision making Q. A can suggest best possible alternatives, hence quantitative techniques can be valuable supplements 72 vikas vadakara
  • 73.
    Systems Approach  Developedduring early 1960s  Contributors: Kenneth Boulding, Johnson and Bernard etc  System: An interrelated set of elements functioning as a whole  Organizations are viewed as a system Basic types of system:  Open System: organization that interacts with its environment  Closed System: that doesn’t interact with its environment 73 vikas vadakara
  • 74.
    The Organization asan Open System 74 vikas vadakara
  • 75.
    Inputs: human, financial, materials, information resources from its environment  Through technological and managerial processes inputs are transferred into outputs  Outputs to environment: products, services  Environment reacts to these outputs and provides feedback to the system 75 vikas vadakara
  • 76.
    Sub systems  Approach also focuses on sub systems: systems within a broader system  Change in one subsystem can affect other subsystem  E.g.: if purchase department does not acquire right quality of inputs [ raw material], production department will not be able to do its job efficiently  Synergy suggests that organizational units or sub units may become more successful working together than working alone. 76 vikas vadakara
  • 77.
    Example for synergy  : Walt Disney Company’s movies, theme parks, television programs, other licensed programs all benefit one another  Children who enjoy Walt Disney movie like Mickey Mouse, want to go to Disney World, see the movie there, buy Mickey Mouse toys, buy theme printed lunchbox, cloths etc, and film music generates additional revenue. 77 vikas vadakara
  • 78.
    Entropy  Is a normal process that leads to system decline  When an organization does not monitor feedback from its environment and make appropriate adjustments, it may fail 78 vikas vadakara
  • 79.
    Implications  As per systems approach management should continuously re-energize the organization to avoid entropy  Coordination of the organization’s parts is essential for proper functioning of the entire organization.  Decisions and actions taken in one area of the organization will have an effect in other areas of the organization.  Organizations are not self-contained and, therefore, must adapt to changes in their external environment 79 vikas vadakara
  • 80.
    Contingency Approach/Situational Approach  Classical, neo classical and quantitative approaches considered universal perspectives, because they tried to indentify the “one best way” to manage organizations.  Contingency Approach suggests there is no one best way of doing things under all conditions 80 vikas vadakara
  • 81.
    Features  Stresses that there is no best way of doing a thing. Conditions of contingency/situation will determine which technique would be most suitable  Managers should prepare objectives, policies, procedures, rules and regulations according to situation of business  Success in management depends upon the ability to cope with environmental demands  Managers should sharpen their diagnostic skills to anticipate and comprehend environment changes 81 vikas vadakara
  • 82.
    Limitations  This approach lacks theoretical base  Manager is required to think through all possible alternatives, as there is no clear cut principles to act upon. 82 vikas vadakara
  • 83.
    Quality And PerformanceExcellence  In a progressive organization management and employees are quality conscious  Through continuous improvement they bring performance excellence in their work place  Excellence Model  Though there are many excellence models, European Foundation For Quality Management model is very famous 83 vikas vadakara
  • 84.
    EFQM Model  Was founded in 1988  Started with 14 European countries, now comprises with over 600 companies from most Western European countries  Involves nine criteria for excellence; first five are enablers means one should perform them first, rest four are results of achieving excellence 84 vikas vadakara
  • 85.
    EFQM Model People People Management Satisfaction Leadershi Policies , Customer Business Processes Satisfaction p Strategies Results Impact on Resources Society 85 vikas vadakara
  • 86.
    Learning Organization  Meansan organization that has developed continuous capacity to adapt and change Features:  Systematic thinking  Developing personal mastery  Building share vision  Team learning/ continuous improvement 86 vikas vadakara
  • 87.
    Global Awareness  Awareness of current happenings- national and international updates  Technological challenges 87 vikas vadakara
  • 88.
    21st Century Executiveschallenges  Global strategies: diverse cultural, economies, different regulations, demography  Technological developments  Inspiring leaders  Role model of ethical behaviour  Win -Win Approach: seeking mutual benefit  Work life balance 88 vikas vadakara
  • 89.
    Social Responsibility ofManagers  Organization is a part of society  Relationship with the community or society in which organizations are exist and work  Decisions taken may affect society in different ways  Show the concern towards society 89 vikas vadakara
  • 90.
    Economic responsibilities: produce goods and services required and helpful to the society  Legal Responsibilities: follow rules and regulations, laws  Environmental Responsibilities: protect environment and preserve ecological balance  Ethical Responsibilities: e.g. fair and unbiased treatment to workers  Discretionary Responsibilities: contribution to society by adopting villages to develop, donate books, computers to schools, free medical campaign 90 vikas vadakara
  • 91.
    91 vikas vadakara