BUILDING INFORMATION
MODELING
DIGITAL INDIA GROWING INDIA
BY : AKUL PANDYA
Current scenario of
construction industry
o Lack use of technology
o Inefficiencies in delivery process
o Skills deficits
o Long and lengthy process
o Unavailability of coordination
o Wastage of materials
Mr. Dinesh Patel
Director Of Patel
Infrastructure Pvt. Ltd.
Mr. Ronak Gohel
Chief Eng. At Patel
Infrastructure Pvt. Ltd.
Vibrant Gujarat 2017
- Technology and building
innovations and process
development event
Mr.Kaushik Gajjar
BIM Manager At hitech
I -solutions LLP(AEC
INDUSTRY)
Mr.Dinesh Patel
Director Of Patel
Infrastructure Pvt. Ltd.
 Mr. Dinesh Patel sharing his current building process and finding solutions
for better, smart and economical solutions for better future for construction
industry
 Mr. Kaushik Gajjar sharing his future building process lifecycle called
building information modeling and telling how is important for our building
environment sector
 Key features of BIM:
a) increase and improved coordination
b) faster construction cycle
c) improved visualization
d) clash detection and less construction surprise
e) reduce wastage
f) cost reduction & control
g) increase accuracy
h) improved project monitoring
B2B Discussion
-Mr. Dinesh Patel
-Mr. Kaushik Gajjar
BIM benefits for the
architects:
 reduced errors and omissions in documents
 increased competitive advantage
 reduced risk and rework
 reduced cycle Time of specific workflow, enhancing
the productivity
BIM benefits for the
engineers:
 garnering the response rate
 maintaining repeat business
 offering new services
 reduced errors and rework
BIM benefits for
the contractors:
 job site productivity
 reduced rework
 reduced project duration
BIM benefits for
the owners:
 reduced document errors
 reduced construction cost
 reduced project duration
 reduced litigation
Project stages we
can use BIM:
-Facility operation
-Construction
-Procurement and tendering
-Design development
-Concept schematic design
We can Generate BIM
Model Using Various
Softwares like:
1. Trimble Tekla
2. Trimble Vico
3. Nemtschech Vectorworks
4. Bentley Micro Station
5. Sketch up
6. Graphisoft Archicad
7. Autodesk Revit
8. Autodesk Navisworks
BARRIERS TO BIM
IMPLEMENTATION
 Mind set issue
 Unavailability of specialist consultant
 Compatibility between software platform
 Avaibility of skilled resources
 High hardware and software cost
 Unavailability of process implementation
guideline
 No mandate from government for BIM
implementation
BIM Model And
Coordination
Images
VIDEO ON
BIM
Rendering software to
better visualization for
construction industry
-LUMION
-3D MAX
-ARCHICAD
BIM Life Cycle
B I M  When I was going to fail in planning you were there
 When coordination failed you were there
 When there was a slack in the activity you were there
 When I wanted to update schedule you were there
 When I wanted to find clashes in project you were there
 When I wanted Sustainable building you were there
 When I wanted to innovation you were there!!!
BUILDING INFORMATION MODELING PRESENTATION  FInal

BUILDING INFORMATION MODELING PRESENTATION FInal

  • 1.
    BUILDING INFORMATION MODELING DIGITAL INDIAGROWING INDIA BY : AKUL PANDYA
  • 2.
    Current scenario of constructionindustry o Lack use of technology o Inefficiencies in delivery process o Skills deficits o Long and lengthy process o Unavailability of coordination o Wastage of materials Mr. Dinesh Patel Director Of Patel Infrastructure Pvt. Ltd. Mr. Ronak Gohel Chief Eng. At Patel Infrastructure Pvt. Ltd.
  • 3.
    Vibrant Gujarat 2017 -Technology and building innovations and process development event Mr.Kaushik Gajjar BIM Manager At hitech I -solutions LLP(AEC INDUSTRY) Mr.Dinesh Patel Director Of Patel Infrastructure Pvt. Ltd.
  • 4.
     Mr. DineshPatel sharing his current building process and finding solutions for better, smart and economical solutions for better future for construction industry  Mr. Kaushik Gajjar sharing his future building process lifecycle called building information modeling and telling how is important for our building environment sector  Key features of BIM: a) increase and improved coordination b) faster construction cycle c) improved visualization d) clash detection and less construction surprise e) reduce wastage f) cost reduction & control g) increase accuracy h) improved project monitoring B2B Discussion -Mr. Dinesh Patel -Mr. Kaushik Gajjar
  • 5.
    BIM benefits forthe architects:  reduced errors and omissions in documents  increased competitive advantage  reduced risk and rework  reduced cycle Time of specific workflow, enhancing the productivity
  • 6.
    BIM benefits forthe engineers:  garnering the response rate  maintaining repeat business  offering new services  reduced errors and rework
  • 7.
    BIM benefits for thecontractors:  job site productivity  reduced rework  reduced project duration
  • 8.
    BIM benefits for theowners:  reduced document errors  reduced construction cost  reduced project duration  reduced litigation
  • 9.
    Project stages we canuse BIM: -Facility operation -Construction -Procurement and tendering -Design development -Concept schematic design
  • 10.
    We can GenerateBIM Model Using Various Softwares like: 1. Trimble Tekla 2. Trimble Vico 3. Nemtschech Vectorworks 4. Bentley Micro Station 5. Sketch up 6. Graphisoft Archicad 7. Autodesk Revit 8. Autodesk Navisworks
  • 11.
    BARRIERS TO BIM IMPLEMENTATION Mind set issue  Unavailability of specialist consultant  Compatibility between software platform  Avaibility of skilled resources  High hardware and software cost  Unavailability of process implementation guideline  No mandate from government for BIM implementation
  • 12.
  • 13.
  • 14.
    Rendering software to bettervisualization for construction industry -LUMION -3D MAX -ARCHICAD
  • 15.
  • 16.
    B I M When I was going to fail in planning you were there  When coordination failed you were there  When there was a slack in the activity you were there  When I wanted to update schedule you were there  When I wanted to find clashes in project you were there  When I wanted Sustainable building you were there  When I wanted to innovation you were there!!!