Ousainou Demba has over 15 years of experience in RF engineering, design, and optimization for cellular networks including AMPS, TDMA, CDMA, GSM, UMTS, and LTE. He currently works as a consulting RF engineer for T-Mobile performing tasks such as site design, parameter optimization, and troubleshooting. Previously he has held RF engineering roles at Ericsson, Sprint, Cricket Communications, and US Cellular focusing on areas such as network design, deployment, optimization, and performance engineering.