Contact for Inquiries
Brisbane • Sydney • Abu Dhabi • Kuwait
Web	www.botharboring.com.au
Brisbane	 114 Ingleston Road
	 Wakerley, QLD, AUS 4154	
Ph	 +61 7 3907 0777	
Fax	 +61 7 3907 0888
Sydney	 4 Kibble Place
	 Narellan, NSW, AUS 2567
Ph	 +61 2 4648 5044	
Fax	 +61 2 4648 5344
Abu Dhabi	 Al Nasr Building, M Floor
	 Defence Road
	 PO Box 32567
	 Abu Dhabi, UAE
Ph	 +971 (02) 6420 002
Fax	 +971 (02) 6420 228
Kuwait	 Al Shayma’a Tower
	 Omar Bin Al Khattab Street
	 Murgab Area-3rd floor
	Kuwait
Ph	 +965 2225 1311
Fax	 +965 2225 1312
2iii
Bothar Boring & Tunnelling
Bothar Boring & Tunnelling is a specialist engineering services
company proficient in the non-destructive installation and
rehabilitation of underground services and facilities for water,
gas, sewage and utilities housing cables, through the use
of a full range of trenchless installation techniques.
With two decades experience, key offices in Brisbane,
Sydney, Abu Dhabi, Kuwait, and a new office set to open in
Europe, Bothar Boring & Tunnelling continues to broaden its
international reach, offering innovative trenchless engineering
solutions for major global boring and tunnelling projects.
Bothar Boring & Tunnelling offers a full suite of trenchless services
including tunnelling and pipe jacking, auger boring, micro-
tunnelling, horizontal directional drilling and rehabilitation,
while proudly designing and manufacturing its own range of
sophisticated auger boring and tunnelling machines in house.
The equipment used by Bothar Boring & Tunnelling is
capable of undertaking a range of projects from 300mm
up to 4,000mm in all variations of ground conditions.
»» Tunnelling and Micro-tunnelling...... 400mm to 4,000mm
»» Auger Boring....................................... 300mm to 1,550mm
»» HDD...................................................... 300mm to 1,000mm
The company’s substantial trenchless fleet includes the following:
»» Thirteen (13) tunnelling and micro-tunnelling
machines (including 5 Herrenknecht machines)
»» Ten (10) auger boring machines
Bothar Boring & Tunnelling also carries a large inventory of jacking
rigs, drive trains, power packs, excavators, trucks and cranes.
43
Our PeopleWho We Are
Tony Guinan Executive Director
Tony Guinan began his relationship with Bothar Boring &
Tunnelling in 1993 after migrating to Australia from Ireland.
With 17 years experience in the oil, gas and trenchless
industry, Tony has been instrumental to the company in driving
major innovations in subsurface technology, and has directly
managed various large-scale projects throughout Australia.
Tony has played a pivotal role in growing the company into
one of Australia’s leading trenchless installation service
providers. Further to this, he has been directly responsible
for the recruitment, training and retention of the firm’s highly
experienced and accredited workforce, as well as expediting
the growth of Bothar Boring & Tunnelling’s equipment fleet.
Steve Mitchell General Manager Australia
Joining Bothar Boring & Tunnelling in 2000, Steve Mitchell
is a civil engineer who boasts an impressive background
in the design and construction of various civil engineering,
water infrastructure, pipeline design and construction, and
trenchless projects in Australia and the United Kingdom. 
In addition to supervising the daily activities of the company,
Steve’s role involves providing technical support and project
managing various pipe jacking, auger boring and micro-
tunnelling projects throughout Australia. He is also responsible
for the review and tender of various trenchless projects and acts
as a technical consultant to designers, contractors and clients,
in relation to the design and construction of various types of
tunnelling equipment used by Bothar Boring & Tunnelling.
Further to this, Steve oversees the programming of works and
procurement of materials, as well as organising tunnelling crews
and subcontractors and liaising with clients on a daily basis.
Noel Kerr Executive Director
Noel Kerr has significant experience in all facets of trenchless
installation including tunnelling, micro-tunnelling, auger
boring and HDD in Australia, the Middle East and Europe.
With 25 years’ experience in business ownership, most recently
Noel was the founder and CEO of Diversified Construction
Corporation Pty Ltd (DCC), an oil and gas pipeline construction
and maintenance business which he grew to an annual turnover
in excess of $200 million and profit of circa $15 million.
Noel successfully negotiated the merger of DCC with Walter
Diversified Services Pty Ltd (WDS) in 2006, becoming a founding
shareholder of the newly established company. Upholding his
role as CEO for the next two years, Noel was an integral part
of the senior executive management team and in that time saw
WDS secure its listing on the Australian Stock Exchange.
Adam Ibrahim General Manager Middle East
Adam Ibrahim is a mechanical engineer with vast experience
in the project management of various areas of the construction
industry, with a particular emphasis on pipeline and tunnelling
jobs. As Deputy Manager / Project Manager for Thrust
Boring Construction Company in Kuwait, he managed
many contracts and co-coordinated all associated micro
tunnelling and pipe jacking operations and set ups.
In early 2004 Adam became the General Manager of MacCormick
Civil and Tunnelling in the Middle East, leading the company
in negotiations, meetings, conventions and seminars, as well
as liaising with key industry organisations. In addition to this he
provided overall direction and strategic management of the
company’s use of resources, including personnel, technology
and physical assets. Following the acquisition of MacCormick
Civil and Tunnelling by WDS in 2007, Adam was reengaged
to assume a similar role within the restructured firm.
Building the World Beneath You
With two decades of cutting edge experience in the trenchless engineering
industry, Bothar Boring & Tunnelling has become one of Australia’s most
skilled providers of subsurface pipeline construction and tunnelling.
Borthar Boring & Tunnelling has developed a reputation for being a
‘can-do’ company renowned for the delivery of difficult projects and
for safety, quality, efficiency and reliability. These strengths, coupled
with an in-depth understanding of the unique challenges of every
project, have helped Bothar Boring & Tunnelling to leverage their
current status as a market-leading, multinational operation with a
network encompassing Australia, Europe and the Middle East.
Bothar Boring & Tunnelling unites cutting-edge engineering techniques
with extensive technical skills that are unparalleled in the industry. The
company’s comprehensive offering covers the full suite of trenchless
solutions from auger boring, micro-tunnelling and horizontal directional
drilling through to tunnelling, pipejacking and rehabilitation, enabling the
efficient delivery of every aspect of even the most challenging projects.
Bothar Boring & Tunnelling plays a key role in the advancement
of the trenchless solutions industry worldwide and is a member
of the Australasian Society for Trenchless Technology (ASTT), and
the International Society of Trenchless Technology (ISTT).
Our Values
Since establishment 20 years ago, the business, values and
corporate philosophy of Bothar Boring & Tunnelling have remained
resolute. The company strives to deliver the highest level of service
and professionalism without compromising on safety, quality or
sustainability and with an unwavering commitment to innovation.
Safety
Bothar Boring & Tunnelling holds in high regard its moral and legal
responsibilities to provide a safe and healthy working environment
for employees, contractors, customers and visitors. This commitment
extends to ensuring the organisation’s operations do not place the
local community at risk of injury, illness or damage to property.
Quality
It is the aim of Bothar Boring & Tunnelling to achieve maximum
consumer satisfaction via an unwavering commitment to
providing quality products and services, which exceed
agreed quality standards and customer expectations.
Sustainability
When planning and executing even the lowest risk projects, it is the strict
policy position of Bothar Boring & Tunnelling to treat the surrounding
environment as a principal factor for concern. The company strongly
advocates sustainability and through the use of sophisticated trenchless
techniques, takes great care to minimise environmental damage.
65
Company Timeline
1991
»» Business started
operations in Sydney
»» Manufacture of first “Bothar
Built” auger boring machine
– a 900mm diameter
3 cylinder machine
»» First job for Integral
Energy (Sydney) – 30m of
18” diameter steel casing
for electrical cables
»» Other work for various
municipal councils
1994
»» Manufacture of first ‘Bothar Built’ tunnel boring
machine (TBM) – an 1800mm diameter TBM
»» Completed first major tunnelling project
– Oxley to Logan Trunk Water Main
»» Completed first excavation by drill and blast
and pipe jack in rock up to 400mpa of 1200mm
diameter pipe at Nerang, on the Gold Coast
1995
»» Company splits from parent
»» Undertakes 3km of 400mm
diameter auger boring
crossings between Young
and Botany, in Sydney,
NSW for the Moomba
to Sydney Ethane Line
1997
»» Manufacture of largest
‘Bothar Built’ tunnelling
machine to date – a
2,800mm diameter TBM
»» Completion of Coronation
Drive Drainage Project in
Brisbane, Australia, from
the Inn on the Park Hotel
to the Brisbane River.
1993
»» Established
presence in
Queensland
market
2000
»» Manufacture of largest new ‘Bothar
Built’ tunneling machine to date
– a 3,500mm diameter TBM
»» Completion of Black Street
Stormwater Drainage at Milton,
Brisbane, Queensland. For Brisbane
City Council (remove full-stop)
»» 350 meters of 3,000mm diameter
tunnelling for installation of
Reinforced Concrete Jacking Pipe
from Lang Park to Brisbane River
1991
2002
»» Completed 250m of 1200mm
tunnelling in Brisbane CBD for
Gandel (Queen Street Central
Stormwater Diversion Project).
»» Tunnelling was under major
CBD road and mall and
involved shaft and manhole
construction, traffic control,
survey and community liaison.
2011
»» Opens office in Kuwait
»» Awarded first project
in Kuwait – 15km of
various diameter (ranging
from 400mm to 1000m)
for stormwater.
2007 – 2009
»» Completed over 600 meters of tunnelling from 1,350mm
up to 2,100mm for Liverpool City Council on the Central
Business District Trunk Storm Water Drainage Project for
the installation of Reinforced Concrete Jacking Pipe
2005
»» Completed Isaac Street
Stormwater Relief Drainage
project for Brisbane City Works
including 130m of tunnelling
from 1,500mm up to 2,100mm
2010
»» Expands to Middle East
»» Opens office in Abu Dhabi
»» Commence first micro-tunnelling
job – 1.7km of 2,000mm diameter
for installation of Reinforced
Concrete Jacking Pipe for
400 KVA Cables Works.
2011
87
Trenchless Solutions
Bothar Boring & Tunnelling’s full service offering sets the company apart and enables them to efficiently deliver on any boring or tunnelling
project, regardless of its difficulty or complexity. The firm employs state-of-the-art technology and superior machinery to achieve the optimum
results within tight deadlines, while never compromising on quality. Drawing upon 20 years experience to ensure the most suitable methods
are engaged at each stage every project, Bothar Boring & Tunnelling can manage all work without the need to engage external contractors.
Rehabilitation
Bothar Boring & Tunnelling has now been providing rehabilitation and replacement of existing
pipelines as an alternative to the installation of new pipelines for many years. The company has
a sophisticated range of specialist equipment available to undertake this work when required.
Micro Tunnelling and Tunnelling
When absolute precision is required, Bothar Boring & Tunnelling utilises cutting-
edge micro-tunnelling machines manufactured by world leaders Herrenknecht.
Ideal for wet, sandy locations or deeper tunnels, these micro-tunnelling
machines are operated using state-of-the-art laser-guided technology.
Bothar Boring & Tunnelling’s own fleet of “Bothar Built” TBMs are designed for
tunnelling through a variety of ground conditions from hard rock to sand and virtually
anything in between. Bothar Boring & Tunnelling has successfully completed tunnelling
projects from 1,050mm up to 4,000mm in all types of ground conditions.
Where particularly tough ground conditions require manual excavation, Bothar Boring
& Tunnelling is also highly skilled in pipe-jacking and have developed unique methods
to achieve maximum accuracy during jacking in order to lengthen the jacked distance
and control varying ground conditions whilst installing pipelines, ducts and culverts.
The company’s micro-tunneling and tunneling fleet ranges from 400mm to 4000mm diameter.
Auger Boring
Bothar Boring & Tunnelling’s expertise in auger boring is unparalleled. The company’s
auger boring techniques provide a safe and economical alternative to other forms of
tunnelling, without compromising on efficiency or quality and is a reliable method for
making crossings beneath highways, railways and other existing infrastructure.
The company’s auger boring fleet ranges in size from 300 – 1,550mm in diameter.
Horizontal Directional Drilling (HDD)
HDD is a technique typically used for long crossings over waterways, gorges and
environmentally sensitive areas, where traditional trenching or excavating is not practical.
Bothar Boring & Tunnelling’s capabilities in HDD permit the placing of pipes or conduits
over considerable distances without disturbing the surface or damaging the surrounding
environment. This method of trenchless technology is suitable for laying water and
wastewater pipes, gas and oil pipelines, and electricity and telecommunications cables.
Our HDD size range is from 300mm – 1,000mm in diameter.
Our Markets
With a raft of blue-chip clients and experience that covers a
wide range of global industries, Bothar Boring & Tunnelling’s
specialist teams are comfortably positioned to draw from
a depth of specialist knowledge and skill, ensuring client
expectations are consistently exceeded with each new project.
Bothar Boring & Tunnelling caters to a diverse range
of markets with services that typically include:
»» Non-destructive crossings (NDC’s) of major infrastructure
including roads, railway lines and other existing services
»» Installation of new pipelines for oil and gas, and water and sewage
»» Rehabilitation or replacement of existing underground asset
The company’s key markets include:
»» Water/Sewer Infrastructure
»» Oil & Gas
»» CSG
»» Mining
»» Transport Road & Rail)
»» Electricity & Communications Utility
In its 20 years of operation, Bothar Boring & Tunnelling
has earned a solid reputation for being able to deliver
technically difficult projects that other contractors cannot.
Now recognised as one of Australia’s leading trenchless
construction companies, Bothar Boring & Tunnelling has
established a credible blue-chip client base which includes
many of Australia’s largest construction companies,
and a significant number of government departments,
municipal councils and utilities, including:
»» Leightons, BMD Group, John Holland;
»» Fulton Hogan, Baulderstone, Murphey Pipe & Civil;
»» Origin, WDS Limited, BCG / BMA;
»» Roadtek (QLD Department of Transport & Main
Roads), RTA (Roads & Traffic Authority NSW)
»» Al Nasr Contracting Company LLC, Kuwait Company for
Process Plant Construction & Contracting K.S.C.;
»» Queensland Urban Utilities, Sydney Water, Melbourne
Water Corporation, South Australian Water; and
»» Municipal Councils including, Liverpool (NSW), Gold
Coast, Ipswich & Moreton Bay Regional Councils.
»» Brisbane City Council
109
Key Projects
Central Business District Trunk
Stormwater Drainage
Client	 Liverpool City Council
Location	 Liverpool, NSW, Australia
Type of Works	 Tunnelling (Principal Contractor)
Scope of Works
610m of tunneling from 1,350mm up to 2,100mm diameter
reinforced concrete jacking pipe under state railway and
roads including survey and set out, location of services, traffic
control, design and construction of jacking and receiving
shafts up to 11m deep, construction of reinforced concrete
chambers, construction of sandstone outfall to Georges River,
backfilling pits, restoration of site and as-constructed survey.
400 KVA cables works for Mushrif -
Mamzar Beach - Nahda 400/132 KV
Substations Al Nahda area, Dubai, UAE
Client	 Dubai Electricity and Water Authority / Nexans
Location	 Dubai, United Arab Emirates
Type of Works	 Micro-tunnelling (Sub-Contractor)
Scope of Works
1700m x 2,000mm diameter reinforced concrete jacking
pipes under highways, main roads and other existing
utilities (including survey, set out and as built).
Townsville Waste Water Upgrade Project
Client	 Townsville City Council
Location	 Townsville, Queensland, Australia
Type of Works	 Auger Boring (Subcontractor)
Scope of Works
8 x 1,200mm and 8 x 700mm auger bores ranging in
length up to 90 meters. Installation for sewage pressure
mains under state railway and roads including location of
services, construction of boring and exit pits, boring and
installation of steel casing, backfilling and restoration.
Black Street Stormwater Drainage
Client	 Brisbane City Council
Location	 Brisbane, Queensland, Australia
Type of Works	 Tunnelling (Principal Contractor)
Scope of Works
350m x 3,000mm diameter reinforced concrete jacking pipe under
state railway, roads and multi storey buildings including survey and
set out, location of services, traffic control, construction and design
of sheet piled jacking pit, reinforced concrete chambers, sheet
piled cofferdam in Brisbane River for TBM exit and construction
of headwall, various open trenching for stormwater drainage,
backfilling pits, restoration of site and as-constructed survey.
1
2
3
4
Our Technology
The determination of Bothar Boring & Tunnelling to pioneer new
technology and lead innovation is demonstrated by its ongoing
investment into research and development. The company’s extensive
fleet of boring and tunnelling machinery which are designed and
manufactured in house, is frequently reviewed and advanced to ensure
Bothar maintains its position as a cutting edge leader in the industry.
Bothar Boring & Tunnelling’s commitment to employing the
most advanced techniques also extends to the practice of their
industry partners. The company’s micro-tunnelling machines
are supplied exclusively by Herrenknecht, a market leader with
over 30 years of experience in the field of tunnelling. With its
research and development resources and engineering expertise,
Herrenknecht has made a substantial contribution to the significant
advancements made in mechanised tunnelling in recent years.

More Related Content

What's hot

KAUP Attachments Provide Safe and Effective Tyre Handling Solutions
KAUP Attachments Provide Safe and Effective Tyre Handling SolutionsKAUP Attachments Provide Safe and Effective Tyre Handling Solutions
KAUP Attachments Provide Safe and Effective Tyre Handling SolutionsMJDelaMasa
 
QBlast
QBlastQBlast
QBlastQBlast
 
November 2015 - G-Tech
November 2015 - G-TechNovember 2015 - G-Tech
November 2015 - G-TechAaron Chapman
 
Kuulumisia, Normet Oy
Kuulumisia, Normet  OyKuulumisia, Normet  Oy
Kuulumisia, Normet OyINFRAry
 
Cab Company Presentation Low Res
Cab Company Presentation Low ResCab Company Presentation Low Res
Cab Company Presentation Low Resjhickmancabauto
 
Road Repair Marketing
Road Repair MarketingRoad Repair Marketing
Road Repair Marketinggarry sharp
 
Team effort wins plate order
Team effort wins plate orderTeam effort wins plate order
Team effort wins plate orderBoulton Richard
 
Norfolk Chamber Great Yarmouth Presentation
Norfolk Chamber Great Yarmouth PresentationNorfolk Chamber Great Yarmouth Presentation
Norfolk Chamber Great Yarmouth PresentationBryony Smith
 
(014) Giraffe Equipment Australia
(014) Giraffe Equipment Australia(014) Giraffe Equipment Australia
(014) Giraffe Equipment AustraliaBobby Fawkes
 
Engine honing technology
Engine honing technologyEngine honing technology
Engine honing technologyDavid Chobany
 

What's hot (17)

RELIABILITY IN HEAVY HAUL
RELIABILITY IN HEAVY HAULRELIABILITY IN HEAVY HAUL
RELIABILITY IN HEAVY HAUL
 
KAUP Attachments Provide Safe and Effective Tyre Handling Solutions
KAUP Attachments Provide Safe and Effective Tyre Handling SolutionsKAUP Attachments Provide Safe and Effective Tyre Handling Solutions
KAUP Attachments Provide Safe and Effective Tyre Handling Solutions
 
QBlast
QBlastQBlast
QBlast
 
CT_V1N3_A4_revised May4
CT_V1N3_A4_revised May4CT_V1N3_A4_revised May4
CT_V1N3_A4_revised May4
 
November 2015 - G-Tech
November 2015 - G-TechNovember 2015 - G-Tech
November 2015 - G-Tech
 
Kuulumisia, Normet Oy
Kuulumisia, Normet  OyKuulumisia, Normet  Oy
Kuulumisia, Normet Oy
 
BELL B60D
BELL B60DBELL B60D
BELL B60D
 
CSC Screeding
CSC ScreedingCSC Screeding
CSC Screeding
 
Cab Company Presentation Low Res
Cab Company Presentation Low ResCab Company Presentation Low Res
Cab Company Presentation Low Res
 
Road Repair Marketing
Road Repair MarketingRoad Repair Marketing
Road Repair Marketing
 
Wellspun corp
Wellspun corpWellspun corp
Wellspun corp
 
Team effort wins plate order
Team effort wins plate orderTeam effort wins plate order
Team effort wins plate order
 
Norfolk Chamber Great Yarmouth Presentation
Norfolk Chamber Great Yarmouth PresentationNorfolk Chamber Great Yarmouth Presentation
Norfolk Chamber Great Yarmouth Presentation
 
(014) Giraffe Equipment Australia
(014) Giraffe Equipment Australia(014) Giraffe Equipment Australia
(014) Giraffe Equipment Australia
 
Engine honing technology
Engine honing technologyEngine honing technology
Engine honing technology
 
N c group presentation
N c group presentationN c group presentation
N c group presentation
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 

Viewers also liked

CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...
CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...
CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...Cristhiane Assenhaimer Takahashi
 
Introduction to startup buenos aires
Introduction to startup buenos airesIntroduction to startup buenos aires
Introduction to startup buenos airesMartin Rozec
 
Argentina’s Startup Landscape Report
Argentina’s Startup Landscape ReportArgentina’s Startup Landscape Report
Argentina’s Startup Landscape ReportMartin Rozec
 
Interviewing the Cruschiki King
Interviewing the Cruschiki KingInterviewing the Cruschiki King
Interviewing the Cruschiki KingTSheen123
 
Isg para-cezalari-25-nisan-2015-b
Isg para-cezalari-25-nisan-2015-bIsg para-cezalari-25-nisan-2015-b
Isg para-cezalari-25-nisan-2015-bmetoinside
 
GRaSS-1_results_eng-fin
GRaSS-1_results_eng-finGRaSS-1_results_eng-fin
GRaSS-1_results_eng-finMarketSense_RF
 
6 a brandiepratt
6 a brandiepratt6 a brandiepratt
6 a brandieprattddpratty
 
What Makes a Good Story for a Nonprofit by Matt Kupec
What Makes a Good Story for a Nonprofit by Matt KupecWhat Makes a Good Story for a Nonprofit by Matt Kupec
What Makes a Good Story for a Nonprofit by Matt KupecMatt Kupec
 

Viewers also liked (15)

Laboratory model sets
Laboratory model setsLaboratory model sets
Laboratory model sets
 
CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...
CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...
CET_Analysis of the Stability of Metal Working Fluid Emulsions by Turbidity S...
 
Introduction to startup buenos aires
Introduction to startup buenos airesIntroduction to startup buenos aires
Introduction to startup buenos aires
 
Writing for the Web
Writing for the Web Writing for the Web
Writing for the Web
 
Argentina’s Startup Landscape Report
Argentina’s Startup Landscape ReportArgentina’s Startup Landscape Report
Argentina’s Startup Landscape Report
 
En ville
En villeEn ville
En ville
 
Interviewing the Cruschiki King
Interviewing the Cruschiki KingInterviewing the Cruschiki King
Interviewing the Cruschiki King
 
Isg para-cezalari-25-nisan-2015-b
Isg para-cezalari-25-nisan-2015-bIsg para-cezalari-25-nisan-2015-b
Isg para-cezalari-25-nisan-2015-b
 
RyanResumeUpdated (2015
RyanResumeUpdated (2015RyanResumeUpdated (2015
RyanResumeUpdated (2015
 
GRaSS-1_results_eng-fin
GRaSS-1_results_eng-finGRaSS-1_results_eng-fin
GRaSS-1_results_eng-fin
 
Winter drawing how_tos
Winter drawing how_tosWinter drawing how_tos
Winter drawing how_tos
 
6 a brandiepratt
6 a brandiepratt6 a brandiepratt
6 a brandiepratt
 
Grass-4_rus
Grass-4_rusGrass-4_rus
Grass-4_rus
 
What Makes a Good Story for a Nonprofit by Matt Kupec
What Makes a Good Story for a Nonprofit by Matt KupecWhat Makes a Good Story for a Nonprofit by Matt Kupec
What Makes a Good Story for a Nonprofit by Matt Kupec
 
Verbs compound blog
Verbs compound blogVerbs compound blog
Verbs compound blog
 

Similar to Contact Bothar Boring for Trenchless Engineering Inquiries

MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfKAWMAW
 
BMSA Corporate Profile
BMSA Corporate ProfileBMSA Corporate Profile
BMSA Corporate ProfileDave Barr
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CVRupert Davison
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Dockarl luke
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Lynx Precast Case Study
Lynx Precast Case StudyLynx Precast Case Study
Lynx Precast Case StudyMJDelaMasa
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy CleaningAaron Chapman
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy CleaningBen Urry
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15David Graham
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Mark Rowell
 

Similar to Contact Bothar Boring for Trenchless Engineering Inquiries (20)

ColumnsBrochure
ColumnsBrochureColumnsBrochure
ColumnsBrochure
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
BMSA Corporate Profile
BMSA Corporate ProfileBMSA Corporate Profile
BMSA Corporate Profile
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
 
RW CV
RW CVRW CV
RW CV
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Lynx Precast Case Study
Lynx Precast Case StudyLynx Precast Case Study
Lynx Precast Case Study
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy Cleaning
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy Cleaning
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
M&R Company profile
M&R Company profileM&R Company profile
M&R Company profile
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Contact Bothar Boring for Trenchless Engineering Inquiries

  • 1. Contact for Inquiries Brisbane • Sydney • Abu Dhabi • Kuwait Web www.botharboring.com.au Brisbane 114 Ingleston Road Wakerley, QLD, AUS 4154 Ph +61 7 3907 0777 Fax +61 7 3907 0888 Sydney 4 Kibble Place Narellan, NSW, AUS 2567 Ph +61 2 4648 5044 Fax +61 2 4648 5344 Abu Dhabi Al Nasr Building, M Floor Defence Road PO Box 32567 Abu Dhabi, UAE Ph +971 (02) 6420 002 Fax +971 (02) 6420 228 Kuwait Al Shayma’a Tower Omar Bin Al Khattab Street Murgab Area-3rd floor Kuwait Ph +965 2225 1311 Fax +965 2225 1312
  • 2. 2iii Bothar Boring & Tunnelling Bothar Boring & Tunnelling is a specialist engineering services company proficient in the non-destructive installation and rehabilitation of underground services and facilities for water, gas, sewage and utilities housing cables, through the use of a full range of trenchless installation techniques. With two decades experience, key offices in Brisbane, Sydney, Abu Dhabi, Kuwait, and a new office set to open in Europe, Bothar Boring & Tunnelling continues to broaden its international reach, offering innovative trenchless engineering solutions for major global boring and tunnelling projects. Bothar Boring & Tunnelling offers a full suite of trenchless services including tunnelling and pipe jacking, auger boring, micro- tunnelling, horizontal directional drilling and rehabilitation, while proudly designing and manufacturing its own range of sophisticated auger boring and tunnelling machines in house. The equipment used by Bothar Boring & Tunnelling is capable of undertaking a range of projects from 300mm up to 4,000mm in all variations of ground conditions. »» Tunnelling and Micro-tunnelling...... 400mm to 4,000mm »» Auger Boring....................................... 300mm to 1,550mm »» HDD...................................................... 300mm to 1,000mm The company’s substantial trenchless fleet includes the following: »» Thirteen (13) tunnelling and micro-tunnelling machines (including 5 Herrenknecht machines) »» Ten (10) auger boring machines Bothar Boring & Tunnelling also carries a large inventory of jacking rigs, drive trains, power packs, excavators, trucks and cranes.
  • 3. 43 Our PeopleWho We Are Tony Guinan Executive Director Tony Guinan began his relationship with Bothar Boring & Tunnelling in 1993 after migrating to Australia from Ireland. With 17 years experience in the oil, gas and trenchless industry, Tony has been instrumental to the company in driving major innovations in subsurface technology, and has directly managed various large-scale projects throughout Australia. Tony has played a pivotal role in growing the company into one of Australia’s leading trenchless installation service providers. Further to this, he has been directly responsible for the recruitment, training and retention of the firm’s highly experienced and accredited workforce, as well as expediting the growth of Bothar Boring & Tunnelling’s equipment fleet. Steve Mitchell General Manager Australia Joining Bothar Boring & Tunnelling in 2000, Steve Mitchell is a civil engineer who boasts an impressive background in the design and construction of various civil engineering, water infrastructure, pipeline design and construction, and trenchless projects in Australia and the United Kingdom.  In addition to supervising the daily activities of the company, Steve’s role involves providing technical support and project managing various pipe jacking, auger boring and micro- tunnelling projects throughout Australia. He is also responsible for the review and tender of various trenchless projects and acts as a technical consultant to designers, contractors and clients, in relation to the design and construction of various types of tunnelling equipment used by Bothar Boring & Tunnelling. Further to this, Steve oversees the programming of works and procurement of materials, as well as organising tunnelling crews and subcontractors and liaising with clients on a daily basis. Noel Kerr Executive Director Noel Kerr has significant experience in all facets of trenchless installation including tunnelling, micro-tunnelling, auger boring and HDD in Australia, the Middle East and Europe. With 25 years’ experience in business ownership, most recently Noel was the founder and CEO of Diversified Construction Corporation Pty Ltd (DCC), an oil and gas pipeline construction and maintenance business which he grew to an annual turnover in excess of $200 million and profit of circa $15 million. Noel successfully negotiated the merger of DCC with Walter Diversified Services Pty Ltd (WDS) in 2006, becoming a founding shareholder of the newly established company. Upholding his role as CEO for the next two years, Noel was an integral part of the senior executive management team and in that time saw WDS secure its listing on the Australian Stock Exchange. Adam Ibrahim General Manager Middle East Adam Ibrahim is a mechanical engineer with vast experience in the project management of various areas of the construction industry, with a particular emphasis on pipeline and tunnelling jobs. As Deputy Manager / Project Manager for Thrust Boring Construction Company in Kuwait, he managed many contracts and co-coordinated all associated micro tunnelling and pipe jacking operations and set ups. In early 2004 Adam became the General Manager of MacCormick Civil and Tunnelling in the Middle East, leading the company in negotiations, meetings, conventions and seminars, as well as liaising with key industry organisations. In addition to this he provided overall direction and strategic management of the company’s use of resources, including personnel, technology and physical assets. Following the acquisition of MacCormick Civil and Tunnelling by WDS in 2007, Adam was reengaged to assume a similar role within the restructured firm. Building the World Beneath You With two decades of cutting edge experience in the trenchless engineering industry, Bothar Boring & Tunnelling has become one of Australia’s most skilled providers of subsurface pipeline construction and tunnelling. Borthar Boring & Tunnelling has developed a reputation for being a ‘can-do’ company renowned for the delivery of difficult projects and for safety, quality, efficiency and reliability. These strengths, coupled with an in-depth understanding of the unique challenges of every project, have helped Bothar Boring & Tunnelling to leverage their current status as a market-leading, multinational operation with a network encompassing Australia, Europe and the Middle East. Bothar Boring & Tunnelling unites cutting-edge engineering techniques with extensive technical skills that are unparalleled in the industry. The company’s comprehensive offering covers the full suite of trenchless solutions from auger boring, micro-tunnelling and horizontal directional drilling through to tunnelling, pipejacking and rehabilitation, enabling the efficient delivery of every aspect of even the most challenging projects. Bothar Boring & Tunnelling plays a key role in the advancement of the trenchless solutions industry worldwide and is a member of the Australasian Society for Trenchless Technology (ASTT), and the International Society of Trenchless Technology (ISTT). Our Values Since establishment 20 years ago, the business, values and corporate philosophy of Bothar Boring & Tunnelling have remained resolute. The company strives to deliver the highest level of service and professionalism without compromising on safety, quality or sustainability and with an unwavering commitment to innovation. Safety Bothar Boring & Tunnelling holds in high regard its moral and legal responsibilities to provide a safe and healthy working environment for employees, contractors, customers and visitors. This commitment extends to ensuring the organisation’s operations do not place the local community at risk of injury, illness or damage to property. Quality It is the aim of Bothar Boring & Tunnelling to achieve maximum consumer satisfaction via an unwavering commitment to providing quality products and services, which exceed agreed quality standards and customer expectations. Sustainability When planning and executing even the lowest risk projects, it is the strict policy position of Bothar Boring & Tunnelling to treat the surrounding environment as a principal factor for concern. The company strongly advocates sustainability and through the use of sophisticated trenchless techniques, takes great care to minimise environmental damage.
  • 4. 65 Company Timeline 1991 »» Business started operations in Sydney »» Manufacture of first “Bothar Built” auger boring machine – a 900mm diameter 3 cylinder machine »» First job for Integral Energy (Sydney) – 30m of 18” diameter steel casing for electrical cables »» Other work for various municipal councils 1994 »» Manufacture of first ‘Bothar Built’ tunnel boring machine (TBM) – an 1800mm diameter TBM »» Completed first major tunnelling project – Oxley to Logan Trunk Water Main »» Completed first excavation by drill and blast and pipe jack in rock up to 400mpa of 1200mm diameter pipe at Nerang, on the Gold Coast 1995 »» Company splits from parent »» Undertakes 3km of 400mm diameter auger boring crossings between Young and Botany, in Sydney, NSW for the Moomba to Sydney Ethane Line 1997 »» Manufacture of largest ‘Bothar Built’ tunnelling machine to date – a 2,800mm diameter TBM »» Completion of Coronation Drive Drainage Project in Brisbane, Australia, from the Inn on the Park Hotel to the Brisbane River. 1993 »» Established presence in Queensland market 2000 »» Manufacture of largest new ‘Bothar Built’ tunneling machine to date – a 3,500mm diameter TBM »» Completion of Black Street Stormwater Drainage at Milton, Brisbane, Queensland. For Brisbane City Council (remove full-stop) »» 350 meters of 3,000mm diameter tunnelling for installation of Reinforced Concrete Jacking Pipe from Lang Park to Brisbane River 1991 2002 »» Completed 250m of 1200mm tunnelling in Brisbane CBD for Gandel (Queen Street Central Stormwater Diversion Project). »» Tunnelling was under major CBD road and mall and involved shaft and manhole construction, traffic control, survey and community liaison. 2011 »» Opens office in Kuwait »» Awarded first project in Kuwait – 15km of various diameter (ranging from 400mm to 1000m) for stormwater. 2007 – 2009 »» Completed over 600 meters of tunnelling from 1,350mm up to 2,100mm for Liverpool City Council on the Central Business District Trunk Storm Water Drainage Project for the installation of Reinforced Concrete Jacking Pipe 2005 »» Completed Isaac Street Stormwater Relief Drainage project for Brisbane City Works including 130m of tunnelling from 1,500mm up to 2,100mm 2010 »» Expands to Middle East »» Opens office in Abu Dhabi »» Commence first micro-tunnelling job – 1.7km of 2,000mm diameter for installation of Reinforced Concrete Jacking Pipe for 400 KVA Cables Works. 2011
  • 5. 87 Trenchless Solutions Bothar Boring & Tunnelling’s full service offering sets the company apart and enables them to efficiently deliver on any boring or tunnelling project, regardless of its difficulty or complexity. The firm employs state-of-the-art technology and superior machinery to achieve the optimum results within tight deadlines, while never compromising on quality. Drawing upon 20 years experience to ensure the most suitable methods are engaged at each stage every project, Bothar Boring & Tunnelling can manage all work without the need to engage external contractors. Rehabilitation Bothar Boring & Tunnelling has now been providing rehabilitation and replacement of existing pipelines as an alternative to the installation of new pipelines for many years. The company has a sophisticated range of specialist equipment available to undertake this work when required. Micro Tunnelling and Tunnelling When absolute precision is required, Bothar Boring & Tunnelling utilises cutting- edge micro-tunnelling machines manufactured by world leaders Herrenknecht. Ideal for wet, sandy locations or deeper tunnels, these micro-tunnelling machines are operated using state-of-the-art laser-guided technology. Bothar Boring & Tunnelling’s own fleet of “Bothar Built” TBMs are designed for tunnelling through a variety of ground conditions from hard rock to sand and virtually anything in between. Bothar Boring & Tunnelling has successfully completed tunnelling projects from 1,050mm up to 4,000mm in all types of ground conditions. Where particularly tough ground conditions require manual excavation, Bothar Boring & Tunnelling is also highly skilled in pipe-jacking and have developed unique methods to achieve maximum accuracy during jacking in order to lengthen the jacked distance and control varying ground conditions whilst installing pipelines, ducts and culverts. The company’s micro-tunneling and tunneling fleet ranges from 400mm to 4000mm diameter. Auger Boring Bothar Boring & Tunnelling’s expertise in auger boring is unparalleled. The company’s auger boring techniques provide a safe and economical alternative to other forms of tunnelling, without compromising on efficiency or quality and is a reliable method for making crossings beneath highways, railways and other existing infrastructure. The company’s auger boring fleet ranges in size from 300 – 1,550mm in diameter. Horizontal Directional Drilling (HDD) HDD is a technique typically used for long crossings over waterways, gorges and environmentally sensitive areas, where traditional trenching or excavating is not practical. Bothar Boring & Tunnelling’s capabilities in HDD permit the placing of pipes or conduits over considerable distances without disturbing the surface or damaging the surrounding environment. This method of trenchless technology is suitable for laying water and wastewater pipes, gas and oil pipelines, and electricity and telecommunications cables. Our HDD size range is from 300mm – 1,000mm in diameter. Our Markets With a raft of blue-chip clients and experience that covers a wide range of global industries, Bothar Boring & Tunnelling’s specialist teams are comfortably positioned to draw from a depth of specialist knowledge and skill, ensuring client expectations are consistently exceeded with each new project. Bothar Boring & Tunnelling caters to a diverse range of markets with services that typically include: »» Non-destructive crossings (NDC’s) of major infrastructure including roads, railway lines and other existing services »» Installation of new pipelines for oil and gas, and water and sewage »» Rehabilitation or replacement of existing underground asset The company’s key markets include: »» Water/Sewer Infrastructure »» Oil & Gas »» CSG »» Mining »» Transport Road & Rail) »» Electricity & Communications Utility In its 20 years of operation, Bothar Boring & Tunnelling has earned a solid reputation for being able to deliver technically difficult projects that other contractors cannot. Now recognised as one of Australia’s leading trenchless construction companies, Bothar Boring & Tunnelling has established a credible blue-chip client base which includes many of Australia’s largest construction companies, and a significant number of government departments, municipal councils and utilities, including: »» Leightons, BMD Group, John Holland; »» Fulton Hogan, Baulderstone, Murphey Pipe & Civil; »» Origin, WDS Limited, BCG / BMA; »» Roadtek (QLD Department of Transport & Main Roads), RTA (Roads & Traffic Authority NSW) »» Al Nasr Contracting Company LLC, Kuwait Company for Process Plant Construction & Contracting K.S.C.; »» Queensland Urban Utilities, Sydney Water, Melbourne Water Corporation, South Australian Water; and »» Municipal Councils including, Liverpool (NSW), Gold Coast, Ipswich & Moreton Bay Regional Councils. »» Brisbane City Council
  • 6. 109 Key Projects Central Business District Trunk Stormwater Drainage Client Liverpool City Council Location Liverpool, NSW, Australia Type of Works Tunnelling (Principal Contractor) Scope of Works 610m of tunneling from 1,350mm up to 2,100mm diameter reinforced concrete jacking pipe under state railway and roads including survey and set out, location of services, traffic control, design and construction of jacking and receiving shafts up to 11m deep, construction of reinforced concrete chambers, construction of sandstone outfall to Georges River, backfilling pits, restoration of site and as-constructed survey. 400 KVA cables works for Mushrif - Mamzar Beach - Nahda 400/132 KV Substations Al Nahda area, Dubai, UAE Client Dubai Electricity and Water Authority / Nexans Location Dubai, United Arab Emirates Type of Works Micro-tunnelling (Sub-Contractor) Scope of Works 1700m x 2,000mm diameter reinforced concrete jacking pipes under highways, main roads and other existing utilities (including survey, set out and as built). Townsville Waste Water Upgrade Project Client Townsville City Council Location Townsville, Queensland, Australia Type of Works Auger Boring (Subcontractor) Scope of Works 8 x 1,200mm and 8 x 700mm auger bores ranging in length up to 90 meters. Installation for sewage pressure mains under state railway and roads including location of services, construction of boring and exit pits, boring and installation of steel casing, backfilling and restoration. Black Street Stormwater Drainage Client Brisbane City Council Location Brisbane, Queensland, Australia Type of Works Tunnelling (Principal Contractor) Scope of Works 350m x 3,000mm diameter reinforced concrete jacking pipe under state railway, roads and multi storey buildings including survey and set out, location of services, traffic control, construction and design of sheet piled jacking pit, reinforced concrete chambers, sheet piled cofferdam in Brisbane River for TBM exit and construction of headwall, various open trenching for stormwater drainage, backfilling pits, restoration of site and as-constructed survey. 1 2 3 4 Our Technology The determination of Bothar Boring & Tunnelling to pioneer new technology and lead innovation is demonstrated by its ongoing investment into research and development. The company’s extensive fleet of boring and tunnelling machinery which are designed and manufactured in house, is frequently reviewed and advanced to ensure Bothar maintains its position as a cutting edge leader in the industry. Bothar Boring & Tunnelling’s commitment to employing the most advanced techniques also extends to the practice of their industry partners. The company’s micro-tunnelling machines are supplied exclusively by Herrenknecht, a market leader with over 30 years of experience in the field of tunnelling. With its research and development resources and engineering expertise, Herrenknecht has made a substantial contribution to the significant advancements made in mechanised tunnelling in recent years.