Bill of quantity
(BOQ)
WHAT IS A BOQ?
• The full form of BOQ is Bill of Quantities.
• It is a list which consists of different components of your interior design project basis your
expectations, budget and scope of work.
• In front of each item, its estimated total cost is mentioned.
• This serves as an estimate for your entire project.
• The quantities may be measured in number, area, volume, weight or time. Preparing a bill of
quantities requires that the design is complete and a specification has been prepared.
Drafting Your Bill of Quantities
Set up a spreadsheet for your bill of quantities. Include
columns for the item numbers, description, unit of
measurement, quantity, rate for the item, labor, and
total cost for the item.
Your item numbers will be consecutive, starting from 1.
Restart the item numbers for each section or category
of the build.
The columns for the rate for each item and total costs
will be filled in by contractors bidding on the project.
You typically won't have any values in those columns
while you're drafting your BoQ.
REAL EXAMPLE OF A BOQ
NEUFERT & TIME SAVER
TODAY’S CLASS:
Collect class notes
Review progress

BOQ AND TIMESAVER.pptx

  • 1.
  • 2.
    WHAT IS ABOQ? • The full form of BOQ is Bill of Quantities. • It is a list which consists of different components of your interior design project basis your expectations, budget and scope of work. • In front of each item, its estimated total cost is mentioned. • This serves as an estimate for your entire project. • The quantities may be measured in number, area, volume, weight or time. Preparing a bill of quantities requires that the design is complete and a specification has been prepared.
  • 3.
    Drafting Your Billof Quantities Set up a spreadsheet for your bill of quantities. Include columns for the item numbers, description, unit of measurement, quantity, rate for the item, labor, and total cost for the item. Your item numbers will be consecutive, starting from 1. Restart the item numbers for each section or category of the build. The columns for the rate for each item and total costs will be filled in by contractors bidding on the project. You typically won't have any values in those columns while you're drafting your BoQ.
  • 4.
  • 5.
  • 6.
    TODAY’S CLASS: Collect classnotes Review progress