The document appears to be a blog tracking tasks for a group school project. It lists tasks assigned to group members like Tibby, Kozzi, Leon and Mohammed along with due dates. For each task it notes if the task was done on time and provides any additional details. Many tasks were not finished on time due to delays in completing prerequisite tasks like finalizing the script or locating filming locations. The blog will continue to be updated as the group works to complete all planning tasks ahead of starting filming.
1. NEW BLOG TABLE <br />DatenameTask to do and for whenTask done or notIf not why?Any more info...25/1/11TibbyPreliminary taskdoneEveryone received a text for 25th after school filming timeKozziPreliminary taskDoneLeonPreliminary taskDoneMohammedPreliminary taskDonetibbyHave the story board done for 7/2/11DonekozziHave script done by7/2/11DoneLeonHave editing done9/2/11DoneMohammed-7/2/11TibbyOverview – summary paragraph by Friday 11/2/11DoneSat down at lunch and free with the group and explained everything that needs to be done/ make sure all work is in for Monday.KozziOutline – 3 different bullet points (beginning, middle, end) for Friday 11/2/11DoneLeonInfo – on the certificate production company and length of whole film. (in minutes)Friday 11/2/11DoneMohammadStart with synopsis – (whole plot of film)DoneWeek 2 weekendWhole groupGoing through the synopsis and making sure everyone’s had a go and had their sayDoneTexted everyone to meet upWeek 314/2/11TibbyStory board and decisions, prop lists and decisions18/2/11Not doneDue to script not being doneKozziScript,Film treatment and finish of plot synopsis.18/2/11Not finishedGiven till 29th of feb to finishDONELeonHelp find locations and record videos and learn new skills with editing and help others in the group with everythingdoneMohammedActors, photographs, and film schedule.Not finishedDue to not havin script finished didn’t have secure actors and locations.Week 4Half term holiday (planning)Whole groupDo as much of the planning as you can and add any new info to your blog for others. Contact me for any further information for work set for the group. If any problems have a look at the planning sheet on my blog.Week 528/2/11TibbyStory board finished and uploadednot uploaded to script not being uploadedKozziFirst draft of script and finish synopsis.Done synopsis but not finished script.LeonMohammedPhotographs of possible locationsNot uploaded Week 67/3/11TibbyStory board of new clip, prop list and imagesDone but not up loaded due to no cameraNot uploadedStill Done but not up loaded due to no cameras being availableKozziScript and finish the synopsis.Not uploadedConfusion about synopsis as it was done to a horror standard and we wanted to make it a thriller so hadto go through it with teacher and group to change themes of the script.Given till 7/2/11 to finish and uploadLeonMusic /soundtrack decisions/uploaded title practicing.DoneMohammedLocation shots/costume sketches and film schedule11/2/11Half doneOnly problem is trouble finding a location with a cot but will be contacting few people to get it sortedWeek 7 14/3/11TibbyUploaded video of story board analysis. /come with possible locations for house / try find location of house possible ideasThursday 10/3/11 DoneKozziKozzi upload synopsis to find 3 lullabies and must be in mp3 form and uploaded to his blog Wednesday 9/3/11Half done Synopsis was completed and uploaded but lullabies were notHas to be done by 18/3/11 and uploadedLeonLeon to get 4 possible dramatic sounds and upload main character costumes the girl.Wednesday 15/3/11doneMohammedTuesday have uploaded the location shots and work with group to find out actors and locations of film,Ask Pablo if we can film in his childs room for a clip of the film. Send miss a email and take print screen about asking teachers for a cot. Ask Mrs. Johnson if we can borrow a cot or crib for our video. Find push chairs and take pictures. Get a few articles of the internet for the female characters scrap bookTuesday 15/3/11Half doneDue to not getting in contact with Pablo this week have not yet sorted a location for the shot of the cot but will be done by the weekend. 20/3/1119/3/11Whole group Finish of anything left for planning and upload to blog for Monday 21/3/11 and uploaded new and upgraded work as filming will start from Tuesday.Texted everyone in group in case not looked at blog and if needed help understanding something.LEON – have pic of friends house for me for Monday morning so i can add to location shots.KOZZI – have pictures of friends little brother for me for Monday morning to add to characters on blog.BOTH OF THEM NOT DONETexted both <br />