Big Kola Company
           The POM + Project


PMB 410 โ€“ Project Planning and Control
           March 31, 2013
                     Team Alpha:
           Nadia Aaron: Artwork/ PowerPoint
              Glacier Bonjardim: Write-up
             Elizabeth Bosley: MS Project
 Peggy Sue Carpenter : Team Lead, Editing, Presentation
Why Pomegranate?
Market potential is promising, with higher profit margin than other juice products


   Pomegranate โ€“ 71% ability to                           Blueberries โ€“ 33%
       produce antitoxins                                 Cranberries- 20%
Priority Matrix
Parts 1 & 2: Planning Phase
WBS
Activities: Relationships
Critical Path & Lags
Budgeting
Resource Loading/Leveling
WBS




Potential Milestones:
01/03/12 โ€“ Project Start Date, R&D Product Development
02/22/12- Initial Production
03/07/12 โ€“ Distribution (biggest and busiest activities)
04/18/12- Legal (Project is about 95% complete)
Network Diagram with Critical Path




Activity with most slack: Task ID 17: Selecting distributors is
estimated to take 25 days but may actually only take about one
week of that allotted duration.
Cascade/Waterfall Chart
Critical Activities:

ID 3 - Need Survey
ID 4 -Set product specs
ID 5 -Shelf life report
ID 7 -Secure fruit supplies
ID 9 -Equipment Rehab
ID 10 -Production trials
ID 11-Quality trials
ID 12 -Quality metrics
ID 13 โ€“Quality training
ID 21-Prepare product launch
Leveled Resources within Slack
Marketing Resource Allocation
Activity                    Description                    BCWS                ACWP              BCWP         PCT %                 ETC             BAC                      EAC                   VAC
                                                             PV                     AC               EV
                                                     Baseline BAC       Financial            BAC*%                         BAC-EV                                   AC+ETC                   BAC-EAC
      1 POM+Project                                                 0                    0                0           0%              $805,920        $805,920                 $805,920                  $0
     1.1 R&D Product Development                                    0                    0                0           0%              $121,600        $121,600                 $121,600                  $0
   1.1.1   Need Survey                                              0                    0                0           0%                  $64,000         $64,000                  $64,000               $0
   1.1.2   Set Product Specs                                        0                    0                0           0%                  $28,800         $28,800                  $28,800               $0
   1.1.3   Shelf Life Report                                        0                    0                0           0%                  $19,200         $19,200                  $19,200               $0
   1.1.4   Nutrition Report                                         0                    0                0           0%                   $9,600          $9,600                   $9,600               $0
     1.2 Secure Fruit Suppliers                                     0                    0                0           0%                   $9,600          $9,600                   $9,600               $0
     1.3 Initial Production                                         0                    0                0           0%              $370,400        $370,400                 $370,400                  $0
   1.3.1   Equipment Rehab                                          0                    0                0           0%              $254,400        $254,400                 $254,400                  $0
   1.3.2   Production Trials                                        0                    0                0           0%                  $26,400         $26,400                  $26,400               $0
   1.3.3   Quality Trials                                           0                    0                0           0%                  $48,000         $48,000                  $48,000               $0
   1.3.4   Qualiity Metrics                                         0                    0                0           0%                   $5,600          $5,600                   $5,600               $0
   1.3.5   Quality Training                                         0                    0                0           0%                  $36,000         $36,000                  $36,000               $0
     1.4 Distribution                                               0                    0                0           0%              $191,520        $191,520                 $191,520                  $0
   1.4.1   Market Testing                                           0                    0                0           0%                  $96,000         $96,000                  $96,000               $0
   1.4.2   Package Design                                           0                    0                0           0%                  $15,520         $15,520                  $15,520               $0
   1.4.3   Select Distributors                                      0                    0                0           0%                  $80,000         $80,000                  $80,000               $0
     1.5 Legal                                                      0                    0                0           0%                  $57,600         $57,600                  $57,600               $0
   1.5.1   Complete FDA Certificate                                 0                    0                0           0%                  $43,200         $43,200                  $43,200               $0
   1.5.2   Register                                                 0                    0                0           0%                  $14,400         $14,400                  $14,400               $0
     1.6 Prepare Product                                            0                    0                0           0%                  $55,200         $55,200                  $55,200               $0


                                          PMB 410 Project Planning and Control
                                          Team Alpha Week 2 POM Big Kola Budget and Cost Calculations

                                          Legend:
                                          BAC: Budget at complete: 805,920
                                          EAC: Estimate at complete: 805,920
                                          VAC variance at complete: zero
                                          BCWS: Baseline budget at complete: zero
                                          ACWP: Retrieved from Financials: none yetโ€ฆ.
                                          BCWP: (BAC * % complete): nothing yetโ€ฆ.
                                          PV: Planned value: baseline budget at complete
                                          AC: actual costs: none yet
                                          EV: earned value (in MS project only done by cost) currently zero
                                          Have not started the project yet, so ETC is 805,920 (BAC-EV) (805,920 โ€“ 0)
                                          EAC= (AC+ETC) = (0+805,920)
                                          VAC= (BAC-EAC) = (805,920 โ€“ 0)
Planning Phase - Conclusion
    ๏ƒ˜Network is very sensitive, majority of the tasks are dependent on the task
                                    before it.

๏ƒ˜   Production has resources over allocated of 1500% with an estimated cost of
                                    $370,400

The POM + Project is estimated to be completed on July 12, 2012 with a total
๏ƒ˜

                              of 135 working days.
Part 3 Baseline Status
Baseline as of 2 months
Project is 29% Complete
Status of progress
Analysis and Recommendations
Changes in project
    ๏ƒ˜    Top management has accepted The POM + Project completion date of
                                  July 19, 2012


๏ƒ˜       With new projected completion date, estimated project cost is: $890,720
             with a cost variance of $84,800 from original estimated cost


๏ƒ˜   Activity ID 8: Initial Production remains the most expensive activity with
    an initial baseline of $370,400 and a variance of $40,000 bringing the total
                                task cost of: $410,400
                                        ๏ƒ˜
Completed Milestone: R&D Product Development
Actual Duration: 54 days/Actual Cost: $166,400
EVM Performance indices are illustrating an overrun

R&D was on track with the optimal indicator of 1.0

Need to secure fruit supplier , so Initial Production-longest running activity does not delay the
rest of the project
Cost as of: March 31, 2012
Budget as of: March 31, 2012
Cash Flow Report
                    Cost   Cumulative Cost



       70000                                 1000000


                                             900000
       60000

                                             800000


       50000
                                             700000


                                             600000




                                                       Cumulative Cost
       40000
Cost




                                             500000

       30000
                                             400000


                                             300000
       20000


                                             200000

       10000
                                             100000


           0                                 0
Status Report as of: March 31, 2012

Progress โ€“ Cost & Schedule                                        Activities
๏‚ง    Marketing department is overrunning on          ๏‚ง   R&D tasks have been completed
     hours since beginning of 1st quarter โ€“              successfully with exception of Task ID
     Possible solution: Hire additional                  6: Securing Fruit Supplier, where task
     personnel, provide more funding for                 has not yet started
     overtime or May need to level resources         ๏‚ง   Initial production has started with a
     outside of slack to push deadline                   current downtime due to failure of
๏‚ง    Increase in legal departments actual                equipment, undergoing rehabilitation
     work hours


    Conclusion: Can no longer meet completion date of: 07/19/2012. R&D has
    pushed out our schedule by 5 days. Based on priority matrix, controlling costs is most
    important than meeting estimated completion date. By controlling the slips identified
    today, Team Alpha can still deliver the POM+ project effectively.
Summary as of: March 31, 2012




New estimated date of completion: 07/26/2012
Part 3: New Baseline

Baseline as of 5 months
Project is 77% Complete
Status of progress
Analysis and Recommendations
Cascade/Waterfall Chart as of: May 31, 2012




New estimated date of completion: 07/27/2012
Earned Value Indicators 5/31/12




According to our PCIB, we have 77% of our work complete with our budget and PCIC indicates that based on our
new estimates, we have accomplished about 79% of our tasks from the entire project.
Earned Value Indices in MS Project




*Note โ€“ When the BAC = EV or a zero appears in the formula on the numerator, MS Project will display an ERROR
Revised Budget as of: May 31, 2012




The current EAC is at $1,180,016, where the predicted variance cost is an overrun of $80,816.
New Cash Flow Report
POM + - Project Actuals
Variance Review as of: May 31, 2012




Project is running slightly over budget as previously indicated by performance indicators. The overrun
is tied to cost and schedule issues caused by the Initial Production deliverable which is now complete.
Summary as of: May 31, 2012
Milestones:

๏ƒ˜R&D is 100% complete, the second milestone of Initial Production has gone past itโ€™s
midway mark at 76% complete.

๏ƒ˜Market testing and package design. Certification from the FDA has also been completed

Risks/Opportunities:
๏ƒ˜Budget and Cost overruns, and finishing distributor selection.

๏ƒ˜We are showing to have overrun our budget with a cost variance of $114,995 in
production. The TCPI confirms the overrun is not expected to be correctable before the
project ends.
๏ƒ˜Initial production has not finished. Distribution and Legal deliverables have started.
Prioritizing the schedule has shown an opportunity for correction, which will help with budget
forecasts, but the overrun cannot be corrected for completed tasks. The production team must
stay on track to complete the Initial Production Deliverable and keep Distribution on track.

๏ƒ˜The estimated date of completion is July 27, 2012, which is a day behind our projected
completion date of July 26, 2012.
References

Gray, C., & Larson, E. (2011). Project management the
        managerial process. (5 ed., p. 625-630). New York, NY:
        McGraw-Hill/Irwin. Retrieved from:
        http://highered.mcgraw-hill.com/sites/dl/free/0073403342/825965/Appendix_02.pdf

More Related Content

What's hot

New world chemicals
New world chemicalsNew world chemicals
New world chemicals
Grace de Ramos
ย 
McKinsey_Data_and_analytics_innovation_inCPM.pdf
McKinsey_Data_and_analytics_innovation_inCPM.pdfMcKinsey_Data_and_analytics_innovation_inCPM.pdf
McKinsey_Data_and_analytics_innovation_inCPM.pdf
ssusera1763f
ย 
Dyer at kearny presentation
Dyer at kearny presentationDyer at kearny presentation
Dyer at kearny presentation
CALSTART
ย 
JPMorgan Chase Analysis Project_WC
JPMorgan Chase Analysis Project_WCJPMorgan Chase Analysis Project_WC
JPMorgan Chase Analysis Project_WC
Wyatt A. Chartrand
ย 
Arcadian microarray technologies R45 A2
Arcadian microarray technologies R45 A2Arcadian microarray technologies R45 A2
Arcadian microarray technologies R45 A2
Angga Graharya Suherman
ย 
Intermediate Accounting Comprehensive Project
Intermediate Accounting Comprehensive ProjectIntermediate Accounting Comprehensive Project
Intermediate Accounting Comprehensive Project
Shivani Desai
ย 

What's hot (20)

Boston Consulting Group โ€“ Critical Business Response
Boston Consulting Group โ€“ Critical Business ResponseBoston Consulting Group โ€“ Critical Business Response
Boston Consulting Group โ€“ Critical Business Response
ย 
Many C-suite Executives Say Their Organizations Want to Build Trust in Year A...
Many C-suite Executives Say Their Organizations Want to Build Trust in Year A...Many C-suite Executives Say Their Organizations Want to Build Trust in Year A...
Many C-suite Executives Say Their Organizations Want to Build Trust in Year A...
ย 
e-Conomy SEA 2021: Kแปท nguyรชn sแป‘ cแปงa ฤรดng Nam ร
e-Conomy SEA 2021: Kแปท nguyรชn sแป‘ cแปงa ฤรดng Nam รe-Conomy SEA 2021: Kแปท nguyรชn sแป‘ cแปงa ฤรดng Nam ร
e-Conomy SEA 2021: Kแปท nguyรชn sแป‘ cแปงa ฤรดng Nam ร
ย 
Bain & Co. GDRoadshow Presentation
Bain & Co. GDRoadshow PresentationBain & Co. GDRoadshow Presentation
Bain & Co. GDRoadshow Presentation
ย 
Collapse of Silicon valley bank.pptx
Collapse of Silicon valley bank.pptxCollapse of Silicon valley bank.pptx
Collapse of Silicon valley bank.pptx
ย 
New world chemicals
New world chemicalsNew world chemicals
New world chemicals
ย 
BABOK Study Group - meeting 1
BABOK Study Group - meeting 1BABOK Study Group - meeting 1
BABOK Study Group - meeting 1
ย 
horngren_ca16_ppt_01- Student.pptx
horngren_ca16_ppt_01- Student.pptxhorngren_ca16_ppt_01- Student.pptx
horngren_ca16_ppt_01- Student.pptx
ย 
McKinsey_Data_and_analytics_innovation_inCPM.pdf
McKinsey_Data_and_analytics_innovation_inCPM.pdfMcKinsey_Data_and_analytics_innovation_inCPM.pdf
McKinsey_Data_and_analytics_innovation_inCPM.pdf
ย 
Tata Consultancy Services: Selling Certainty
Tata Consultancy Services: Selling Certainty Tata Consultancy Services: Selling Certainty
Tata Consultancy Services: Selling Certainty
ย 
Dyer at kearny presentation
Dyer at kearny presentationDyer at kearny presentation
Dyer at kearny presentation
ย 
JPMorgan Chase Analysis Project_WC
JPMorgan Chase Analysis Project_WCJPMorgan Chase Analysis Project_WC
JPMorgan Chase Analysis Project_WC
ย 
Arcadian microarray technologies R45 A2
Arcadian microarray technologies R45 A2Arcadian microarray technologies R45 A2
Arcadian microarray technologies R45 A2
ย 
Bcg the-art-of-successful-acquisition-oct-2015 tcm9-18798
Bcg the-art-of-successful-acquisition-oct-2015 tcm9-18798Bcg the-art-of-successful-acquisition-oct-2015 tcm9-18798
Bcg the-art-of-successful-acquisition-oct-2015 tcm9-18798
ย 
Career Guide Private Equity and Hedge Fund Interview
Career Guide Private Equity and Hedge Fund InterviewCareer Guide Private Equity and Hedge Fund Interview
Career Guide Private Equity and Hedge Fund Interview
ย 
COLLAPSE OF SILICON VALLEY BANK.pptx
COLLAPSE OF SILICON VALLEY BANK.pptxCOLLAPSE OF SILICON VALLEY BANK.pptx
COLLAPSE OF SILICON VALLEY BANK.pptx
ย 
Data privacy by the numbers
Data privacy by the numbersData privacy by the numbers
Data privacy by the numbers
ย 
Intermediate Accounting Comprehensive Project
Intermediate Accounting Comprehensive ProjectIntermediate Accounting Comprehensive Project
Intermediate Accounting Comprehensive Project
ย 
Corporate ventures in sweden
Corporate ventures in swedenCorporate ventures in sweden
Corporate ventures in sweden
ย 
Capstone Project: Verizon Strategic Analysis and Acquisition Proposal
Capstone Project: Verizon Strategic Analysis and Acquisition ProposalCapstone Project: Verizon Strategic Analysis and Acquisition Proposal
Capstone Project: Verizon Strategic Analysis and Acquisition Proposal
ย 

Similar to Big kola company team alpha presentation wk 4

Water Sense 3 2010 Income
Water Sense 3 2010 IncomeWater Sense 3 2010 Income
Water Sense 3 2010 Income
billgraham777
ย 
Perfect business
Perfect businessPerfect business
Perfect business
seyfom
ย 
atmos enerrgy wachovia062607
atmos enerrgy wachovia062607atmos enerrgy wachovia062607
atmos enerrgy wachovia062607
finance35
ย 
D2 challenger point
D2 challenger pointD2 challenger point
D2 challenger point
Jon Morgan
ย 
Monedize.com Business Plan
Monedize.com Business PlanMonedize.com Business Plan
Monedize.com Business Plan
noswald
ย 
VMware Partner Program P&L Analysis
VMware Partner Program P&L AnalysisVMware Partner Program P&L Analysis
VMware Partner Program P&L Analysis
Elliott Lowe
ย 
autozone AZO_2002
autozone  AZO_2002autozone  AZO_2002
autozone AZO_2002
finance46
ย 
Risk Management Association\'s CRE Panel
Risk Management Association\'s CRE PanelRisk Management Association\'s CRE Panel
Risk Management Association\'s CRE Panel
cesimpsoniii
ย 
Compass Records
Compass RecordsCompass Records
Compass Records
guest316e99fe
ย 

Similar to Big kola company team alpha presentation wk 4 (20)

Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
ย 
Car Net Business Plan
Car Net Business PlanCar Net Business Plan
Car Net Business Plan
ย 
Water Sense 3 2010 Income
Water Sense 3 2010 IncomeWater Sense 3 2010 Income
Water Sense 3 2010 Income
ย 
Growth Comes Knocking...
Growth Comes Knocking...Growth Comes Knocking...
Growth Comes Knocking...
ย 
Perfect business
Perfect businessPerfect business
Perfect business
ย 
Energy Efficiency in the State of Minnesota
Energy Efficiency in the State of MinnesotaEnergy Efficiency in the State of Minnesota
Energy Efficiency in the State of Minnesota
ย 
atmos enerrgy wachovia062607
atmos enerrgy wachovia062607atmos enerrgy wachovia062607
atmos enerrgy wachovia062607
ย 
D2 challenger point
D2 challenger pointD2 challenger point
D2 challenger point
ย 
Monedize.com Business Plan
Monedize.com Business PlanMonedize.com Business Plan
Monedize.com Business Plan
ย 
Real Estate Investment - Kansas City Cash-Flow Duplexes
Real Estate Investment - Kansas City Cash-Flow DuplexesReal Estate Investment - Kansas City Cash-Flow Duplexes
Real Estate Investment - Kansas City Cash-Flow Duplexes
ย 
Mini Case2
Mini Case2Mini Case2
Mini Case2
ย 
VMware Partner Program P&L Analysis
VMware Partner Program P&L AnalysisVMware Partner Program P&L Analysis
VMware Partner Program P&L Analysis
ย 
Final Chocolate Assignment
Final Chocolate AssignmentFinal Chocolate Assignment
Final Chocolate Assignment
ย 
autozone AZO_2002
autozone  AZO_2002autozone  AZO_2002
autozone AZO_2002
ย 
Risk Management Association\'s CRE Panel
Risk Management Association\'s CRE PanelRisk Management Association\'s CRE Panel
Risk Management Association\'s CRE Panel
ย 
A Cheaper Hospital In Five Days
A Cheaper Hospital In Five DaysA Cheaper Hospital In Five Days
A Cheaper Hospital In Five Days
ย 
Bemis mar13brief
Bemis mar13briefBemis mar13brief
Bemis mar13brief
ย 
Bemis mar13brief
Bemis mar13briefBemis mar13brief
Bemis mar13brief
ย 
Compass Records
Compass RecordsCompass Records
Compass Records
ย 
Ch.11
Ch.11Ch.11
Ch.11
ย 

Recently uploaded

anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
ย 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
ย 

Recently uploaded (20)

Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
ย 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
ย 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
ย 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
ย 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
ย 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
ย 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
ย 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
ย 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
ย 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
ย 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
ย 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
ย 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
ย 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
ย 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
ย 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
ย 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
ย 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
ย 

Big kola company team alpha presentation wk 4

  • 1. Big Kola Company The POM + Project PMB 410 โ€“ Project Planning and Control March 31, 2013 Team Alpha: Nadia Aaron: Artwork/ PowerPoint Glacier Bonjardim: Write-up Elizabeth Bosley: MS Project Peggy Sue Carpenter : Team Lead, Editing, Presentation
  • 2. Why Pomegranate? Market potential is promising, with higher profit margin than other juice products Pomegranate โ€“ 71% ability to Blueberries โ€“ 33% produce antitoxins Cranberries- 20%
  • 4. Parts 1 & 2: Planning Phase WBS Activities: Relationships Critical Path & Lags Budgeting Resource Loading/Leveling
  • 5. WBS Potential Milestones: 01/03/12 โ€“ Project Start Date, R&D Product Development 02/22/12- Initial Production 03/07/12 โ€“ Distribution (biggest and busiest activities) 04/18/12- Legal (Project is about 95% complete)
  • 6. Network Diagram with Critical Path Activity with most slack: Task ID 17: Selecting distributors is estimated to take 25 days but may actually only take about one week of that allotted duration.
  • 7. Cascade/Waterfall Chart Critical Activities: ID 3 - Need Survey ID 4 -Set product specs ID 5 -Shelf life report ID 7 -Secure fruit supplies ID 9 -Equipment Rehab ID 10 -Production trials ID 11-Quality trials ID 12 -Quality metrics ID 13 โ€“Quality training ID 21-Prepare product launch
  • 10. Activity Description BCWS ACWP BCWP PCT % ETC BAC EAC VAC PV AC EV Baseline BAC Financial BAC*% BAC-EV AC+ETC BAC-EAC 1 POM+Project 0 0 0 0% $805,920 $805,920 $805,920 $0 1.1 R&D Product Development 0 0 0 0% $121,600 $121,600 $121,600 $0 1.1.1 Need Survey 0 0 0 0% $64,000 $64,000 $64,000 $0 1.1.2 Set Product Specs 0 0 0 0% $28,800 $28,800 $28,800 $0 1.1.3 Shelf Life Report 0 0 0 0% $19,200 $19,200 $19,200 $0 1.1.4 Nutrition Report 0 0 0 0% $9,600 $9,600 $9,600 $0 1.2 Secure Fruit Suppliers 0 0 0 0% $9,600 $9,600 $9,600 $0 1.3 Initial Production 0 0 0 0% $370,400 $370,400 $370,400 $0 1.3.1 Equipment Rehab 0 0 0 0% $254,400 $254,400 $254,400 $0 1.3.2 Production Trials 0 0 0 0% $26,400 $26,400 $26,400 $0 1.3.3 Quality Trials 0 0 0 0% $48,000 $48,000 $48,000 $0 1.3.4 Qualiity Metrics 0 0 0 0% $5,600 $5,600 $5,600 $0 1.3.5 Quality Training 0 0 0 0% $36,000 $36,000 $36,000 $0 1.4 Distribution 0 0 0 0% $191,520 $191,520 $191,520 $0 1.4.1 Market Testing 0 0 0 0% $96,000 $96,000 $96,000 $0 1.4.2 Package Design 0 0 0 0% $15,520 $15,520 $15,520 $0 1.4.3 Select Distributors 0 0 0 0% $80,000 $80,000 $80,000 $0 1.5 Legal 0 0 0 0% $57,600 $57,600 $57,600 $0 1.5.1 Complete FDA Certificate 0 0 0 0% $43,200 $43,200 $43,200 $0 1.5.2 Register 0 0 0 0% $14,400 $14,400 $14,400 $0 1.6 Prepare Product 0 0 0 0% $55,200 $55,200 $55,200 $0 PMB 410 Project Planning and Control Team Alpha Week 2 POM Big Kola Budget and Cost Calculations Legend: BAC: Budget at complete: 805,920 EAC: Estimate at complete: 805,920 VAC variance at complete: zero BCWS: Baseline budget at complete: zero ACWP: Retrieved from Financials: none yetโ€ฆ. BCWP: (BAC * % complete): nothing yetโ€ฆ. PV: Planned value: baseline budget at complete AC: actual costs: none yet EV: earned value (in MS project only done by cost) currently zero Have not started the project yet, so ETC is 805,920 (BAC-EV) (805,920 โ€“ 0) EAC= (AC+ETC) = (0+805,920) VAC= (BAC-EAC) = (805,920 โ€“ 0)
  • 11. Planning Phase - Conclusion ๏ƒ˜Network is very sensitive, majority of the tasks are dependent on the task before it. ๏ƒ˜ Production has resources over allocated of 1500% with an estimated cost of $370,400 The POM + Project is estimated to be completed on July 12, 2012 with a total ๏ƒ˜ of 135 working days.
  • 12. Part 3 Baseline Status Baseline as of 2 months Project is 29% Complete Status of progress Analysis and Recommendations
  • 13. Changes in project ๏ƒ˜ Top management has accepted The POM + Project completion date of July 19, 2012 ๏ƒ˜ With new projected completion date, estimated project cost is: $890,720 with a cost variance of $84,800 from original estimated cost ๏ƒ˜ Activity ID 8: Initial Production remains the most expensive activity with an initial baseline of $370,400 and a variance of $40,000 bringing the total task cost of: $410,400 ๏ƒ˜
  • 14. Completed Milestone: R&D Product Development Actual Duration: 54 days/Actual Cost: $166,400
  • 15. EVM Performance indices are illustrating an overrun R&D was on track with the optimal indicator of 1.0 Need to secure fruit supplier , so Initial Production-longest running activity does not delay the rest of the project
  • 16. Cost as of: March 31, 2012
  • 17. Budget as of: March 31, 2012
  • 18. Cash Flow Report Cost Cumulative Cost 70000 1000000 900000 60000 800000 50000 700000 600000 Cumulative Cost 40000 Cost 500000 30000 400000 300000 20000 200000 10000 100000 0 0
  • 19. Status Report as of: March 31, 2012 Progress โ€“ Cost & Schedule Activities ๏‚ง Marketing department is overrunning on ๏‚ง R&D tasks have been completed hours since beginning of 1st quarter โ€“ successfully with exception of Task ID Possible solution: Hire additional 6: Securing Fruit Supplier, where task personnel, provide more funding for has not yet started overtime or May need to level resources ๏‚ง Initial production has started with a outside of slack to push deadline current downtime due to failure of ๏‚ง Increase in legal departments actual equipment, undergoing rehabilitation work hours Conclusion: Can no longer meet completion date of: 07/19/2012. R&D has pushed out our schedule by 5 days. Based on priority matrix, controlling costs is most important than meeting estimated completion date. By controlling the slips identified today, Team Alpha can still deliver the POM+ project effectively.
  • 20. Summary as of: March 31, 2012 New estimated date of completion: 07/26/2012
  • 21. Part 3: New Baseline Baseline as of 5 months Project is 77% Complete Status of progress Analysis and Recommendations
  • 22. Cascade/Waterfall Chart as of: May 31, 2012 New estimated date of completion: 07/27/2012
  • 23. Earned Value Indicators 5/31/12 According to our PCIB, we have 77% of our work complete with our budget and PCIC indicates that based on our new estimates, we have accomplished about 79% of our tasks from the entire project.
  • 24. Earned Value Indices in MS Project *Note โ€“ When the BAC = EV or a zero appears in the formula on the numerator, MS Project will display an ERROR
  • 25. Revised Budget as of: May 31, 2012 The current EAC is at $1,180,016, where the predicted variance cost is an overrun of $80,816.
  • 26. New Cash Flow Report
  • 27. POM + - Project Actuals
  • 28. Variance Review as of: May 31, 2012 Project is running slightly over budget as previously indicated by performance indicators. The overrun is tied to cost and schedule issues caused by the Initial Production deliverable which is now complete.
  • 29. Summary as of: May 31, 2012 Milestones: ๏ƒ˜R&D is 100% complete, the second milestone of Initial Production has gone past itโ€™s midway mark at 76% complete. ๏ƒ˜Market testing and package design. Certification from the FDA has also been completed Risks/Opportunities: ๏ƒ˜Budget and Cost overruns, and finishing distributor selection. ๏ƒ˜We are showing to have overrun our budget with a cost variance of $114,995 in production. The TCPI confirms the overrun is not expected to be correctable before the project ends. ๏ƒ˜Initial production has not finished. Distribution and Legal deliverables have started. Prioritizing the schedule has shown an opportunity for correction, which will help with budget forecasts, but the overrun cannot be corrected for completed tasks. The production team must stay on track to complete the Initial Production Deliverable and keep Distribution on track. ๏ƒ˜The estimated date of completion is July 27, 2012, which is a day behind our projected completion date of July 26, 2012.
  • 30. References Gray, C., & Larson, E. (2011). Project management the managerial process. (5 ed., p. 625-630). New York, NY: McGraw-Hill/Irwin. Retrieved from: http://highered.mcgraw-hill.com/sites/dl/free/0073403342/825965/Appendix_02.pdf