Pressure Pumping
Internship
Summer 2014
Paul Nepine
About Me
• Attend:
• Montana Tech University,
Butte Montana
 Junior
 BS, Petroleum Engineering
 Memberships:
 SPE, AADE, AISES
 Two Term President: AISES
 Daughter 19 yrs.
 Grand daughter 2 yrs.
 Golfing, Hunting, Fishing,
Community Activities
Baker Hughes’ Core Values
1. Integrity
2. Team Work
3. Performance
4. Learning
San Antonio Operations Facility
 Tool Shop Operations
 Cement Bulk Plant
 Mechanic Bays
 Pressure Testing
 Drilling Fluids Lab
 Frac Fluids Lab
 Cement Lab
 Stim Plus Lab
 Yard Equipment
 Chemical Storage
Frac Field Operations
Tour #1 Stumberg Ranch 39 H
Anadarko:
 Wireline- Plug and Perf
 Coil Tubing 36 H
 Frac
 ACID
 Gel
 Proppant
Equipment:
 Pump Trucks
• Gorillas and Rhinos
 Blender
 Hydration
 Chem Add
 Acid Tanker
 Manifold-”Missile”
 Sand Kings
 Fluid Van
 TMV Van
Frac Field Tour #2
Stumberg Ranch 40H & 41 H
Anadarko:
 Slick Water Frac
• Proppant:
• 100 Mesh Sand
• 40/70 Sand
• Friction Reducer
 2 Blenders
 Equipment Issues
Experiences:
 Truck PTO engagement
 Rig Down Goats Head to swap
iron to new well
 Rig Down Blenders
 Blender and Sand King
 Gel Tanker Straps
 TMV Operator
 Sand Analysis and reporting
Briscoe Ranch Wells 48 & 49 H
Third Tour July 20th-August 7th
SM Energy:
 Multi Stage Frac
 Plug and Perf
 Slick water
 Proppant Laden Linear Gel
 Proppant Laden Viking D 2000
 Proppants 100 and 30/50 Mesh
My Experiences:
 Start Rig up
• Iron
• TMV Communication Cables
 Proposal Review
 Fluid Van
• Gel Analysis
 TMV Operator
• Chemical Strap Inventory
 Consultant Experience
• Asked Questions about Frac
Engineer’s Responsibilities
Engineering:
 Chemical Inventory
 Frac Chemical Control
 Frac Reporting Company Man
 Gel Densities
 Job log and Summary’s
 Point man for Communication
• Operations
• Customer
My Experiences:
 Assisted: Chem Add
• Straps
• Swap Totes during Stage
• Report Straps
 TMV Operator
• Record Chemical Straps
• Recording Stages
• Communication
 See another Frac Operation
• Fine tune and Review
 Cementing Operations (2)
 Obtain Another Internship
With Baker Hughes
Goals for rest of Internship
1. Familiarization with Operations at Yard and Field
2. Hands On in all aspects of internship
3. Challenged myself to learn something everyday.
4. 31 Days Field Experience on 3 Frac Sites
5. Gained Valuable insight of field operations.
6. Experienced different problems in the field for operations and
formed opinions about solutions.
7. Not done yet and want more exposure to Baker Hughes’
Operations
8. Appreciated the Opportunity to Work here!
Summary
References
1. www.bakerhughes.com/
2. Baker Hughes-Frac Proposal
Briscoe Ranch

More Related Content

What's hot

Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedRijumoni Boro
 
5000bpd Refinery Example
5000bpd Refinery Example5000bpd Refinery Example
5000bpd Refinery Example
Ritch Wingo
 
Shale Gas
Shale GasShale Gas
Shale Gas
aikyatha
 
Hoisting System
Hoisting SystemHoisting System
Hoisting System
AFATous
 
ONGC
ONGCONGC
Introduction to project economics in oil and gas upstream industry
Introduction to project economics in oil and gas upstream industryIntroduction to project economics in oil and gas upstream industry
Introduction to project economics in oil and gas upstream industry
Ir. Puput Risanto, IPM, PMP, PMI-RMP, ASEAN Eng
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
Society of Petroleum Engineers
 
Modelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining ProcessesModelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining Processes
CTBE - Brazilian Bioethanol Sci&Tech Laboratory
 
Oil & gas sector presentation
Oil & gas sector presentationOil & gas sector presentation
Oil & gas sector presentationInfraline Energy
 
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Student
 
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) NoonmatiIndustrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Priyam Jyoti Borah
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
Bogura Polytechnic Inistitute
 
Lesson 1 Introduction to Separation Process.pdf
Lesson 1 Introduction to Separation Process.pdfLesson 1 Introduction to Separation Process.pdf
Lesson 1 Introduction to Separation Process.pdf
ChingyinNg1
 
2014 Graduation project Ammonia production and optimization
2014 Graduation project  Ammonia production and optimization2014 Graduation project  Ammonia production and optimization
2014 Graduation project Ammonia production and optimization
Karim Hosny
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineriescanaleenergia
 
Oil and Gas Risk Analysis
Oil and Gas Risk AnalysisOil and Gas Risk Analysis
Oil and Gas Risk Analysis
Intaver Insititute
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting system
fianxxx
 

What's hot (20)

Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India Limited
 
5000bpd Refinery Example
5000bpd Refinery Example5000bpd Refinery Example
5000bpd Refinery Example
 
Shale Gas
Shale GasShale Gas
Shale Gas
 
Hoisting System
Hoisting SystemHoisting System
Hoisting System
 
ONGC
ONGCONGC
ONGC
 
Introduction to project economics in oil and gas upstream industry
Introduction to project economics in oil and gas upstream industryIntroduction to project economics in oil and gas upstream industry
Introduction to project economics in oil and gas upstream industry
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
 
Kuai modular refineries
Kuai modular refineriesKuai modular refineries
Kuai modular refineries
 
Modelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining ProcessesModelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining Processes
 
PETROLEUM ENGINEER
PETROLEUM ENGINEERPETROLEUM ENGINEER
PETROLEUM ENGINEER
 
Oil & gas sector presentation
Oil & gas sector presentationOil & gas sector presentation
Oil & gas sector presentation
 
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
 
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) NoonmatiIndustrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
Lesson 1 Introduction to Separation Process.pdf
Lesson 1 Introduction to Separation Process.pdfLesson 1 Introduction to Separation Process.pdf
Lesson 1 Introduction to Separation Process.pdf
 
2014 Graduation project Ammonia production and optimization
2014 Graduation project  Ammonia production and optimization2014 Graduation project  Ammonia production and optimization
2014 Graduation project Ammonia production and optimization
 
SPE 172686 final
SPE 172686 finalSPE 172686 final
SPE 172686 final
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineries
 
Oil and Gas Risk Analysis
Oil and Gas Risk AnalysisOil and Gas Risk Analysis
Oil and Gas Risk Analysis
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting system
 

Similar to Baker Hughes Powerpoint Presentation

Jim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track testJim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track test
California Asphalt Pavement Association
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
Larry Whitmarsh
 
Process Qualification Optimization
Process Qualification OptimizationProcess Qualification Optimization
Process Qualification Optimization
Martin Zess
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
Abdullah Ansari
 
Alliance Internship Great Lakes Poster
Alliance Internship Great Lakes PosterAlliance Internship Great Lakes Poster
Alliance Internship Great Lakes Poster
Charles Drennen
 
Corun_-_Polymers (1).ppt
Corun_-_Polymers (1).pptCorun_-_Polymers (1).ppt
Corun_-_Polymers (1).ppt
LekhazDevulapalli1
 
Lou-Rich final presentation
Lou-Rich final presentationLou-Rich final presentation
Lou-Rich final presentationCarter Tollefson
 
Resume: George LaCasse
Resume: George LaCasseResume: George LaCasse
Resume: George LaCasseGeorge LaCasse
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014
marketinglbcg
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT OperationsHPHT Wells Summit
 
PPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdfPPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdf
AlejandroHumbertoVar
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
Society of Petroleum Engineers
 
2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods
California Asphalt Pavement Association
 
Dan_sResumerevised2014
Dan_sResumerevised2014Dan_sResumerevised2014
Dan_sResumerevised2014Daniel Carter
 

Similar to Baker Hughes Powerpoint Presentation (20)

Jim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track testJim Signore: Hamburg Wheel Track test
Jim Signore: Hamburg Wheel Track test
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
 
Process Qualification Optimization
Process Qualification OptimizationProcess Qualification Optimization
Process Qualification Optimization
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Alliance Internship Great Lakes Poster
Alliance Internship Great Lakes PosterAlliance Internship Great Lakes Poster
Alliance Internship Great Lakes Poster
 
VAIBHAV RESUME
VAIBHAV RESUMEVAIBHAV RESUME
VAIBHAV RESUME
 
Corun_-_Polymers (1).ppt
Corun_-_Polymers (1).pptCorun_-_Polymers (1).ppt
Corun_-_Polymers (1).ppt
 
Lou-Rich final presentation
Lou-Rich final presentationLou-Rich final presentation
Lou-Rich final presentation
 
Resume George LaCasse
Resume George LaCasseResume George LaCasse
Resume George LaCasse
 
Resume: George LaCasse
Resume: George LaCasseResume: George LaCasse
Resume: George LaCasse
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
PPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdfPPT Centrifugal Pumps Reliability Case Studies.pdf
PPT Centrifugal Pumps Reliability Case Studies.pdf
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
 
MZS umc (4)
MZS umc (4)MZS umc (4)
MZS umc (4)
 
upinder_CV
upinder_CVupinder_CV
upinder_CV
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods
 
Dan_sResumerevised2014
Dan_sResumerevised2014Dan_sResumerevised2014
Dan_sResumerevised2014
 

Baker Hughes Powerpoint Presentation

  • 2. About Me • Attend: • Montana Tech University, Butte Montana  Junior  BS, Petroleum Engineering  Memberships:  SPE, AADE, AISES  Two Term President: AISES  Daughter 19 yrs.  Grand daughter 2 yrs.  Golfing, Hunting, Fishing, Community Activities
  • 3. Baker Hughes’ Core Values 1. Integrity 2. Team Work 3. Performance 4. Learning
  • 4. San Antonio Operations Facility  Tool Shop Operations  Cement Bulk Plant  Mechanic Bays  Pressure Testing  Drilling Fluids Lab  Frac Fluids Lab  Cement Lab  Stim Plus Lab  Yard Equipment  Chemical Storage
  • 5. Frac Field Operations Tour #1 Stumberg Ranch 39 H Anadarko:  Wireline- Plug and Perf  Coil Tubing 36 H  Frac  ACID  Gel  Proppant Equipment:  Pump Trucks • Gorillas and Rhinos  Blender  Hydration  Chem Add  Acid Tanker  Manifold-”Missile”  Sand Kings  Fluid Van  TMV Van
  • 6. Frac Field Tour #2 Stumberg Ranch 40H & 41 H Anadarko:  Slick Water Frac • Proppant: • 100 Mesh Sand • 40/70 Sand • Friction Reducer  2 Blenders  Equipment Issues Experiences:  Truck PTO engagement  Rig Down Goats Head to swap iron to new well  Rig Down Blenders  Blender and Sand King  Gel Tanker Straps  TMV Operator  Sand Analysis and reporting
  • 7. Briscoe Ranch Wells 48 & 49 H Third Tour July 20th-August 7th SM Energy:  Multi Stage Frac  Plug and Perf  Slick water  Proppant Laden Linear Gel  Proppant Laden Viking D 2000  Proppants 100 and 30/50 Mesh My Experiences:  Start Rig up • Iron • TMV Communication Cables  Proposal Review  Fluid Van • Gel Analysis  TMV Operator • Chemical Strap Inventory  Consultant Experience • Asked Questions about Frac
  • 8. Engineer’s Responsibilities Engineering:  Chemical Inventory  Frac Chemical Control  Frac Reporting Company Man  Gel Densities  Job log and Summary’s  Point man for Communication • Operations • Customer My Experiences:  Assisted: Chem Add • Straps • Swap Totes during Stage • Report Straps  TMV Operator • Record Chemical Straps • Recording Stages • Communication
  • 9.  See another Frac Operation • Fine tune and Review  Cementing Operations (2)  Obtain Another Internship With Baker Hughes Goals for rest of Internship
  • 10. 1. Familiarization with Operations at Yard and Field 2. Hands On in all aspects of internship 3. Challenged myself to learn something everyday. 4. 31 Days Field Experience on 3 Frac Sites 5. Gained Valuable insight of field operations. 6. Experienced different problems in the field for operations and formed opinions about solutions. 7. Not done yet and want more exposure to Baker Hughes’ Operations 8. Appreciated the Opportunity to Work here! Summary
  • 11. References 1. www.bakerhughes.com/ 2. Baker Hughes-Frac Proposal Briscoe Ranch