3. About DBI In Satpuda(History):-
Diverting Water from Nala/ River for
irrigating Rabbi Crop
4. Diversion Channel Based Irrigation-
Achievements
Year No. of villages Households Acres Acres Acres
benefitted irrigated in irrigated in irrigated in
Rainy Winter Summer
season Season Season
2009 2 ( 4 Site) 55 00 191 28
2010 11 (25 site) 350 123 750 112
2011 11 350 123 750
5. Details Of Programme
Sr Programme Unit Unit Targe Y1 Y2 Y3
No Components Cost t
1 Impounding No 62,200 25 4 21 0
Structure
2 Channel No 25,000 25 4 21 0
Development
3 Distribution No 8,300 25 0 25 0
Chambers
4 Land Ha 7,210 432 350 82 0
Development
5 Improved Acre 1500 900 900 900 900
Agriculture s
8. Scope:-
Due to hilly area in Nandurbar dist(Dhadgaon&
Akkalkuwa block)there is too much scope to develop
such site for increasing irrigation because in this area
considerable nos of Nalas & Streams which flows
through out the year with ample amount of water
Another 150 Sites has been identified and proposal
submitted to JTT for 50 Sites . And HUL for 50 Sites.
9. Suggestions:-
Technical & Social Training cum Exposure
Should be arrange
Practical approach should be taken.
10. Economics of Rani Kajal & Dev mogara site
Rani Kajal Dev mogara
Sr no Indicator Unit Before After Before After
1 Number of families benefited number 3 13 4 7
2 Total area under irrigation acres 2.8 10.48 2.5 6.62
Hours per
3 Average time of irrigation acre 3.5 2.5 5 3
4 Length of diversion channel meter 375 525 550 742
Major crops area
Gram acres 2.7 7.45 2 3.62
Maize acres 0 1.5 0 0
wheat acres 0 1.3 0.5 3
6 Vegetable acres 0.1 0.23 0 0
Production of major crops
Gram quintal 13 41 8 22
Maize quintal 0 12.5 0 0
7 wheat quintal 0 10 4.5 23
Total grain production quintal 13 50.5 12.5 45