The document describes a new software platform called Automation Platform.NExTTM from Progea. It is presented as an open and scalable platform based on .NET using modern software technologies and modular concepts. The platform is designed to manage business needs efficiently through functional modules for supervision, HMI, control, historian, MES, and industrial analysis. It incorporates the latest technologies like WPF, XAML, web access, and OPC UA to provide a flexible and customizable platform for industrial automation applications.
Movicon.NExTTM is a new generation of SCADA/HMI software that revolutionizes the technology in an unprecedented way. It is based on the Automation Platform.NExTTM, an open and scalable architecture designed for modern automation software. Movicon.NExTTM offers intuitive configuration, advanced graphics, connectivity to devices, cloud integration, and is designed as a flexible platform for Industry 4.0 applications.
The document describes the MoviconTM 11 Scada/HMI solution, highlighting its open and flexible architecture, exclusive "XML-Inside" technology, and applicability across industrial automation sectors. It provides an all-in-one development environment for HMI, Scada, soft logic, and data analysis applications to reduce development times and deliver powerful, open, flexible solutions. MoviconTM 11 offers unrivaled openness, simplicity, and performance with technologies like XML, Web services, and support for standards like OPC, SQL, and .NET.
Movicon™ 11 is the secure and reliable solution for all those companies needing to develop and maintain supervisory, control and data acquisition software applications with operator interface where data can be accessed remotely or from mobile systems. The Movicon proven technology makes it possible to guarantee reliability at the same time, potential, openings and unmatched flexibility.
Progea is an Italian company that develops industrial automation software. It has been in business for over 25 years and employs over 40 people across its headquarters and branch offices. It offers a suite of software products under the Movicon brand for industrial supervision and control, including SCADA, HMI, connectivity systems, and IIoT/Industry 4.0 solutions. Progea prioritizes innovation, quality, and customer service and support.
Qiang Yu is a software engineer with over 13 years of experience developing embedded real-time systems using C/C++. He has worked across several sectors including data storage, railway, security, oil and gas, and IoT. His specialties include agile development, architecture design, C/C++, Linux, networking, and wireless technologies. Recent roles include developing frameworks for oil and gas tools at Schlumberger, low power wireless communications for well monitoring at Expro, and railway signaling simulation and modeling at Atkins.
Movicon PowerHMI is an HMI software that offers flexible, scalable, and independent solutions. It provides powerful functionality for visualization, alarms, recipes, and more in an intuitive interface. The software can be used on various devices like touch panels and PCs. It aims to give users independence from hardware and proprietary solutions through its open and standard platform.
This document discusses modernizing human-machine interfaces (HMIs). It describes how HMIs are evolving to become more integrated systems that provide increased productivity, platform viability, compliance with regulations, support for virtualization and high availability, compatibility with new standards, mobility features, system-wide alarming, information sharing across systems, and enhanced security. The document provides examples of these modernized HMI capabilities using Rockwell Automation's FactoryTalk suite of HMI products.
#ABB shows that OPC UA over TSN is the game-changer for industrial automation. In the corporate technical journal are the company's innovations and technological advancements highlighted.
https://bit.ly/2U2lOi8
Movicon.NExTTM is a new generation of SCADA/HMI software that revolutionizes the technology in an unprecedented way. It is based on the Automation Platform.NExTTM, an open and scalable architecture designed for modern automation software. Movicon.NExTTM offers intuitive configuration, advanced graphics, connectivity to devices, cloud integration, and is designed as a flexible platform for Industry 4.0 applications.
The document describes the MoviconTM 11 Scada/HMI solution, highlighting its open and flexible architecture, exclusive "XML-Inside" technology, and applicability across industrial automation sectors. It provides an all-in-one development environment for HMI, Scada, soft logic, and data analysis applications to reduce development times and deliver powerful, open, flexible solutions. MoviconTM 11 offers unrivaled openness, simplicity, and performance with technologies like XML, Web services, and support for standards like OPC, SQL, and .NET.
Movicon™ 11 is the secure and reliable solution for all those companies needing to develop and maintain supervisory, control and data acquisition software applications with operator interface where data can be accessed remotely or from mobile systems. The Movicon proven technology makes it possible to guarantee reliability at the same time, potential, openings and unmatched flexibility.
Progea is an Italian company that develops industrial automation software. It has been in business for over 25 years and employs over 40 people across its headquarters and branch offices. It offers a suite of software products under the Movicon brand for industrial supervision and control, including SCADA, HMI, connectivity systems, and IIoT/Industry 4.0 solutions. Progea prioritizes innovation, quality, and customer service and support.
Qiang Yu is a software engineer with over 13 years of experience developing embedded real-time systems using C/C++. He has worked across several sectors including data storage, railway, security, oil and gas, and IoT. His specialties include agile development, architecture design, C/C++, Linux, networking, and wireless technologies. Recent roles include developing frameworks for oil and gas tools at Schlumberger, low power wireless communications for well monitoring at Expro, and railway signaling simulation and modeling at Atkins.
Movicon PowerHMI is an HMI software that offers flexible, scalable, and independent solutions. It provides powerful functionality for visualization, alarms, recipes, and more in an intuitive interface. The software can be used on various devices like touch panels and PCs. It aims to give users independence from hardware and proprietary solutions through its open and standard platform.
This document discusses modernizing human-machine interfaces (HMIs). It describes how HMIs are evolving to become more integrated systems that provide increased productivity, platform viability, compliance with regulations, support for virtualization and high availability, compatibility with new standards, mobility features, system-wide alarming, information sharing across systems, and enhanced security. The document provides examples of these modernized HMI capabilities using Rockwell Automation's FactoryTalk suite of HMI products.
#ABB shows that OPC UA over TSN is the game-changer for industrial automation. In the corporate technical journal are the company's innovations and technological advancements highlighted.
https://bit.ly/2U2lOi8
RA TechED 2019 - CL02 - Integrated Architecture System Software What's NewRockwell Automation
The document provides an overview of new and updated system software from Rockwell Automation, including Studio 5000 Logix Designer, View Designer, Application Code Manager, Logix Emulate, and connectivity to CAD software packages. Key updates include expanded controller support, enhanced Logix tag-based alarming, productivity improvements, and digital engineering tools to enable virtual commissioning and operator training.
When first designing industrial automation projects, it’s easy to make some common mistakes that can make integrating harder than it needs to be and cause headaches down the road. The best way to set yourself up for success is to recognize best practices as soon as possible. Not only does this save time on rework and future development, but it also allows for more predictability, better organization, and increased functionality.
Designing Machine-level HMI with Studio 5000 View Designer® DemonstrationRockwell Automation
This session will introduce you to the new PanelView™ 5500
hardware and Studio 5000 View Designer® software. You will
learn how easy it is to create, download, and run an application
as well as see some of the more powerful capabilities of the new platform. You will also get an early look at new features coming later this year.
RA TechED 2019 - IN10 - What Machine Learning can do for you using FactoryTal...Rockwell Automation
This document discusses how machine learning can be used with FactoryTalk InnovationSuite. It outlines the machine learning adoption strategy and data science process. The data science process includes defining the business problem, mapping it to machine learning problems, data analysis, model building, evaluation, and operationalization. It discusses using FactoryTalk products like DataFlowML, DataView, and Edge at different steps. Critical success points are defining the machine learning problem, preparing training data, and creating an accurate model. The document also covers operationalizing predictions with pipelines for prediction, visualization, writing back to controllers, saving predictions, and automatic retraining.
Point-to-Point vs. MEAP - The Right Approach for an Integrated Mobility Solut...RapidValue
There are two commonly used approaches for building integrated mobility solutions: Point-to-point integration and Mobile Enterprise Application Platform (MEAP).
This paper explains why an enterprise mobility integration solution is needed, describes and compares the two approaches, and provides a guide for how to choose the right mobility integration technique for your organization. The paper also examines various MEAP platforms available and the key differences between popular platforms - Kony and SAP Unwired Platform.
From a mobile application development standpoint, there is another widely used approach: cross-platform development frameworks. These frameworks allow
developers to build once and deploy across multiple device platforms. However, these frameworks lack integration and mobile device management capabilities,
and therefore we have excluded them from consideration for the purposes of this whitepaper. To learn more about cross-platform development, download our whitepaper: “How to Choose the Right Architecture for your Mobile Application” -
http://www.rapidvaluesolutions.com/whitepaper/
RA TechED 2019 - IN02 - Empower Your Connected Enterprise with FactoryTalk In...Rockwell Automation
FactoryTalk InnovationSuite is a suite of IIoT solutions including ThingWorx, an IIoT platform. ThingWorx includes capabilities like asset management, analytics, and mobile/AR applications. It allows users to connect devices and machines, create digital twins using a "ThingModel", develop applications using a visual mashup tool, and engage users through mobile and augmented reality. DataAnalytics solutions like DataView allow self-service data exploration and storyboarding to gain insights without extensive IT or data science expertise.
The article discusses how the OPC Foundation is developing extensions to OPC UA to provide real-time capability, including time-sensitive networking (TSN) and a publish-subscribe model. TSN will enable deterministic data transmission over Ethernet, while publish-subscribe allows one-to-many and many-to-many communication between servers and clients. These extensions are expected to make OPC UA suitable for real-time applications in industrial automation.
This resume summarizes Pratik Panchal's experience as an embedded engineer. He has over 4 years of experience working with C and C++ on projects involving digital signage, energy meters, networking gateways, and vending machines. His roles have included application development, firmware programming, and functionality testing on platforms such as Linux, Windows, and microcontrollers from Texas Instruments and Microchip. He is seeking a position where he can apply his programming skills and experience developing embedded systems.
At last, a IoT solution that simplifies automation connectivity has arrived. Progea Cloud.DataBoom designed to capture data and manage Business Analytics. Progea Cloud.Databoom offers the best solutions for your automation system interconnectivity to capture data from the plant to the Cloud using Industrial Internet of Things connectivity (IIoT). It is designed to collect essential information for your business, record them on NoSQL DB for incredibly easy analysis using fully customizable Web Dashboards.
Value Journal, a monthly news journal from Redington Value Distribution, intends to update the channel on the latest vendor news and Redington Value’s Channel Initiatives.
Progea is an international company based in Italy that produces industrial automation software. They have over 40 employees across offices in Italy, Germany, and Switzerland. Progea has experienced constant growth over 20 years in both profits and international market expansion. Their Scada/HMI software products are used in various industries around the world. Progea focuses on research and development while also investing in marketing. They are known for high quality software and strong customer support services.
Open Digital Architecture (ODA) is a blueprint for modular, cloud-based, open digital platforms that can be orchestrated using AI.
Designed to support our industry into the cloud native era, ODA sets the framework required
for CSPs to invest in IT, transforming business agility and operations by creating simpler IT and network solutions that are easier and cheaper to deploy, integrate and upgrade. Enabling growth, profitability and a cutting-edge customer experience.
Connext is an I/O Server that can handle vast numbers of communication protocols to interconnect different levels of factory IT and OT using OPC UA technology. Connext is an OPC UA Server that supports a large amount of protocols, is of industrial type that for infrastructure and buildings. It supports advanced features such as Gateway, Historian / Data Loggers, redundancy, OPC UA server and client IIoT protocols and much more. And ‘the ideal solution for every need of connectivity, is that M2M between IT and OT factory levels.
The EdgeIQ Platform provides software infrastructure for deploying, managing, and integrating connected products. It allows for simplifying integration with external services, orchestrating workflows to empower customers and reduce burden on support teams. The API-first platform can manage any connected product and its data across its entire lifecycle. It provides features like customizable user interfaces, multi-tenant support, and integration with existing cloud services and applications.
Brochure of Yokogawa's Fast/Tools Supervisory SystemsYokogawa
The document summarizes the capabilities of the FAST/TOOLS supervisory control and data acquisition (SCADA) system. It describes FAST/TOOLS as a powerful, state-of-the-art, flexible distributed operations and information system that utilizes the latest IT technology. The system offers reliability, availability, security, integration capabilities and comprehensive functions for alarm management, trending, reporting and more. It can be deployed globally using a web-based architecture and supports oil and gas, manufacturing and other critical industrial applications.
This webinar will focus on IoTView, InduSoft’s IoT and IIoT platform agnostic solution for creating HMIs for IoT devices and intelligent systems. In this webinar we’ll learn more about the capabilities of InduSoft IoTView, and how it can be embedded in end point devices such as pumps, motion control, valves, power monitors, and other controllers to create robust IIoT solutions.
ESA Automation produces automation solutions for industrial applications. It offers integrated PLC, HMI, motion control, and IT capabilities on a single device. The document discusses ESA's focus on innovation and creating customer-oriented solutions. It provides examples of automation applications ESA has developed for machine tools, packaging, ceramic processing, and other industries.
RA TechED 2019 - CL02 - Integrated Architecture System Software What's NewRockwell Automation
The document provides an overview of new and updated system software from Rockwell Automation, including Studio 5000 Logix Designer, View Designer, Application Code Manager, Logix Emulate, and connectivity to CAD software packages. Key updates include expanded controller support, enhanced Logix tag-based alarming, productivity improvements, and digital engineering tools to enable virtual commissioning and operator training.
When first designing industrial automation projects, it’s easy to make some common mistakes that can make integrating harder than it needs to be and cause headaches down the road. The best way to set yourself up for success is to recognize best practices as soon as possible. Not only does this save time on rework and future development, but it also allows for more predictability, better organization, and increased functionality.
Designing Machine-level HMI with Studio 5000 View Designer® DemonstrationRockwell Automation
This session will introduce you to the new PanelView™ 5500
hardware and Studio 5000 View Designer® software. You will
learn how easy it is to create, download, and run an application
as well as see some of the more powerful capabilities of the new platform. You will also get an early look at new features coming later this year.
RA TechED 2019 - IN10 - What Machine Learning can do for you using FactoryTal...Rockwell Automation
This document discusses how machine learning can be used with FactoryTalk InnovationSuite. It outlines the machine learning adoption strategy and data science process. The data science process includes defining the business problem, mapping it to machine learning problems, data analysis, model building, evaluation, and operationalization. It discusses using FactoryTalk products like DataFlowML, DataView, and Edge at different steps. Critical success points are defining the machine learning problem, preparing training data, and creating an accurate model. The document also covers operationalizing predictions with pipelines for prediction, visualization, writing back to controllers, saving predictions, and automatic retraining.
Point-to-Point vs. MEAP - The Right Approach for an Integrated Mobility Solut...RapidValue
There are two commonly used approaches for building integrated mobility solutions: Point-to-point integration and Mobile Enterprise Application Platform (MEAP).
This paper explains why an enterprise mobility integration solution is needed, describes and compares the two approaches, and provides a guide for how to choose the right mobility integration technique for your organization. The paper also examines various MEAP platforms available and the key differences between popular platforms - Kony and SAP Unwired Platform.
From a mobile application development standpoint, there is another widely used approach: cross-platform development frameworks. These frameworks allow
developers to build once and deploy across multiple device platforms. However, these frameworks lack integration and mobile device management capabilities,
and therefore we have excluded them from consideration for the purposes of this whitepaper. To learn more about cross-platform development, download our whitepaper: “How to Choose the Right Architecture for your Mobile Application” -
http://www.rapidvaluesolutions.com/whitepaper/
RA TechED 2019 - IN02 - Empower Your Connected Enterprise with FactoryTalk In...Rockwell Automation
FactoryTalk InnovationSuite is a suite of IIoT solutions including ThingWorx, an IIoT platform. ThingWorx includes capabilities like asset management, analytics, and mobile/AR applications. It allows users to connect devices and machines, create digital twins using a "ThingModel", develop applications using a visual mashup tool, and engage users through mobile and augmented reality. DataAnalytics solutions like DataView allow self-service data exploration and storyboarding to gain insights without extensive IT or data science expertise.
The article discusses how the OPC Foundation is developing extensions to OPC UA to provide real-time capability, including time-sensitive networking (TSN) and a publish-subscribe model. TSN will enable deterministic data transmission over Ethernet, while publish-subscribe allows one-to-many and many-to-many communication between servers and clients. These extensions are expected to make OPC UA suitable for real-time applications in industrial automation.
This resume summarizes Pratik Panchal's experience as an embedded engineer. He has over 4 years of experience working with C and C++ on projects involving digital signage, energy meters, networking gateways, and vending machines. His roles have included application development, firmware programming, and functionality testing on platforms such as Linux, Windows, and microcontrollers from Texas Instruments and Microchip. He is seeking a position where he can apply his programming skills and experience developing embedded systems.
At last, a IoT solution that simplifies automation connectivity has arrived. Progea Cloud.DataBoom designed to capture data and manage Business Analytics. Progea Cloud.Databoom offers the best solutions for your automation system interconnectivity to capture data from the plant to the Cloud using Industrial Internet of Things connectivity (IIoT). It is designed to collect essential information for your business, record them on NoSQL DB for incredibly easy analysis using fully customizable Web Dashboards.
Value Journal, a monthly news journal from Redington Value Distribution, intends to update the channel on the latest vendor news and Redington Value’s Channel Initiatives.
Progea is an international company based in Italy that produces industrial automation software. They have over 40 employees across offices in Italy, Germany, and Switzerland. Progea has experienced constant growth over 20 years in both profits and international market expansion. Their Scada/HMI software products are used in various industries around the world. Progea focuses on research and development while also investing in marketing. They are known for high quality software and strong customer support services.
Open Digital Architecture (ODA) is a blueprint for modular, cloud-based, open digital platforms that can be orchestrated using AI.
Designed to support our industry into the cloud native era, ODA sets the framework required
for CSPs to invest in IT, transforming business agility and operations by creating simpler IT and network solutions that are easier and cheaper to deploy, integrate and upgrade. Enabling growth, profitability and a cutting-edge customer experience.
Connext is an I/O Server that can handle vast numbers of communication protocols to interconnect different levels of factory IT and OT using OPC UA technology. Connext is an OPC UA Server that supports a large amount of protocols, is of industrial type that for infrastructure and buildings. It supports advanced features such as Gateway, Historian / Data Loggers, redundancy, OPC UA server and client IIoT protocols and much more. And ‘the ideal solution for every need of connectivity, is that M2M between IT and OT factory levels.
The EdgeIQ Platform provides software infrastructure for deploying, managing, and integrating connected products. It allows for simplifying integration with external services, orchestrating workflows to empower customers and reduce burden on support teams. The API-first platform can manage any connected product and its data across its entire lifecycle. It provides features like customizable user interfaces, multi-tenant support, and integration with existing cloud services and applications.
Brochure of Yokogawa's Fast/Tools Supervisory SystemsYokogawa
The document summarizes the capabilities of the FAST/TOOLS supervisory control and data acquisition (SCADA) system. It describes FAST/TOOLS as a powerful, state-of-the-art, flexible distributed operations and information system that utilizes the latest IT technology. The system offers reliability, availability, security, integration capabilities and comprehensive functions for alarm management, trending, reporting and more. It can be deployed globally using a web-based architecture and supports oil and gas, manufacturing and other critical industrial applications.
This webinar will focus on IoTView, InduSoft’s IoT and IIoT platform agnostic solution for creating HMIs for IoT devices and intelligent systems. In this webinar we’ll learn more about the capabilities of InduSoft IoTView, and how it can be embedded in end point devices such as pumps, motion control, valves, power monitors, and other controllers to create robust IIoT solutions.
ESA Automation produces automation solutions for industrial applications. It offers integrated PLC, HMI, motion control, and IT capabilities on a single device. The document discusses ESA's focus on innovation and creating customer-oriented solutions. It provides examples of automation applications ESA has developed for machine tools, packaging, ceramic processing, and other industries.
The document discusses using an IoT gateway and software platform to integrate an intelligent factory. It describes how the gateway can connect heterogeneous machines and systems using various protocols and convert the data into a standard format for IoT communication. The software provides tools to establish logical control flows between systems so they can work synergistically. This allows for centralized monitoring and management of the entire intelligent factory from data collection and analytics to remote control capabilities.
Blue Prism is an operating system for a digital workforce that allows organizations to digitize their operations through technologies like artificial intelligence, machine learning, and robotic process automation (RPA). It serves as an intelligent, connected, and easy to control digital workforce platform that is used by over 400 customers. Key features of Blue Prism version 6 include improved analytics, control room visibility, multi-lingual interfaces, cloud deployment capabilities, and robot screen capturing for troubleshooting. The update expands usability, scalability, and security of the digital workforce solution.
Messung, as one of India’s leading industrial automation companies, offers cutting-edge custom-built solutions for factory automation, process automation and special purpose machine automation. Messung is considered one of the top PLC manufacturers and offers an excellent range of world-class Programmable Logic Controllers (PLCs), Remote I/O modules, Servo & Motion Control solutions and Human Machine Interfaces (HMIs) for a cornucopia of applications across diverse industries.
Starting 22nd September 2021, Automation Expo Connect is the first virtual expo for Automation & Instrumentation in S.E.Asia.Using a new virtual exhibition platform, Automation Expo Connect will enable more live sessions, meeting possibilities, and better person-to-person networking.
Automation Expo Connect will showcase high-quality trends through presentations of latest technologies, live interactions with the visitors. The virtual environment will also make it easier to meet customers from around the globe, and discuss their latest developments with our industry partners.
Messung is a regular exhibitor at Automation Expo, and this year too, looks forward to connecting with potential customers from India and abroad.
RUGGEDCOM REFLEX is a substation HMI solution that provides remote monitoring and control of substation operations. It supports protocols for devices decades old and modern IEDs. REFLEX incorporates enterprise data through its SQL architecture. It offers features like single line diagrams, alarm handling, historian logging, custom graphics, rapid deployment through templates, and scalability through clustering. Security includes encryption, authentication, and integration with Active Directory.
Anypoint platform architecture and componentsD.Rajesh Kumar
The document provides an overview of the Anypoint platform architecture and its components. The platform offers tools for designing, building, and managing APIs, applications, and products across their entire lifecycle. The core runtime engine is Mule, which combines data and application integration. The platform includes design tools, management interfaces, connectors, marketplaces, and platform services to enable integration across systems.
Designing an Edge to Cloud Architecture for IIoTHiveMQ
A key aspect of IIoT systems is moving data from the factory and factory equipment to the cloud so the factory data can be used for machine learning, predictive analytics, and integration into IT systems. Understanding how to design an architecture that moves data from the edge to the cloud in a reliable, scalable, and secure manner is critical to the success of IIoT deployments.
In this webinar, experts from Tatsoft and HiveMQ discussed the key components of a modern edge to cloud IIoT architecture and identified key challenges to its implementation. During the session, Marc Taccolini demonstrated how Tatsoft’s FrameworX combined with HiveMQ is built to address some of the key technical challenges organizations face when building new IIoT applications.
We are very excited to announce that Tatsoft and HiveMQ have entered into a partnership to make HiveMQ available to Tatsoft customers. Together, both the companies will ensure the customers receive world-class support and products for their IIoT deployments.
About the Speakers.
Ian Skerrett is Vice President of Marketing at HiveMQ. He has over 25 years of experience in the software industry and is one of the top experts for creating Open Source Strategies for enterprise software products. He was instrumental in creating the Eclipse IoT open source community with more than 15 different open source projects that provide the building blocks developers require for building IoT solutions. He is also a frequent speaker on IoT and MQTT.
Marc Taccolini is founder and CTO of Tatsoft.
To watch the webinar recording: https://www.hivemq.com/webinars/designing-an-edge-to-cloud-architecture-for-iiot/
This document provides an overview of InTouch Machine Edition (ITME), an open-standard HMI software that allows designing applications once and deploying them across multiple operating systems and devices. ITME offers portability, platform independence, mobility and interoperability. It integrates local HMIs with central SCADA systems and supports Wonderware Historian. ITME is designed for easy use, power and affordability. It protects investments through compatibility across versions and evolves to new platforms. ITME supports various industries and applications through comprehensive tools, customization options and a modular architecture with layers of abstraction.
Find out what ERP is, the standard packaged ERP features and functionality, how SYSPRO can be tailored to suite your business needs and what SYSPRO technology delivers
Movicon (TM) 11 BA, Building Automation - EnglishPROGEA s.r.l.
The document discusses Progea's Movicon BA software for building automation and supervision. Movicon BA is a SCADA/HMI solution that allows users to integrate, monitor and control various building systems, including HVAC, lighting, security systems, and more, through one centralized software. It offers flexibility in platforms, open integration, powerful graphics, alarm management, remote access and logging/reporting of building data. Movicon BA provides a cost-effective way to manage building automation through a single supervision system.
Progea is a leading Italian company that produces industrial supervision software. It has been in business for over 20 years and has seen steady international growth. Progea prioritizes technological innovation, research, and development over marketing. It has a highly motivated and dynamic team of managers, engineers, and technicians who work collaboratively to develop high-quality automation software products. Progea invests over 30% of its resources into research and development to stay at the cutting edge of technology.
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slackshyamraj55
Discover the seamless integration of RPA (Robotic Process Automation), COMPOSER, and APM with AWS IDP enhanced with Slack notifications. Explore how these technologies converge to streamline workflows, optimize performance, and ensure secure access, all while leveraging the power of AWS IDP and real-time communication via Slack notifications.
GraphRAG for Life Science to increase LLM accuracyTomaz Bratanic
GraphRAG for life science domain, where you retriever information from biomedical knowledge graphs using LLMs to increase the accuracy and performance of generated answers
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceIndexBug
Imagine a world where machines not only perform tasks but also learn, adapt, and make decisions. This is the promise of Artificial Intelligence (AI), a technology that's not just enhancing our lives but revolutionizing entire industries.
Building Production Ready Search Pipelines with Spark and MilvusZilliz
Spark is the widely used ETL tool for processing, indexing and ingesting data to serving stack for search. Milvus is the production-ready open-source vector database. In this talk we will show how to use Spark to process unstructured data to extract vector representations, and push the vectors to Milvus vector database for search serving.
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Speck&Tech
ABSTRACT: A prima vista, un mattoncino Lego e la backdoor XZ potrebbero avere in comune il fatto di essere entrambi blocchi di costruzione, o dipendenze di progetti creativi e software. La realtà è che un mattoncino Lego e il caso della backdoor XZ hanno molto di più di tutto ciò in comune.
Partecipate alla presentazione per immergervi in una storia di interoperabilità, standard e formati aperti, per poi discutere del ruolo importante che i contributori hanno in una comunità open source sostenibile.
BIO: Sostenitrice del software libero e dei formati standard e aperti. È stata un membro attivo dei progetti Fedora e openSUSE e ha co-fondato l'Associazione LibreItalia dove è stata coinvolta in diversi eventi, migrazioni e formazione relativi a LibreOffice. In precedenza ha lavorato a migrazioni e corsi di formazione su LibreOffice per diverse amministrazioni pubbliche e privati. Da gennaio 2020 lavora in SUSE come Software Release Engineer per Uyuni e SUSE Manager e quando non segue la sua passione per i computer e per Geeko coltiva la sua curiosità per l'astronomia (da cui deriva il suo nickname deneb_alpha).
Pushing the limits of ePRTC: 100ns holdover for 100 daysAdtran
At WSTS 2024, Alon Stern explored the topic of parametric holdover and explained how recent research findings can be implemented in real-world PNT networks to achieve 100 nanoseconds of accuracy for up to 100 days.
In his public lecture, Christian Timmerer provides insights into the fascinating history of video streaming, starting from its humble beginnings before YouTube to the groundbreaking technologies that now dominate platforms like Netflix and ORF ON. Timmerer also presents provocative contributions of his own that have significantly influenced the industry. He concludes by looking at future challenges and invites the audience to join in a discussion.
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc
How does your privacy program stack up against your peers? What challenges are privacy teams tackling and prioritizing in 2024?
In the fifth annual Global Privacy Benchmarks Survey, we asked over 1,800 global privacy professionals and business executives to share their perspectives on the current state of privacy inside and outside of their organizations. This year’s report focused on emerging areas of importance for privacy and compliance professionals, including considerations and implications of Artificial Intelligence (AI) technologies, building brand trust, and different approaches for achieving higher privacy competence scores.
See how organizational priorities and strategic approaches to data security and privacy are evolving around the globe.
This webinar will review:
- The top 10 privacy insights from the fifth annual Global Privacy Benchmarks Survey
- The top challenges for privacy leaders, practitioners, and organizations in 2024
- Key themes to consider in developing and maintaining your privacy program
Infrastructure Challenges in Scaling RAG with Custom AI modelsZilliz
Building Retrieval-Augmented Generation (RAG) systems with open-source and custom AI models is a complex task. This talk explores the challenges in productionizing RAG systems, including retrieval performance, response synthesis, and evaluation. We’ll discuss how to leverage open-source models like text embeddings, language models, and custom fine-tuned models to enhance RAG performance. Additionally, we’ll cover how BentoML can help orchestrate and scale these AI components efficiently, ensuring seamless deployment and management of RAG systems in the cloud.
Best 20 SEO Techniques To Improve Website Visibility In SERPPixlogix Infotech
Boost your website's visibility with proven SEO techniques! Our latest blog dives into essential strategies to enhance your online presence, increase traffic, and rank higher on search engines. From keyword optimization to quality content creation, learn how to make your site stand out in the crowded digital landscape. Discover actionable tips and expert insights to elevate your SEO game.
Driving Business Innovation: Latest Generative AI Advancements & Success StorySafe Software
Are you ready to revolutionize how you handle data? Join us for a webinar where we’ll bring you up to speed with the latest advancements in Generative AI technology and discover how leveraging FME with tools from giants like Google Gemini, Amazon, and Microsoft OpenAI can supercharge your workflow efficiency.
During the hour, we’ll take you through:
Guest Speaker Segment with Hannah Barrington: Dive into the world of dynamic real estate marketing with Hannah, the Marketing Manager at Workspace Group. Hear firsthand how their team generates engaging descriptions for thousands of office units by integrating diverse data sources—from PDF floorplans to web pages—using FME transformers, like OpenAIVisionConnector and AnthropicVisionConnector. This use case will show you how GenAI can streamline content creation for marketing across the board.
Ollama Use Case: Learn how Scenario Specialist Dmitri Bagh has utilized Ollama within FME to input data, create custom models, and enhance security protocols. This segment will include demos to illustrate the full capabilities of FME in AI-driven processes.
Custom AI Models: Discover how to leverage FME to build personalized AI models using your data. Whether it’s populating a model with local data for added security or integrating public AI tools, find out how FME facilitates a versatile and secure approach to AI.
We’ll wrap up with a live Q&A session where you can engage with our experts on your specific use cases, and learn more about optimizing your data workflows with AI.
This webinar is ideal for professionals seeking to harness the power of AI within their data management systems while ensuring high levels of customization and security. Whether you're a novice or an expert, gain actionable insights and strategies to elevate your data processes. Join us to see how FME and AI can revolutionize how you work with data!
Sudheer Mechineni, Head of Application Frameworks, Standard Chartered Bank
Discover how Standard Chartered Bank harnessed the power of Neo4j to transform complex data access challenges into a dynamic, scalable graph database solution. This keynote will cover their journey from initial adoption to deploying a fully automated, enterprise-grade causal cluster, highlighting key strategies for modelling organisational changes and ensuring robust disaster recovery. Learn how these innovations have not only enhanced Standard Chartered Bank’s data infrastructure but also positioned them as pioneers in the banking sector’s adoption of graph technology.
Communications Mining Series - Zero to Hero - Session 1DianaGray10
This session provides introduction to UiPath Communication Mining, importance and platform overview. You will acquire a good understand of the phases in Communication Mining as we go over the platform with you. Topics covered:
• Communication Mining Overview
• Why is it important?
• How can it help today’s business and the benefits
• Phases in Communication Mining
• Demo on Platform overview
• Q/A
Dr. Sean Tan, Head of Data Science, Changi Airport Group
Discover how Changi Airport Group (CAG) leverages graph technologies and generative AI to revolutionize their search capabilities. This session delves into the unique search needs of CAG’s diverse passengers and customers, showcasing how graph data structures enhance the accuracy and relevance of AI-generated search results, mitigating the risk of “hallucinations” and improving the overall customer journey.
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!SOFTTECHHUB
As the digital landscape continually evolves, operating systems play a critical role in shaping user experiences and productivity. The launch of Nitrux Linux 3.5.0 marks a significant milestone, offering a robust alternative to traditional systems such as Windows 11. This article delves into the essence of Nitrux Linux 3.5.0, exploring its unique features, advantages, and how it stands as a compelling choice for both casual users and tech enthusiasts.
2. I punti di forza della moderna ed
innovativa tecnologia di Automation
Platform.NExT™
Progea presents Automation Platform.NExT™,
the new era of industrial supervision
Automation Platform.NExT™ is a software architecture designed for building the foundations of modern automation software. It is an open
and scalable platform, based on .NET using the latest software technologies and modular concepts with “plug in” technology. An industrial
software architecture made more open and scalable with integrated functional modules tIt is fully capable of managing all business
enterprise needs in the most efficient and effective way possible. This modular and open platform will empower automation professionals as
the perfect solution for Supervision, HMI, Control, Historian, MES and industrial Analysis.
2
3. New horizons
in automation systems
Automation Platform.NExT™ is the best software solution for every
company need. Enhance your enterprise wide process information flow with
efficient management from sensors to business intelligence
Technology evolution is essential in the competitive
automation world. Technology evolution is not just a
question of introducing new features or improvements
here and there. It involves finding the courage to
confront new challenges directly, rethinking
approaches and brainstorming to find better ways
to venture into explore new technology frontiers.
This is the only way to make the imaginable a reality.
Automation Platform.NExT™ is the new frontier of
SCADA/HMI technology. We are not just dealing with
an enhanced Movicon platform but a completely new
platform designed on the technology of the future.
This is the fruit of Progea’s 20 years of experience
in the automation sector and a represents a new
reference point for SCADA/HMI software.
The Automation Platform.NExT™ project has been engineered
to override the restricted use of conventional SCADA/HMI
technology by proposing next-generation native-based software
solutions incorporating the most advanced technology. These
solutions create solid foundations for longterm investments,
without compromise, offering openness and integration never
before imagined in the world of automation.The Platform
has been designed to offer an all-rolled-into-one modular
and flexible work environment for design engineering and
distributing industrial software applications for managing
field communication, data collection, HMI interface graphics
and supervision, Historicals and analysis, performances and
business productivity efficiency calculations, maintenance
management, event notification management and much more.
OEE, KPI
Plant Intelligence
Production Reports
Historian
Data Collections
Alarm Management
Alarm Management
Local HMI
Local HMI
Web Access
Schedulers,
Maintenance
Supervision
3
4. New generation software
technology
Automation Platform.NExT™ is the software that integrates automation systems
with the most innovative and modern technologies at all levels enterprise-wide
• Scalability. Automation Platform.NExT™ has been
designed to guarantee maximum scalability and offers all-inone development environment for modular solutions that are
flexible and easy to integrate within the platform. The scalable
Platform.NExT™ architecture is remarkably cost effective and
time saving and offers unlimited possibilities for deployment.
• Openness. The Automation Platform.NExT™ technology
is based on the “plug-in” concept, allowing maximum
interoperability with systems to integrate new functional
models within the Progea framework for fully customizable
.NET solutions. The graphics environment is based on WPF and
supports powerful external tools such as Expression Blend for
creating XAML graphics. The powerful and integrated VB.NET
language standard guarantees all kinds of customization.
• Security. Automation Platform.NExT™ guarantees
the maximum level of security. In addition to the user
management other solutions are provided that embrace the
any approach to using alternative security models offered by
preferred providers.
• Standards. Automation Platform.NExT™ is
completely based on market standards providing openness
and reliability. The XAML and WPF technologies guarantee
the most effective and modern graphics standards, and
historical logging technologies based on MS SQL Server
and Azure with transparent support to all other providing
relational databases. The project files are XML standard
based. The powerful language is VB.NET syntax standard
based. Communication is OPC UA-based in addition to
various integrated protocols.
• Performances. Automation Platform.NExT™
emphasizes performance management. Fast communications,
real-time data management and graphics optimization that
make full use of graphics accelerators and DirectX, guarantee
maximum technology without sacrificing performances.
4
• Connectivity The Automation Platform.NExT™
Information Model is based on the innovative OPC UA
technology. This guarantees maximum native connectivity to
any device or application module based on this technology
which offer unbeatable features for security and performance.
The I/O Data Server module offers a significant number of
native O/I drivers, integrated and free, that provide direct
connectivity for devices with proprietary protocols such as
Siemens S7, Rockwell, Modbus, Omron, and others. The
platform’s Client/Server architecture has been explicitly
designed to unite IT and decision-making levels with the
automation level of all production companies.
• Web-enabled. Automation Platform.NExT™ is
based on the system access via web for which it already is
an unparalleled reference point. Web-enabled projects can
be created with extreme ease and effectiveness exploiting
the Silverlight technology to obtain solutions with maximum
performance as well as graphics and HTML5 technology to
guarantee maximum portability to diverse platforms and
systems.
• Engineering. Automation Platform.NExT™
proposes an extremely innovative and particularly
pleasurable work environment with a rich and intuitive set
of features. The platform is completely based on the new
technologies which can be used for quick and effective
project realization that before. This can be easily done by
using the various wizards and templates, symbol libraries
and toolbox. All of which are unprecedented in terms of
graphics quality and re-usability. The platform is based
on the function modularity concepts that permit users to
create and implement plug in function modules externally
and integrate them in the platform.
5. Open architecture designed
for the future
Automation Platform.NExT™
is the open and scalable solution
Progea software technology surpasses all automation
design engineer’s expectations of today. Progea wanted to
build a modular platform to ensure the type of scalability
needed for modern day automation systems combined
with the sort of openness essential for customizing
software systems as required by customers operating in
sectors, such as manufacturing, infrastructure, energy,
food and beverage and pharmaceuticals.
Automation Platform.NExT™ offers an intuitive
configuration environment to facilitate the process
of creating even the most complex projects that entail
integrating system function models or those designed
by third parties which are easy to integrate on platform.
Configuration, communication, visualization, data logging,
analysis, security, control, information distribution are
provided at all company levels, local or geographically
distributed. All are at easy reach in the one platform that
offers the advantage of both total integration and plug-in
modularity.
5
6. New Generation SCADA/HMI
technology
A level of technology never reached before
in automation software
An innovative workspace, totally integrated work
environment, a customizable Progea framework with plug-in
technology, revolutionary graphics with enriched
symbol libraries that contain smart graphics of every
typology, an open communication model, independent
persistent data architecture, web performance and crossplatform technology are all included. The vast and long
experience combined with the capacity to be innovative has
empowered Progea to be extremely ambitious in designing an
exceptional project destined to be a role model for all future
SCADA/HMI architectures.
Automation Platform.NExT™ is one of the most ambitious
projects in the field of industrial software technology
with the objective to offer the base-line for realizing any
automation application. As a base-line it covers all the
fundamental requirements such as data acquisition and I/O
Server, historicals, visualization, analysis and reports, plant
intelligence with MES solutions, control and monitoring
with SoftPLC solutions, Alarm and Downtime management,
Web-enabled visualization and control and other unlimited
feature uses due to the modular architecture open to third
party function model integration to enable collaborative
engineering.
6
WPF/XAML
Multitouch
Silverlight
HTML5
OPC UA
Cloud
7. Software architecture
designed for the future
Cloud
What makes the Automation Platform.NExT™
Scada/HMI technology so revolutionary?
The technologies used in Automation Platform.NExT™ are
the best and most innovative in existence designed to give
SCADA/HMI system users a completely new experience
and advantages never thought possible before.
Web Client
Access from
everywhere
Management Level
Movicon Supervisor
Factory Level
• Plug-in Framework
The new Platform.NExT™ technology is based on .NET
code that uses the 64 bit system potentiality with a
framework specifically designed to guarantee reliability,
openness and performance. This platform uses the
plug-in model to guarantee full customization of modular
systems and integration of new customized modules.
The Movicon.NExT™ framework offers a rich suite of
functional modules capable of guaranteeing rich and
complete supervision and user interface solutions with
total openness and expandability.
• New Generation WPF and XAML Graphics
Movicon.NExT™ offers a new user interface concept
that uses the latest generation of DirectX graphics
acceleration to fully exploit the exceptional quality
of WPF/XAML vector graphics technology in 2D and
3D. A diverse selection of New Generation Object
and Symbol libraries provides native support to the
very latest multi-touch and Kinect user interface
technologies with Windows™ 8 style and navigation
• WinRT app, Silverlight and HTML5
Platform.NExT™ offers new generation client solutions
that include apps for WinRT and Windows phone, and
integrates the new Web Client technology to allow access
via the web to servers using the Microsoft Silverlight
or HTML technologies, allowing users to choose which
client technology best suits their kind of architecture.
Movicon SCADA
Plant Level
Movicon HMI
• OPC UA and I/O Driver Connectivity
Platform.NExT™ is based on a client/server architecture
using the information model defined by the OPC UA
standards that exploit the WCF technology in the
communication infrastructures. There are also a large
number of integrated and native I/O drivers available in this
model capable of managing communication protocols of all
the most widely used automation devices (PLC, Netword,
Fieldbus, tools, etc).
• Performing Database and Cloud
Movicon.NExT™ uses the Virtual File System (VFS) to
render applications independent from persistent data
models. This enables the user to feel free to connect to
relational databases (i.e. SQL Server), use cloud computing
(i.e. Azure) or use normal XML files on disk for historically
logging and archiving process or project data.
• Users and Memberships
The Platform.NExT™ security model is based on user login
authentication with Membership management to ensure
maximum security and openness aimed toward integrating
authentication systems from diverse providers.
7
8. Innovative solutions with solid
technological foundations
New software architecture concepts
Automation Platform.NExT™ has been designed on
innovative criteria to drastically reduce development time
that incur more than 80% of project engineering costs.
Progea’s extensive research and development work
combined with its vast experience in supervision software
has enabled it to reach the highest level of quality
and technology currently available in industrial automation
software. Reducing development time is a major concern
for most SCADA/HMI user companies. Platform.NExT™
is fully equipped with just the right tools to ensure that
your work and time are safeguarded. The objective to
provide a unique all-in-one platform has been realized
with Platform.NExT™, where ideas and innovation merge
to create solid foundations of technology.
8
As an all-in-one and therefore totally integrated platform,
the use of plug-in technology also makes it modular and
open to integrating plug in modules customized on the
Progea Framework. This allows users to expand potentiality
by customizing the system towards vertical solutions that
go beyond the limited use of “closed” technology. The .NET
technology enables users to expand further by using the fully
integrated .NET assembly and user controls.
9. A modern and intuitive
configuration environment
for all platform modules
A new userfriendly work
environment based on WPF
The Automation Platform.NExT™ workspace is the result
of continued Progea technology evolution derived from
research conducted in software ergonomics combined with
the vast experience of a company that has always valued
feedback and suggestions from thousands of design
engineers all over the world.
Workspace: WPF vector
Graphics Editor, Resource
configurations and the
platform’s function modules
The Platform.NExT™ configuration far exceeds any other
product for simplicity of use and intuitiveness which has
been made possible with its intelligent editors and autoconfiguration tools, wizards, and tag importers. Platform.
NExT™ is a pleasure to use for engineering automation
projects with exceptional visual impact instantly that also
ensures that your investments are safeguarded.
Applicable graphical
object styles and effects
Ribbon Interface
Properties Window for simple
and intuitive configuring of
selected objects and resources
for the various platform modules
Toolbox containing
Preconfigured
Objects, Analysis
and User Controls
Project Explorer for
easy access to all modules
existing in the platform
Language Editor
VB.Net integrated
Trace Explorer
Symbol Graphics
Library completely
based on XAML
(WPF/Silverlight)
Command Explorer
XML Explorer
Animation Explorer
9
10. WPF and XAML graphics
plus new graphics libraries
for unprecedented results
Movicon.NExT™ is the Platform.NEx™
Client module that revolutionizes
the world of SCADA/HMI software
Movicon.NExT™ uses the WPF graphics engine and DirectX
graphics accelerator together with the latest generation of
symbol libraries to offer graphics with remarkable quality.
Design has now become an essential component of a product’s
success especially for software applications dedicated to user
interface and supervision. Applications based on Graphics
device interface (GDI) technology are still using solutions
designed in the 90’s, incapable of natively exploiting all the
wonderful features offered by the latest generation of modern
hardware graphics. Conversely Movicon.NExT™ uses the the
new WPF technology, the graphics engine for tomorrow’s
applications, designed to change the way of thinking about and
representing Windows user interfaces and above all capable of
exploiting modern hardware.
The Movicon. NExT™ uses XAML-based vector graphics that
excel beyond restrictive use of conventional graphics.
Supporting 2D and 3D graphics and equipped with
revolutionary and dynamic functions, that out-do the limited
use of current products, users can now express their creative
side to the full. All the symbol libraries were created
using the XAML techniques and offer a rich selection of quality
objects and symbols to facilitate design engineering.
Highimpact visual HMI interfaces can now be achieved in less
time than ever before.There is no need to have XAML expertise
when using Movicon.NExT™ because its openness enables
users to now have the opportunity to create symbols and 2D
and 3D designs externally and implement them within the
platform by using the powerful features of the XAML graphics
and the Movicon.NExT™ real-time engine.
10
11. Supports the latest
generation of 3D graphics
Exceptional 2D and 3D Graphics
Movicon.NExT™ offers support to dynamic 3D graphics
visualizations with XAML technology. Screens can display
3D models imported or selected from those included in
the platform. Various advanced functions are provided
to enble the design engineer to animate graphics with
3D model components and define sequences of rooms
containing different 3D scenarios for viewing along a
trajectory. The user can interact with dynamic real-time
system data using 3D graphical components to create
tri-dimensional and interactive user interfaces. The new
graphical experience empowers users with the freedom
to design mixed 2D and 3D solutions, using predisposed
dynamic functions for associating real-time information
with objects. At the same time users are free to create
and integrate their own XAML designs to expand library
contents.
Spectacular 2D and 3D graphics with astounding special
effects can be created independently from the local screen or
web screen. The different tools and capabilities include:
•
•
2D and 3D vector graphics with DirectX10 support
Rich library of symbols and WPF objects
preconfigured with top quality graphics
•
•
•
Expanded support to graphical objects in XAML
Extensive set of dynamic functions
Support to all functions needed for manipulating
objects in Runtime (zoom, drag, pinch, and more)
•
•
•
•
Support to screen styles and layouts
Full support of all multitouch functions
Kinect (voice and gestures) support
Native Windows 8 tile interface and automatic project
navigation support
11
12. More space
to be creative
New generation graphics libraries
Progea has invested significant resources to engage
graphics and designers on a complete redesign of their
product’s XAML-based symbol library and to exploit the
most modern graphics solutions using different styles
and storyboards. Users can deploy a rich variety of
high quality graphics never seen before in SCADA/HMI,
all included in the platform and contained in the object
and symbol libraries for every industrial use.
Users can expand their design creativity with a library
rich in high quality static and dynamic symbols plus a
toolbox of graphical objects, including pre-configured
complex objects. Combining these with a powerful
integrated vector WPF graphics editor empowers designer
creativity with extended technical capabilities to enhance
transparency, fading, shading and shadow effects.
In addition to the Movicon.NExT™ graphical object
libraries, this platform provides users with ample
freedom for graphical expression with XAML. This allows
new symbols and objects to be created using Expression
Blend graphics, dynamic use of storyboards, and full
support to user control customized with Visual Studio.
12
13. Powerful integrated features for
a new engineering design experience
Movicon.NExT™ offers efficient all-in-one solutions for
creating powerful graphical HMI and SCADA interfaces
with great effect. The toolbox includes objects purposely
designed for viewing data and information from server
modules, such as the Historian, Schedulers, Alarm
Management and more. Everything you will ever need has
been integrated within Movicon.NExT™ for easy use even
for the most complex visualization functionalities.
Built-in geo-localization
Movicon.NExT™ projects can be geo-localized. Integration
with cartography and geographical maps allow the user
to define geographic co-ordinates for specific screens or
projects to dynamically display desired access points and
information on maps.
Using the navigation and zoom techniques within this
geographical map system will simplify distributed
information management in different territorial locations.
Maps can be used to represent the operational status of
localized projects to obtain a rapid geographic collocation
of information and navigability.
Multilanguage texts with
simultaneous translation
Each Movicon project can contain an unlimited number
of text strings in any languages to localize the project with
any language or character set (Unicode also includes
UTF-16 code for Asian and Arabic characters). Texts
are managed in the project’s string table which is fully
compatible with Copy and Paste functions directly from
editors such as MS Excel™ making Movicon™ projects truly
international. Powerful built-in text management tools
are specially designed to manage text faster, such as the
automatic text translation of languages used in the project.
Any language can be changed and activated instantly,
whether in Editor or Runtime mode. Specific languages
can be activated for specific users when logging on
and system fonts will adapt accordingly to the changed
language.
13
14. Unparalleled security levels
with Membership Manager
User and Password Management
The Movicon.NExT™ applications ensure the maximum
level of security and reliability. The complete and robust
users and password management, has been designed
explicitly to guarantee that conformity to the stringent
security norms is an integral part of project design that
is achievable with simplicity. Movicon.NExT™ guarantees
maximum data and system access protection managed
with 1024 user levels and 16 access areas. Project users
can be shared with Windows™ domain users with the
option to centralize user profiles. All the necessary
security criteria are fully integrated and configurable
with a few clicks, and include features such as electronic
signatures, unauthorized access attempt control
checks, password expiration, automatic log-offs and audit
trail management. In addition, Movicon™ offers the ability
to define protection levels and user traceability directly in
each tag, independent from the associated commands.
User Management
Movicon.NExT™ allows user profiles to be defined with
mixed configurations among other project users, Runtime
administrator users, Windows™ domain users and connected
child project users. Users can also be associated with access
privileges for actions and command functions and individually
for project tags. The innovative Movicon.NExT™ user
anagement is much more expandable and open than previous
designs. Users can now be shared with different security
management architectures using the membership feature.
Audit Trails
Audit trails can be applied to each data value and variation for
recording and reporting each change with the subsequent,
time stamp and the name of the user logged on when changes
occurred. .
FDA CFR21 Part 11 and GAMP5
All CFR21 Part 11 requirements have been implemented for
creating FDA and GAMP5 ready projects with simplicity.
14
15. Robust, reliable
and efficient I/O Server
I/O Data Server is the Platform.NExT™
communication model that guarantees
a framework with efficient safe and
reliable communication
Third Part
OPC UA
Clients
Automation Platform.NExT
I/O Data
Server
I/O Drivers
I/O Drivers
I/O Drivers
I/O Drivers
The Platform.NExT™ I/O Data Server has been designed
on extremely robust and reliable server architecture.
The I/O data server engine manages real-time information
by using the communication type defined in the network’s
address space, the gathering point of all the variables
connected to the various field devices.
The Platform.NExT™ I/O Data Server supports all data
types, including those defined in the data server OPC
UA – PLC Open IEC1131 specifications, to allow users to
freely define and customize their own data types including
the most complex ones, breaking down the boundaries
imposed by current technologies. Platform.NExT™ I/O
data server uses the data communication model specified
by OPC UA, to ensure that communication is efficient, open
and secure. I/O driver management is also based on this
model and uses the specific protocol managements for
field devices such as Siemens, Rockwell, Omron, Modbus,
Profibus, ProfiNet, Konnex, EtherCAT, and PowerLink.
The model provides maximum interoperability with OPC
UA specifications, whether client or server, and supports
all complex data specifications. The data server ensures
excellent performance and server independence from the
various types of connected clients, whether for local HMI
or via Web visualization. Using these new technologies
the system architecture can support very efficient data
models and drastically reduce design engineering times by
applying all engineering information to tags that are then
propagated to connected objects. This enables properties
to be centralized transforming the tags into true global
information centers.
Clients
HMI
•
•
•
•
•
•
OPC UA
Third Part
OPC UA
Servers
Total Platform.NExT™ integraton
Simplified connectivity
Full support to OPC UA client and server specifications
Native and direct I/O drivers included in system
Tag propagation property configuration
Intelligent networking in OCP UA model
15
16. Server Allarmi
completo e
Alarm Server:
potente Evolutionary
diagnostics functions
The powerful Platform.NExT™ model
for alarm and event management
The Alarm Manager is the Platform.NExT™ Alarm Server
module that enables complete and powerful management
of alarms to guarantee that events are handled with
maximum precision. Users are provided with a vast variety
of detailed information to keep them constantly and
completely updated on all ongoing plant system activities
and situations. By using this vital information users will
be prepared at all times to interact appropriately to reduce
production downtime to a minimum and improve efficiency.
The Platform.NExT™ Alarm Manager introduces new alarm
functionalities and typologies, extending the conventional
method of activation on event. Alarm activation can now be
triggered on value deviation or rapid data change events to
promote a better way of managing systems with simplicity.
The alarm manager is configured with defaults according
to the ISA S-18 standard but is completely customizable to
support ON, OFF, ACK, RESET and SHELVE events.
16
All areas, analysis and filter functions (by time, area,
severity, period, etc.) are supported and dynamically
combinable with help.
The Alarm Manager also records each alarm and event
for its complete traceability using the Platform.NExT™
Virtual File System (VFS). Therefore the Alarm Manager
module can also be used for configuring the event archive
management whether on relational DB, local file or cloud.
Statistical Downtime Analysis
Plant production and maintenance managers need
reliable tools capable of statistically analyzing
plant downtimes during periods of production runs.
The data analysis permits quick detection of critical
points within the production process to allow
improvements to be implemented and to maximize system
efficiency and productivity. Without this information it
would be difficult to improve productivity.
Platform.NExT™ integrates this powerful tool for
managing analysis of events and production downtimes
into reports of total and partial downtime plant
system occurrences. Information can be
represented in table format, pie charts or
histograms, to individualize lists of alarm events
and their clasifications by “duration” (total time
of all events of the same type) or by “frequency”
(total number of occurrences of the same type) for
the preselected time range and period. These reports
can be displayed or printed on command or on event and
can be exported in various formats (Excel, PDF, HTML,).
They provide all the information and details on each
individual alarm analyzed.
17. Displaying and Managing
Alarms in Movicon.NExT™
Displaying Alarms from the Alarm
Manager in Movicon.NExT™
Clients
HMI
(Alarms List)
Automation Platform.NExT
Server
Downtime
Analisys
Alarms
Manager
Cloud
SQL Server
Local File
Other DB
VFS
Historical
Log
SQL Server
The Alarm Window and the Historical Log Window are
active alarm visualization tools and can be inserted
as objects in any screen and configured just like other
graphical objects from the toolbox. Alarm display objects
can be built from symbols and templates that differ
completely in style and can be added to the symbol library
like other graphical objects. Movicon.NExT™ offers
complete configuration of alarm visualizations and their
operations, using either direct or customized commands.
The display windows can be connected across networks
where the display object becomes a “client” for displaying
active alarms and historical logs originating from different
network servers. Columns reporting alarm information
can be configured to adapt to every visualization need.
Among other interesting features, Movicon also provides
users with the ability to instantly view histories of specific
alarms and their occurrences. This is a great aid to simplify
event analysis to improve productivity. There are all types
of “sort-bys” and “filters” to help users obtain and display
information transparently and intuitively.
17
18. Server Allarmi
completo e
Historian with databases
potente
in local DB or cloud
The Platform.NExT™ Historian
module guarantees innovative process
data recording with performances and
security intact
18
Clients
HMI
(Data Analisys)
Automation Platform.NExT
Server
Historian
Data
Historian
Cloud
SQL Server
Local File
VFS
Others DB
Data
Logger
SQL Server
It is essential that every modern production system ensure
correct and efficient data recording to enable efficient
analysis of crucial information to improve productivity.
The Platform.NExT™ Historian module uses innovative
criteria to record historical data, to archive plant system
data on a database, hard disk, or Cloud to guarantee
everlasting performance and security independently from
the volume of data involved. Using the Progea Virtual
File System (VFS) technology, the persistent data model
integrated in Platform.NExT™ Historian enables project
independence from servers and database formats so that
users can define where to archive data independently
from their project. Data can be archived locally on file, in a
relational database (Microsoft SQL Server used for default),
or in the cloud, using cloud computer technologies.
The server module can record variables using one or more
Historian prototype definitions allowing user projects to
easily adapt to client requirements without wasting time.
The properties of each individual Historian prototype can
be defined and configured with specific recording criteria
(on event, change or cyclic), the value type to be sampled,
(absolute, percentages, etc.) and data destination. Each
individual tag defined in the address space can then be
associated with a Historian model to create its own simple
and flexible archive configuration.The Historian recording
engine uses advanced compressed algorithms
that increase performance and sustain the recording flow
of huge data volumes.
19. Historian and Movicon.NExT™
for perfect data analysis
Historical data managed by the Historian
module are displayable using the powerful
Movicon.NExT™ analysis tools
A major part of the Movicon. NExT™ HMI module toolbox
allow database connectivity for representing and manipulating linked data tables, independently from the fact that
they have been recorded by the Platform.NExT™ Historian
engine: ComboBox, lists, grids and many other controls
permit any interface type to be created for visualizing and
manipulating data in database tables.
Trends, Data Analysis and Tables
Sophisticated Trend objects allow access to data and
display curves representing process data behaviors. The
Trends can be both dynamic or historical(run-pause) and
provide sophisticated features for representing values
graphically, with ample pen and legend customization.
They allow data to be represented by time/date range and
the use of other filters such as zooming, pen selecting,
logarithmic scales, fit-into-one-page graphics, printing,
etc. The Trends also can be configured in Runtime and the
VBA feature provides maximum configurability to allow
users to create their own powerful Trend Template objects.
The Data Analysis objects have been extended to provide
more sophisticated modes to perform effective and
exclusive analysis on historical data with relating graphical
representations. The Data Analysis objects allow users to
apply fast analysis according to prefixed time/date ranges
using comparison and overlapping curves. This includes,
for example, analysis with sampling curves or comparing
different periods (e.g. comparing values from one year to
those from a previous year), where measures are taken by
tracing lines between different chart points to obtain the
difference in values.
19
20. Server Allarmi
completoenhanced
e
Unsurpassed
potente
Report management
The Platform.NExT™ Report Manager
offers a complete and integrated
solution for creating and displaying
powerful data analysis Reports
The built-in powerful Report Manager offers Platform.
NExT™ users a powerful and flexible tool for generating,
performing and distributing data reports to cover any data
analysis requirement no matter how sophisticated. the
analysis are performed on data recorded by the Platform
such as archives managed by the Historian. Analysis and
Reports can also be performed on any source of data as
well as connecting to existing relational DBs of any type
to offer the widest range of flexibility possible. the Report
Manager module offers a visual object-oriented interface
that enables the user to create Reports following a short
step-by-step procedure or wizards and templates. By
using the Report Manager, based on .NET technology,
the user will be able to create powerful visual reports
intuitively by using the tools provided in the toolbox. Once
the data source has been established (i.e. database tables)
the report can be easily built using fields, tables, statistics
and 2D and 3D graphics.
All types of analysis tools are supported such as multilevel filters, grouping and sort by, calulation or formula
functions, Reports Master and Sub-Reports. The user
can display, print or export their reports which support all
export formats such as PDF, HTML, RTF, XPS, or Excel
XLS and XLSX formats. A navigation tool has been provided
for the user managing complex reports which can be used
for mapping reports to be viewed in a hierarchy using the
tree structure.
20
The Reports can be published through the Web by using
the Web Reports module functions which are supported
by the Web Reports Module. When projects are published
via the web using the Web Server module, the report will
be displayed via web using the Platform.NExT™ HTML5
technology.
21. Funzioni di
Notifica edEverything under control, with
Analisi
the modules
Statistica Allarmi Platform.NExT™
The Alarm Dispatcher is the Platform.
NExT™ module for sending Alarm and
Event notifications to operators
Unmanned or partially manned plant systems ensure
information is supplied quickly to on-call duty staff to
avoid unnecessary prolonged production downtimes.
This is one of the reasons why all the project alarms can
be configured to immediately notify predefined users.
The Alarm Dispatcher is the Platform.NExT™ component
for directly notifying personnel alarm events using SMS
or e-mail, and is indicated for systems that must stay
continuously connected (i.e. local network or Web).
Notifications are sent to specified users or user groups.
Notifications can be customized to be set at specific times,
calendar dates, work shifts or on-call duty work shifts.
The Archive Manager module is used
for archiving the Platform.NExT™
production and recipe data
Platform.NExT™ has a module for editing and activating
extremely advanced Recipes that enable the archive
management to be configured in asynchronous mode in
respect to the Address Space. The configurator allows
Recipe objects to be managed with data layouts, freely
configurable user interfaces and connectivity to independent
devices. Functions have also been included for downloading
and uploading recipe data in “atomic” mode, made possible
by functionalities provided specifically for these purposes in
the Data Server’s I/O drivers.
21
22. Server Allarmi
completo e
potente
Scheduler Server Module for
scheduling commands and events
This function and command scheduler server module has been
purposely designed to make object configuring extremely easy
and functional to perform specific functions according to a
time schedule or planned expiry date. This module function as
a independent Server within the platform, and receives which
commands to activate and deactivate according to scheduled
activation expiry times (repetitive or cyclic, preset date and time)
both in develop and runtime mode. Configuration operations
can also be performed in runtime on HMI client side using a
predisposed graphical object for this task that is available from
the Movicon.NExT™ toolbox.
Integrating new and third party
modules in Platform.NExT™
The Platform.NExT™ technology has been purposely designed
to be modular and scalable. In addition to the suite of function
modules provided by Progea, users can also develop and add
new modules in the platform of their own for creating vertical
and integrated solutions. This gives users the advantage of
using the platform’s functions to optimize their work, increase
potentiality and reduce development time and management
costs. Progea offers wizard models for Ms Visual Studio
2012 to provide users with all they need for building their
function modules in as little time as possible by using the .NET
and C# technology. Furthermore, Progea can also provide
documentation, SDKs and the necessary information to help
user create their own vertical solutions to integrate with the
Platform.NExT™ technology.
22
23. Empowered by integrated
VB.NET language
Project design openness
with integrated VB.NET language
Platform.NExT™ integrates a powerful VB.NET engine,
capable of executing code compatible with the VB.NET
standard (Visual Basic for .NET™), with a vast and powerful
set of APIs. Not only are event and method properties
provided to customize any type of system functionality,
but they can be used to gain full access to your system’s
.NET world. Scripts can be executed as normal routines
or embedded in objects in response to events, such as
the alarm, template or data logger graphical objects.
The Platform.NExT™ VB.NET language guarantees
multithreading, which means that different VBA script can
be executed simultaneously, offering unmatched solutions
that no other system using standard languages can
offer. The powerful debugger also provides step-by-step,
breakpoint and other execution types.
The expression generator
The symbols and objects of the Platform.NExT™ graphical
interface offer the option to use a “VET.NET Expression
Generator” to edit logic expressions with or without Tags,
directly in the object itself. The resulting expression value
will be considered as the value to display or manage
simplifying the most complex data display functionality.
23
24. Server Allarmi
completo e
New generation
potente
Web technology
Access your automation
and supervision project by remote
access in total security with
the Platform.NExT™ Web Server
module using the web HTML5 and
Silverlight technologies
The true modern automation concept places emphasis
on the necessity to access your automation system data
from any point at any moment. Using the web to access,
manage or view production process information, with total
security, is essential to all users, maintenance personnel,
production managers and company managers in general.
The Platform.NExT™ Web Server module is an excellent
function designed to make remote access happen using
the most modern and innovative web technologies of
HTML5 and Silverlight. The Movicon.NExT™ configurator
is used for creating the graphical interface displayed over
the web independently from the fact that it can also be
displayed by HMI Clients.
Communication is established through the I/O Data Server,
or directly with OPC UA. The Web Server’s task is to
manage local instances and publish data over the web.
The Web Client stations permit command activation as
defined on servers using the same adopted security for
accessing commands. All access and commands are
traced and recorded on the server’s log. In addition, Web
Client station log on is completely independent from other
stations, where other users can log on with different
privilege levels using the multi-user concept.
24
•
Access and view project via the Web using any
browser with any operating system with Silverlight
and HTML5 technology support
•
Creating web pages on the server is completely
automatic with a click of the mouse
•
Project screen browser navigation defined on Server
with user login, access control and option to restrict
navigation on the web side
•
No need for additional installations or configuring on
client or server
•
Enhanced performance and transparent support to
project functionalities and commands using normal
browsers
•
•
•
•
Data management security
Enhanced performances and event notification only
Communication based on Web services
Multiplatform support, no software to be distributed
or installed, application centralized on server side
25. State-of-the-art remote
access with Internet
Cross-Platform Visualization
with HTML5 and Silverlight
HTML5 is the standard that defines a series of
technologies, which substantially include all the ost recent
technology innovations concerning web development
and engineering web applications. By surpassing the
usual contraints met in web technology the new HTML5
technology empowers you to define new semantic
functions, storage, API for device access, web sockets,
webworkers and graphical solutions, multimedia and
2D/3D never thought possible before in standard and
cross-platform technologies. By supporting this standard
the Movicon Web Client technology is able to offer users
true standard and cross-platform web architecture
which is portable on any PC, operating system, browser
and mobile device. The advantage of having a crossplatform solution is that it permits accessibility to
projects anywhere and everywhere with perfect graphic
rendering all guaranteed in total security. However, unlike
solutions based on Silverlight, HTML5 requires the server
to process client data in part and in doing so may affect
performances slightly. This does not exclude the fact that
HTML5 is an open standard that will empower you with full
interoperability within any platform.
Microsoft Silverlight is a free plug-in that can be used in
platforms (PC and Mac) and browsers to provide content
and multimedia services based on Microsoft .NET and
Rich Interactive Application (RIA) applications for the Web.
With the Silverlight technology, the Platform.NExT™
Web Server is capable of managing application remote
instances, allowing the client side to obtain the same
graphical functionality and performance of extremely
advanced servers. The Web Client does not require any
additional installations to use Silverlight and the server is
automatically configured to make projects accessible via
the web with just one mouse click. Although the Silverlight
plug-in is required on the client side, it has the e-graphics
and high performing technology crucial for obtaining
successful Web Client solutions that are not completely
cross-platform. With the XAML technology on which the
Movicon.NExT™ is based, the availability of graphical realtime system data representations are at your complete
disposal for using in architectures based on web and
mobile devices such as smartphones and tablets.
Internet
25
26. Quality control
Value-added services
Progea as a company has always place emphasis on
product quality which has become a central point of
their activity. The entire company, including product
development and validation processes, are System Quality
certified according to the ISO 9001:2008 specifications,
with additional audits in compliance with the EN50128
SIL0 requirements. In addition to this Progea guarantees
excellent customer care services essential for those who
work in the critical automation processes such as process
control and infrastructures.
The Total Cost of Ownership Costs (TCO) of a software
platform is greatly influenced by the quality of its correlated
services. Every user company is well aware that even the
best products can induce indirect expenditure for the end
user if not properly supported. Important parameters
such as learning time, response time, quality services,
even though not directly linked to product such as
customer care, are generally considered the true Added
Value of a software product. The relationship between
Product Company and Consumer in the software sector
is ‘different’, it is considered a ‘partnership’. Movicon™
is designed on the simplicity-of-use criterion, correlated
with complete documentation and website dedicated to
support services and provided to enrich the knowledge
of the developer community with useful information and
examples to minimize their need to revert to the Technical
Help services. Furthermore, Progea is unique in providing
quality services that only a product company can ensure
and provide. Training, technical help and customer care
guarantee the user the support they need to confront
and resolve any application need whether planned or
unexpected, contributing to reducing installation and
internal development costs. Progea is directly presented
through and by its offices in Italy, Germany and the USA,
in addition to an international network which supports and
guarantees the Movicon™ brand name worldwide.
Movicon™ Community
Progea promotes and greatly encourages active
knowledge sharing. Users can take full advantage of the
user community to exchange know-how, tips and advice
and use the web tools administered by Progea to access
all technical information about platform technology
life cycles. Progea organizes events for the Community
along with information programs and free training
courses. The website provides Forums, Blogs, bugbase,
KnowledgeBase, Examples and much more to the full
discretion of users to access and manipulate
A solid partnership
Movicon™ is a well-known product used in automation
by leading companies from every industrial sector and
has more than 80.000 licenses installed worldwide. As
a demonstration of the Movicon™ product’s quality and
reliability, Progea is honored for being chosen by the
leading players in the industrial automation sector. The
Progea technology is also used and distributed under
a variety of brand names by international companies,
including Phoenix Contact, Panasonic, ABB, ASEM, VIPA,
Suetron and many more.
26
27. Progea represents more than 20 years of software technology
excellence in every industrial automation sector
Progea offers open and flexible crossover solutions for various civil and industrial automation sectors. Our software
platforms are installed all over the world to manage and control all types of automation sectors, which include:
Food &
Beverage
Automotive
Water
Treatment
Process
Control
Oil & Gas
Infrastruct.
Manufactur.
Energy
27