The document discusses using facial recognition for attendance tracking in a school setting. It proposes developing a system that uses real-time face detection and Principal Component Analysis to match detected faces to staff members and automatically record their attendance. This would eliminate the manual and time-consuming process of logging attendance. The system would enroll staff faces during a one-time process and then identify and update their attendance in a database system in real-time. Research shows this type of automatic attendance tracking outperforms manual systems and provides more efficient leave and interface management.
Attendance Using FacialRecognition Page 2
1.1 Abstract
Face recognition is a biometric identification process which demand as well as performance increase
rapidly over each and every year, and such systems are mainly used for security and commercial
purpose. an automatic system for face recognition in a real time background for a school to mark the
group action of their staff. The task is extremely difficult because the real time background subtraction
in a picture remains a challenge [1]. To discover real time, face square measure used and a simple quick
Principal Element Analysis the faces detected with a high accuracy rate. The matched face is employed
to mark group action of the worker. Manual coming into of group action in logbooks becomes a
troublesome task and it also wastes the time. thus we develop module that includes of face recognition
to manage the group action records of staff [2]. This enrolling could be a quondam method and their
face can be hold on within the info. throughout enrolling of face we tend to need a system since it's a
quondam process. you'll have your own roll variety as your worker id which can be distinctive for each
worker. The presence of every worker are updated in an exceedingly info. The results showed improved
performance over manual group action management system. group action is marked once worker
identification. This product provides way more solutions with correct results in user interface guide
and leave management systems.
In this paper first people investigation and recognition in video. The video suppurated format for this
project is MP4, AVI and wmv files. It first extracts frame from then video then extracts all the faces
from each frame, puts the faces in a directory folder known as database. Once you choose your input
video, it extracts all the faces in directory through extracts local binary pattern (LBP) options and count
number of faces in video through binary tree classifier. Finally, it shown range of persons present
within the scene. After that it matches the faces present in the test folder and then identity the person
name and address. The database contains 75 student information’s which is manually created and can
be increase and decrease depend on student take admission in institute.
KEYWORDS
Attendance using facial Recognition GUI program, facial Recognition, Classification algorithm,
binary tree classifier, extracts LBP features.
3.
Attendance Using FacialRecognition Page 3
1.2 INTRODUCTION
Any organization like school, college, industry, or business and so on. The attendance plays an
important role in such kind of organisations and due to time consuming process also it requires
manpower [3] and finical resources. So we have to think about a scenario where each student in an
classroom call one by one for recording their presence and absence in school register sheet. This issues
is solved by an automated face recognition system. There are some automatic attendances creating
system that are presently utilized by abundant establishment. One of such system is biometric
technique. Although it's automatic and a step earlier than ancient methodology it fails to satisfy the
time constraint. This project introduces attending marking system, devoid of any kind of interference
with the normal teaching procedure. The system is often conjointly enforced throughout examination
sessions or in alternative teaching activities wherever attending is extremely essential. This system
eliminates classical student identification like career name of the scholar, or checking individual
identification cards of the scholar, which might not solely interfere with the continuing teaching
process, but also can be stressful for students during examination sessions.
The attendance is most important in student point of view because if the student fail to attend classes
it may not allow to sit in the examination which will more important. Regarding teacher point of view,
it takes time to maintain attendance record which will also effect on teaching time. But make record of
attendance it is compulsory and mandatory in each and every organisation. There are many techniques
developed day by day for marking record of attendance like, biometric eye recognition, fingerprint
recolonization, and most important face recognition. Face Recognition is related to image processing
which will performs very well in low light condition. Our old system which include manual process
are facing some serious issues like, manipulation, loss of records, more time require, fake attendance.
The use of pen and paper also cause to damage in environment. The automated face recognition system
is more accurate and secure. Now a day people are moving towards paperless work and more like to
digitalised.
4.
Attendance Using FacialRecognition Page 4
Figure 1.1: Flow chart.
LBP
START
INPUT
VIDEO
DETECT
FACE
LBP
COUNT NO OF PERSON
USING TREE CLASIFIER
If else condition
apply
STOP
NO
YES
5.
Attendance Using FacialRecognition Page 5
On this paper, local binary pattern and decision tree classifier algorithm is used to implement the
proposed work. Below are the steps involved in the project.
Step #1: Read the video in MP4, MOV,
Step #2: Detect face in each frame
Step #3: Store face with it LBP features.
Step #4: Count the total number of faces using tree classifier.
Step #5: If yes, then Show the detail of person with database.
Step #6: If no, then message is prompt. Person is not valid
The basic application of face recognition is person identification or verification system is used in
school, hospital, corporate and at the customs authorities on an airport. A face recognition system could
replace by the current unreliable and outdated system identification methods. There are several
methods which already used for attendance like entering the pin code into attendance system, using
password for the attendance system, using id card for the attendance system. The disadvantage of
methods like these is that they rely on the cooperation of the participants, whereas a person
identification system based on the analysis of (frontal) images of the face can be effective without the
participant’s cooperation or knowledge. Despite of the actual fact that at this moment already varied
of business face recognition systems are in use, this way of identification continues to be an interesting
topic for researchers. This is thanks to the actual fact that this system performs well below
comparatively easy and controlled environments, but perform much worse when variations in different
factors are present, such as pose, viewpoint, facial expressions, time when the pictures are made.
6.
Attendance Using FacialRecognition Page 6
1.3 LITERATURE REVIEW
The basic process of person identification by using face recognition can be into four main sections as
shown in figure 1.1. These are detection and normalization, feature extraction such as Histograms of
Oriented Gradients (HOG), Scale Invariant Feature Transform (SIFT), Speed-up robust features
(SURF) and Local binary pattern (LBP) and classification using decision tree classifier. In the face
detection and normalization part, the video frame image is scaled and rotated till and cropped the faces
from the video frames. The figure 1.2 is the Shows the basic operation of face detection using local
binary pattern in which the first step is to detect the face from input data. The input data can be an
image or video. After the input data the face is detected from input data and is normalized according
to user requirement. The feature is extracted in this stage from detected face. The feature extraction
algorithm such as HOG, SURF or LBP etc which is popularly used. The classification stage is the final
stage in which the image facture is matched with the database stored feature. If the feature is matched
with database then it mark as present if it is not matched with the database then it is mark as absent.
Figure 1.2: The original local binary pattern (LBP) operator
FACE
DETECTION
AND
NORMALIZATI
ON
CLASSIFICATION
DATABASE
FEATURE
EXTRATION
7.
Attendance Using FacialRecognition Page 7
RESEARCH PAPER METHOD USED IN PAPER ACCURACY
OF RESULT
FALSE
DETECTION
Yang et al (2002 pp.36-37) Knowledge-Based-Method 83.33% 28
Ryu et al. (2006) [22] Image-Based Method 89.1% 32
Feraud et al. (2001) neural network-based 86.0% 8
Rowley et al. (1998) [23] Neural Network-Based 86.2% 23
Wang et al. (2016) CNN-Based 98.1%
Hjelmås and Low, (2001, p.240) [24] Edge Detection-Based 76% 30
Viola and Jones (2001). [25] Viola-Jones 88.84% 103
Wang et al, (2015, p.318) [26] PCA with SVM) 89% 110
Thai et al. (2011) [27] Canny , PCA, ANN 85.7% N/A
TABLE 1.1: face detection paper with different methods.
8.
Attendance Using FacialRecognition Page 8
1.3.1 Gabor filters
𝑓(𝑟, 𝑡, 𝛽, 𝛿, 𝛾𝑟, 𝛾𝑡) =
1
2𝜋𝛾𝑟,𝛾𝑡
exp[
−1
2
((
𝑟
𝛾𝑟
)2
+ (
𝑡
𝛾𝑡
)2
) + 𝑗𝛽(𝑟 cos 𝜃 +tsin 𝜃)]--------------------------(1)
Where as
𝛾𝐼𝑠 the spatial spread
𝛽 Is the frequency
𝛿 Is the orientation
Gabor filters has been found to be particularly appropriate for image texture representation and
discrimination. From theoretic view point, given by Okajima [8]. derived Gabor functions as solutions
for a certain mutual information maximization problem. It shows that the Gabor receptive field can
extract the maximum information from local image regions. Researchers have also shown that Gabor
features, when appropriately designed, are invariant against translation, rotation, and scale [12]. Gabor
filter could be a linear filter used for edge detection. In spatial domain shown in paper [17], a 2D Gabor
filter is a Gaussian kernel function modulated by a sinusoidal plane wave. The filter incorporates a real
associate degreed an unreal part representing orthogonal directions. The two components may be
shaped into a fancy range or used individually
Real
𝑥(𝑟, 𝑡; 𝜕, 𝛼, ∄, 𝛿, 𝜑) = exp(−
𝑟2+𝑡2
2𝛿2
) cos(2𝜋
𝑟2
𝜕
+ ∄)---------------------------------(2)
Imaginary
𝑥(𝑟, 𝑡; 𝜕, 𝛼, ∄, 𝛿, 𝜑) = exp(−
𝑟2+𝑡2
2𝛿2
) sin(2𝜋
𝑟2
𝜕
+ ∄)---------------------------------(3)
9.
Attendance Using FacialRecognition Page 9
where
𝑟,
= 𝑟 cos ∅ + 𝑟 sin ∅---------------------------------------------------------------------(4)
Gabor filter of the face image is that the result of video frame 𝑉(𝑟, 𝑡) convolution with the bank of
Gabor filters𝑓𝑢,𝑣(𝑟, 𝑡). The convolution result is complex worth which might be rotten to real and
imaginary part:
𝐹𝑢,𝑣(𝑟, 𝑡) = 𝑉(𝑟, 𝑡) ∗ 𝑓𝑢,𝑣(𝑟, 𝑡)-----------------------------------------------(5)
𝑃𝑢,𝑣(𝑟, 𝑡) = 𝑅𝑒𝐹𝑢,𝑣(𝑟, 𝑡)------------------------------------------------------(6)
𝑄 𝑢,𝑣(𝑟, 𝑡) = 𝐼𝑚𝐹𝑢,𝑣(𝑟, 𝑡)------------------------------------------------(7)
𝑆 𝑢,𝑣(𝑟, 𝑡) = √ 𝑃𝑢,𝑣
2 (𝑟, 𝑡) + 𝑄 𝑢,𝑣
2 (𝑟, 𝑡) ------------------------------------------------(8)
∅ 𝑢,𝑣(𝑟, 𝑡) = 𝑎𝑟𝑐 tan (
𝑄 𝑢,𝑣(𝑟,𝑡)
𝑃 𝑢,𝑣(𝑟,𝑡)
)-----------------------------------------------------(9)
10.
Attendance Using FacialRecognition Page 10
1.3.2 Histograms of Oriented Gradients (HOG)
Histograms of Oriented Gradients are generally used in computer vision, pattern recognition and image
processing to detect and recognize visual objects (i.e. faces recognition). They are computed on a dense
grid of cells that overlap local contrast histogram normalizations of image gradient orientations to
improve the detector performance [5]. So that, this feature set performs very well for different form
primarily based object categories (i.e. face detection) because of the distribution of local intensity
gradients, even not any knowledge of the corresponding gradient [4]. To extract HOG descriptors, first
count the occurrences of edge orientations during a native neighborhood of a picture.
video is taken as an input. which is probably given by user. Gradient calculation is used and median
filter to perform filtering by value [1 0 1] [-1 0 -1], the image vertical gradient and horizontal gradient
can be calculated. The input video is converted into a sequence of image frame. This image is divided
into average tiny cell size of 256*256 pixels. Each cell is further divided into four small blocks and
each block size is considering as 2*2 pixels. Using histogram of oriented gradient bar graph is obtained.
The coordinate of the bar graph represents the 13 direction channels elite in step three. Normalization
is the process in which vector is represent and associated with pixels. local contrast is correcting by
block normalization and also normalized histograms of each block cells.
𝐿 𝑟(𝑟, 𝑡) = 𝐾(𝑟 + 1, 𝑡) − 𝐾(𝑟 − 1, 𝑡) ------------------------------------------------(10)
𝐿 𝑟(𝑟, 𝑡) = 𝐾(𝑟, 𝑡 + 1) − 𝐾(𝑟, 𝑡 − 1)---------------------------------------------(11)
𝐿(𝑟, 𝑡) = √𝐿 𝑟
2(𝑟, 𝑡) + 𝐿 𝑡
2
(𝑟, 𝑡) ----------------------------------------------(12)
∅(𝑟, 𝑡) = tan−1
(
𝐿 𝑡(𝑟,𝑡)
𝐿 𝑟(𝑟,𝑡)
) -------------------------------------------------------(13)
11.
Attendance Using FacialRecognition Page 11
Histogram of Oriented Gradient is a algorithm that uses for local reference of coordinate of images,
and by calculating the local direction of gradient. At present, the approach HOG is applied to image
recognition and achieved a good success rate in human face detection.
The HOG feature is based on histogram of oriented gradient. It can not only describe the feature of
face contours, but also be not sensitive to light and small offset. Obtain the human options countenance|
facial expression face expression by combining the features of all blocks in line. Take the input image
of 256*256 as associate example shown in fig eleven shows the procedure of extracting depth image’s
HOG options, we calculate the HOG feature as follows:
1) video is taken as an input. which is probably given by user.
2) Gradient calculation is used and median filter to perform filtering by value [1 0 1] [-1 0 -1], the
image vertical gradient and horizontal gradient can be calculated.
3)The input video is converted into a sequence of image frame. This image is divided into average tiny
cell size of 256*256 pixels. Each cell is further divided into four small blocks and each block size is
considering as 2*2 pixels.
5)Using histogram of oriented gradient bar graph is obtained. The coordinate of the bar graph
represents the 13 direction channels elite in step three.
6) Normalization is the process in which vector is represent and associated with pixels. local contrast
is correcting by block normalization and also normalized histograms of each block cells.
12.
Attendance Using FacialRecognition Page 12
1.3.3 Scale Invariant Feature Transform (SIFT)
Scale Invariant Feature Transform (SIFT)was first proposed by Lowe [6] becomes one of the research
interests for pattern recognition because of its excellent performance on object recognition. The SIFT
method first detects the local key points then stable for pictures in several resolutions and uses scale
and rotation to represent the key-points. SIFT features are quite similar with LBP features with local
histogram patterns representing on the whole face image. Although SIFT has excellent performance in
visual perception, whether it is a good descriptor for face images should be analyzed more. Because
object recognition requires only coarse features whereas face recognition wants rather more
discriminative features. An investigation of SIFT features on face representation has ever been done as
the first decide to analyze the SIFT approach in face analysis context [7].
𝐿(𝑟, 𝑡, Ԁ) = (𝑆(𝑟, 𝑡, 𝑘Ԁ)) − 𝑆(𝑟, 𝑡, Ԁ) ∗ 𝑃(𝑟, 𝑡)
= 𝐽(𝑟, 𝑡, 𝑘Ԁ) − 𝐽(𝑟, 𝑡, Ԁ) -----------------------------------------(14)
Then local maxima and minima of 𝐿(𝑟, 𝑡, Ԁ) are computed based on comparing each sample point to
its eight neighbors in current image and nine neighbors in the scale above and below. At this scale, the
gradient magnitude 𝑔(𝑟, 𝑡) , and ∅(𝑟, 𝑡)orientation, , is computed using pixel differences in Thereafter,
an orientation is determined by building a histogram of gradient orientations weighted by the gradient
magnitudes from the key-point’s neighborhood and it is assigned to each interest point combined with
the scale above and provides a scale and rotation invariant coordinate system for the descriptor
𝑔(𝑟, 𝑡) = √(𝐽(𝑟 + 1𝑡) − 𝐽(𝑟 − 1𝑡))2+(𝐽(𝑟, 𝑡 + 1) − 𝐽(𝑟, 𝑡 − 1))2 -------------------------------------(15)
∅(𝑟, 𝑡) = tan−1 ((𝐽(𝑟, 𝑡 + 1) − 𝐽(𝑟, 𝑡 − 1))
(𝐽(𝑟 + 1𝑡) − 𝐽(𝑟 − 1𝑡))⁄ ------------------------------------(16)
13.
Attendance Using FacialRecognition Page 13
Scale Invariant Feature Transform Descriptor, proposed by David Lowe, permits the local matching
between different images by using the invariants Key points which are robust to scale and rotation. The
SIFT Descriptor’s calculation could be accomplished in four steps:
1) Detecting the potential Key points in the image by using the Gaussian of difference (GoD). The
Gaussian of difference is represented by Equation 17 which is shown below.
𝐺𝑜𝐷(𝑙, 𝑚, ∅) = [𝐷(𝑙, 𝑚, 𝑘∅)] − [𝐷(𝑙, 𝑚, ∅)] ∗ 𝐼(𝑙, 𝑚) ---------------------------------(17)
𝐷( 𝑙, 𝑚, ∅) =
1
2𝜋∅2 𝑒
(𝑙2+𝑚2)
2∅2
----------------------------------------------------(18)
Whereas the parameter is used in Equation 18 are given below
D is representing for Gaussian kernel,
k is the scale factor,
𝐼(𝑙, 𝑚) is the source image.
2) The Key points that present a maximum or minimum are stable so we keep them. The other points
are instable and they’re rejected.
3) An orientation and magnitude is assigned to each key point.
4) Each key point is coded into a vector with a 128 dimensions which is invariant to scale, rotation and
illumination changes.
So basically when we apply the SIFT algorithm on the image, we detect a certain number of Key points
N that describes the image. On one hand the quantity of key points depends on the SIFT parameters
such as number of octaves, edge threshold and kernel Gaussian and so on. On the other hand on the
image type such as RGB, gray-scale, depth map and binary. All key points are gathered in a matrix
named SIFT matrix, in which the number of columns is set on 128, and the number of lines equals N.
After that the K-means algorithm transforms the SIFT matrix of RGB, Saliency map and LTB images
into vectors. These vectors are then concatenated in a single vector which will be used in the
classification.
14.
Attendance Using FacialRecognition Page 14
1.3.4 Speed-up robust features (SURF)
SURF in full form written as speed up robust features may be a scale and in-plane rotation invariant
feature. The SURF [18] feature is invariant to rotation, scale, brightness. For the application of face
recognition, invariance with respect to rotation is often not necessary. Therefore, we have used the
upright version of the SURF descriptor. The Speed up robust features algorithm interest point detector
is find by computing integral image and then apply 2nd derivative (approximate) filters to image Non-
maximal suppression. To find local maxima in (x,y,s) space the Quadratic interpolation Interest point
descriptor is used. The window is divided into 4*4 matrix (16 sub windows Compute Haar wavelet
outputs Within each sub window, This yields a 64-element descriptor. For 9x9 filter, l0 = 3
and the length of positive or negative lobe in direction of derivative. To keep central pixel, must
increase l0 by minimum of 2 pixels increase filter dimension by 6 Therefore, sizes of filter will be in
this 9x9, 15x15, 21x21, 27x27.
Once interest point has been found
– Place window around point
– Divide into 4x4 sub windows
– In each sub window,
• measure at 25 (5x5) places: dx and dy
sum over all 25 places to get 4 values:
15.
Attendance Using FacialRecognition Page 15
Figure 1.3: Speed-up robust features example
• First octave filter sizes: 9, 15, 21, 27
• Second octave sizes: 15, 27, 39, 51
– Increase by 12 each time (not 6)
– Spans from 21 (s=1.2*21/9=2.8)
to 45 (s=1.2*45/9=6)
(some overlap with first octave)
– Ok to measure at every other pixel in image (saves computation, like down sampling)
• Third octave sizes: 27, 51, 75, 99
– Increase by 24 each time
– Spans from
39 (s=1.2*39/9=5.2)
to 87 (s=1.2*87/9=11.6)
Attendance Using FacialRecognition Page 17
1.4 METHODOLOGY
Figure 1.6: The basic face detection methodology and classification.
The face detection is basically categories in two types. first one is feature base and second one is image
base. The feature base is subdivided in low level analysis and feature analysis. The low level are again
subdivided in two types skin color and edge detection. Feature analysis is subdivided into three types
LBP, viola jones and gabor feature. The image base is divided into two types neural network and
statistical approach. The statistical approach is again sub divided into DTC, PCA, and SVM. In this
paper we are demonstrating the combination of local binary pattern(LBP) and decision tree
classifier(DTC) which are explained below in the section 1.4.1 and 1.4.2.
FACE DETECTION
FEATURE BASE IMAGE BASE
FEATURE
ANALYSIS
LOW LEVEL
ANALYSIS
EDGE
DETECTION
SKIN COLOR
GABOR
FEATURE
VIOLA JONES
NEURAL
NETWORKS
PCA
SVM
DTCLBP
STASTISTICAL
APPROACH
18.
Attendance Using FacialRecognition Page 18
1.4.1 Local Binary Patterns
Local binary patterns (LBP) were first introduced by Ojala et al [9] and it describe about scale
texture descriptor. The figure 1.7 shows the basic operation of the local binary pattern. First consider
a image having in the form of 3*3 matrix in which central pixel is consider as a reference to their
corresponding neighbour pixels.
In general setting, a LBP operator assigns a decimal number to a pair (𝑔, 𝑐𝑖)
𝑅 =∑ 2
𝑙−1
𝐼(𝑔, 𝑐𝑖)𝑠
𝑙=1 ---------------------(19)
Whereas g represents the middle pixels, 𝑐 = (𝑐1 … … . . 𝑐 𝑛) corresponds to a collection of pixels
sampled from neighborhood of g.
𝐼( 𝑔, 𝑐𝑖) ={
1𝑖𝑓𝑔 < 𝑐𝑖
0𝑜𝑡ℎ𝑒𝑟𝑤𝑖𝑠𝑒
----------(20)
Wang has used both local binary pattern (LBP) with Histogram of Oriented Gradients (HOG)
descriptor to improve detection performance in his paper [10]. In the figure 1.7 the 4 is taken as central
pixel by using this central pixel value we can find its neighbourhood pixel values [11]. If the value of
central pixel is greater than its neighbourhood pixel then it is consider as one (1) otherwise if the central
pixel is smaller than its neighbourhood pixel then it is consider as zero (0).
Figure 1.7: local binary pattern (LBP) operator example.
6 1 8
2 4 7
5 9 3
1 0 1
0 1
1 1 0
Threshold
19.
Attendance Using FacialRecognition Page 19
L=12 M=2.5
L=16 M=4
Let us consider the clockwise scenario. The neighbourhood pixel 6 in figure 1.7 is greater than
central pixel 4 so it is considering as one. Similarly, the neighbourhood pixel 1 is smaller than central
pixel 4 so it is considering as zero. Now again neighbourhood pixel 8 is greater than central pixel 4 so
it is considering as one and so on in a clockwise direction.
Figure 1.8: LBP Circular neighbor with different values of L, M.
In the figure 1.8 the black and blue are representing the values of L and M. The M is the radius of circle
which is consider as 1, 2.5 and 4 for three different scenarios. The L is the neighbourhood pixel which
is consider as 8, 12 and 16 for three different scenarios. The process of finding the value neighbourhood
pixel is same as explained in figure 1.7.
L=8 M=1
20.
Attendance Using FacialRecognition Page 20
1.4.2 Decision Tree classifier
Decision Trees classifier (DTC) represented by a flowchart like tree structure was introduced by J.
R. Quinlan in 1986 [13]. As the name suggest decision tree algorithm have tree structure module and
used for pattern recognition and classification [14]. Breiman has introduced the Classification and
Regression Tree (CART) algorithm [15]. The decision trees are logic flow and mainly used in discrete
value classifier which is its main advantages but on the other hand it has also some disadvantages which
over sensitivity and irrelevant data with noise [16]. The decision tree is a learning algorithm as long as
we provide different input and train it they perform very well . The Gain ratio is calculated for the
training set attributes for all the features. It is a tree structure as shown in figure 1.9 example in which
it has three main parts. The first one is root the second one is subset and the last is leaf node. The root
work is to collect different data given by the user. Then the data is trained in the subset section. In
subset section they are trained in same attribute or may have different attribute. The leaf section is
created by repeating the section one and section two.
Information Entropy is defined as:
𝛽(𝑇) = − ∑ 𝐺𝑗 log2 𝐺𝑗
𝑟
𝑗=0 ------------------------------------------(21)
Where as,
T is the test data .
m is the sample set. I = 1,2,3……r
𝐺𝑗 𝐺𝑗𝑖are the proportions:
𝐺𝑗 = 𝑚𝑗/[𝑇]
𝐺𝑗𝑖 = 𝑚𝑗𝑖/[𝑇𝑗]
21.
Attendance Using FacialRecognition Page 21
Figure 1.9: decision tree classifier basic structure.
NODE 4
NODE 1
NODE 2
NODE 3
Root of tree
I J K
subset
Leaf node
22.
Attendance Using FacialRecognition Page 22
1.4.3 Technical Requirements
In this paper hardware and software play a major role. Regarding hardware, a standard computer needs
to be installed and placed in the school office room where student is entered. Camera must be
positioned in the office room to obtain the video with 25 fps and resolution 512 by 512 pixels.
Secondary memory s needed to store all the images and video database. Software requirements
MATLAB Version R2018a and Windows 10 is used with i3processor speed with quad-core 3.33 GHz
CPU and 2GB RAM.
23.
Attendance Using FacialRecognition Page 23
1.5 RESULT AND DISCUSSION
The below figure1.8 shows the GUI which is built in matlab2018a version for attendance using face
recognition system. The first step is to input a proper supported format video with carefully chosen
frame rate of video. After that it will automatically detect face in video and store that face in a folder
called people. Once this step is over we need to go to count button. The count is basically count the
number of faces or person by using decision tree classifier. The last step is to identify for that we need
to go people identify button. When we press the people identify button it will match the identity of
faces with stored database and show the result according to that. If the person is valid then their name,
address will be shown if the person is not valid then message will be prompt person is not valid.
Figure 1.10: GUI for Attendance using facial Recognition System.
24.
Attendance Using FacialRecognition Page 24
The below figure1.10 shows the database which is manually created by changing in matlab2018a
version command program. The face image is first stored in the folder called as data. In the data folder
total 76 face is stored and their name and address is manually input by the program developer. The face
image must be in RGB colour and JPG file format with sequence numbers. The face used in this
database is usually collected from different students with mobile camera. The input sample video used
in this project is download from internet.
Figure 1.11: Database created by input video.
The first step of project is to input source video file from database. The video file input will be from
the database, it does not support input directly with a webcam. If video file is loading from the database,
the figure 1.11 functionality is shown. The “uigetfile” on line 84 is an algorithm in MATLAB that will
load video file of MP4, MOV type format is supported and the “strcat” on line 86 adds the filename
that will read the video using the Matlab 2018a version “VideoReader” command is used on line 90 to
read the video in avi file format.
25.
Attendance Using FacialRecognition Page 25
Figure 1.12: Input video from static source Folder/Database.
After video read by matlab in a sequence of n number of frame the vision.CascadeObjectDetector();
command in line no 95 is used for detect the face in an each frame. The delete('.People*.jpg'); is used
in line 101 for the purpose of deleting the old data. Then by using for loop in command line no 102
input video is read and display on axis no 1. The detected face is drown a border line and shown to
users. In line no 111 “imresize” command is used to resize the detected face in 128 * 128 format. The
imwrite(im2,fn); is used to write the image in jpg format in people folder.
26.
Attendance Using FacialRecognition Page 26
Figure 1.13: Count total no of people faces in video.
The count is the second steps where the face data created in folder people in first step is going to read
all faces one by one in a sequence manner. The dn1=strcat(dn,'*.jpg'); command is used to read face
image from people folder. The for loop is used in line no 146 in which image is read and shown in axis
no2 after reading lbp_sir(im); command is use in line 152 which basically a local binary pattern
function. The axis 3 represent local binary pattern result. The NetTree=[]; command is used for decision
tree classification algorithm.
27.
Attendance Using FacialRecognition Page 27
Figure 1.14: People identify.
The people identify callback has been embedded by the same gui. However, because the requirement
requested to display the input image side by side with the matched corresponding detail like address , name.
Figure 1.15: Restart the program.
The command line no 416-418 is used for restarting the program and the command clc used for clear
the command window the clear all function is to clear the history and close all will close all currently
running program which is also act as exit button as shown in figure 1.15
Figure 1.16: Exit the GUI.
28.
Attendance Using FacialRecognition Page 28
Figure 1.17: Decision tree classification result.
29.
Attendance Using FacialRecognition Page 29
1.6 CONCLUSION
In this paper various analysis of face detection, classification and feature extraction is discussing and
closely examine through database taken from record video and uses function from system identification
to detect faces. The type of examination conduct such as local binary pattern and decision tree
classification. The graphical user interface is created using matlab2018a version software. The
graphical user interface takes input video through user and detect faces then count no of people present
in the video after that it show result according to database created by the user and examine the result.
Experimental results closely examine and show that the technique used in this paper successfully
identifies face of person and matches with the database.
In the future work we can combine more feature extraction algorithm with same classifier to do more
research. By using different methods, we can achieve more accurate and sophisticate result. In order to
implement new technique and method more time is required. In future work the parameter is used in
finding local binary pattern of image can be improving and change. The graphical user interface is built
in matlab and can be easily modify so in future we convert this graphical user interface in a app builder
in standalone form so it is more secure and difficult to modify. Also user id and password section can
be implement in GUI which create additional security in this system. The database is created manually
by the organization staffs so it very important regarding data confidentiality. It is very important to
inform the persons that their face is used for the purpose of face attendance system. In this project face
data is created by persons face for experimental purpose but the real scenario will be totally different.
The figure 1.18 shows the gantt chat of the project. Basically this is implement in seven phases which
shows in gantt chat. The actual time taken to complete the project is representing by orange color bar
and the estimate time is representing by blue colour. The initial planning is made in the month of
December which include study of various algorithm related to face recognition. The next section in
GUI design which is develop in January month which include installation of matlab software and basic
learning to make a GUI. Data base creation involve collection of face of various students. The
algorithm implementation is the most difficult part of the project which include advance study of
matlab code and implement of proper algorithm. After implementation connection is made between
algorithm and GUI. Code optimization is very necessary for every project because it reduce the
30.
Attendance Using FacialRecognition Page 30
execution time of project and also remove some error if exist. Report preparation is the final stage of
project.
Figure 1.18: Gantt chat.
25 March22 February15 January12 December
Estimate completion dates actual completion dates
Initial planning
GUI design
Database creation
Algorithm implement
(LBP & DTC)
Establish connection
between GUI and Algorithm
Code optimization
Report preparation
31.
Attendance Using FacialRecognition Page 31
References
[1]. Kyungnam Kim “Face Recognition using Principle Component Analysis”, Department of
Computer Science, University of Maryland, College Park, MD 20742, USA..
[2]. H.K.Ekenel and R.Stiefelhagen,Analysis of local appearance based face recognition: Effe
cts of feature selection and feature normalization. In CVPR Biometrics Workshop, New York, USA,
2006.
[3] Bhumika G. Bhatt, Zankhana H. Shah “Face Feature Extraction Techniques: A Survey”, National
Conference on Recent Trends in Engineering & Technology, 13-14 May 2011..
[4]. Dr. Nita Thakare , Meghna Shrivastava , Nidhi Kumari ,Neha Kumari , Darleen Kaur , Rinku Singh
.”Face Detection And Recognition For Automatic Attendance System.” International Journal of
Computer Science and Mobile Computing, Vol.5 Issue.4,.
[5]. Cohen L (1989) Time–frequency distributions a review. Proc IEEE 77(7):941–981.
[6]. D. Lowe, “Distince image features from scale-invariant keypoints,” Int. Journal of Computer
Vision, vol.60, no.2, pp.91-110, 2004
[7]. M. Bicego, A. Lagorio, E. Grosso, and M. Tistarelli, “On the use of SIFT features for face
authentication,” Proc. of IEEE Int Workshop on Biometrics, in association with CVPR, NY, 2006
[8]. ] K. Okajima, “Two-dimensional Gabor-type receptive field as derived by mutual information
maximization,” Neural Networks, vol. 11, no. 3, pp. 441–447, 1998.
[9] Ojala, T., Pietik•ainen, M., Harwood, D.: A comparative study of texture measures with
classication based on featured distributions. Pattern Recognition 29 (1996) 51-59.
32.
Attendance Using FacialRecognition Page 32
[10] X. Wang, T. X. Han, and S. Yan, “An HOG-LBP human detector with partial occlusion handling,”
in 2009 IEEE 12th International Conference on Computer Vision, pp. 32–39..
[11]. “Local Binary Patterns: New Variants and Applications.”,” IEEE Transactions, Vol. 61, No. 4,
pp. 990 – 1001, 2012.
[12]. J.G. Daugman: Uncertainty relations for resolution in space, spatial frequency, and orientation
optimized by two-dimensional visual cortical filters, Journal of the Optical Society of America A, vol.
2, pp. 1160-1169,1985.
[13] J. R. Quinlan, “Induction of decision trees,” vol. 1, no. 1, pp. 81–106..
[14] Automatic Design of Decision-Tree Induction Algorithms — Rodrigo C. Barros — Springer.
[15] L. Breiman, J. Friedman, C. J. Stone, and R. Olshen. Classification and Regression Trees.
.
[16] L. Rokach and O. Maimon, “Top-down induction of decision trees classifiers - a survey,” vol.
35, no. 4, pp. 476–487.
[17]. G. Donato, M.S. Bartlett, J.C. Hager, “Classifying Facial Actions”, IEEE Trans. Pattern Analysis
and Machine Intelligence, Vol. 21, 1999, pp.974-989 .
[18]. H. Bay, A. Ess, T. Tuytelaars, and L. V. Gool, SURF: Speeded Up Robust Features (SURF),
Computer Vision and Image Understanding (CVIU), Vol. 110, No. 3, pp. 346–359, 2008
[19]. H. Bay, A. Ess, T. Tuytelaars, and L. V. Gool, SURF: Speeded Up Robust Features (SURF),
Computer Vision and Image Understanding (CVIU), Vol. 110, No. 3, pp. 346–359, 2008
[20]. Wang, Y., Ai, H., Wu, B., & Huang, C. (2004, August). Real time facial expression recognition
with adaboost. In Proceedings of the 17th International Conference on Pattern Recognition, 2004. ICPR
2004. (Vol. 3, pp. 926-929). IEEE.
33.
Attendance Using FacialRecognition Page 33
[21]. H. Bay, A. Ess, T. Tuytelaars, and L. V. Gool, SURF: Speeded Up Robust Features (SURF),
Computer Vision and Image Understanding (CVIU), Vol. 110, No. 3, pp. 346–359, 2008
[22]. Ryu, H., Chun, S. S. and Sull, S. (2006) 'Multiple classifiers approach for computational
efficiency in multi-scale search based face detection', Advances in Natural Computation, Pt 1, 4221
pp. 483-492.
[23] Rowley, H. A., Baluja, S. and Kanade, T. (1998) 'Neural network-based face detection', Pattern
Analysis and Machine Intelligence, IEEE Transactions on, 20 (1), pp. 23-38.
[24] Hjelmås, E. and Low, B. K. (2001) 'Face Detection: A Survey', Computer Vision and Image
Understanding, 83 (3), pp. 236-274.
[25] Viola, P. and Jones, M. (2001) 'Rapid object detection using a boosted cascade of simple features',
Proceedings of the IEEE Computer Society Conference on Computer Vision and Pattern Recognition,
1 pp. I511-I518.
[26] Wang, K., Song, Z., Sheng, M., He, P. and Tang, Z. (2015) 'Modular Real-Time Face Detection
System', Annals of Data Science, 2 (3), pp. 317-333.
[27] Thai, L. H., Nguyen, N. D. T. and Hai, T. S. (2011) 'A Facial Expression Classification System
Integrating Canny, Principal Component Analysis and Artificial Neural Network', International Journal
of Machine Learning and Computing, 1 (4), pp. 388-393.