SlideShare a Scribd company logo
Industrial Attachment at
“Karim Textiles Limited”
BY,
MD. AHSAN HABIB (191-021-651)
MD. SHUHAIEB AL SAKIB (191-029-651)
MAHIE ISLAM (191-021-651)
Contents
 Company Profile
 Products Type
 Attachment at KTL
 Departments
 Tools and Techniques
 Implementation of 5S
 Production improvement in Lay Spreader Machine
 Cause and Effect Diagram
Company Profile
PURBANI takes pride in their operations
being 100% National and Alliance
Compliant.
Purbani is one of the largest & oldest
established 100% export-oriented Textile
conglomerates in Bangladesh since 1973 and
doing business for more than 4 decades with
eminence.
Purbani Group
Spinning
Karim Spnning
Mils Ltd.
Shohagpur Textile
Mills Ltd.
Purbani Rotor
Spinning Ltd.
Purbani Synthetic
Spinning Ltd.
Dyeing
Purbani Yarn
Dyeing Ltd.
Knitting
Purbani Fabrics
Ltd.
Apparels
Karim Textiles
Ltd.
Purbani Fashion
Ltd.
Agro processing
Purbani Agro
Processing Ltd.
Purbani Fisheries
Traders Purbani Traders
Attachment at KTL
We have completed our attachment at Karim Textiles
Limited in Purbani Group.
Founded in 1988, it carries a rich reputation in garments
manufacturing in the country. Over the last decade it has
evolved from a traditional garment manufacturing unit to a
highly efficient manufacturer with all modern processes
implemented.
The daily cutting capacity is currently 75,000 pieces
(extendable up to 85,000 pieces). Total production capacity
is 70,000 pcs/day (approx.).
Departments at KTL
 Store Department
 CAD Section
 Cutting Department
 Super Shop
 Sewing Section
 Finishing Section
Store
Department
CAD
Section
Cutting
Department
Super Shop
Sewing
Section
Finishing
Section
Machinery & Equipment
The sewing section has m/c combination of Juki and Pegasus,
which can make 75,000 pcs per day. Machines used by KTL are -
 Sewing Section: Plain, Over Lock, Flat Lock, Button Hole,
Button Stitch, Snap Button Attaching machines etc.
 Cutting section: It has 5 European automatic fabric spreading
machine, 2 robotic auto-cutters & 2 Straight Knife Cutters, 3
Relaxation Machine, 11 Heat Cell machine, 1 Fusing machine,
Numbering Machines etc.
 CAD Section: It has Winda Inkjet Plotter Machine, Lead Inject
Vertical Cutting Plotter & Plotter cutting machine.
 Finishing section: Sucker Machine & Metal Detector Machine.
Tools and Techniques
 Traffic Light System/ 7pcs Garments System
 Lean Manufacturing
 KANBAN
 Six Sigma
 5S
 KAIZEN
 Standard Operating Procedure (SOP)
 Line Balancing
 Consumption, SMV, Efficiency Calculation & Ratio Solving Processes
 Line Target
 D.H.U.
Implementation of 5S
In store section there are several quantities
of plastic plate is present for storing fabrics
batches. Such plates should not be used
instead of racks. This is because these plates
do not have the same capacity like other
normal racks used in the store section. Also,
it becomes very difficult to find a specific
batch when needed. A lot of time is being
wasted because of this.
For implementation of 5S we were allowed
for applying 5S in maintenance room.
Before applying 5S After applying 5S
Productivity improvement in Lay Spreader
Machine
After finding less production in Lay Spreader Machine. We brain storm between us and use 5 why
and Cause and Effect diagram tools for finding the root cause of these problem. After completing
those method, we found there are some reasons responsible for these problems. We asked the
supervisor about this problem 5 times. Each time he gives us a different answer. Those are - Refill
time delay, Less Marker, Marker delay, Faulty marker from CAD section, Lack of communication
between Cutting and CAD section.
On the basis of these causes and other surroundings we further analyze these causes under cause-and-
effect diagram to find the root cause of this problem.
the illustration is attested in the next slide.
Cause and Effect Diagram
People Method Environment
Machine Material Management
Low productivity
in ‘Lay Spreader
Machine’
Operator fatigue issues
Employees Mistake
Instructions were not followed
Not Following SOP
Noisy Surroundings
Relax Store Capacity
Improper Relaxation
Misuse of Power
Nepotism
Wrong Setup
Equipment Error
Marker delay
Shortage of Marker Printer
Physical & Emotional Strength
Lack of Training
Lack of Experience
Lack of Education
Behavior at Work
Lack of Analytical Skills
Lack of Motivation
Extra Movement
Not Updating Process
Less Concern About Time Temperature
Humidity
Season
High Machine Sound &
Talkative Co-Workers
Lack of Training
Poor Motivation &
Reward System
Lack of Chain of Command
Multi - Skillen's
Wooden Fabric
High Shrunk of Fabric
Machine Breakdown
Manual Operation
Vibration
Long Waiting Time for Operator
Wrong Working Process
Wrong Planning
Thank You

More Related Content

Similar to Attachment Report Presentation

Welcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets GroupWelcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets Group
MATIUR R. SHEIKH
 
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Nitin kumar
 
OCM Pvt. Ltd. Textile Internship Report
OCM Pvt. Ltd. Textile Internship ReportOCM Pvt. Ltd. Textile Internship Report
OCM Pvt. Ltd. Textile Internship Report
Akansha Choudhary
 
Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysis
Rumman Samrat
 
Internship Report on Garments Merchandising
Internship Report on Garments MerchandisingInternship Report on Garments Merchandising
Internship Report on Garments Merchandising
Aasif Arafat
 
ANALYSIS OF SUPPLY CHAIN MANAGEMENT AT SHUJABAD WEAVING MILL
ANALYSIS OF SUPPLY CHAIN MANAGEMENTAT SHUJABAD WEAVING MILLANALYSIS OF SUPPLY CHAIN MANAGEMENTAT SHUJABAD WEAVING MILL
ANALYSIS OF SUPPLY CHAIN MANAGEMENT AT SHUJABAD WEAVING MILL
KFC
 
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTDINDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
Md. Mazadul Hasan Shishir
 
Momento Company Profile Linkin
Momento Company Profile LinkinMomento Company Profile Linkin
Momento Company Profile Linkin
RinaDShrestha
 
Six sigma project report
Six sigma project reportSix sigma project report
Six sigma project report
mahtabsiddiqui
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
Sharif Mrh
 
Kay & Emms Final report
Kay & Emms Final reportKay & Emms Final report
Kay & Emms Final report
Muhammad Qasim
 
Winter project
Winter projectWinter project
Winter project
Hetal Bhatt
 
Textile internship report
Textile internship reportTextile internship report
Textile internship report
Noorul Islam Saiful
 
Project on Inventory Management
Project on Inventory ManagementProject on Inventory Management
Project on Inventory ManagementHarmandeep0053
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 
Group of garments
Group of garmentsGroup of garments
Group of garments
ridimarakin
 
Final industrial report (SQUARE Textiles Limited)
Final industrial report (SQUARE Textiles Limited)Final industrial report (SQUARE Textiles Limited)
Final industrial report (SQUARE Textiles Limited)
Taukir Kabir Tusar
 

Similar to Attachment Report Presentation (20)

Welcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets GroupWelcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets Group
 
INDUSTRIAL ATTACHMENT OF rupa fabrics ltd.
INDUSTRIAL ATTACHMENT OF rupa fabrics ltd. INDUSTRIAL ATTACHMENT OF rupa fabrics ltd.
INDUSTRIAL ATTACHMENT OF rupa fabrics ltd.
 
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
 
OCM Pvt. Ltd. Textile Internship Report
OCM Pvt. Ltd. Textile Internship ReportOCM Pvt. Ltd. Textile Internship Report
OCM Pvt. Ltd. Textile Internship Report
 
Presentation1Shell
Presentation1ShellPresentation1Shell
Presentation1Shell
 
Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysis
 
Internship Report on Garments Merchandising
Internship Report on Garments MerchandisingInternship Report on Garments Merchandising
Internship Report on Garments Merchandising
 
ANALYSIS OF SUPPLY CHAIN MANAGEMENT AT SHUJABAD WEAVING MILL
ANALYSIS OF SUPPLY CHAIN MANAGEMENTAT SHUJABAD WEAVING MILLANALYSIS OF SUPPLY CHAIN MANAGEMENTAT SHUJABAD WEAVING MILL
ANALYSIS OF SUPPLY CHAIN MANAGEMENT AT SHUJABAD WEAVING MILL
 
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTDINDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
INDUSTRIAL ATTACHMENT OF BISWAS GROUP LTD
 
Momento Company Profile Linkin
Momento Company Profile LinkinMomento Company Profile Linkin
Momento Company Profile Linkin
 
Six sigma project report
Six sigma project reportSix sigma project report
Six sigma project report
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
 
Kay & Emms Final report
Kay & Emms Final reportKay & Emms Final report
Kay & Emms Final report
 
Winter project
Winter projectWinter project
Winter project
 
Textile internship report
Textile internship reportTextile internship report
Textile internship report
 
Project on Inventory Management
Project on Inventory ManagementProject on Inventory Management
Project on Inventory Management
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Group of garments
Group of garmentsGroup of garments
Group of garments
 
Final industrial report (SQUARE Textiles Limited)
Final industrial report (SQUARE Textiles Limited)Final industrial report (SQUARE Textiles Limited)
Final industrial report (SQUARE Textiles Limited)
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Attachment Report Presentation

  • 1. Industrial Attachment at “Karim Textiles Limited” BY, MD. AHSAN HABIB (191-021-651) MD. SHUHAIEB AL SAKIB (191-029-651) MAHIE ISLAM (191-021-651)
  • 2. Contents  Company Profile  Products Type  Attachment at KTL  Departments  Tools and Techniques  Implementation of 5S  Production improvement in Lay Spreader Machine  Cause and Effect Diagram
  • 3. Company Profile PURBANI takes pride in their operations being 100% National and Alliance Compliant. Purbani is one of the largest & oldest established 100% export-oriented Textile conglomerates in Bangladesh since 1973 and doing business for more than 4 decades with eminence. Purbani Group Spinning Karim Spnning Mils Ltd. Shohagpur Textile Mills Ltd. Purbani Rotor Spinning Ltd. Purbani Synthetic Spinning Ltd. Dyeing Purbani Yarn Dyeing Ltd. Knitting Purbani Fabrics Ltd. Apparels Karim Textiles Ltd. Purbani Fashion Ltd. Agro processing Purbani Agro Processing Ltd. Purbani Fisheries Traders Purbani Traders
  • 4. Attachment at KTL We have completed our attachment at Karim Textiles Limited in Purbani Group. Founded in 1988, it carries a rich reputation in garments manufacturing in the country. Over the last decade it has evolved from a traditional garment manufacturing unit to a highly efficient manufacturer with all modern processes implemented. The daily cutting capacity is currently 75,000 pieces (extendable up to 85,000 pieces). Total production capacity is 70,000 pcs/day (approx.).
  • 5. Departments at KTL  Store Department  CAD Section  Cutting Department  Super Shop  Sewing Section  Finishing Section Store Department CAD Section Cutting Department Super Shop Sewing Section Finishing Section
  • 6. Machinery & Equipment The sewing section has m/c combination of Juki and Pegasus, which can make 75,000 pcs per day. Machines used by KTL are -  Sewing Section: Plain, Over Lock, Flat Lock, Button Hole, Button Stitch, Snap Button Attaching machines etc.  Cutting section: It has 5 European automatic fabric spreading machine, 2 robotic auto-cutters & 2 Straight Knife Cutters, 3 Relaxation Machine, 11 Heat Cell machine, 1 Fusing machine, Numbering Machines etc.  CAD Section: It has Winda Inkjet Plotter Machine, Lead Inject Vertical Cutting Plotter & Plotter cutting machine.  Finishing section: Sucker Machine & Metal Detector Machine.
  • 7. Tools and Techniques  Traffic Light System/ 7pcs Garments System  Lean Manufacturing  KANBAN  Six Sigma  5S  KAIZEN  Standard Operating Procedure (SOP)  Line Balancing  Consumption, SMV, Efficiency Calculation & Ratio Solving Processes  Line Target  D.H.U.
  • 8. Implementation of 5S In store section there are several quantities of plastic plate is present for storing fabrics batches. Such plates should not be used instead of racks. This is because these plates do not have the same capacity like other normal racks used in the store section. Also, it becomes very difficult to find a specific batch when needed. A lot of time is being wasted because of this. For implementation of 5S we were allowed for applying 5S in maintenance room. Before applying 5S After applying 5S
  • 9. Productivity improvement in Lay Spreader Machine After finding less production in Lay Spreader Machine. We brain storm between us and use 5 why and Cause and Effect diagram tools for finding the root cause of these problem. After completing those method, we found there are some reasons responsible for these problems. We asked the supervisor about this problem 5 times. Each time he gives us a different answer. Those are - Refill time delay, Less Marker, Marker delay, Faulty marker from CAD section, Lack of communication between Cutting and CAD section. On the basis of these causes and other surroundings we further analyze these causes under cause-and- effect diagram to find the root cause of this problem. the illustration is attested in the next slide.
  • 10. Cause and Effect Diagram People Method Environment Machine Material Management Low productivity in ‘Lay Spreader Machine’ Operator fatigue issues Employees Mistake Instructions were not followed Not Following SOP Noisy Surroundings Relax Store Capacity Improper Relaxation Misuse of Power Nepotism Wrong Setup Equipment Error Marker delay Shortage of Marker Printer Physical & Emotional Strength Lack of Training Lack of Experience Lack of Education Behavior at Work Lack of Analytical Skills Lack of Motivation Extra Movement Not Updating Process Less Concern About Time Temperature Humidity Season High Machine Sound & Talkative Co-Workers Lack of Training Poor Motivation & Reward System Lack of Chain of Command Multi - Skillen's Wooden Fabric High Shrunk of Fabric Machine Breakdown Manual Operation Vibration Long Waiting Time for Operator Wrong Working Process Wrong Planning