The document summarizes pre- and post-dam agricultural activities and irrigation development plans around the Akosombo and Kpong dams in Ghana. Before the dams, flood recession farming occurred on 51,800 hectares and dry season flows were insufficient for irrigation. After the dams, rainfed farming and small-scale irrigation increased, along with large-scale public and private irrigation projects totaling over 6,500 hectares. Planned irrigation development includes expansion of projects on the Kpong left bank, Kpong right bank, and Accra Plains totaling up to 150,000-200,000 hectares. Target values are identified for flood recession agriculture, irrigation water supply, and domestic water use in Accra and other areas