The document summarizes information about the Mangla Dam located in Pakistan. It describes how the dam was constructed between 1961-1965 across the Jhelum River to strengthen Pakistan's irrigation system and reduce agricultural shortcomings. It cost Rs15.587 billion to build and displaced over 110,000 people. The dam initially had a reservoir capacity of 7.25 billion cubic meters but sedimentation reduced this. A raising project from 2004-2009 increased the dam height and storage capacity.
This presentation covers an imaginary design of diversion dam in Tarbela dam Pakistan. The design covers all the prospects of dam engineering, from basics dam planning to construction.
Summer internship Project on Sangam barrage working procedure,PANEM SRINIVASULU
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Annnamayya Dam presentation made on behalf of Executive Engineer, Annamayya Project Division, Kadapa. At present Permanent Restoration of the dam is under progress
This presentation covers an imaginary design of diversion dam in Tarbela dam Pakistan. The design covers all the prospects of dam engineering, from basics dam planning to construction.
Summer internship Project on Sangam barrage working procedure,PANEM SRINIVASULU
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Annnamayya Dam presentation made on behalf of Executive Engineer, Annamayya Project Division, Kadapa. At present Permanent Restoration of the dam is under progress
The Maithon Dam is 48 km from Dhanbad, in the state of Jharkhand.
DVC is the first-ever multipurpose river valley project of independent India
DVC has been generating, transmitting & distributing electrical energy since 1953
Discussion on types of soil, floods, interlinking of rivers, fisheries etc
Problems faced in Maithon dam in respect of power generation, sedimentation.
Preventive measures to be taken for sedimentation.
Warsak Hydroelectric Project is located on River Kabul at about 30 KM from Peshawar in Distt. Peshawar (KPK). The Project was completed under Colombo Plan in two phases, financed by Canadian Government.
Explore our comprehensive data analysis project presentation on predicting product ad campaign performance. Learn how data-driven insights can optimize your marketing strategies and enhance campaign effectiveness. Perfect for professionals and students looking to understand the power of data analysis in advertising. for more details visit: https://bostoninstituteofanalytics.org/data-science-and-artificial-intelligence/
Techniques to optimize the pagerank algorithm usually fall in two categories. One is to try reducing the work per iteration, and the other is to try reducing the number of iterations. These goals are often at odds with one another. Skipping computation on vertices which have already converged has the potential to save iteration time. Skipping in-identical vertices, with the same in-links, helps reduce duplicate computations and thus could help reduce iteration time. Road networks often have chains which can be short-circuited before pagerank computation to improve performance. Final ranks of chain nodes can be easily calculated. This could reduce both the iteration time, and the number of iterations. If a graph has no dangling nodes, pagerank of each strongly connected component can be computed in topological order. This could help reduce the iteration time, no. of iterations, and also enable multi-iteration concurrency in pagerank computation. The combination of all of the above methods is the STICD algorithm. [sticd] For dynamic graphs, unchanged components whose ranks are unaffected can be skipped altogether.
As Europe's leading economic powerhouse and the fourth-largest hashtag#economy globally, Germany stands at the forefront of innovation and industrial might. Renowned for its precision engineering and high-tech sectors, Germany's economic structure is heavily supported by a robust service industry, accounting for approximately 68% of its GDP. This economic clout and strategic geopolitical stance position Germany as a focal point in the global cyber threat landscape.
In the face of escalating global tensions, particularly those emanating from geopolitical disputes with nations like hashtag#Russia and hashtag#China, hashtag#Germany has witnessed a significant uptick in targeted cyber operations. Our analysis indicates a marked increase in hashtag#cyberattack sophistication aimed at critical infrastructure and key industrial sectors. These attacks range from ransomware campaigns to hashtag#AdvancedPersistentThreats (hashtag#APTs), threatening national security and business integrity.
🔑 Key findings include:
🔍 Increased frequency and complexity of cyber threats.
🔍 Escalation of state-sponsored and criminally motivated cyber operations.
🔍 Active dark web exchanges of malicious tools and tactics.
Our comprehensive report delves into these challenges, using a blend of open-source and proprietary data collection techniques. By monitoring activity on critical networks and analyzing attack patterns, our team provides a detailed overview of the threats facing German entities.
This report aims to equip stakeholders across public and private sectors with the knowledge to enhance their defensive strategies, reduce exposure to cyber risks, and reinforce Germany's resilience against cyber threats.
Adjusting primitives for graph : SHORT REPORT / NOTESSubhajit Sahu
Graph algorithms, like PageRank Compressed Sparse Row (CSR) is an adjacency-list based graph representation that is
Multiply with different modes (map)
1. Performance of sequential execution based vs OpenMP based vector multiply.
2. Comparing various launch configs for CUDA based vector multiply.
Sum with different storage types (reduce)
1. Performance of vector element sum using float vs bfloat16 as the storage type.
Sum with different modes (reduce)
1. Performance of sequential execution based vs OpenMP based vector element sum.
2. Performance of memcpy vs in-place based CUDA based vector element sum.
3. Comparing various launch configs for CUDA based vector element sum (memcpy).
4. Comparing various launch configs for CUDA based vector element sum (in-place).
Sum with in-place strategies of CUDA mode (reduce)
1. Comparing various launch configs for CUDA based vector element sum (in-place).
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...pchutichetpong
M Capital Group (“MCG”) expects to see demand and the changing evolution of supply, facilitated through institutional investment rotation out of offices and into work from home (“WFH”), while the ever-expanding need for data storage as global internet usage expands, with experts predicting 5.3 billion users by 2023. These market factors will be underpinned by technological changes, such as progressing cloud services and edge sites, allowing the industry to see strong expected annual growth of 13% over the next 4 years.
Whilst competitive headwinds remain, represented through the recent second bankruptcy filing of Sungard, which blames “COVID-19 and other macroeconomic trends including delayed customer spending decisions, insourcing and reductions in IT spending, energy inflation and reduction in demand for certain services”, the industry has seen key adjustments, where MCG believes that engineering cost management and technological innovation will be paramount to success.
MCG reports that the more favorable market conditions expected over the next few years, helped by the winding down of pandemic restrictions and a hybrid working environment will be driving market momentum forward. The continuous injection of capital by alternative investment firms, as well as the growing infrastructural investment from cloud service providers and social media companies, whose revenues are expected to grow over 3.6x larger by value in 2026, will likely help propel center provision and innovation. These factors paint a promising picture for the industry players that offset rising input costs and adapt to new technologies.
According to M Capital Group: “Specifically, the long-term cost-saving opportunities available from the rise of remote managing will likely aid value growth for the industry. Through margin optimization and further availability of capital for reinvestment, strong players will maintain their competitive foothold, while weaker players exit the market to balance supply and demand.”
Opendatabay - Open Data Marketplace.pptxOpendatabay
Opendatabay.com unlocks the power of data for everyone. Open Data Marketplace fosters a collaborative hub for data enthusiasts to explore, share, and contribute to a vast collection of datasets.
First ever open hub for data enthusiasts to collaborate and innovate. A platform to explore, share, and contribute to a vast collection of datasets. Through robust quality control and innovative technologies like blockchain verification, opendatabay ensures the authenticity and reliability of datasets, empowering users to make data-driven decisions with confidence. Leverage cutting-edge AI technologies to enhance the data exploration, analysis, and discovery experience.
From intelligent search and recommendations to automated data productisation and quotation, Opendatabay AI-driven features streamline the data workflow. Finding the data you need shouldn't be a complex. Opendatabay simplifies the data acquisition process with an intuitive interface and robust search tools. Effortlessly explore, discover, and access the data you need, allowing you to focus on extracting valuable insights. Opendatabay breaks new ground with a dedicated, AI-generated, synthetic datasets.
Leverage these privacy-preserving datasets for training and testing AI models without compromising sensitive information. Opendatabay prioritizes transparency by providing detailed metadata, provenance information, and usage guidelines for each dataset, ensuring users have a comprehensive understanding of the data they're working with. By leveraging a powerful combination of distributed ledger technology and rigorous third-party audits Opendatabay ensures the authenticity and reliability of every dataset. Security is at the core of Opendatabay. Marketplace implements stringent security measures, including encryption, access controls, and regular vulnerability assessments, to safeguard your data and protect your privacy.
2. SDC Presentation Competition | 2021
MANGLA DAM
• MANGLA DAM is a multipurpose dam situated on
the Jhelum River in the Mirpur District of Azad
Jammu and Kashmir, Pakistan.
• It is the seventh-largest dam in the world.
• In November 1961, it was announced that Binnie &
Partners, a British engineering firm, were going to
serve as the lead designers, engineers and
inspectors for construction of the dam
Introduction
3. • India gained rights to the waters of the Ravi, Sutlej,
and Beas rivers.
• While Pakistan received the rights to develop the
Jhelum, Chenab and Indus river basins
• The agricultural yield was very low for a number of
reasons, the most significant being a lack of water
during critical growing periods.
• This Dam was the first of the two dams constructed
to reduce this shortcoming and strengthen the
irrigation system of the country, other is Tarbela
Dam Swabi, KPK.
INDUS WATERS TREATY- 1960
IMPORTANT ISSUE
SDC Presentation Competition | 2021
Backgroud
4. • ₨15.587 billion = US$ 1.473 billion
• funding is provided by the World Bank and the
Asian Development Bank.
• The dam was constructed between 1961 and 1965
across the Jhelum River in the Mirpur District of
Azad Kashmir
• A Reservoir
• Main Embankment
• Intake Embankment
• Main Spillway
• 5 tunnels
• A Power Station
COST
RESERVOIR
DAM COMPONENTS INCLUDE
Construction
SDC Presentation Competition | 2021
5. SDC Presentation Competition | 2021
Displacement &
Resettlement
• The Government of Pakistan had agreed to pay
royalties to the Government of AJK (Azad Jammu and
Kashmir) for the use of the water and electricity
generated by the dam.
• Over 280 villages and the towns of Mirpur and Dadyal
were submerged and over 110,000 people were
displaced from the area as a result of the dam being
built.
• There are 747,000 Mirpuris in the United Kingdom
and there are 70% of the Mirpuris are present in the
British Pakistani community.
6. • Mangla reservoir had an initial reservoir capacity of
7.25 billion cubic meters (5.88 million acre-feet),
which reduced to 5.77 billion cubic meters(4.674
million acre-ft) in 2005 due to the sedimentation.
• Mangla Dam Raising Project was started in 2004
and the main dam, spillway, and its allied works
were completed in 2009 at a cost of Rs. 101.384
billion.
• This project effectively raised:
- Dam height by 30 feet to 482 feet (147 m),
- water conservation level from 1202 feet to
1242 feet.
REASON
CONTRACT
Mangla Dam
Raising Project
SDC Presentation Competition | 2021
7. • This increased the dam's storage capacity from 5.56 to
9.12 billion m3 (4.51 to 7.39 million acre-ft).
• after raising the height of the Mangla Dam by 30 feet,
the powerhouse will generate 12 percent additional
energy per year which will increase its installed capacity
from 1,000 MW to 1,120 MW.
• The Mangla Dam Raising Project, however, has affected
more than 40,000 people. The total cost of
compensation and resettlement was Rs. 70 billion.
• The resettlement project includes the construction of
- New Mirpur City,
- Four satellite towns,
- The Mirpur Bypass and
- Two bridges across River Jehlum and Bong Canal.
Mangla Dam
Raising Project
SDC Presentation Competition | 2021
8. • In November 2012, United States announced a
grant of $150 million for the expansion of the
Mangla Dam powerhouse. Under the project, $400
million would be spent on the Mangla Dam
powerhouse which is estimated to provide
additional production for the next 40 years.
• After completion, It will increase the power
generation capacity of the Mangla Dam to 1,310
MW from the existing 1000 MW capacity.
Mangla Power
House
Expansion
Project
SDC Presentation Competition | 2021
ADDITIONAL
• The dam was further expanded in the era of Pervez
Musharraf but it did not enhance the capacity of
electric generation except increasing the level of
water in the dam.