ASHOK SHARMA
Email: ashok.2188@gmail.com Mobile: +91-9672977299, +91-9100026749
Current City: Hyderabad
Performance driven Professional with 5+ years of experience in Government Project
Operations /Training & Development/Inventory & Accounting/SLAs/SOP/MIS
Management/Strategic Planning/PMO Methodologies
ACADEMIC & IT QUALIFICATIONS
 B. Tech. (Comp. Science) from Rajasthan Technical University, Kota
 Proficient in MS-Office and all Windows Operating systems.
 Pursuing ITIL Certification.
PROFESSIONAL STRENGTHS
 Project Management • Process/Workflow design • Liasoning/Client Relationship
 Strategic Planning • SLA/SOP Management • Team Building & Mentoring
 EDP Operations • Training and Development • Problem Solving & Troubleshooting
 Delivery Management • General Administration • Data Monitoring/Analysis/Evaluation
 Cash Flow Management • PMO Methodologies • Stock /Inventory/Logistics Operations
SYNOPSIS
 Mid-level professional with over 5+ years of experience with strategic planning in daily operations, SLA
Management, Quality Control & Team management in Govt. Projects sectors.
 EDP & Operations, Backend operations, Planning & Development activities in e-governance projects
 Key Planner, Strategist Implementer with demonstrated abilities in devising Daily Operations
 An effective Communicator with excellent relationships & interpersonal skills
 A thorough professional with a proactive attitude, capable of generating new design solutions/ideas
 Expertise knowledge in Project designing, developing and implementing with high success ratios
 An out-of-the-box thinker with excellent leadership skills and demonstrated abilities to meet sharp
deadlines and working with high level of confidence under pressure situations
 Interact easily with people of diverse backgrounds, cultures, and professional levels. Excellent
understanding and ability to accommodate individual learning styles
 Successful track record of devising and implementing strategies enhancing organizational profitability
 Pre-planning, directing, co-ordination and controlling work flow to ensure high productivity levels
 Ensures high-end customer satisfaction levels through various service areas, and also retention of clients
who wants to exit from contracts
 Highly experienced in end user lifecycle data management from date of inception with all related
confidential and other government related information with resolved queries
CAREER HISTORY
 Jun 2015 to till date -- LINK POINT INFRASTRUCTURE PVT. LTD., -Manager - Operations
 Mar 2014 to Jun 2015 -- RADIANT HAROTI INDUSTRIES INDIA LTD., (RHIIL) -State Project
Coordinator
 Nov.2011 to Mar 2014 -- VTMC PVT.LTD. (GROUP COMPANY RHIIL)- Project Manager
 Dec 2010 to Sept.2011 -- TELEPERFORMANCE, Technical Support Executive
KEY RESULT AREAS
Project Workflow Planning & Management:-
 Precision in setting out quality standards for various operational areas, implementing quality systems &
procedures to facilitate a high-quality customer experience, while adhering to the SLA and SOPs
 Expertise knowledge in preparation of SOPs as per the workflow management and process design
 Mapping client’s requirements, attending / conducting business user meeting, project planning & scheduling
providing them customized business solutions
 Ensuring that all workflows have been auctioned within the SLA and providing satisfactory services within
TAT according to the prescribed work plans
 Identified training needs & prepared training schedules/plans & training material for easier learning process
 Prepared and Monitored complete induction/training modules to all new/regular employees at regular
intervals to improve their individual performance levels
 Strengthening the entire project workflow monitoring process by incorporating qualitative measures to meet
the contractual commitments of the client
 Played Key role in the entire recruitment of the company for suitable and qualified professionals
 Conducted workshops with detailed analysis in power point presentations on related training topics/modules
to setting out quality standards for various operational areas to ensure a high-quality customer experience
 A Keen planner & implementer with track record of developing operations polices/norms, systems &
controls, schemes & training standards, also introducing new methods, conducting workshops and training
programs with focus on enhancing quality levels
 Conducting performance improvement analysis to constantly analyze data for improvement in optimal
utilization of resources and also performing cost-benefit analysis and identifying cost saving measures
Production/Inventory/Dispatch/Collections/Accountability:-
 Complete planner in daily production capacities according to the daily schedule planner
 Experience in dispatch activities of produced material and preparing delivery plans as per the SLA
 Dispatching material on daily basis to the scheduled areas with proper inventory and waybills and
confirming the same from the branch operations team.
 Branch team will update in ERP after receiving the material, then SMS will send to concerned end user.
 Preparation of monthly procurement of material from HO, according to the monthly sales assumptions
 Perfect planning in daily production and distribution of the material as per the SLA and SOP
 Managed day-day collections of HSRP with on-time deposits of the same into ESCROW account.
Liasoning / Client Relationship & Management:-
 Maintaining good working relationship with Government officials with in local areas and also at their
corporate level to discuss any issues / concerns raised
 Playing Vital Role as Authorized representative of organization having good relationship with the Client
management includes top officials like Directors, TC and other government officials as well
 Implementing new changes in the process as per the client /government requirement/suggestions and
exploring innovative ideas to easier & high satisfactory levels
 Reviewed the new mutual benefit plans with Higher Authorities to get suggestions / changes to maintain
smooth / satisfactory functioning of the working environment
 Retention of clients who wants to exit from our services by providing special support and resolving their
queries & complaints before TAT and also showcasing him the productive results
MIS Reports/SOP/Data Analysis and Monitoring:-
 Expertise knowledge in data management both physical and electronically with complete life cycle and
submitting the same as and when required by the Govt. Department.
 Understanding and analyzing present system of data collection flow & reporting, initiating new approaches
to improve accuracy in reporting
 Designing innovative and compatible new MIS reports in close coordination with core technical and Non-
technical operation teams
 Maintaining high level of integrity in collection of data and analyzing according to the SLA’s and PIA
 Coordinating with program implementation and core operational team of both technical and non-technical in
monitoring the district level units for smooth functional operations
 Implemented customer feedback mechanism for continuous evaluation and improvements towards
successful running of project for high satisfaction levels of customers
 Played a key role in developing and executing sound monitoring and evaluation strategies to improve
quality in program and setting up a powerful monitoring and evaluation system
 Responsible for maintaining technical content and integrity of the M&E system and make optimal use of
information technology
 Preparing special/customized reports and serving client immediate/ high priority requirements
 Conducted review meetings with team and discussing & preparing action plans for successive months to
maintain smooth functioning of the work.
 Conducted Employees appraisal on time and increased the employee’s standard
 Preparing cost effective Budget plans according to the company requirements within budgeted funds.
BMDC (Biometric Data Centre) Management:-
 Ensure the uploading of Biometric Data on Server before deadline as per UIDAI Standards.
 Analyze and determine appropriate layout of all equipments in data center with help of balancing
And cooling.
 Monitor and supervise all data center solutions.
 Assist various departments in installations and removal of data center hardware as per
requirement.
 Document all power and space schematics and ensure accuracy in same.
 Oversaw capacity planning, perform power audits and ensure appropriate supply of power to all
Equipments.
 Maintain access of data to data center and ensure appropriate backup of data on available
servers.
 Monitor all issues and escalate issue to appropriate department to ensure effective resolution.
 Ensure compliance schedule for everyday operations.
EDP Operations & General Administration:-
 Demonstrating knowledge in EDP project management in all government projects operations to team.
 Perfectly identifying Vendors/Suppliers for all internal requirements like Office infrastructure, Stationery,
Facilities, Postal, and Logistic Services
 Complete Vendor management to look after the total purchases, and producing high negotiation skills
 Successful track record of devising and implementing strategies enhancing organizational profitability
 Pre-planning, directing, co-ordination and controlling work flow to ensure high productivity levels
 Building good relations with external suppliers/vendors, service providers and the local authorities
 Capable of working in a challenging & competitive environment utilizing analytical and logical skills for
constructive growth
 Exposure to HR management functions, Total Asset management
ORGANIZATIONAL EXPERIENCE
Link Point Infrastructure Pvt. Ltd., Hyderabad (E-governance Project of State Transport
Department, HSRP)
Manager – Project Operations for AP and Telangana (Jun 2015 to till date)
Responsibilities:
 Handling 500cr project of both Andhra Pradesh & Telangana states and directly reporting to CEO.
 Leading e-governance project of High Security Registration Plate (HSRP) of State Transport Department
 Controlling 125 branches complete day-to-day operations includes (Collection, Production, Inventory, IT, HR
and Accounts) of both states with 100% accuracy and zero compliance
 Leading a large team of highly experienced professionals includes GM – Operations, Head – IT, DGM –
Accounts and AGM - HR for both states and including their next level team of 500 blue colored members
 Interacting with Top officials in government like Transport Commissioner, Principal Secretary Transport and
other senior officials regarding the process of the HSRP project
 Perfect planning in daily activities like Collection, production, distribution and affixation as per the PIA
 Commanding control and co-ordination over all segments like HR, Operations, IT, Production and Accounts
 Discussing with IT development team to incorporate changes in application as and when required
 Conducting periodical review meetings with all departments and making necessary improvement plans
 Planned and implemented new ONLINE COLLECTION PROCESS with HSRP at dealer level with various
banking payment gateways.
 Responsible for service delivery with standards and quality as per the agreement, mandatory compliance
reports submission and maintaining healthy relationship with department officials
 Attending regular review meetings with government officials regarding HSRP project and submitting
required reports and information as per the schedules and implementing required changes
 Conduct research on best practice methodologies in terms of PMO design, systems, processes and policies
and contribute in building the capability.
 Successfully handling government official visits to production centers, and ARAI quality checks as per the
COP standards and got certified 11 times.
Achievements:
 Ranked as Top Performer for the year 2015-2016.
 Successfully Implemented the Online Collection Process at Dealer Level in entire Telangana.
Radiant Haroti Industries India Ltd. (RHIIL), Delhi
State Project Coordinator – UIDAI ADHAAR Project (Mar 2014 to Jun 2015)
Responsibilities:
 Coordinating with the Projects Team, Finance team and the Clients.
 Planning and Monitoring Projects closely and ensuring they are implemented within stipulated
budgets, on time and delivering highest quality standards.
 Working from the office as well visiting Sites for supervision and monitoring.
 Managing material procurement, manpower and financial resources applicable to Projects.
 Vendor management.
 Managing project deliverables in line with the project plan.
 Resolving cross-functional issues at project level.
 Liaises with, and updates progress to, operations/senior management, government officials.
 Managing project scope and change control and escalating issues where necessary.
 Help the Projects Head to implement multiple and complex projects and guide subordinates towards
optimum performance.
 Meetings with the clients for technical inputs.
 Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently
In advance for allocation of funds.
 Submission of daily activity report and daily productivity report.
VTMC Pvt Ltd, (Group Company RHIIL)
Project Manager (Nov. 2011 to Mar 2014)
1. Project Name: - NPR-40 Biometrics (March 2013- March 2014)
(E-Governance Project of Uttar Pradesh State)
Responsibilities:
 Maintaining the flow of the project and making on the spot-decision (financial/non-financial) to settle
Issues.
 Co-ordination with District Coordinators to check vendor progress
 Monitoring the recruitment process at the district level for the DBA/Operators/Supervisors and to ensure
the certification process
 Planning for starting of camps with proper assets at districts.
 Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently
In advance for allocation of funds.
 Select and hire consultants wherever required based on specific project deliverable and monitor their
works.
 Submission of daily activity report and daily productivity report.
2. Project Name: - Socio Economic Caste Census (SECC) (Nov. 2011 to March 2013)
(E-Governance Project of Rajasthan and Uttar Pradesh State)
Responsibilities:
 Planning for starting cataloguing within the timelines at districts
 Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently
 in advance for allocation of funds.
 Select and hire consultants wherever required based on specific project deliverable and monitor their works.
 Monitoring the recruitment process at the district level for the DBA and charge centre incharge
 Co-ordination with DC to check vendor progress
 Submission of daily activity report and daily productivity report
 Sourcing vendors in districts where there are no vendors.
 Maintaining the flow of the project and making on the spot-decision (non-financial) to settle Issues.
 Liasioning with govt. authorities at district level.
 Monitoring the progress of DEO recruitment for each charge centre based on the number of Ebs in each of the
centre.
2. Teleperformance, Jaipur – Technical Support Executive (Dec.2010 to Sep.2011)
ReResponsibilities:
 Assisting Blackberry customers with technical support.
 Providing GPRS, EDGE, 3G, Modem etc. technical support to customers.

Awards & Achievements/Co-Curricular Activities:
 Participated in National level Inter-College Tech-Fest NUCLEUS (Concoct).
 Participated as a Coordinator in an International Event “Hot Air Balloon Safari” in Pushkar
 International Fair 2010 with International Pilots (Mr. Ian Sharpe & Carol Sharpe, England)
licensed by Ministry of Civil Aviation & supported by Department of Rajasthan Tourism.
 Runner- up in Volley-ball Inter- College Competition.
 Senior Volunteer in National level inter-college tech-fest NUCLEUS.
 Participated in Technical Event TECH-LAUNCH held in GOVT. ENGG.COLLEGE, KOTA in Model
Exhibition.
 Participated in Cultural Week Decoration as a Head Coordinator in College.
 Won First prize in Ball-Throw Competition in School.
 Played two times Basket-Ball Clusters organized by C.B.S.E.
Trainings Undertaken:-
Organization : Instrumentation Ltd., Kota
Duration : 4 Weeks
Area of work : UPS, PCB, TELECOM, IT CENTERS.
Project & Seminar:
1. Seminar on “TELEPORTATION” technology in B. Tech (7th Semester).
2. Project Name : POST ADVERSTISEMENT
Web Technology : ASP.NET(C#), JavaScript, HTML, AJAX
Database : MY-SQL
Computing Skills:-
Operating Systems : Windows 9X/2000/XP/2007/2010, LINUX (CENT-OS 5.5)
Languages : C, C++, Data Structure, ASP.NET(C#), SQL SERVER-2014.
Others : Ms-Office, Ms-Excel.
PERSONAL PARTICULARS
Date of Birth : 21st
May 1988
Marital Status : Married
Languages : Fluent in English, Hindi, and Rajasthani
Passport No. : M3533723
Permanent Address : H.No.6-S-12, Mahaveer Nagar Extension, Kota (Rajasthan)
Declaration:
I hereby declare that the information furnished above is true to the best of my Knowledge.
Place: (Ashok Sharma)

Ashok Sharma_Updated Resume

  • 1.
    ASHOK SHARMA Email: ashok.2188@gmail.comMobile: +91-9672977299, +91-9100026749 Current City: Hyderabad Performance driven Professional with 5+ years of experience in Government Project Operations /Training & Development/Inventory & Accounting/SLAs/SOP/MIS Management/Strategic Planning/PMO Methodologies ACADEMIC & IT QUALIFICATIONS  B. Tech. (Comp. Science) from Rajasthan Technical University, Kota  Proficient in MS-Office and all Windows Operating systems.  Pursuing ITIL Certification. PROFESSIONAL STRENGTHS  Project Management • Process/Workflow design • Liasoning/Client Relationship  Strategic Planning • SLA/SOP Management • Team Building & Mentoring  EDP Operations • Training and Development • Problem Solving & Troubleshooting  Delivery Management • General Administration • Data Monitoring/Analysis/Evaluation  Cash Flow Management • PMO Methodologies • Stock /Inventory/Logistics Operations SYNOPSIS  Mid-level professional with over 5+ years of experience with strategic planning in daily operations, SLA Management, Quality Control & Team management in Govt. Projects sectors.  EDP & Operations, Backend operations, Planning & Development activities in e-governance projects  Key Planner, Strategist Implementer with demonstrated abilities in devising Daily Operations  An effective Communicator with excellent relationships & interpersonal skills  A thorough professional with a proactive attitude, capable of generating new design solutions/ideas  Expertise knowledge in Project designing, developing and implementing with high success ratios  An out-of-the-box thinker with excellent leadership skills and demonstrated abilities to meet sharp deadlines and working with high level of confidence under pressure situations  Interact easily with people of diverse backgrounds, cultures, and professional levels. Excellent understanding and ability to accommodate individual learning styles  Successful track record of devising and implementing strategies enhancing organizational profitability  Pre-planning, directing, co-ordination and controlling work flow to ensure high productivity levels  Ensures high-end customer satisfaction levels through various service areas, and also retention of clients who wants to exit from contracts  Highly experienced in end user lifecycle data management from date of inception with all related confidential and other government related information with resolved queries CAREER HISTORY  Jun 2015 to till date -- LINK POINT INFRASTRUCTURE PVT. LTD., -Manager - Operations  Mar 2014 to Jun 2015 -- RADIANT HAROTI INDUSTRIES INDIA LTD., (RHIIL) -State Project Coordinator  Nov.2011 to Mar 2014 -- VTMC PVT.LTD. (GROUP COMPANY RHIIL)- Project Manager  Dec 2010 to Sept.2011 -- TELEPERFORMANCE, Technical Support Executive KEY RESULT AREAS Project Workflow Planning & Management:-  Precision in setting out quality standards for various operational areas, implementing quality systems & procedures to facilitate a high-quality customer experience, while adhering to the SLA and SOPs  Expertise knowledge in preparation of SOPs as per the workflow management and process design  Mapping client’s requirements, attending / conducting business user meeting, project planning & scheduling providing them customized business solutions  Ensuring that all workflows have been auctioned within the SLA and providing satisfactory services within TAT according to the prescribed work plans  Identified training needs & prepared training schedules/plans & training material for easier learning process  Prepared and Monitored complete induction/training modules to all new/regular employees at regular intervals to improve their individual performance levels  Strengthening the entire project workflow monitoring process by incorporating qualitative measures to meet the contractual commitments of the client  Played Key role in the entire recruitment of the company for suitable and qualified professionals  Conducted workshops with detailed analysis in power point presentations on related training topics/modules to setting out quality standards for various operational areas to ensure a high-quality customer experience
  • 2.
     A Keenplanner & implementer with track record of developing operations polices/norms, systems & controls, schemes & training standards, also introducing new methods, conducting workshops and training programs with focus on enhancing quality levels  Conducting performance improvement analysis to constantly analyze data for improvement in optimal utilization of resources and also performing cost-benefit analysis and identifying cost saving measures Production/Inventory/Dispatch/Collections/Accountability:-  Complete planner in daily production capacities according to the daily schedule planner  Experience in dispatch activities of produced material and preparing delivery plans as per the SLA  Dispatching material on daily basis to the scheduled areas with proper inventory and waybills and confirming the same from the branch operations team.  Branch team will update in ERP after receiving the material, then SMS will send to concerned end user.  Preparation of monthly procurement of material from HO, according to the monthly sales assumptions  Perfect planning in daily production and distribution of the material as per the SLA and SOP  Managed day-day collections of HSRP with on-time deposits of the same into ESCROW account. Liasoning / Client Relationship & Management:-  Maintaining good working relationship with Government officials with in local areas and also at their corporate level to discuss any issues / concerns raised  Playing Vital Role as Authorized representative of organization having good relationship with the Client management includes top officials like Directors, TC and other government officials as well  Implementing new changes in the process as per the client /government requirement/suggestions and exploring innovative ideas to easier & high satisfactory levels  Reviewed the new mutual benefit plans with Higher Authorities to get suggestions / changes to maintain smooth / satisfactory functioning of the working environment  Retention of clients who wants to exit from our services by providing special support and resolving their queries & complaints before TAT and also showcasing him the productive results MIS Reports/SOP/Data Analysis and Monitoring:-  Expertise knowledge in data management both physical and electronically with complete life cycle and submitting the same as and when required by the Govt. Department.  Understanding and analyzing present system of data collection flow & reporting, initiating new approaches to improve accuracy in reporting  Designing innovative and compatible new MIS reports in close coordination with core technical and Non- technical operation teams  Maintaining high level of integrity in collection of data and analyzing according to the SLA’s and PIA  Coordinating with program implementation and core operational team of both technical and non-technical in monitoring the district level units for smooth functional operations  Implemented customer feedback mechanism for continuous evaluation and improvements towards successful running of project for high satisfaction levels of customers  Played a key role in developing and executing sound monitoring and evaluation strategies to improve quality in program and setting up a powerful monitoring and evaluation system  Responsible for maintaining technical content and integrity of the M&E system and make optimal use of information technology  Preparing special/customized reports and serving client immediate/ high priority requirements  Conducted review meetings with team and discussing & preparing action plans for successive months to maintain smooth functioning of the work.  Conducted Employees appraisal on time and increased the employee’s standard  Preparing cost effective Budget plans according to the company requirements within budgeted funds. BMDC (Biometric Data Centre) Management:-  Ensure the uploading of Biometric Data on Server before deadline as per UIDAI Standards.  Analyze and determine appropriate layout of all equipments in data center with help of balancing And cooling.  Monitor and supervise all data center solutions.  Assist various departments in installations and removal of data center hardware as per requirement.  Document all power and space schematics and ensure accuracy in same.  Oversaw capacity planning, perform power audits and ensure appropriate supply of power to all Equipments.  Maintain access of data to data center and ensure appropriate backup of data on available servers.  Monitor all issues and escalate issue to appropriate department to ensure effective resolution.  Ensure compliance schedule for everyday operations.
  • 3.
    EDP Operations &General Administration:-  Demonstrating knowledge in EDP project management in all government projects operations to team.  Perfectly identifying Vendors/Suppliers for all internal requirements like Office infrastructure, Stationery, Facilities, Postal, and Logistic Services  Complete Vendor management to look after the total purchases, and producing high negotiation skills  Successful track record of devising and implementing strategies enhancing organizational profitability  Pre-planning, directing, co-ordination and controlling work flow to ensure high productivity levels  Building good relations with external suppliers/vendors, service providers and the local authorities  Capable of working in a challenging & competitive environment utilizing analytical and logical skills for constructive growth  Exposure to HR management functions, Total Asset management ORGANIZATIONAL EXPERIENCE Link Point Infrastructure Pvt. Ltd., Hyderabad (E-governance Project of State Transport Department, HSRP) Manager – Project Operations for AP and Telangana (Jun 2015 to till date) Responsibilities:  Handling 500cr project of both Andhra Pradesh & Telangana states and directly reporting to CEO.  Leading e-governance project of High Security Registration Plate (HSRP) of State Transport Department  Controlling 125 branches complete day-to-day operations includes (Collection, Production, Inventory, IT, HR and Accounts) of both states with 100% accuracy and zero compliance  Leading a large team of highly experienced professionals includes GM – Operations, Head – IT, DGM – Accounts and AGM - HR for both states and including their next level team of 500 blue colored members  Interacting with Top officials in government like Transport Commissioner, Principal Secretary Transport and other senior officials regarding the process of the HSRP project  Perfect planning in daily activities like Collection, production, distribution and affixation as per the PIA  Commanding control and co-ordination over all segments like HR, Operations, IT, Production and Accounts  Discussing with IT development team to incorporate changes in application as and when required  Conducting periodical review meetings with all departments and making necessary improvement plans  Planned and implemented new ONLINE COLLECTION PROCESS with HSRP at dealer level with various banking payment gateways.  Responsible for service delivery with standards and quality as per the agreement, mandatory compliance reports submission and maintaining healthy relationship with department officials  Attending regular review meetings with government officials regarding HSRP project and submitting required reports and information as per the schedules and implementing required changes  Conduct research on best practice methodologies in terms of PMO design, systems, processes and policies and contribute in building the capability.  Successfully handling government official visits to production centers, and ARAI quality checks as per the COP standards and got certified 11 times. Achievements:  Ranked as Top Performer for the year 2015-2016.  Successfully Implemented the Online Collection Process at Dealer Level in entire Telangana. Radiant Haroti Industries India Ltd. (RHIIL), Delhi State Project Coordinator – UIDAI ADHAAR Project (Mar 2014 to Jun 2015) Responsibilities:  Coordinating with the Projects Team, Finance team and the Clients.  Planning and Monitoring Projects closely and ensuring they are implemented within stipulated budgets, on time and delivering highest quality standards.  Working from the office as well visiting Sites for supervision and monitoring.  Managing material procurement, manpower and financial resources applicable to Projects.  Vendor management.  Managing project deliverables in line with the project plan.  Resolving cross-functional issues at project level.  Liaises with, and updates progress to, operations/senior management, government officials.  Managing project scope and change control and escalating issues where necessary.  Help the Projects Head to implement multiple and complex projects and guide subordinates towards optimum performance.  Meetings with the clients for technical inputs.  Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently In advance for allocation of funds.  Submission of daily activity report and daily productivity report.
  • 4.
    VTMC Pvt Ltd,(Group Company RHIIL) Project Manager (Nov. 2011 to Mar 2014) 1. Project Name: - NPR-40 Biometrics (March 2013- March 2014) (E-Governance Project of Uttar Pradesh State) Responsibilities:  Maintaining the flow of the project and making on the spot-decision (financial/non-financial) to settle Issues.  Co-ordination with District Coordinators to check vendor progress  Monitoring the recruitment process at the district level for the DBA/Operators/Supervisors and to ensure the certification process  Planning for starting of camps with proper assets at districts.  Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently In advance for allocation of funds.  Select and hire consultants wherever required based on specific project deliverable and monitor their works.  Submission of daily activity report and daily productivity report. 2. Project Name: - Socio Economic Caste Census (SECC) (Nov. 2011 to March 2013) (E-Governance Project of Rajasthan and Uttar Pradesh State) Responsibilities:  Planning for starting cataloguing within the timelines at districts  Prepare monthly budgets centre-wise/operation wise and submit to the management sufficiently  in advance for allocation of funds.  Select and hire consultants wherever required based on specific project deliverable and monitor their works.  Monitoring the recruitment process at the district level for the DBA and charge centre incharge  Co-ordination with DC to check vendor progress  Submission of daily activity report and daily productivity report  Sourcing vendors in districts where there are no vendors.  Maintaining the flow of the project and making on the spot-decision (non-financial) to settle Issues.  Liasioning with govt. authorities at district level.  Monitoring the progress of DEO recruitment for each charge centre based on the number of Ebs in each of the centre. 2. Teleperformance, Jaipur – Technical Support Executive (Dec.2010 to Sep.2011) ReResponsibilities:  Assisting Blackberry customers with technical support.  Providing GPRS, EDGE, 3G, Modem etc. technical support to customers.  Awards & Achievements/Co-Curricular Activities:  Participated in National level Inter-College Tech-Fest NUCLEUS (Concoct).  Participated as a Coordinator in an International Event “Hot Air Balloon Safari” in Pushkar  International Fair 2010 with International Pilots (Mr. Ian Sharpe & Carol Sharpe, England) licensed by Ministry of Civil Aviation & supported by Department of Rajasthan Tourism.  Runner- up in Volley-ball Inter- College Competition.  Senior Volunteer in National level inter-college tech-fest NUCLEUS.  Participated in Technical Event TECH-LAUNCH held in GOVT. ENGG.COLLEGE, KOTA in Model Exhibition.  Participated in Cultural Week Decoration as a Head Coordinator in College.  Won First prize in Ball-Throw Competition in School.  Played two times Basket-Ball Clusters organized by C.B.S.E. Trainings Undertaken:- Organization : Instrumentation Ltd., Kota Duration : 4 Weeks Area of work : UPS, PCB, TELECOM, IT CENTERS.
  • 5.
    Project & Seminar: 1.Seminar on “TELEPORTATION” technology in B. Tech (7th Semester). 2. Project Name : POST ADVERSTISEMENT Web Technology : ASP.NET(C#), JavaScript, HTML, AJAX Database : MY-SQL Computing Skills:- Operating Systems : Windows 9X/2000/XP/2007/2010, LINUX (CENT-OS 5.5) Languages : C, C++, Data Structure, ASP.NET(C#), SQL SERVER-2014. Others : Ms-Office, Ms-Excel. PERSONAL PARTICULARS Date of Birth : 21st May 1988 Marital Status : Married Languages : Fluent in English, Hindi, and Rajasthani Passport No. : M3533723 Permanent Address : H.No.6-S-12, Mahaveer Nagar Extension, Kota (Rajasthan) Declaration: I hereby declare that the information furnished above is true to the best of my Knowledge. Place: (Ashok Sharma)