ADB Review of Procurement Decisions  Asian Development Bank Procurement Guidelines
ADB Review of Procurement Decisions  Scheduling of Procurement
Scheduling of Procurement  Para 1 ADB shall review the procurement arrangements proposed by the borrower in the procurement plan for its conformity with the financing agreement and these Guidelines. The procurement plan shall cover an initial period of at least 18 months. The borrower shall update the procurement plan on an annual basis or as needed always covering the next 18 months period of project implementation. Any revisions proposed to the procurement plan shall be furnished to ADB for its prior approval.
ADB Review of Procurement Decisions  Post Review
Prior Review  Para 2 (a) With respect to all contracts which are subject to ADB’s prior review: In cases where prequalification is used, the borrower shall, before prequalification submissions are invited, furnish ADB with the draft documents to be used, including  the text of the invitation to prequalify,  the prequalification documents (including instructions to applicants, qualification criteria, application forms, and scope of contract), and  the evaluation methodology, together with a description of the advertising procedures to be followed, and shall introduce such modifications in said procedure and documents, as ADB shall reasonably request.
Prior Review  Para 2 (a) The report evaluating the applications received by the borrower, the list of proposed prequalified bidders, together with a statement of their qualifications and of the reasons for the exclusion of any applicant for prequalification, shall be furnished by the borrower to ADB for its comments before the applicants are notified of the borrower’s decision, and the borrower shall
Prior Review  Para 2 (b)	 Before bids are invited, the borrower shall furnish to ADB for its comments, draft bidding documents, including  the invitation to bid;  instructions to bidders, including the basis of bid evaluation and contract award; and  the conditions of contract and specifications for the civil works, supply of goods, or installation of equipment, etc., as the case may be, together with a description of the advertising procedures to be followed for the bidding (if prequalification has not been used), and shall make such modifications in the said documents as ADB shall reasonably request.  Any further modification shall require ADB’s approval before it is issued to the prospective bidders.
Prior Review  Para 2 (c) After bids have been received and evaluated, the borrower shall, before a final decision on the award is made, furnish to ADB, at least four weeks prior to expiration of bid validity, a detailed report (prepared, if ADB shall so request, by experts acceptable to ADB), on the evaluation and comparison of the bids received, together with the recommendations for award and such other information as ADB shall reasonably request.  ADB shall, if it determines that the intended award would be inconsistent with the financing agreement and/or the procurement plan, promptly inform the borrower and state the reasons for such determination.  Otherwise, ADB shall provide its no objection to the recommendation for contract award.  The borrower shall award the contract only after receiving the “no objection” from ADB.
Prior Review  Para 2 (d)	 If the borrower requires an extension of bid validity to complete the process of evaluation, obtain necessary approvals and clearances, and to make the award, it should seek ADB’s prior approval for the first request for extension, if it is longer than four weeks, and for all subsequent requests for extension, irrespective of the period.
Prior Review  Para 2 (e) If after publication of the results of evaluation, the borrower receives protests or complaints from bidders, a copy of the complaint and a copy of the borrower’s response shall be sent to ADB for information.
Prior Review  Para 2 (f) If as result of analysis of a protest the borrower changes its contract award recommendation, the reasons for such decision and a revised evaluation report shall be submitted to ADB for no objection. The borrower shall provide a republication of the contract award in the format of paragraph 2.60 of these Guidelines.
Prior Review  Para 2 (g) The terms and conditions of a contract shall not, without ADB’s prior approval, materially differ from those on which bids were asked or prequalification of contractors, if any, was invited.
Prior Review  Para 2 (h) Promptly after each contract is awarded, ADB shall be furnished with three copies of the contract as executed. If the final contract proposed to be executed differs substantially from the draft contract previously approved by ADB, or if any substantial amendment of the contract is proposed after its execution, the proposed changes shall be submitted to ADB for prior approval.
Prior Review  Para 2 (i) All evaluation reports shall be accompanied by a summary of the procurement on a form provided by ADB. The description and amount of the contract, together with the name and address of the successful bidder, shall be subject to release by ADB upon receipt of the signed copy of the contract.
Modifications Para 3 In the case of contracts subject to prior review, before granting a material extension of the stipulated time for performance of a contract, agreeing to any modification or waiver of the conditions of such contract, including issuing any change order or orders under such contract (except in cases of extreme urgency) which would in aggregate increase the original amount of the contract by more than 15% of the original price, the borrower shall seek ADB’s no objection to the proposed extension, modification, or change order.  If ADB determines that the proposal would be inconsistent with the provisions of the financing agreement and/or procurement plan, it shall promptly inform the borrower and state the reasons for its determination. A copy of all amendments to the contract shall be furnished to ADB for its record.
Translations Para 4 Contracts awarded under ICB must be written in English. Any supporting documentation that might have originated in another language (such as technical descriptions of equipment) must be accompanied with an English translation.
ADB Review of Procurement Decisions  Post Review
Post Review Para 5 If ADB and the borrower have agreed on post review, ADB will review and respond as soon as practicable, but no later than 6 months after receipt of the required documents, or it will be assumed that ADB has no objection to the borrower’s action.  The borrower shall retain all documentation with respect to each contract where post review is required during project implementation and up to two years after the project closing date.  This documentation would include, but not be limited to, the signed original of the contract, the evaluation report including the analysis of the respective proposals, and recommendations for award, for examination by ADB or by its consultants.
Post Review Para 5 Master copies of electronic documents must be retained in print form, suitably authenticated by the issuing agency by signature, stamp or other feature acceptable to ADB.  The borrower shall furnish such documentation to ADB upon award of contract unless otherwise specified in the financing agreement.  If ADB determines that the goods, or works were not procured in accordance with the agreed procedures as reflected in the financing agreement, it may declare misprocurement as established in paragraph 1.12 of the Guidelines.  ADB shall promptly inform the borrower the reasons for such determination. If misprocurement is declared after disbursement, the borrower shall refund the corresponding amount to ADB.
Appendix 1   adb review of procurement decisions

More Related Content

What's hot

Real estate regulation and development bill
Real estate regulation and development billReal estate regulation and development bill
Real estate regulation and development bill
www.checkfloor.com
 
Wb procurement intro 2
Wb procurement intro 2Wb procurement intro 2
Wb procurement intro 2
Joy Irman
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction Provision
Richard Retita
 
Important provisions about RERA
Important provisions about RERAImportant provisions about RERA
Important provisions about RERA
Dhruv Seth
 
RERA for Developer/ Promoter
RERA for Developer/ PromoterRERA for Developer/ Promoter
RERA for Developer/ Promoter
Himanshu Goyal
 
Standard specifications for_building_wor
Standard specifications for_building_worStandard specifications for_building_wor
Standard specifications for_building_wor
GAJENDRAN MUTHUKRISHNAN
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
Assen Antov
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
Adrias TAN
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 

What's hot (9)

Real estate regulation and development bill
Real estate regulation and development billReal estate regulation and development bill
Real estate regulation and development bill
 
Wb procurement intro 2
Wb procurement intro 2Wb procurement intro 2
Wb procurement intro 2
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction Provision
 
Important provisions about RERA
Important provisions about RERAImportant provisions about RERA
Important provisions about RERA
 
RERA for Developer/ Promoter
RERA for Developer/ PromoterRERA for Developer/ Promoter
RERA for Developer/ Promoter
 
Standard specifications for_building_wor
Standard specifications for_building_worStandard specifications for_building_wor
Standard specifications for_building_wor
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 

Viewers also liked

India+case+study+on+e government+procurement+development-published
India+case+study+on+e government+procurement+development-publishedIndia+case+study+on+e government+procurement+development-published
India+case+study+on+e government+procurement+development-published
ramana01
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usahaJoy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
E - Procurement
E - ProcurementE - Procurement
E - Procurement
Disha Bedi
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - peroranganJoy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Joy Irman
 
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud CauchoisADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
Global Water Partnership
 

Viewers also liked (7)

India+case+study+on+e government+procurement+development-published
India+case+study+on+e government+procurement+development-publishedIndia+case+study+on+e government+procurement+development-published
India+case+study+on+e government+procurement+development-published
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usaha
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
E - Procurement
E - ProcurementE - Procurement
E - Procurement
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - perorangan
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud CauchoisADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
 

Similar to Appendix 1 adb review of procurement decisions

Document samples
Document samplesDocument samples
Document samples
Arthur Wilson
 
Adb procurement guidelines introduction1
Adb procurement guidelines   introduction1Adb procurement guidelines   introduction1
Adb procurement guidelines introduction1
Joy Irman
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
Joy Irman
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
Joy Irman
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Joy Irman
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
abenyeung1
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Joy Irman
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karim
Salama Shurrab
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
 
Wb procurement icb c2
Wb procurement icb c2Wb procurement icb c2
Wb procurement icb c2
Joy Irman
 
FINANCING AGREEMENT
FINANCING AGREEMENT FINANCING AGREEMENT
FINANCING AGREEMENT
Kanoon Ke Rakhwale India
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
RISHARD FAIS
 
Sample Construction Contract.PDF
Sample Construction Contract.PDFSample Construction Contract.PDF
Sample Construction Contract.PDF
ssuser6a7545
 
Sample construction contract
Sample construction contractSample construction contract
Sample construction contract
Trung Nguyen Dang, PMP
 
Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal Pradesh
Headway Solar
 
Wb consultants 8
Wb consultants 8Wb consultants 8
Wb consultants 8
Joy Irman
 
Terms & Conditions
Terms & ConditionsTerms & Conditions
Terms & Conditions
Danielle Donovan
 
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdfSTANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
MehediHasan615606
 
Wb procurement intro 1
Wb procurement intro 1Wb procurement intro 1
Wb procurement intro 1
Joy Irman
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)
Muhammad Akram
 

Similar to Appendix 1 adb review of procurement decisions (20)

Document samples
Document samplesDocument samples
Document samples
 
Adb procurement guidelines introduction1
Adb procurement guidelines   introduction1Adb procurement guidelines   introduction1
Adb procurement guidelines introduction1
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karim
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Wb procurement icb c2
Wb procurement icb c2Wb procurement icb c2
Wb procurement icb c2
 
FINANCING AGREEMENT
FINANCING AGREEMENT FINANCING AGREEMENT
FINANCING AGREEMENT
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
 
Sample Construction Contract.PDF
Sample Construction Contract.PDFSample Construction Contract.PDF
Sample Construction Contract.PDF
 
Sample construction contract
Sample construction contractSample construction contract
Sample construction contract
 
Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal Pradesh
 
Wb consultants 8
Wb consultants 8Wb consultants 8
Wb consultants 8
 
Terms & Conditions
Terms & ConditionsTerms & Conditions
Terms & Conditions
 
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdfSTANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
STANDARD SPECIFICATIONS FOR BUILDING WORKS.pdf
 
Wb procurement intro 1
Wb procurement intro 1Wb procurement intro 1
Wb procurement intro 1
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)
 

More from Joy Irman

Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
Joy Irman
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Joy Irman
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
Joy Irman
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Joy Irman
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
Joy Irman
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
Joy Irman
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
Joy Irman
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
Joy Irman
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
Joy Irman
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
Joy Irman
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
Joy Irman
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
Joy Irman
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
Joy Irman
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
Joy Irman
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
Joy Irman
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
Joy Irman
 
3 2 pengguna anggaran
3 2 pengguna anggaran3 2 pengguna anggaran
3 2 pengguna anggaran
Joy Irman
 
2 tata nilai pengadaan
2 tata nilai pengadaan2 tata nilai pengadaan
2 tata nilai pengadaan
Joy Irman
 
1 2 ruang lingkup
1 2 ruang lingkup1 2 ruang lingkup
1 2 ruang lingkup
Joy Irman
 
1 1 pengertian dan istilah
1 1 pengertian dan istilah1 1 pengertian dan istilah
1 1 pengertian dan istilah
Joy Irman
 

More from Joy Irman (20)

Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
 
3 2 pengguna anggaran
3 2 pengguna anggaran3 2 pengguna anggaran
3 2 pengguna anggaran
 
2 tata nilai pengadaan
2 tata nilai pengadaan2 tata nilai pengadaan
2 tata nilai pengadaan
 
1 2 ruang lingkup
1 2 ruang lingkup1 2 ruang lingkup
1 2 ruang lingkup
 
1 1 pengertian dan istilah
1 1 pengertian dan istilah1 1 pengertian dan istilah
1 1 pengertian dan istilah
 

Recently uploaded

TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
SalesTown
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Lviv Startup Club
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
➑➌➋➑➒➎➑➑➊➍
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 

Recently uploaded (20)

TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 

Appendix 1 adb review of procurement decisions

  • 1. ADB Review of Procurement Decisions Asian Development Bank Procurement Guidelines
  • 2. ADB Review of Procurement Decisions Scheduling of Procurement
  • 3. Scheduling of Procurement Para 1 ADB shall review the procurement arrangements proposed by the borrower in the procurement plan for its conformity with the financing agreement and these Guidelines. The procurement plan shall cover an initial period of at least 18 months. The borrower shall update the procurement plan on an annual basis or as needed always covering the next 18 months period of project implementation. Any revisions proposed to the procurement plan shall be furnished to ADB for its prior approval.
  • 4. ADB Review of Procurement Decisions Post Review
  • 5. Prior Review Para 2 (a) With respect to all contracts which are subject to ADB’s prior review: In cases where prequalification is used, the borrower shall, before prequalification submissions are invited, furnish ADB with the draft documents to be used, including the text of the invitation to prequalify, the prequalification documents (including instructions to applicants, qualification criteria, application forms, and scope of contract), and the evaluation methodology, together with a description of the advertising procedures to be followed, and shall introduce such modifications in said procedure and documents, as ADB shall reasonably request.
  • 6. Prior Review Para 2 (a) The report evaluating the applications received by the borrower, the list of proposed prequalified bidders, together with a statement of their qualifications and of the reasons for the exclusion of any applicant for prequalification, shall be furnished by the borrower to ADB for its comments before the applicants are notified of the borrower’s decision, and the borrower shall
  • 7. Prior Review Para 2 (b) Before bids are invited, the borrower shall furnish to ADB for its comments, draft bidding documents, including the invitation to bid; instructions to bidders, including the basis of bid evaluation and contract award; and the conditions of contract and specifications for the civil works, supply of goods, or installation of equipment, etc., as the case may be, together with a description of the advertising procedures to be followed for the bidding (if prequalification has not been used), and shall make such modifications in the said documents as ADB shall reasonably request. Any further modification shall require ADB’s approval before it is issued to the prospective bidders.
  • 8. Prior Review Para 2 (c) After bids have been received and evaluated, the borrower shall, before a final decision on the award is made, furnish to ADB, at least four weeks prior to expiration of bid validity, a detailed report (prepared, if ADB shall so request, by experts acceptable to ADB), on the evaluation and comparison of the bids received, together with the recommendations for award and such other information as ADB shall reasonably request. ADB shall, if it determines that the intended award would be inconsistent with the financing agreement and/or the procurement plan, promptly inform the borrower and state the reasons for such determination. Otherwise, ADB shall provide its no objection to the recommendation for contract award. The borrower shall award the contract only after receiving the “no objection” from ADB.
  • 9. Prior Review Para 2 (d) If the borrower requires an extension of bid validity to complete the process of evaluation, obtain necessary approvals and clearances, and to make the award, it should seek ADB’s prior approval for the first request for extension, if it is longer than four weeks, and for all subsequent requests for extension, irrespective of the period.
  • 10. Prior Review Para 2 (e) If after publication of the results of evaluation, the borrower receives protests or complaints from bidders, a copy of the complaint and a copy of the borrower’s response shall be sent to ADB for information.
  • 11. Prior Review Para 2 (f) If as result of analysis of a protest the borrower changes its contract award recommendation, the reasons for such decision and a revised evaluation report shall be submitted to ADB for no objection. The borrower shall provide a republication of the contract award in the format of paragraph 2.60 of these Guidelines.
  • 12. Prior Review Para 2 (g) The terms and conditions of a contract shall not, without ADB’s prior approval, materially differ from those on which bids were asked or prequalification of contractors, if any, was invited.
  • 13. Prior Review Para 2 (h) Promptly after each contract is awarded, ADB shall be furnished with three copies of the contract as executed. If the final contract proposed to be executed differs substantially from the draft contract previously approved by ADB, or if any substantial amendment of the contract is proposed after its execution, the proposed changes shall be submitted to ADB for prior approval.
  • 14. Prior Review Para 2 (i) All evaluation reports shall be accompanied by a summary of the procurement on a form provided by ADB. The description and amount of the contract, together with the name and address of the successful bidder, shall be subject to release by ADB upon receipt of the signed copy of the contract.
  • 15. Modifications Para 3 In the case of contracts subject to prior review, before granting a material extension of the stipulated time for performance of a contract, agreeing to any modification or waiver of the conditions of such contract, including issuing any change order or orders under such contract (except in cases of extreme urgency) which would in aggregate increase the original amount of the contract by more than 15% of the original price, the borrower shall seek ADB’s no objection to the proposed extension, modification, or change order. If ADB determines that the proposal would be inconsistent with the provisions of the financing agreement and/or procurement plan, it shall promptly inform the borrower and state the reasons for its determination. A copy of all amendments to the contract shall be furnished to ADB for its record.
  • 16. Translations Para 4 Contracts awarded under ICB must be written in English. Any supporting documentation that might have originated in another language (such as technical descriptions of equipment) must be accompanied with an English translation.
  • 17. ADB Review of Procurement Decisions Post Review
  • 18. Post Review Para 5 If ADB and the borrower have agreed on post review, ADB will review and respond as soon as practicable, but no later than 6 months after receipt of the required documents, or it will be assumed that ADB has no objection to the borrower’s action. The borrower shall retain all documentation with respect to each contract where post review is required during project implementation and up to two years after the project closing date. This documentation would include, but not be limited to, the signed original of the contract, the evaluation report including the analysis of the respective proposals, and recommendations for award, for examination by ADB or by its consultants.
  • 19. Post Review Para 5 Master copies of electronic documents must be retained in print form, suitably authenticated by the issuing agency by signature, stamp or other feature acceptable to ADB. The borrower shall furnish such documentation to ADB upon award of contract unless otherwise specified in the financing agreement. If ADB determines that the goods, or works were not procured in accordance with the agreed procedures as reflected in the financing agreement, it may declare misprocurement as established in paragraph 1.12 of the Guidelines. ADB shall promptly inform the borrower the reasons for such determination. If misprocurement is declared after disbursement, the borrower shall refund the corresponding amount to ADB.