© 2015 IBM Corporation
2382
What’s New in
IBM API Management
Sid Bhatia – Product Management
Chris Markes – Product Design &
Engineering
API Economy Value Chain
Securely expose your business to an internal/external developer ecosystem
Provide self-service API
portals to internal/external
app developers
Expose business services
securely as APIs to select
developer communities &
analyze API usage
Manage & monitor the
entire API platform
On-premise
private
Off-premise
SaaS
Off-premise
dedicated
Hybrid
IBM API Management
Easily manage your APIs, in your private environment
design, secure, control, publish, monitor & manage
Explore API documentation
Provision application keys
Self-service experience
Developer Portal API Manager Management Console
Define and manage APIs
Explore API usage with analytics
Manage API user communities
Provision system resources
Monitor runtime health
Scale the environment
API Gateway
(IBM DataPower)
Enforce runtime policies to control API traffic
© 2014 IBM Corporation
API Management solution, on-premise
Product APIs allow customers
to interact with the API
Management solution, and
extend/customize
Product APIs Management layer Gateway layer
The management layer embodies
the capability for organizations to
define, manage, expose and
control APIs. Provides API
Manager, Developer Portal and
Management Console.
(Virtual Appliance running
VMWare ESXi 5.0, vCenter V5.5,
Citrix XenServer 6.2, IBM
PureApplication System W1500 1.1)
API configurations are deployed
to the gateway, which provides
the enforcement point for
runtime policies to control API
traffic
(DataPower physical appliance or
virtual appliance VMWare ESXi
5.0, vCenter V5.5, Citrix XenServer
6.2, IBM PureApplication System
W1500 1.1)
What’s delivered since
last year & what’s new
2.0
IBM API Management product updates
•Multi-tenant
on-premise
solution to
define,
assemble,
publish,
monitor REST
APIs
•Developer
portal to
easily
consume APIs
•DataPower
as the API
gateway
•SOAP support
•Manage various
dev
communities
•Simplified
deployment &
packaging
•Service
discovery from
WSRR
•Xen & PureApp
support
•Developer
portal
customization
•Multiple
Gateway cluster
support
2013 2014
3.0
•Interactive API
test on portal
•Developer
notifications on
rate limits
•APIs to
customize portal,
user mgmt
•Service
discovery from
custom registries
•Free 30-day SaaS
trial
•Buy SaaS with
credit card
•Monthly billing
•Self-service or
sales-assisted
3.0.2 3.0.3
•Viewer only
app developer
role
•Developer
onboarding by
invitation only
•Enhanced
privacy
•Application
suspension
•Support for
3rd party
authentication
providers
•Encryption of
Plans
Oct Nov
•Topology
flexibility
with mgmt
& data
traffic
separation
•Multi-
gateway
cluster
support on
single
gateway
appliance
•API usage
statistics at
a glance
3.0.1 Sep
•Scripted deploy
•Non-disruptive
publish
•API cloning
•SSL Mutual
Auth for UI
consoles
•Custom Roles
•REST API
discovery
•Assembly
debug
•Multi-site
•Custom portal
w/CMS
-Ready! API plug-in
-Tech preview:
Swagger import
3.0.4
Dec
IBM API Management v.3.0.1*
API Development
• OAuth2 Refresh/Revocation: API Developer can enable OAuth2 token refresh and/or revocation
• API Properties: API Developer can create custom properties enabling seamless transition between
environments (e.g. environmentally dependent service endpoints)
• Pluggable SOAP Discovery: API Provider can develop a discovery agent to enable SOAP
discovery from custom registries for exposure as REST/SOAP APIs
• Cross Origin Resource Sharing (CORS): CORS support enabling easy cross site API requests
Developer Portal enhancements
• Live Docs: App Developer can invoke/test an API within the documentation to accelerate their API
comprehension
• Rate Limit Notifications: App Developer can receive notification when near or exceeding their
subscribed rate limit to make informed and timely adjustments
• WSDL Download: App Developer can download the WSDL for a SOAP API to be used for testing
and client development
• Catalog APIs: Script application creation or develop a custom Developer Portal
Analytics & Reporting
• 90 Day Visualization: API Provider UI dashboards can display up to 90 days for instant analysis
• Fine Grained Export: API Provider can export fine grained analytics via API Manager for integration
with 3rd party business intelligence systems, monetization and billing, or reporting
SaaS Offering
• Try & Buy: Self service signup for 30 day free trial, Pay with credit card or contact Sales
• Usage based pricing: API volume and application developer based + optional detailed usage
logging
* released Sep 26, 2014 for on-premise & applied to SaaS
Details at www-01.ibm.com/support/docview.wss?uid=swg21685516
IBM API Management v3.0.2*
Developer Engagement
• By invitation only: Enable app developer onboarding by invitation
only
• Viewer Role: Enable a view-only app developer role
• Client ID / secret confidentiality: Enhanced privacy in the
Developer Portal to get client secret; Deferred retrieval of client
secret
Provider Productivity
• Authentication URL: API Provider can configure non-LDAP based
IDPs by using Authentication URL. For example, enabling
integration with third-party authentication providers.
• Application suspension: Individual apps can be suspended by the
API Provider. Block the app from invoking APIs and prevent blocked
apps from registering with Plans
• Encrypted Plan: API Provider can export/import Plans as an
encrypted package for secure handling between disconnected
environments.
* released Oct 20, 2014 for on-premise & applied to Saa
Details at www-01.ibm.com/support/docview.wss?uid=swg21687434
IBM API Management v3.0.3*
Topology Flexibility
• Dual NICs on Management Server: Enhanced networking/topology
flexibility on the management appliance to separate management &
data traffic.
• Multiple gateway clusters per DataPower appliance: Scale with
ease for increased gateway utilization through multiple clusters
within a single DataPower appliance
Analytics & Reporting
• Usage summary statistics: Aggregated quick view usage statistics
of number of API calls across environments, number of developer
account & storage against payload logging
* released Nov 21, 2014 for on-premise
Details at: www-01.ibm.com/support/docview.wss?uid=swg21690570
IBM API Management v3.0.4*
API Lifecycle & Governance
• Scripted Deployment: Deploy Plans from outside API Manager using a script for operational
integration. Support for deploy, undeploy, publish, unpublish, suspend, resume
• Non-disruptive Publish: Deploy changes to rate limits, minor API revisions in a plan without any
outage while also providing auto subscriber migration
• API Cloning: Create a new copy of an API with a single click to accelerate API development
Security
• Secure UI access: SSL Mutual Authentication support for secure UI traffic to Cloud Management
Console , API Manager UI and Developer portal
• Custom Roles: Create unique roles across the API provider organization, each with view/modify
access to Plans, APIs, environments, etc.
API Provider Productivity
• API Discovery: Easily find & expose REST services, by discovering them from custom registries
such as those on z/OS. This is in addition to already available SOAP service discovery from custom
registries
• Assembly Debugging: Debug API assembly flow with ease from within the API Manager UI
Topology Flexibility
• High performance multi-site configuration: Optimize and load balance communications between
gateway servers and management servers in a multi-site configuration
Tech Preview
• Swagger Import: Accelerate API development & reuse existing API definitions through import of
Swagger 2.0 representation
* released Dec 22, 2014 for on-premiseDetails at: www-01.ibm.com/support/docview.wss?uid=swg21693132
API Providers & Consumers:
Test API readiness with Ready! API plugin
Export:
Define new APIs in
Ready! API product by
uploading Swagger,
WADL, RAML, WSDL,
etc., and then test the
API.
 Commit to a full
range of tests –
functional, load,
security
 When ready, click a
button to
Export API to insert
the tested API into
API Manager UI
Import:
Use Ready! API
testing platform to
Import SOAP &
REST API definitions
directly from IBM API
Mgmt Dev portal for
unit/functional testing,
load testing, service
virtualization & more
 Select any API from
Dev Portal
 Auto-generate test
suite
 Validate functionality
and resiliency
 Virtualize for
application testing &
API Consumers API Providers
Custom API Portal using IBM API Mgmt & Drupal CMS
What’s new
IBM Interconnect 201514
Securely expose business services to
internal & external developer communities
• Easily assemble business APIs into a single
catalog & publish to custom social portals
• Manage APIs using IBM API Management in
Bluemix & share APIs with Bluemix developers
• Accelerate API creation, deployment &
invocation with Swagger 2.0 support
• Extract API usage & analytics data via API
• Leverage API Management Service delivered in
Softlayer with built-in failover, redundancy &
dynamic scaling
• Move APIs & Plans from public cloud to
private/on-premise for complete flexibility
IBM API Management v4
On-premise SaaS Bluemix
GA: Mar 20, 2015
IBM Interconnect 201515
15
IBM API Management v4*
Lifecycle & Governance
• Swagger based API creation: Allows APIs to be imported from Swagger, deployed, and
invoked without any manual configuration steps to the API
• Co-Publish: Co-publish and supersede plans as well as manage plan subscription migrations
• Promotion Approval: Environment based configuration for approving plan lifecycle changes
• Plan Auto-creation & Wildcarding: Auto create plan when API is created with a reference
to all resources that are added to the API
• Enforced: Option to just publish APIs and not gateway enforce them
• Policy for SOAP: Ability to add/modify policies for SOAP Services
• Discover: Manage REST & SOAP services from System z and custom registries
Security
• Mutual Authentication: Out of the box support for custom certificates for backend
endpoints, LDAP, and SMTP servers
Assembly
• Error Handling: Ability to map errors returned from a Service call into a Response
Developer Portal (Drupal)
• Multi-factor authentication: Enabled in the Drupal based developer portal
• Search: Out of the box support for search and developer management
• Categorization: Flexible Plan/API multi-level classification
• CAPTCHA : Support to prevent automated programs from accessing the portal to enroll users
• Password Lockout
* GA: Mar 20, 2015
API lifecycle
management
New view for managing
API and plan lifecycle
Filter by lifecycle state
New actions for managing
API and plan lifecycle
Manage plan visibility
and subscribability
Manage application subscriptions
across plans
Migrate subscriptions between plans
Optional approval steps for
publishing and lifecycle actions
'Macro actions' for key tasks
Manage transition from one
version to another
Managed deprecation and
retirement of plans at end of life
Developer portal
All-new developer portal, based on
Drupal content management system
Self-service
developer registration
Getting started
Browsing APIs
API detail
App registration and
subscription detail
Built-in collaboraton features
API configuration
Cloud
API Management comes to Bluemix
IBM API Management Service (SaaS)
Embrace the API Economy in the Cloud
• Design & Secure APIs, Publish to developer
portals, Analyze API usage & performance
• A resilient and highly available API runtime
infrastructure with built-in failover, redundancy &
dynamic scaling on IBM SoftLayer
• Seamlessly move APIs & Plans from public to
private cloud or on-prem for complete flexibility
• 30-day full feature trial, self-service pay with credit
card
• Grow as you need: Pricing based on API calls &
developer accounts with optional logging of API
payload
• Identical capabilities of on-premise
• Manage your APIs in Bluemix
• Share APIs with Bluemix developers
ibm.biz/apimsaas
Global Network
London
FrankfurtTokyo
Singapore
San Jose
Houston
Enabling businesses to join the API Economy
IBM API Management - on-cloud & on-premise
Engage with app developers through portals
• API exploration
• Self-service sign up
• Interactive API testing
• App & Key management
• API usage analytics
• Rate limit notification
• Multiple dev communities
• Build custom portal with blogs,
forums
• Define & Secure REST & SOAP APIs, Publish to multiple
developer portals & users, Analyze API usage &
performance
• A resilient integrated API runtime gateway infrastructure
with IBM DataPower Gateway for enforcement of
runtime policies to secure & control API traffic
• Seamlessly move APIs & Plans from public to private
cloud or on-prem for complete flexibility
Define, publish & manage APIs
• OAuth security management
• Backend service discovery
• API lifecycle management
• API subscription management
• Data transformation/redaction
• Rate limiting at Plan/Resource level
• API user & Plan management
• API deployment to Gateway
• API security enforcement
• API Analytics to gain business
insight
• Custom roles & role-based access
control
Manage API environment
• Administer & scale system
resources
• Monitor runtime health
• Multi-tenancy
REST APIs to extend/customize
• Developer Portal
• User onboarding
• Integration with API testing
tools (SoapUI NG Pro,
Ready! API)
• Integration with Content
Management System
(Drupal)
Subscription and Support
A comprehensive product upgrade and Technical Support Solution that
helps you take advantage of all the new releases with a 24*7 technical
support.
IBM Software Subscription & Support
Excited about the new features?
Meet our Subscription and Support experts at Essential Services
Zone, Palm Foyer, Level 3, Mandalay Bay to learn how to get
your hands on these features.
API Management Sessions at InterConnect 2015
Client Use Case sessions
• 3282: Enterprise API Strategies: API Economy Customer Panel with Citi, Kaiser Permanente, Humana,
DealerTrack & Toyota
• Mon, 23-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F
• 3480: Exposing WestJet Services Using IBM API Management
• Mon, 23-Feb 02:00 PM - 03:00 PM- Mandalay Bay Surf Ballroom B
• 3322: How Pitney Bowes Helps You Ship Accurately with APIs
• Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Reef Ballroom D
• 5414: Governance and API Management Success Story at Blue Cross Blue Shield of Minnesota
• Mon, 23-Feb 12:15 PM - 01:15 PM- Mandalay Bay Surf Ballroom B
• 3028: API Management Challenges, Wins, Business Outcomes and Ongoing Strategy at Westpac New Zealand
• Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Surf Ballroom B
• 3186: Exploring New Frontiers in M2M Services through API Marketplaces
• Wed, 25-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F
• 3315: How Informatique des Banques Populaires is Driving Banking Innovation and Extending SOA Using APIs
• Wed, 25-Feb 02:00 PM - 03:00 PM- Mandalay Bay Surf Ballroom B
• 3316: Dogfooding: How IBM's CIO Team is Managing IBM APIs Using IBM API Management
• Wed, 25-Feb 08:00 AM - 09:00 AM- Mandalay Bay Lagoon F
© 2015 IBM Corporation
2
API Management Sessions at InterConnect 2015
3
API Economy
• 3286: Ten Reasons Developers Hate Your API (and What to Do About It) –
by John Musser, CEO of API Science & Founder of ProgrammableWeb.com
• Tue, 24-Feb 11:00 AM - 12:00 PM- Mandalay Bay Lagoon F
• 3288: Scale the API Economy with the Open API Definition Leap of Faith –
by Mehdi Medjaoui, APIDays.io & OAuth.io
• Tue, 24-Feb 2:00 PM - 3:00 PM- Mandalay Bay Surf Ballroom B
• 2246: From APIs to API Economy
• Tue, 24-Feb 03:30 PM - 04:30 PM- Mandalay Bay Surf Ballroom B
• 2247: API Platforms are Not "Just Another Enterprise Service Bus“
• Tue, 24-Feb 08:00 AM - 09:00 AM- Mandalay Bay Lagoon F
• 2399: IoT + API = Big Opportunities that are Transforming Businesses into Digital Enterprises
• Wed, 25-Feb 11:00 AM - 12:00 PM- Mandalay Bay Surf Ballroom B
• 2405: Banking on APIs
• Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Lagoon F
• 2583: Best Practices in API Management Initiatives
• Tue, 24-Feb 08:00 AM - 09:00 AM- Mandalay Bay Surf Ballroom B
• 3079: Public, Private and Hybrid APIs: What is Right for You?
• Tue, 24-Feb 09:30 AM - 10:30 AM- Mandalay Bay Lagoon F
• 3207: Hosting Your API Hackathon with IBM API Management
• Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Surf Ballroom B
• 3280: API Economy Panel with Industry Experts- John Musser and Mehdi Medjaoui
• Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Reef Ballroom D
• 3723: Ensure Your Web APIs are More than Just a Pretty Façade
• Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Lagoon F
Expo Theater
• 6105: Defining, Publishing and Managing Your APIs in the Cloud
• Tue, 24-Feb 09:00 AM – 09:50 AM
© 2015 IBM Corporation
6613: IBM API
Management Demo
• Mon, 23-Feb 06:00 PM-
06:50 PM- Application
Infrastructure
Engagement Center
Dev@ Conference
6169: Got 5 minutes? Build a Custom
Developer Portal to Publish Your APIs
• Mon, 23-Feb 03:00 PM – 05:00 PM- MGM
Grand, Dev@ conference, Developer
Playground
• Tue, 24-Feb 12:00 PM – 02:00 PM- MGM
Grand, Dev@ conference, Developer
Playground
API Management Sessions at InterConnect 2015
Product sessions
• 2381: Manage your APIs Securely and Easily: IBM API Management Product Introduction
• Mon, 23-Feb 03:30 PM - 04:30 PM- Mandalay Bay Lagoon F
• 2394: Managing APIs in a Hybrid World
• Tue, 24-Feb 11:00 AM - 12:00 PM- Mandalay Bay Reef Ballroom D
• 4573: API Management for IBM MobileFirst Platform
• Tue, 24-Feb 12:30 PM -1:30PM- Mandalay Bay, Mandalay Ballroom C
• 2401: IBM Bluemix & API Management: Consume APIs from the API Management Portal
• Tue, 24-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F
• 2382: What's New in IBM API Management
• Tue, 24-Feb 03:30 PM - 04:30 PM- Mandalay Bay Lagoon F
• 2393: Manage All Your APIs and Services in a Single API Catalog
• Tue, 24-Feb 05:30 PM - 06:30 PM- Mandalay Bay Lagoon F
• 5418: Discovery of Enterprise/z Systems Assets for API Management
• Wed, 25-Feb 08:00 AM - 09:00 AM- Mandalay Bay Surf Ballroom B
• 1177: Best Practices when Creating Your Own Cloud-Hosted API Management Platform
• Wed, 25-Feb 05:30 PM - 06:30 PM- Mandalay Bay Surf Ballroom B
• 2323: Policy-driven API Control with IBM API Management
• Thu, 26-Feb 09:00 AM - 10:00 AM- Mandalay Bay Lagoon F
• 2389: IBM's “API-First” Approach: A Closer Look at Managing Your APIs with Our APIs
• Thu, 26-Feb 09:00 AM - 10:00 AM-Mandalay Bay Surf Ballroom B
• 2398: Integrating Mobile Apps with Enterprise/Third-Party APIs Quickly and Securely
• Thu, 26-Feb 01:00 PM - 02:00 PM-Mandalay Bay Lagoon F
• 3148: Topologies for Implementation of IBM API Management
• Thu, 26-Feb 01:00 PM - 02:00 PM- Mandalay Bay Surf Ballroom B
Hands-on Labs
• 3336: IBM API Management Basics: Hands-On Experience for Beginners
• Wed, 25-Feb 08:00 AM - 10:00 AM Mandalay Bay South Seas Ballroom G
• 4037: IBM API Management Advanced Lab: Securing Your APIs with OAuth and Adding a Custom Policy
• Thu, 26-Feb 08:00 AM - 10:00 AM Mandalay Bay South Seas Ballroom B
4
2376: IBM API
Management Customer
Feedback Session
• Tue, 24-Feb 09:30 AM -
10:30 AM- Mandalay Bay
Tropics B
• Wed, 25-Feb 05:30 PM -
06:30 PM-Mandalay Bay
Tropics B
• Thu, 26-Feb 10:30 AM -
11:30 AM-Mandalay Bay
Tropics B
3276: Meet the IBM API
Management Experts
• Mon, 23-Feb 05:00 PM –
05:50 PM- Mandalay Bay,
Meet the Experts Forum #1
© 2015 IBM Corporation
Backup
A closer look
API Developer
• How do I assemble APIs?
• How do I manage security?
• Will the infrastructure scale?
• How do I measure
performance?
App Developer
• Where do I access
APIs?
• How do I understand the
APIs?
• How do I measure
success?
API Product Manager
• How can I rapidly release & update my
APIs?
• How do I publicize my API?
• How do I measure success?
Operations Lead*
• How do I manage all the
API Environments that are
being requested?
• How can I scale each
environment?
• How can I easily find and
fix issues?
API Success Requires Addressing Needs of
Multiple Stakeholders
* Not applicable to SaaS
Intuitively and iteratively define
APIs and associated policies
Rapidly assemble APIs via
configuration, not coding
Minimize risk with industry leading
security & scalability
Define
API
Develope
r
Assemble
Meter
SecureDeploy,
Test & Debug
Monitor
Scale
Version
48
API Developer: Create, Secure & Version APIs
Simple interface accelerates iterative API development & deployment
API Developer:
Easily find & create REST and SOAP APIs
 Define the REST or
SOAP API you wish to
expose
 Import WSDL, Swagger
or REST/SOAP APIs
from a registry
 Search for, add custom
tags to, and mark
favorite APIs for easier
discovery
API Developer:
Assemble New APIs Through Configuration
 Assemble a new API
by combining multiple
REST or SOAP
services into a
composite API
 Provide examples of
the request and
response messages,
headers and
parameters
 Drag and connect
linking the request and
response messages
 Transform the
message elements
with a click
API Developer: Secure the API
 Identify application
with Client ID &
Secret
 Authenticate using
LDAP or
Authentication URL
 Authorize using
OAuth 2.0 support
with implicit grant
type, authorization
code, resource
owner, client
credentials
 Set configuration
properties
API Developer:
Version & Clone an API for iterative development
 Version the API
configuration in just
one click
 Revert to prior version
 Create an API by
copying a specific
version of an existing
API
API Developer: Test the API
 Interactive test of an
API resource in just
one click
 Provide parameters
and receive response
 Allows quick, iterative
develop / deploy / test
cycles
API Provider: Customize each API Portal
54
Tailor the look and feel of
each Developer Portal and
create many Portals
•Company Logo
•Browser icon
•Marketing Image
•Background Color
•Font
•Terms of Service URL
•Support Link
•Twitter ID
•Website URL
Catalog APIs Management layer Gateway layerContent
Management
System
+
=
Build a Custom API Portal
…
Custom API Portal
API Provider can
-manage community content, blogs, forums
API User can
-view & interact with published APIs on API portal
-manage their apps
-report a problem
-participate in forums
API Provider: Create Custom Roles &
Manage Role Access
•As the owner or
administrator,
you can create
your own
custom roles
that reflect your
unique
organizational
needs
•Specify which
permissions are
to be assigned
for each role
API Provider: Control App & Portal access
57
•Suspend/Resume
App
• Block/allow App
from invoking
APIs
•Viewer Role
•Enable a view-
only app
developer role
•By invitation only
• Enable app
developer
onboarding by
invitation only
API Provider: “Productize” APIs using Plans
 Introduce API
Trial Use
 Free, limited
plans can be
made available
alongside
premium plans
 For example, a
free plan could
be
unrestricted,
and a premium
plan restricted
API Provider: “Productize” APIs using Plans
 Quick and
easy for
developers to
register for the
free plan and
start testing
APIs
 Multiple
available
plans
presented to
developers for
comparison
API Provider: “Productize” APIs using Plans
 Include multiple APIs
and Resources per
Plan
 Version your Plans
 Apply Rate Limit by
Plan or Resource
 Reject calls when limit
reached
API Provider: Centrally manage all Plans
• Easily
publish,
republish,
unpublish,
undeploy
Plans
• View
subscription
approval
requests
• View the
analytics
details for
each Plan
version
• View
developer
organization
API usage
API Provider: Publish plans to select developer
communities or portals
 Fine grained control
over plan deployment
 Decide which
environments or
portals to deploy
Plans to
 Determine visibility for
developer
communities
 Non-disruptive
Publish: Replace a
currently published
version of a Plan
without any disruption
in API availability
API Provider: Publish your APIs to multiple
developer portals
Multiple Developer Portals
API Manager
API Provider
App Developers
In group 1
App
Developers in
group 2
Securely share APIs/Plans with various
select developer communities
API Provider: Gain Business Insights
• Pinpoint key
market
fluctuations and
find
correlations
related to your
business
• Business
Analytics for
both API provider
and application
developer:
• Top traffic
producing
API ,
• Top
application
producing
traffic
API Provider: Optimize / Analyze API Performance
• Analyze
performance of
APIs with full
lucene query
syntax
• Structured
Filtered Search
across analytics
for example
• country:USA,
color:red
• Saved Searches
and Filters for
easy and
consistent
retrieval
• Bookmarkable
queries
API Provider: Optimize / Analyze API Performance
• Scope queries
by environment,
plan, API,
developer,
application, time
period
• Example queries
for response
times and
response codes
• Enables
chargeback or
billing for API
consumption by
developers
through export
of activity as
.csv file
API Provider: Optimize / Analyze Highly-used APIs
• Dig deeper
into the
high-use
APIs by
scoping
the
Analytics
view
• Focus on
just an
API, or
individual
resource
within an
API
App Developer: Interactive developer portals
 Create unlimited self-
service developer
portals to explore APIs
 Browse API
documentation
 Role-based access
for viewing APIs
App Developer: Try out APIs with liveDocs
 Call API resource with
just one click
 Provide parameters
and receive response
 generate cURL
commands to run
outside of the
Developer Portal
App Developer: Register application
 Register new
application
 Request
security keys
with enhanced
privacy
 Deferred
retrieval of
client secret
App Developer: Browse Plans
 Browse available
Plans with limits and
choose from
available plans
 Request access to
Plans
 Use Plan & Select
application
App Developer: Use Plan with Application
 Register new
application
 Request
security keys
 Analyze
Application
usage of APIs
App Developer: Client Application Authorization Revocation
Developers
will be
notified by
email when
their
application is
suspended
and/or
resumed,
and the
Portal will
also make
this clear
App Developer: Upgrade Plan
When
developer
outgrows the
free plan, they
can simply
upgrade to the
premium plan
via the Portal –
pending an
approval
process if
desired
App Developer: Analyze App Performance, Get notified
 Monitor most
active
applications and
APIs
 Rate limit
developer
notifications
IT Admin: Manage Overall Environment
 At-a-glance
server
utilization
metrics
 Management &
Gateway
Server
utilization -
CPU, Memory,
Disk
 Usage over
time available
by drilling down
* Not applicable to SaaS
IT Admin: Optimize / Analyze API Runtime Monitoring
 At-a-glance
server
utilization
metrics
 Log file export
functionality
 Usage over
time available
by drilling down
 Server
utilization,
throughput
(KB/s and
requests/s),
average latency
 Multiple
Gateway
Cluster support
* Not applicable to SaaS
IT Admin:
Support many organizations with one solution
 Multi-tenant
support for
multi-provider
organizations
 Provider and
Consumer
organization
Visibility
 Alerts &
notifications
 Send email
directly through
console
* Not applicable to SaaS
IT Admin: Manage SSL profiles
 Use SSL
profiles to
manage SSL
certificates for
secure
transmission of
data
 Add certificates,
SSL version
and cipher suite
to API Manager
* Not applicable to SaaS
IT Admin: Setup in minutes
 Easy out of the
box setup
 LDAP or
internal identity
provider
support
 Add new user
registries to
securely
authenticate
your
environments
and APIs
* Not applicable to SaaS
IT Admin: Setup in minutes
* Not applicable to SaaS
 Choose the
connection
method to each
of the consoles
 Provide the
details of an
existing SMTP
server and
configure API
Management to
generate
emails, where
required
Where does API Management fit?
On-premise
private
Off-premise
SaaS
Off-premise
dedicated
Developer
organizations
(consume APIs
develop Apps)
API Provider
organizations
Users
Cloud
system
admin
Clusters
of
servers
User registry
(identity provider)
email server
configuration
Anatomy of API Management
IBM /apimanagement 15
Developer
portal
API Manager
Cloud
Management
Console
Catalog APIs Management layer Gateway layerContent
Management
System
+
=
Build a Custom API Portal
…
Custom API Portal
API Provider can
-manage community content, blogs, forums
API User can
-view & interact with published APIs on API portal
-manage their apps
-report a problem
-participate in forums
A successful API initiative requires end-to-end focus
APIs
Apps
Social Feedback and Communities
Marketplace
Self-Service Portal: Registration • Documentation • Sandbox
Security, Metering and
Control
API Design and Integration
Analytics and Monetization
API Lifecycle Management
Composition
Infrastructure Services
DevOps and App
Management
Mobile Services
Internal
Developers
Partner
Developers
External
Developers
Channels: Smartphones • Tablets • Desktops • Cars • TVs • Others
Services: Data • Processes • Applications
Cloud
The API Provider’s Journey
Internal
developers
Partner developers
Public APIs
3rd party services
Public developers
Hackathons
Innovate, Motivate, Iterate
1
2
3
Freemium plans
Monetize
Chargeback
Pay
Private APIs
Partner APIs
Enterprise data
Application logic
Systems of Record
Notices and Disclaimers
Copyright © 2015 by International Business Machines Corporation (IBM). No part of this document may be reproduced or
transmitted in any form without written permission from IBM.
U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with
IBM.
Information in these presentations (including information relating to products that have not yet been announced by IBM) has been
reviewed for accuracy as of the date of initial publication and could include unintentional technical or typographical errors. IBM
shall have no responsibility to update this information. THIS DOCUMENT IS DISTRIBUTED "AS IS" WITHOUT ANY WARRANTY,
EITHER EXPRESS OR IMPLIED. IN NO EVENT SHALL IBM BE LIABLE FOR ANY DAMAGE ARISING FROM THE USE OF
THIS INFORMATION, INCLUDING BUT NOT LIMITED TO, LOSS OF DATA, BUSINESS INTERRUPTION, LOSS OF PROFIT
OR LOSS OF OPPORTUNITY. IBM products and services are warranted according to the terms and conditions of the
agreements under which they are provided.
Any statements regarding IBM's future direction, intent or product plans are subject to change or withdrawal without
notice.
Performance data contained herein was generally obtained in a controlled, isolated environments. Customer examples are
presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual
performance, cost, savings or other results in other operating environments may vary.
References in this document to IBM products, programs, or services does not imply that IBM intends to make such products,
programs or services available in all countries in which IBM operates or does business.
Workshops, sessions and associated materials may have been prepared by independent session speakers, and do not
necessarily reflect the views of IBM. All materials and discussions are provided for informational purposes only, and are neither
intended to, nor shall constitute legal or other guidance or advice to any individual participant or their specific situation.
It is the customer’s responsibility to insure its own compliance with legal requirements and to obtain advice of competent legal
counsel as to the identification and interpretation of any relevant laws and regulatory requirements that may affect the customer’s
business and any actions the customer may need to take to comply with such laws. IBM does not provide legal advice or
represent or warrant that its services or products will ensure that the customer is in compliance with any law.
Notices and Disclaimers (con’t)
Information concerning non-IBM products was obtained from the suppliers of those products, their published
announcements or other publicly available sources. IBM has not tested those products in connection with this
publication and cannot confirm the accuracy of performance, compatibility or any other claims related to non-IBM
products. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products.
IBM does not warrant the quality of any third-party products, or the ability of any such third-party products to
interoperate with IBM’s products. IBM EXPRESSLY DISCLAIMS ALL WARRANTIES, EXPRESSED OR IMPLIED,
INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A
PARTICULAR PURPOSE.
The provision of the information contained herein is not intended to, and does not, grant any right or license under any
IBM patents, copyrights, trademarks or other intellectual property right.
• IBM, the IBM logo, ibm.com, Bluemix, Blueworks Live, CICS, Clearcase, DOORS®, Enterprise Document
Management System™, Global Business Services ®, Global Technology Services ®, Information on Demand,
ILOG, Maximo®, MQIntegrator®, MQSeries®, Netcool®, OMEGAMON, OpenPower, PureAnalytics™,
PureApplication®, pureCluster™, PureCoverage®, PureData®, PureExperience®, PureFlex®, pureQuery®,
pureScale®, PureSystems®, QRadar®, Rational®, Rhapsody®, SoDA, SPSS, StoredIQ, Tivoli®, Trusteer®,
urban{code}®, Watson, WebSphere®, Worklight®, X-Force® and System z® Z/OS, are trademarks of
International Business Machines Corporation, registered in many jurisdictions worldwide. Other product and
service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on
the Web at "Copyright and trademark information" at: www.ibm.com/legal/copytrade.shtml.
Thank You
Your Feedback is
Important!
Access the InterConnect 2015
Conference CONNECT Attendee
Portal to complete your session
surveys from your smartphone,
laptop or conference kiosk.

Api management update for optus

  • 1.
    © 2015 IBMCorporation 2382 What’s New in IBM API Management Sid Bhatia – Product Management Chris Markes – Product Design & Engineering
  • 2.
  • 3.
    Securely expose yourbusiness to an internal/external developer ecosystem Provide self-service API portals to internal/external app developers Expose business services securely as APIs to select developer communities & analyze API usage Manage & monitor the entire API platform On-premise private Off-premise SaaS Off-premise dedicated Hybrid IBM API Management
  • 4.
    Easily manage yourAPIs, in your private environment design, secure, control, publish, monitor & manage Explore API documentation Provision application keys Self-service experience Developer Portal API Manager Management Console Define and manage APIs Explore API usage with analytics Manage API user communities Provision system resources Monitor runtime health Scale the environment API Gateway (IBM DataPower) Enforce runtime policies to control API traffic
  • 5.
    © 2014 IBMCorporation API Management solution, on-premise Product APIs allow customers to interact with the API Management solution, and extend/customize Product APIs Management layer Gateway layer The management layer embodies the capability for organizations to define, manage, expose and control APIs. Provides API Manager, Developer Portal and Management Console. (Virtual Appliance running VMWare ESXi 5.0, vCenter V5.5, Citrix XenServer 6.2, IBM PureApplication System W1500 1.1) API configurations are deployed to the gateway, which provides the enforcement point for runtime policies to control API traffic (DataPower physical appliance or virtual appliance VMWare ESXi 5.0, vCenter V5.5, Citrix XenServer 6.2, IBM PureApplication System W1500 1.1)
  • 6.
    What’s delivered since lastyear & what’s new
  • 7.
    2.0 IBM API Managementproduct updates •Multi-tenant on-premise solution to define, assemble, publish, monitor REST APIs •Developer portal to easily consume APIs •DataPower as the API gateway •SOAP support •Manage various dev communities •Simplified deployment & packaging •Service discovery from WSRR •Xen & PureApp support •Developer portal customization •Multiple Gateway cluster support 2013 2014 3.0 •Interactive API test on portal •Developer notifications on rate limits •APIs to customize portal, user mgmt •Service discovery from custom registries •Free 30-day SaaS trial •Buy SaaS with credit card •Monthly billing •Self-service or sales-assisted 3.0.2 3.0.3 •Viewer only app developer role •Developer onboarding by invitation only •Enhanced privacy •Application suspension •Support for 3rd party authentication providers •Encryption of Plans Oct Nov •Topology flexibility with mgmt & data traffic separation •Multi- gateway cluster support on single gateway appliance •API usage statistics at a glance 3.0.1 Sep •Scripted deploy •Non-disruptive publish •API cloning •SSL Mutual Auth for UI consoles •Custom Roles •REST API discovery •Assembly debug •Multi-site •Custom portal w/CMS -Ready! API plug-in -Tech preview: Swagger import 3.0.4 Dec
  • 8.
    IBM API Managementv.3.0.1* API Development • OAuth2 Refresh/Revocation: API Developer can enable OAuth2 token refresh and/or revocation • API Properties: API Developer can create custom properties enabling seamless transition between environments (e.g. environmentally dependent service endpoints) • Pluggable SOAP Discovery: API Provider can develop a discovery agent to enable SOAP discovery from custom registries for exposure as REST/SOAP APIs • Cross Origin Resource Sharing (CORS): CORS support enabling easy cross site API requests Developer Portal enhancements • Live Docs: App Developer can invoke/test an API within the documentation to accelerate their API comprehension • Rate Limit Notifications: App Developer can receive notification when near or exceeding their subscribed rate limit to make informed and timely adjustments • WSDL Download: App Developer can download the WSDL for a SOAP API to be used for testing and client development • Catalog APIs: Script application creation or develop a custom Developer Portal Analytics & Reporting • 90 Day Visualization: API Provider UI dashboards can display up to 90 days for instant analysis • Fine Grained Export: API Provider can export fine grained analytics via API Manager for integration with 3rd party business intelligence systems, monetization and billing, or reporting SaaS Offering • Try & Buy: Self service signup for 30 day free trial, Pay with credit card or contact Sales • Usage based pricing: API volume and application developer based + optional detailed usage logging * released Sep 26, 2014 for on-premise & applied to SaaS Details at www-01.ibm.com/support/docview.wss?uid=swg21685516
  • 9.
    IBM API Managementv3.0.2* Developer Engagement • By invitation only: Enable app developer onboarding by invitation only • Viewer Role: Enable a view-only app developer role • Client ID / secret confidentiality: Enhanced privacy in the Developer Portal to get client secret; Deferred retrieval of client secret Provider Productivity • Authentication URL: API Provider can configure non-LDAP based IDPs by using Authentication URL. For example, enabling integration with third-party authentication providers. • Application suspension: Individual apps can be suspended by the API Provider. Block the app from invoking APIs and prevent blocked apps from registering with Plans • Encrypted Plan: API Provider can export/import Plans as an encrypted package for secure handling between disconnected environments. * released Oct 20, 2014 for on-premise & applied to Saa Details at www-01.ibm.com/support/docview.wss?uid=swg21687434
  • 10.
    IBM API Managementv3.0.3* Topology Flexibility • Dual NICs on Management Server: Enhanced networking/topology flexibility on the management appliance to separate management & data traffic. • Multiple gateway clusters per DataPower appliance: Scale with ease for increased gateway utilization through multiple clusters within a single DataPower appliance Analytics & Reporting • Usage summary statistics: Aggregated quick view usage statistics of number of API calls across environments, number of developer account & storage against payload logging * released Nov 21, 2014 for on-premise Details at: www-01.ibm.com/support/docview.wss?uid=swg21690570
  • 11.
    IBM API Managementv3.0.4* API Lifecycle & Governance • Scripted Deployment: Deploy Plans from outside API Manager using a script for operational integration. Support for deploy, undeploy, publish, unpublish, suspend, resume • Non-disruptive Publish: Deploy changes to rate limits, minor API revisions in a plan without any outage while also providing auto subscriber migration • API Cloning: Create a new copy of an API with a single click to accelerate API development Security • Secure UI access: SSL Mutual Authentication support for secure UI traffic to Cloud Management Console , API Manager UI and Developer portal • Custom Roles: Create unique roles across the API provider organization, each with view/modify access to Plans, APIs, environments, etc. API Provider Productivity • API Discovery: Easily find & expose REST services, by discovering them from custom registries such as those on z/OS. This is in addition to already available SOAP service discovery from custom registries • Assembly Debugging: Debug API assembly flow with ease from within the API Manager UI Topology Flexibility • High performance multi-site configuration: Optimize and load balance communications between gateway servers and management servers in a multi-site configuration Tech Preview • Swagger Import: Accelerate API development & reuse existing API definitions through import of Swagger 2.0 representation * released Dec 22, 2014 for on-premiseDetails at: www-01.ibm.com/support/docview.wss?uid=swg21693132
  • 12.
    API Providers &Consumers: Test API readiness with Ready! API plugin Export: Define new APIs in Ready! API product by uploading Swagger, WADL, RAML, WSDL, etc., and then test the API.  Commit to a full range of tests – functional, load, security  When ready, click a button to Export API to insert the tested API into API Manager UI Import: Use Ready! API testing platform to Import SOAP & REST API definitions directly from IBM API Mgmt Dev portal for unit/functional testing, load testing, service virtualization & more  Select any API from Dev Portal  Auto-generate test suite  Validate functionality and resiliency  Virtualize for application testing & API Consumers API Providers
  • 13.
    Custom API Portalusing IBM API Mgmt & Drupal CMS
  • 14.
  • 15.
    IBM Interconnect 201514 Securelyexpose business services to internal & external developer communities • Easily assemble business APIs into a single catalog & publish to custom social portals • Manage APIs using IBM API Management in Bluemix & share APIs with Bluemix developers • Accelerate API creation, deployment & invocation with Swagger 2.0 support • Extract API usage & analytics data via API • Leverage API Management Service delivered in Softlayer with built-in failover, redundancy & dynamic scaling • Move APIs & Plans from public cloud to private/on-premise for complete flexibility IBM API Management v4 On-premise SaaS Bluemix GA: Mar 20, 2015
  • 16.
    IBM Interconnect 201515 15 IBMAPI Management v4* Lifecycle & Governance • Swagger based API creation: Allows APIs to be imported from Swagger, deployed, and invoked without any manual configuration steps to the API • Co-Publish: Co-publish and supersede plans as well as manage plan subscription migrations • Promotion Approval: Environment based configuration for approving plan lifecycle changes • Plan Auto-creation & Wildcarding: Auto create plan when API is created with a reference to all resources that are added to the API • Enforced: Option to just publish APIs and not gateway enforce them • Policy for SOAP: Ability to add/modify policies for SOAP Services • Discover: Manage REST & SOAP services from System z and custom registries Security • Mutual Authentication: Out of the box support for custom certificates for backend endpoints, LDAP, and SMTP servers Assembly • Error Handling: Ability to map errors returned from a Service call into a Response Developer Portal (Drupal) • Multi-factor authentication: Enabled in the Drupal based developer portal • Search: Out of the box support for search and developer management • Categorization: Flexible Plan/API multi-level classification • CAPTCHA : Support to prevent automated programs from accessing the portal to enroll users • Password Lockout * GA: Mar 20, 2015
  • 17.
  • 18.
    New view formanaging API and plan lifecycle
  • 19.
  • 20.
    New actions formanaging API and plan lifecycle
  • 21.
  • 22.
  • 23.
  • 24.
    Optional approval stepsfor publishing and lifecycle actions
  • 25.
  • 26.
    Manage transition fromone version to another
  • 27.
    Managed deprecation and retirementof plans at end of life
  • 28.
  • 29.
    All-new developer portal,based on Drupal content management system
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 38.
  • 39.
  • 40.
    IBM API ManagementService (SaaS) Embrace the API Economy in the Cloud • Design & Secure APIs, Publish to developer portals, Analyze API usage & performance • A resilient and highly available API runtime infrastructure with built-in failover, redundancy & dynamic scaling on IBM SoftLayer • Seamlessly move APIs & Plans from public to private cloud or on-prem for complete flexibility • 30-day full feature trial, self-service pay with credit card • Grow as you need: Pricing based on API calls & developer accounts with optional logging of API payload • Identical capabilities of on-premise • Manage your APIs in Bluemix • Share APIs with Bluemix developers ibm.biz/apimsaas Global Network London FrankfurtTokyo Singapore San Jose Houston
  • 41.
    Enabling businesses tojoin the API Economy IBM API Management - on-cloud & on-premise Engage with app developers through portals • API exploration • Self-service sign up • Interactive API testing • App & Key management • API usage analytics • Rate limit notification • Multiple dev communities • Build custom portal with blogs, forums • Define & Secure REST & SOAP APIs, Publish to multiple developer portals & users, Analyze API usage & performance • A resilient integrated API runtime gateway infrastructure with IBM DataPower Gateway for enforcement of runtime policies to secure & control API traffic • Seamlessly move APIs & Plans from public to private cloud or on-prem for complete flexibility Define, publish & manage APIs • OAuth security management • Backend service discovery • API lifecycle management • API subscription management • Data transformation/redaction • Rate limiting at Plan/Resource level • API user & Plan management • API deployment to Gateway • API security enforcement • API Analytics to gain business insight • Custom roles & role-based access control Manage API environment • Administer & scale system resources • Monitor runtime health • Multi-tenancy REST APIs to extend/customize • Developer Portal • User onboarding • Integration with API testing tools (SoapUI NG Pro, Ready! API) • Integration with Content Management System (Drupal)
  • 42.
    Subscription and Support Acomprehensive product upgrade and Technical Support Solution that helps you take advantage of all the new releases with a 24*7 technical support. IBM Software Subscription & Support Excited about the new features? Meet our Subscription and Support experts at Essential Services Zone, Palm Foyer, Level 3, Mandalay Bay to learn how to get your hands on these features.
  • 43.
    API Management Sessionsat InterConnect 2015 Client Use Case sessions • 3282: Enterprise API Strategies: API Economy Customer Panel with Citi, Kaiser Permanente, Humana, DealerTrack & Toyota • Mon, 23-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F • 3480: Exposing WestJet Services Using IBM API Management • Mon, 23-Feb 02:00 PM - 03:00 PM- Mandalay Bay Surf Ballroom B • 3322: How Pitney Bowes Helps You Ship Accurately with APIs • Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Reef Ballroom D • 5414: Governance and API Management Success Story at Blue Cross Blue Shield of Minnesota • Mon, 23-Feb 12:15 PM - 01:15 PM- Mandalay Bay Surf Ballroom B • 3028: API Management Challenges, Wins, Business Outcomes and Ongoing Strategy at Westpac New Zealand • Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Surf Ballroom B • 3186: Exploring New Frontiers in M2M Services through API Marketplaces • Wed, 25-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F • 3315: How Informatique des Banques Populaires is Driving Banking Innovation and Extending SOA Using APIs • Wed, 25-Feb 02:00 PM - 03:00 PM- Mandalay Bay Surf Ballroom B • 3316: Dogfooding: How IBM's CIO Team is Managing IBM APIs Using IBM API Management • Wed, 25-Feb 08:00 AM - 09:00 AM- Mandalay Bay Lagoon F © 2015 IBM Corporation 2
  • 44.
    API Management Sessionsat InterConnect 2015 3 API Economy • 3286: Ten Reasons Developers Hate Your API (and What to Do About It) – by John Musser, CEO of API Science & Founder of ProgrammableWeb.com • Tue, 24-Feb 11:00 AM - 12:00 PM- Mandalay Bay Lagoon F • 3288: Scale the API Economy with the Open API Definition Leap of Faith – by Mehdi Medjaoui, APIDays.io & OAuth.io • Tue, 24-Feb 2:00 PM - 3:00 PM- Mandalay Bay Surf Ballroom B • 2246: From APIs to API Economy • Tue, 24-Feb 03:30 PM - 04:30 PM- Mandalay Bay Surf Ballroom B • 2247: API Platforms are Not "Just Another Enterprise Service Bus“ • Tue, 24-Feb 08:00 AM - 09:00 AM- Mandalay Bay Lagoon F • 2399: IoT + API = Big Opportunities that are Transforming Businesses into Digital Enterprises • Wed, 25-Feb 11:00 AM - 12:00 PM- Mandalay Bay Surf Ballroom B • 2405: Banking on APIs • Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Lagoon F • 2583: Best Practices in API Management Initiatives • Tue, 24-Feb 08:00 AM - 09:00 AM- Mandalay Bay Surf Ballroom B • 3079: Public, Private and Hybrid APIs: What is Right for You? • Tue, 24-Feb 09:30 AM - 10:30 AM- Mandalay Bay Lagoon F • 3207: Hosting Your API Hackathon with IBM API Management • Mon, 23-Feb 11:00 AM - 12:00 PM- Mandalay Bay Surf Ballroom B • 3280: API Economy Panel with Industry Experts- John Musser and Mehdi Medjaoui • Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Reef Ballroom D • 3723: Ensure Your Web APIs are More than Just a Pretty Façade • Wed, 25-Feb 12:30 PM - 01:30 PM- Mandalay Bay Lagoon F Expo Theater • 6105: Defining, Publishing and Managing Your APIs in the Cloud • Tue, 24-Feb 09:00 AM – 09:50 AM © 2015 IBM Corporation 6613: IBM API Management Demo • Mon, 23-Feb 06:00 PM- 06:50 PM- Application Infrastructure Engagement Center Dev@ Conference 6169: Got 5 minutes? Build a Custom Developer Portal to Publish Your APIs • Mon, 23-Feb 03:00 PM – 05:00 PM- MGM Grand, Dev@ conference, Developer Playground • Tue, 24-Feb 12:00 PM – 02:00 PM- MGM Grand, Dev@ conference, Developer Playground
  • 45.
    API Management Sessionsat InterConnect 2015 Product sessions • 2381: Manage your APIs Securely and Easily: IBM API Management Product Introduction • Mon, 23-Feb 03:30 PM - 04:30 PM- Mandalay Bay Lagoon F • 2394: Managing APIs in a Hybrid World • Tue, 24-Feb 11:00 AM - 12:00 PM- Mandalay Bay Reef Ballroom D • 4573: API Management for IBM MobileFirst Platform • Tue, 24-Feb 12:30 PM -1:30PM- Mandalay Bay, Mandalay Ballroom C • 2401: IBM Bluemix & API Management: Consume APIs from the API Management Portal • Tue, 24-Feb 02:00 PM - 03:00 PM- Mandalay Bay Lagoon F • 2382: What's New in IBM API Management • Tue, 24-Feb 03:30 PM - 04:30 PM- Mandalay Bay Lagoon F • 2393: Manage All Your APIs and Services in a Single API Catalog • Tue, 24-Feb 05:30 PM - 06:30 PM- Mandalay Bay Lagoon F • 5418: Discovery of Enterprise/z Systems Assets for API Management • Wed, 25-Feb 08:00 AM - 09:00 AM- Mandalay Bay Surf Ballroom B • 1177: Best Practices when Creating Your Own Cloud-Hosted API Management Platform • Wed, 25-Feb 05:30 PM - 06:30 PM- Mandalay Bay Surf Ballroom B • 2323: Policy-driven API Control with IBM API Management • Thu, 26-Feb 09:00 AM - 10:00 AM- Mandalay Bay Lagoon F • 2389: IBM's “API-First” Approach: A Closer Look at Managing Your APIs with Our APIs • Thu, 26-Feb 09:00 AM - 10:00 AM-Mandalay Bay Surf Ballroom B • 2398: Integrating Mobile Apps with Enterprise/Third-Party APIs Quickly and Securely • Thu, 26-Feb 01:00 PM - 02:00 PM-Mandalay Bay Lagoon F • 3148: Topologies for Implementation of IBM API Management • Thu, 26-Feb 01:00 PM - 02:00 PM- Mandalay Bay Surf Ballroom B Hands-on Labs • 3336: IBM API Management Basics: Hands-On Experience for Beginners • Wed, 25-Feb 08:00 AM - 10:00 AM Mandalay Bay South Seas Ballroom G • 4037: IBM API Management Advanced Lab: Securing Your APIs with OAuth and Adding a Custom Policy • Thu, 26-Feb 08:00 AM - 10:00 AM Mandalay Bay South Seas Ballroom B 4 2376: IBM API Management Customer Feedback Session • Tue, 24-Feb 09:30 AM - 10:30 AM- Mandalay Bay Tropics B • Wed, 25-Feb 05:30 PM - 06:30 PM-Mandalay Bay Tropics B • Thu, 26-Feb 10:30 AM - 11:30 AM-Mandalay Bay Tropics B 3276: Meet the IBM API Management Experts • Mon, 23-Feb 05:00 PM – 05:50 PM- Mandalay Bay, Meet the Experts Forum #1 © 2015 IBM Corporation
  • 46.
  • 47.
  • 48.
    API Developer • Howdo I assemble APIs? • How do I manage security? • Will the infrastructure scale? • How do I measure performance? App Developer • Where do I access APIs? • How do I understand the APIs? • How do I measure success? API Product Manager • How can I rapidly release & update my APIs? • How do I publicize my API? • How do I measure success? Operations Lead* • How do I manage all the API Environments that are being requested? • How can I scale each environment? • How can I easily find and fix issues? API Success Requires Addressing Needs of Multiple Stakeholders * Not applicable to SaaS
  • 49.
    Intuitively and iterativelydefine APIs and associated policies Rapidly assemble APIs via configuration, not coding Minimize risk with industry leading security & scalability Define API Develope r Assemble Meter SecureDeploy, Test & Debug Monitor Scale Version 48 API Developer: Create, Secure & Version APIs Simple interface accelerates iterative API development & deployment
  • 50.
    API Developer: Easily find& create REST and SOAP APIs  Define the REST or SOAP API you wish to expose  Import WSDL, Swagger or REST/SOAP APIs from a registry  Search for, add custom tags to, and mark favorite APIs for easier discovery
  • 51.
    API Developer: Assemble NewAPIs Through Configuration  Assemble a new API by combining multiple REST or SOAP services into a composite API  Provide examples of the request and response messages, headers and parameters  Drag and connect linking the request and response messages  Transform the message elements with a click
  • 52.
    API Developer: Securethe API  Identify application with Client ID & Secret  Authenticate using LDAP or Authentication URL  Authorize using OAuth 2.0 support with implicit grant type, authorization code, resource owner, client credentials  Set configuration properties
  • 53.
    API Developer: Version &Clone an API for iterative development  Version the API configuration in just one click  Revert to prior version  Create an API by copying a specific version of an existing API
  • 54.
    API Developer: Testthe API  Interactive test of an API resource in just one click  Provide parameters and receive response  Allows quick, iterative develop / deploy / test cycles
  • 55.
    API Provider: Customizeeach API Portal 54 Tailor the look and feel of each Developer Portal and create many Portals •Company Logo •Browser icon •Marketing Image •Background Color •Font •Terms of Service URL •Support Link •Twitter ID •Website URL
  • 56.
    Catalog APIs Managementlayer Gateway layerContent Management System + = Build a Custom API Portal … Custom API Portal API Provider can -manage community content, blogs, forums API User can -view & interact with published APIs on API portal -manage their apps -report a problem -participate in forums
  • 57.
    API Provider: CreateCustom Roles & Manage Role Access •As the owner or administrator, you can create your own custom roles that reflect your unique organizational needs •Specify which permissions are to be assigned for each role
  • 58.
    API Provider: ControlApp & Portal access 57 •Suspend/Resume App • Block/allow App from invoking APIs •Viewer Role •Enable a view- only app developer role •By invitation only • Enable app developer onboarding by invitation only
  • 59.
    API Provider: “Productize”APIs using Plans  Introduce API Trial Use  Free, limited plans can be made available alongside premium plans  For example, a free plan could be unrestricted, and a premium plan restricted
  • 60.
    API Provider: “Productize”APIs using Plans  Quick and easy for developers to register for the free plan and start testing APIs  Multiple available plans presented to developers for comparison
  • 61.
    API Provider: “Productize”APIs using Plans  Include multiple APIs and Resources per Plan  Version your Plans  Apply Rate Limit by Plan or Resource  Reject calls when limit reached
  • 62.
    API Provider: Centrallymanage all Plans • Easily publish, republish, unpublish, undeploy Plans • View subscription approval requests • View the analytics details for each Plan version • View developer organization API usage
  • 63.
    API Provider: Publishplans to select developer communities or portals  Fine grained control over plan deployment  Decide which environments or portals to deploy Plans to  Determine visibility for developer communities  Non-disruptive Publish: Replace a currently published version of a Plan without any disruption in API availability
  • 64.
    API Provider: Publishyour APIs to multiple developer portals Multiple Developer Portals API Manager API Provider App Developers In group 1 App Developers in group 2 Securely share APIs/Plans with various select developer communities
  • 65.
    API Provider: GainBusiness Insights • Pinpoint key market fluctuations and find correlations related to your business • Business Analytics for both API provider and application developer: • Top traffic producing API , • Top application producing traffic
  • 66.
    API Provider: Optimize/ Analyze API Performance • Analyze performance of APIs with full lucene query syntax • Structured Filtered Search across analytics for example • country:USA, color:red • Saved Searches and Filters for easy and consistent retrieval • Bookmarkable queries
  • 67.
    API Provider: Optimize/ Analyze API Performance • Scope queries by environment, plan, API, developer, application, time period • Example queries for response times and response codes • Enables chargeback or billing for API consumption by developers through export of activity as .csv file
  • 68.
    API Provider: Optimize/ Analyze Highly-used APIs • Dig deeper into the high-use APIs by scoping the Analytics view • Focus on just an API, or individual resource within an API
  • 69.
    App Developer: Interactivedeveloper portals  Create unlimited self- service developer portals to explore APIs  Browse API documentation  Role-based access for viewing APIs
  • 70.
    App Developer: Tryout APIs with liveDocs  Call API resource with just one click  Provide parameters and receive response  generate cURL commands to run outside of the Developer Portal
  • 71.
    App Developer: Registerapplication  Register new application  Request security keys with enhanced privacy  Deferred retrieval of client secret
  • 72.
    App Developer: BrowsePlans  Browse available Plans with limits and choose from available plans  Request access to Plans  Use Plan & Select application
  • 73.
    App Developer: UsePlan with Application  Register new application  Request security keys  Analyze Application usage of APIs
  • 74.
    App Developer: ClientApplication Authorization Revocation Developers will be notified by email when their application is suspended and/or resumed, and the Portal will also make this clear
  • 75.
    App Developer: UpgradePlan When developer outgrows the free plan, they can simply upgrade to the premium plan via the Portal – pending an approval process if desired
  • 76.
    App Developer: AnalyzeApp Performance, Get notified  Monitor most active applications and APIs  Rate limit developer notifications
  • 77.
    IT Admin: ManageOverall Environment  At-a-glance server utilization metrics  Management & Gateway Server utilization - CPU, Memory, Disk  Usage over time available by drilling down * Not applicable to SaaS
  • 78.
    IT Admin: Optimize/ Analyze API Runtime Monitoring  At-a-glance server utilization metrics  Log file export functionality  Usage over time available by drilling down  Server utilization, throughput (KB/s and requests/s), average latency  Multiple Gateway Cluster support * Not applicable to SaaS
  • 79.
    IT Admin: Support manyorganizations with one solution  Multi-tenant support for multi-provider organizations  Provider and Consumer organization Visibility  Alerts & notifications  Send email directly through console * Not applicable to SaaS
  • 80.
    IT Admin: ManageSSL profiles  Use SSL profiles to manage SSL certificates for secure transmission of data  Add certificates, SSL version and cipher suite to API Manager * Not applicable to SaaS
  • 81.
    IT Admin: Setupin minutes  Easy out of the box setup  LDAP or internal identity provider support  Add new user registries to securely authenticate your environments and APIs * Not applicable to SaaS
  • 82.
    IT Admin: Setupin minutes * Not applicable to SaaS  Choose the connection method to each of the consoles  Provide the details of an existing SMTP server and configure API Management to generate emails, where required
  • 83.
    Where does APIManagement fit? On-premise private Off-premise SaaS Off-premise dedicated
  • 84.
    Developer organizations (consume APIs develop Apps) APIProvider organizations Users Cloud system admin Clusters of servers User registry (identity provider) email server configuration Anatomy of API Management IBM /apimanagement 15 Developer portal API Manager Cloud Management Console
  • 85.
    Catalog APIs Managementlayer Gateway layerContent Management System + = Build a Custom API Portal … Custom API Portal API Provider can -manage community content, blogs, forums API User can -view & interact with published APIs on API portal -manage their apps -report a problem -participate in forums
  • 86.
    A successful APIinitiative requires end-to-end focus APIs Apps Social Feedback and Communities Marketplace Self-Service Portal: Registration • Documentation • Sandbox Security, Metering and Control API Design and Integration Analytics and Monetization API Lifecycle Management Composition Infrastructure Services DevOps and App Management Mobile Services Internal Developers Partner Developers External Developers Channels: Smartphones • Tablets • Desktops • Cars • TVs • Others Services: Data • Processes • Applications Cloud
  • 87.
    The API Provider’sJourney Internal developers Partner developers Public APIs 3rd party services Public developers Hackathons Innovate, Motivate, Iterate 1 2 3 Freemium plans Monetize Chargeback Pay Private APIs Partner APIs Enterprise data Application logic Systems of Record
  • 88.
    Notices and Disclaimers Copyright© 2015 by International Business Machines Corporation (IBM). No part of this document may be reproduced or transmitted in any form without written permission from IBM. U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM. Information in these presentations (including information relating to products that have not yet been announced by IBM) has been reviewed for accuracy as of the date of initial publication and could include unintentional technical or typographical errors. IBM shall have no responsibility to update this information. THIS DOCUMENT IS DISTRIBUTED "AS IS" WITHOUT ANY WARRANTY, EITHER EXPRESS OR IMPLIED. IN NO EVENT SHALL IBM BE LIABLE FOR ANY DAMAGE ARISING FROM THE USE OF THIS INFORMATION, INCLUDING BUT NOT LIMITED TO, LOSS OF DATA, BUSINESS INTERRUPTION, LOSS OF PROFIT OR LOSS OF OPPORTUNITY. IBM products and services are warranted according to the terms and conditions of the agreements under which they are provided. Any statements regarding IBM's future direction, intent or product plans are subject to change or withdrawal without notice. Performance data contained herein was generally obtained in a controlled, isolated environments. Customer examples are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual performance, cost, savings or other results in other operating environments may vary. References in this document to IBM products, programs, or services does not imply that IBM intends to make such products, programs or services available in all countries in which IBM operates or does business. Workshops, sessions and associated materials may have been prepared by independent session speakers, and do not necessarily reflect the views of IBM. All materials and discussions are provided for informational purposes only, and are neither intended to, nor shall constitute legal or other guidance or advice to any individual participant or their specific situation. It is the customer’s responsibility to insure its own compliance with legal requirements and to obtain advice of competent legal counsel as to the identification and interpretation of any relevant laws and regulatory requirements that may affect the customer’s business and any actions the customer may need to take to comply with such laws. IBM does not provide legal advice or represent or warrant that its services or products will ensure that the customer is in compliance with any law.
  • 89.
    Notices and Disclaimers(con’t) Information concerning non-IBM products was obtained from the suppliers of those products, their published announcements or other publicly available sources. IBM has not tested those products in connection with this publication and cannot confirm the accuracy of performance, compatibility or any other claims related to non-IBM products. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products. IBM does not warrant the quality of any third-party products, or the ability of any such third-party products to interoperate with IBM’s products. IBM EXPRESSLY DISCLAIMS ALL WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. The provision of the information contained herein is not intended to, and does not, grant any right or license under any IBM patents, copyrights, trademarks or other intellectual property right. • IBM, the IBM logo, ibm.com, Bluemix, Blueworks Live, CICS, Clearcase, DOORS®, Enterprise Document Management System™, Global Business Services ®, Global Technology Services ®, Information on Demand, ILOG, Maximo®, MQIntegrator®, MQSeries®, Netcool®, OMEGAMON, OpenPower, PureAnalytics™, PureApplication®, pureCluster™, PureCoverage®, PureData®, PureExperience®, PureFlex®, pureQuery®, pureScale®, PureSystems®, QRadar®, Rational®, Rhapsody®, SoDA, SPSS, StoredIQ, Tivoli®, Trusteer®, urban{code}®, Watson, WebSphere®, Worklight®, X-Force® and System z® Z/OS, are trademarks of International Business Machines Corporation, registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at: www.ibm.com/legal/copytrade.shtml.
  • 90.
    Thank You Your Feedbackis Important! Access the InterConnect 2015 Conference CONNECT Attendee Portal to complete your session surveys from your smartphone, laptop or conference kiosk.