Agenda
•API Economy
•What is IBM API Management?
•Governance
•Architecture
•Getting Started with a Successful API
Initiative
© 2015 IBM Corporation3
Why APIs? Why Now?
© 2015 IBM Corporation
Adoption of cloud, analytics, mobile & social
computing is forcing organizations to open IT
assets to new business channels
…and challenging them to rethink the way
they have traditionally approached security & control
Between 2005
and 2020, the
amount of data
in the world will
grow 300X, from
130 to 40,000
exabytes.
81% of adults
use personally
owned mobile
devices for
conducting
business
70% of
employees are
engaged in
social activities
both internally
and externally
73% of
organizations
discovered
cloud usage
outside of IT or
security
policies
© 2015 IBM Corporation
Websites
Connected
Appliances
Partners Websites/Sensors
Internet TVs
Smartphones
Tablets
Game
Consoles
Connected Cars
Millions 1993 -
2000
“…in 1993 and 1994 we
were deeming the web as
the next place for FedEx to
be.” -Thomas Wicinski, VP Digital
Marketing FedEx
The way we reach customers is evolving
APIs
Trillions 2013+
© 2015 IBM Corporation
What is a Business API?
 A Business API is a public persona for an enterprise; exposing defined
assets, data or services for public consumption
 A Business API is simple for app developers to use, access and understand
 A Business API can be easily invoked
What Value Does a Business API Provide?
 Extends an enterprise and opens new markets by allowing external app
developers to easily leverage, publicize and/or aggregate a company’s
assets for broad-based consumption
What “assets, data or services”
are exposed via a Business API?:
 Product catalogs
 Store listings
 Order status
 Inventory
 Social interaction
Business API = Web API = Productized Service
App Developer
© 2015 IBM Corporation
Does this sound familiar?
A repeatable business
task –
e.g., check customer
credit; open new account
A Service
A way of thinking about
your business through
linked services and the
outcomes that they bring
Service Orientation
Service Oriented
Architecture (SOA)
An business-centric architectural
approach based on service oriented
principles
7
Most characteristics
of a good service are
“hidden” in this definition
© 2015 IBM Corporation
Business Design is an end-to-end Endeavor
© 2015 IBM Corporation
APIs are not a new name for SOA Services
There are many similarities – but one very important difference:
The objective they are intended to achieve
APIs SOA
“How can I increase
the pace of
innovation?”
“How can I increase the agility
and effectiveness of
delivery?”
Reuse → Speed to deliver
Sharing → Expediency
Encapsulate → Less to learn
Reuse → Effort to deliver
Sharing → Effectiveness
Encapsulate → Less to change
© 2015 IBM Corporation
Public API Examples – Insurance
Agencyport Turnstyle
provides for extraction of data from ACORD-compliant forms used in the
insurance industry for serialization as XML. It aims to integrate form data
and form-based processes into efficient XML-based workflows to transfer
data to point-of-sale, customer relationship management (CRM), and other
backoffice systems. This process is intended to replace manual rekeying
and sequestration of data in emailed ACORD forms, PDF files, and other
inaccessible formats.
Progressive
SuperCREWS
provides information comparing the rates of other major insurance
companies to its own. The SuperCREWS API provides programmatic
access to this information in a string or in ticker format. Users can input
criteria such as age, gender, marital status, state of residence, and type of
car and then receive their unique insurance rate comparison information.
Insured Rating
enables users to develop a rate plan reflecting risk levels posed by
prospective customers. Quote requests can then be made via the Insured
Rating API which return coverage and premium information. The data
generated helps to manage insurance product offerings and provide
accurate rate quotes matched to determinants of risk.
NAIC Registry
allows automated filing of standard reporting documentation required of
insurance providers for compliance with state regulations. The provider is a
cooperative agency maintained by state governments to encourage
consistent regulatory and business practices for insurance companies.
© 2015 IBM Corporation
API Economy Supply Chain
© 2015 IBM Corporation
© 2015 IBM Corporation
© 2015 IBM Corporation
Public, Open-
To-All APIs
Protected,
Open-To-
Partner APIs
Private, Internal
APIs
Typical Audiences
© 2015 IBM Corporation
 Drives Adoptions of APIs
 Typically low valued
assets
 Drive brand loyalty
 Enter new channels
For Free
Facebook Login API
provides free
authentication for any
Web / mobile app
Example:
Developer Pays
 Business Asset must be of
high value to the Developer
 For example, marketing
analytics, news,
 Capabilities such as credit
checks
Amazon EC2 Web
Services – APIs charge
per usage to launch
and manage virtual
servers.
Example:
Developer Gets Paid
 Provides incentive for
developer to leverage web
API
 Ad placements
 Percentage of revenue
sold product or services
Google AdSense
APIs pay developers
who include
advertising content
into apps
Example:
Indirect
 Use of API achieves some
goal that drives business
model.
 E.g. Increase awareness
of specific content, or
offerings
eBay Trading APIs
offer developers
access to trading
services extending the
reach of listings and
transactions
Example:
The Business of APIs
© 2015 IBM Corporation
 48 hours, 25 developers, over 400,000 API calls
 Impressive 13 pieces of Intellectual Property for ASDA
 Winning Ideas
- “George Go!” - search application using multiple
descriptors
- “Clothing Shaker” - create your outfit by shaking
your device
- “Virtual Fitting Room” - use of Xbox Kinect and
APIs
 IBM API Management on Cloud provided Developer
Portal & secure access to APIs
 https://www.youtube.com/watch?v=biTvnghl5x8
 Looking to transform the Digital Banking landscape:
- Innovative mobile solutions & IoT/ Wearables
 40,000 API calls from more than 100 different groups
 Prototype APIs allowing Developers to interact with fake
accounts
- Account Details (APR/Interest Rate, Available
Credit, Payment Due Date, etc)
- Customer Information (Name, Addresses, Phone
Numbers, Email Addresses)
- Payment Details (Scheduled payments, payment
history, etc)
 IBM API Management on Cloud provided Developer
Portal & secure access to APIs
 https://citimobilechallenge.ciondemand.com/citimobilechallenge/pub/#/apis
New approach to Innovation:
Hackathons, Developer Challenges
© 2015 IBM Corporation
Who is the Audience?
 If you are not clear on the audience you have no clue what makes a good API
 In 2014 More than 80% of API use cases were internal
 APIs are the currency of Cloud and Mobile – often good places to start
What do they want?
 Exposing “what you have” as an API isn’t particularly useful
 Good APIs are simple to understand and use
 There is an art to a “delightful API experience”
 Many APIs may not last very long, that is an opportunity not a problem
Under what terms and conditions
are you willing to share?
 Un-managed APIs quickly lead to chaos
 Business Ts&Cs are important (Plans)
 Its not a one-way street, give and take
 Make sharing easy
Three Questions Lead to Good APIs
https://developer.ibm.com/apimanagement/2015/05/07/how-to-get-to-two-speed-it/
© 2015 IBM Corporation
How can the API Economy help you?
•Mobile (internal dev) –
•What data/transactions would your own mobile apps need?
•Is there data that is generic (e.g. business locations, rates, etc.)?
•Is there data that is specific to existing customers that should be accessible via
your app?
•Partnering –
•Is partner on boarding a long difficult process? Would self registration of
partners be of value (e.g. more partners, wider geographic coverage)?
•What data/transactions do you share between yourself and your partners?
•Public Composite Apps –
•What apps might others write that could use your data/transactions?
•If there were a comparison app for you vs. your competitors would you want to
be listed as an option?
•What other industry sales might also use your products (e.g. car purchase
needs bank loan)?
•Think Mash-ups – what other APIs might make sense with yours? Mapping?
Social?
© 2015 IBM Corporation
How can the API Economy help you?
•Social / Big Data –
•How do your systems interact with social media? Can you spot trends in
social media and raise alerts or take action?
•Can you gain insight on your brand and your competition via social media?
•Can you do real time analytics combining current customer status/behavior
and history?
•Device integration/wearables –
•How are you positioned to integrate the next UI technology (after
Mobile/Tablets)?
•Does your company deal with devices (e.g. cars, appliances,
sensors/meters)? What scenarios can apply to the device (e.g. needs
repair/supplies, needs to send status info, interaction between device and
xxx)?
•Valuable Data –
•What data do you collect on your clients?
•Can your data identify market segments that would be of interest to a non-
related industry? (e.g. expensive cars are purchased in this neighborhood,
lots of child related purchases occurring in this neighborhood).
© 2015 IBM Corporation
Sample API Scenarios for IAG
•IAG Internal Mobile App development – general information about offerings – life, car,
home, travel, business, etc. based on audience (individual, business, adviser). Find an
adviser/location, insurance calculators, tools. FAQs, Document access. Tailored
information such as view/update profile, contact your agent, policy terms. Make payments,
renew policy, file a claim, claim status. Goal oriented planning and advice, Mapping status
to goals.
•Partner integration – Partner on boarding, Providing APIs would allow partners to offer
your insurance options to their customers (White labeling insurance offerings through
partners). Business onboarding to set up insurance plans for employees – make set up
part of the employee on boarding process. Supplier interfaces for acquiring insured
replacement items.
•Public API – Offerings available API for use by a comparative app. Some of the general
information APIs from the internal mobile (above). The Business next door - Financial
education businesses, Healthcare, Banking, Auto sales, real estate, travel.
•Social – Various interest groups for finance, travel, etc. Twitter feeds that reference your
company combined with your own analytics can help determine if actions need to be taken
to rectify customer satisfaction issues. References to consumer or business needs might
allow you to act to offer insurance solutions. Provide news, promote local activities.
•Device – Plan ahead for wearables. Health monitoring, auto driver monitoring.
•Data / Analytics – Target prospects to cross-sell products, offer data access for a fee to
other industries.
https://developer.ibm.com/apimanagement/2014/09/12/apis-for-the-insurance-industry/
© 2015 IBM Corporation
API externalization
Multi-tenancy
Rate limiting
Runtime policy enforcement
API deployment
OAuth security management
Data transformation/redaction
Backend service discovery
Version management
Analytics support
Role-based access control
Environment management
Monitoring and notification
API exploration
Self-service sign up
Interactive API testing
App key provisioning
API usage analytics
Rate limit notification
Multiple dev communities
Real API Success = API externalization + realization
API realization
© 2015 IBM Corporation
Securely expose your business to an internal/external
developer ecosystem
Provide self-service API
portals to
internal/external app
developers
Expose business services
securely as APIs to select
developer communities &
analyze API usage
Manage & monitor the
entire API platform
On-premise
private
Off-premise
SaaS
Off-premise
dedicated
Hybrid
IBM API Management
© 2015 IBM Corporation
Compose a new API, Import APIs, or Discover APIs,
specify security & API behavior, version APIs
Create a Plan, add API resources, choose rate limits,
stage it in a runtime environment, test API resource,
version Plans
Invite developer organizations to use your APIs &
communicate with them
Publish your Plan to select developer organizations &
portals; manage subscribability
Analyze API usage
Managing APIs is simple
© 2015 IBM Corporation
IBM API Management
Fully on-premise, multi-tenant solution,
for API providers
IBM DataPower
API Gateway for security, control, integration &
optimized access to a full range of Mobile, Web, API,
SOA, B2B & Cloud workloads
Over a decade of innovation, 10,000+ units sold,
2000+ customer installations worldwide
A single, comprehensive solution to design, secure,
control, publish, monitor & manage APIs
© 2015 IBM Corporation
Runtime view
IIB or other ESB
WAS or other app server
Applications/Services
in Java, NET, Cobol,
etc
z/OS, IMS, CICS,
DB2
Mobile
Third party APIs
Web
Business Partner
application
IoT
API Management
© 2015 IBM Corporation
Easily manage your APIs, in your private environment
design, secure, control, publish, monitor & manage
Explore API documentation
Provision application keys
Self-service experience
Developer Portal API Manager Management Console
Define and manage APIs
Explore API usage with analytics
Manage API user communities
Provision system resources
Monitor runtime health
Scale the environment
API Gateway
(IBM DataPower)
Enforce runtime policies to control API traffic
© 2015 IBM Corporation27
API Management solution
Product APIs allow
customers to interact
with the API
Management solution,
and extend/customize
Product APIs Management layer Gateway layer
The management layer
embodies the capability for
organizations to define,
manage, expose and
control APIs
Provides API Manager,
Developer Portal and
Management Console
API configurations are
deployed to the gateway,
which provides the
enforcement point for
runtime policies to control
API traffic
Gateway is DataPower
physical or virtual
© 2015 IBM Corporation© 2015 IBM Corporation
On premise
On CloudDedicated
3 | On premise
Behind your firewall for most sensitive
workloads & complete control
API Manager Cloud Management Console*Developer Portals
API Management – The way you want it
2 | On Cloud
Maximize on cloud economics and
agility. Offered as SaaS on SoftLayer
and also available through Bluemix
1 | Dedicated
With Bluemix Dedicated API
Management, everything is dedicated and
connected to you — agility of public
cloud, yet feels like home
© 2015 IBM Corporation
API Developer
• How do I assemble APIs?
• How do I manage security?
• Will the infrastructure scale?
• How do I measure
performance?
App Developer
•Where do I access APIs?
•How do I understand the
APIs?
•How do I measure
success?
API Product Manager
• How can I rapidly release & update my APIs?
• How do I publicize my API?
• How do I measure success?
Operations Lead
•How do I manage all the API
Environments that are being
requested?
•How can I scale each
environment?
•How can I easily find and fix
issues?
API Success Requires Addressing Needs of
Multiple Stakeholders
© 2015 IBM Corporation
Developer
organizations
(consume APIs
develop Apps)
API Provider
organizations
Users
Cloud
system
admin
Clusters
of
servers
User registry
(identity
provider)
email server
configuration
Anatomy of API Management
IBM /apimanagement 15
Developer
portal
API Manager
Cloud
Management
Console
© 2015 IBM Corporation
Organization Structure
Executive Steering
Committee
Core API Team
Business Domain
Owners
API Product
Manager
(Business)
Integration / API
Developer
(Technical)
Operations
Integration
Architects
Service
Owners
Internal App
Developers
•Executive commitment
•Funding
•Resource commitments
•Measurements/Reports
Need a strong Core Team and Business leader to own the
success of the API initiative
© 2015 IBM Corporation
“Just Enough” Governance
For APIs, focus is on speed and time to market. A light weight
Governance model is required.
Governance model will vary based on the control of the API
consumer audience with increased governance the less the
API consumer is controlled.
Always required:
•Communication
•Measurements
Internal:
•Lighter concern on API
identification, versioning,
security (use internal)
•Monetization = Chargeback
•Entitlement enforcement
usually soft
Partner:
•API identification,
•Versioning plan,
•Security,
•Privacy
•Monetization – maybe?
•Entitlement enforcement
soft or hard
Public:
•API identification,
•Versioning plan,
•Security,
•Privacy
•Legal
•Monetization
•Entitlement enforcement
more often hard
© 2015 IBM Corporation33
The “API Factory” Approach
Standardized API development
process in a production factory
process
While the APIs vary considerably in terms of their functionality, all APIs follow a
similar lifecycle of proposal, architecture review, business owner review, followed by
packaging for test, and then deployment to production, deprecated due to re-
versioning, and then retired
Because the API creation process is repetitive, we can use a production engineering
approach to automating API development
In effect, we are building an API Factory: much of the purpose of API Lifecycle
Management is to define how that factory can operate most effectively
© 2015 IBM Corporation34
IBM APIM - API Lifecycle Management
Start
Retired
Proposed
API Designer
proposes API
Defined
Architect Review
(Data & Lead)
Constructed
Business Owner
Review
Certified
Updates
Suggested
API Packaged, Versioned
Staged
Published
Deprecated
Retirement Decision
Re-Versioned
Test
Rework Required
Deployment to
Production
Old Service State
New Service State
Action or Activity
Design Time
Run time
INDEX
Owner
Rejects
© 2015 IBM Corporation
Technical Governance
For APIs, focus is on speed and time to market. A
light weight Governance model is required for the
technical Governance as well.
•API Standards / Best Practices – REST and SOAP are most common. Usually REST/JSON is used for lower bandwidth
devices and to reduce the amount of data transmitted. Set up naming standards! There is no “official” REST standard.
•Granularity / Simplicity – see next slide
•Lifecycle – few stages should be required
•Security – App security handled via App keys and secrets. Users of the App may be identified using OAuth to shield
their private login information from the App itself.
•Deployment / Publishing – early environments are usually handled synchronously. However, Production is usually
isolated and requires a disconnected deployment approach (usually scripted).
•Versioning – most critical for public APIs. Plan for change. Try to make APIs backward compatible so you can move
consumers automatically to the new level. Often will have multiple versions in production at the same time, but need
to plan for consumer movement to new versions.
•Scale – API entitlement levels are used to plan for capacity, the gateway enforces these entitlements. Scaling should
be simple using additional instances added to a cluster.
•Integration – simple integrations to back end services directly or to an ESB to do more complex integration. Generic
results can be returned to the gateway and customized to the required API response to reduce the amount of data
transmitted.
© 2015 IBM Corporation
Simplicity and Granularity
Design for ease of consumption by an App
developer
•APIs are fine grained (not like SOA Services)
•They do one thing
•Easy to understand parameters – aim for self documenting. Supply samples to call the API
and the returned data.
•Don’t do anything unusual
•Make it easy to try
Behind the API systems may be complex
•Don’t show the complexity
•One API call may access 3 backend systems, extract lots of data, throw 90% of it away and
reply back with the 10% that answers the API request. Don’t have 3 APIs and make the
consumer do the work.
By having fine grained simple APIs, it may be possible to keep the API
consistent even when back end systems change.
© 2015 IBM Corporation
Management-Gateway Communications
© 2015 IBM Corporation
Topology – Gateway Cluster in DMZ
38
FIREWALL
DMZ
Trusted
INTERNAL
SERVICES
FIREWALL
LOAD BALANCER
(OPTIONAL)
MANAGEMENT
CLUSTER
GATEWAY
CLUSTER
IDP : END USER
AUTHENTICATION
https
https:24
43
https:94
43
https:55
50
APPLICATIONS
(API CONSUMERS)
SMTP SERVER
IDP FOR
PORTAL USERS
REVERSE PROXY
OR DATAPOWER WAF
LOAD BALANCER
APP DEVELOPERS
https
https
© 2015 IBM Corporation
Topology – Gateway Cluster in Trusted Zone
39
FIREWALL
DMZ
Trusted
INTERNAL
SERVICES
FIREWALL
LOAD BALANCER
OR
DATAPOWER
MANAGEMENT
CLUSTER
GATEWAY
CLUSTER
IDP : END USER
AUTHENTICATION
https
APPLICATIONS
(API CONSUMERS)
SMTP SERVER
IDP FOR
PORTAL USERS
REVERSE PROXY
OR DATAPOWER WAF
LOAD BALANCER
APP DEVELOPERS
https
httpshttps
INTERNAL
APP DEVELOPERS
INTERNAL
APPLICATIONS
© 2015 IBM Corporation
Topology – Multiple Gateway Clusters
40
FIREWALL
DMZ
Trusted
INTERNAL
SERVICES
FIREWALL
LOAD BALANCER
(OPTIONAL)
MANAGEMENT
CLUSTER
GATEWAY
CLUSTER
INTERNAL APIS
IDP : END USER
AUTHENTICATION
https
APPLICATIONS
(API CONSUMERS)
INTERNAL
APPLICATIONS
GATEWAY
CLUSTER
EXTERNAL APIS
GATEWAY
CLUSTER
DEV & TESTING
DEVELOPERS
TESTERS
24
43
94
43
555
0
https
© 2015 IBM Corporation
Cluster Topology – Single Management Cluster
Topology
© 2015 IBM Corporation
Multi-Management Cluster Topology OR
Disconnected Cloud Topology
© 2015 IBM Corporation
Where does API Management fit?
© 2015 IBM Corporation
A successful API initiative requires end-to-end focus
APIs
Apps
Social Feedback and Communities
Marketplace
Self-Service Portal: Registration • Documentation • Sandbox
Security, Metering and
Control
API Design and Integration
Analytics and Monetization
API Lifecycle Management
Composition
Infrastructure Services
DevOps and App Management
Mobile Services
Internal
Developers
Partner
Developers
External
Developers
Channels: Smartphones • Tablets • Desktops • Cars • TVs • Others
Services: Data • Processes • Applications
Cloud
© 2015 IBM Corporation
 Leverage a robust API Gateway to launch your API platform
• An API Management platform needs a robust, secure and scalable API Gateway for runtime
enforcement
• IBM API Management has optimized integration with IBM DataPower gateway appliances
• Single pane of glass to manage APIs, Plans, Users, Clusters to provide a unified operational view
• DataPower is the industry leading security & integration gateway for a range of workloads, with over
2200 customers and 10,000 units deployed worldwide
 Flexible deployment options
• IBM API Management is available as on-premise, hosted, and SaaS
 Thought Leadership & Active developer community
• Free access to experts to help with API strategy
• Discussion forums, blog posts, events at developer.ibm.com/api
• 1M+ participants on IBM developerWorks
 Access to a worldwide marketplace
• IBM Bluemix and IBM Cloud marketplace represent a unique broad developer audience, building
apps
 Choose the API Mgmt vendor strategically
• IBM is investing heavily in API Mgmt, Mobile, Cloud, Analytics, IoT & Big Data
45
Why IBM?
© 2015 IBM Corporation
Key Points to Remember
46
1.IBM DataPower has NOT partnered with any API Mgmt vendor
–There is NO product-level integration
2.IBM provides immediate feature availability
–Take advantage of DataPower new features as soon as it is GA’ed by IBM instead of waiting
months/years for others to add to their product e.g. WebSockets support added mid-2014 in
DataPower v7.0
3.IBM APIM/DataPower natively integrates with WAS, WXS, MobileFirst & Bluemix
4.IBM APIM generates efficient configurations/policies for DataPower to execute/enforce
–Beware of others creating inefficient policies for DataPower. This may result in more
DataPower needed
5.IBM APIM has self-contained virtual appliance packaging
–Beware of others requiring a DB plus addressing DB replication for analytics data
6.IBM’s APIM solution deployment topology is simple – mgmt & gateway
–Beware of others requiring various components sitting on separate servers, plus load balancers
& another DB for HA
7.API Management is strategic to IBM
–IBM is investing heavily in API Mgmt, Mobile, Cloud, Integration, Analytics, IoT & Big Data
–We plan to provide a unified platform for Mobile App Mgmt & API Mgmt using a single gateway
8.With IBM, customers gain access to a worldwide marketplace
–IBM Bluemix & IBM Cloud marketplace represent a unique broad developer audience, building
apps
9.IBM provides Thought Leadership & Active developer community with 1M+ participants
–Free access to experts to help with API strategy
–Discussion forums, blog posts, events at developer.ibm.com/apimanagement
© 2015 IBM Corporation
Getting Started
1. Executive and Business Backing
• APIs are a product to be delivered, not a technology for IT to improve efficiency
• Lack of executive or business buy-in will result in a technology implementation with no/little impact on
the business.
• Leadership absolutely must participate and back the initiative.
2. Establish a strategy and goals
• Understand why you are executing an API strategy
• Set Goals for the initiative with time frames and reporting metrics
3. Commitment to Roles, Responsibilities, and Resources
• There will need to be resources dedicated to the API initiative.
• Enable enough key resources to make governance effective.
4. Get the Message Out
• Involve some folks skilled in formal communication and education
campaigns.
• Do some API evangelist work
• The core team’s role(s) must be understood and propagated
• Collect and Publish Metrics
© 2015 IBM Corporation
API developer
community site
on APIs,
API economy, API Mgmt
Includes
API community forum
API events
Best practices blog
Videos
developer.ibm.com/api
API Management Resources
Product Page
• ibm.com/apimanagement
API developer community
• developer.ibm.com/api
Twitter
• @ibmapimgt
YouTube Channel
• youtube.com/ibmapimanagement
Slideshare
• slideshare.net/ibmapimgmt
Speaker Deck
• speakerdeck.com/ibmapimgmt
49
Backup
50
Intuitively and iteratively define
APIs and associated policies
Rapidly assemble APIs via
configuration, not coding
Minimize risk with industry leading
security & scalability
Define
API
Developer
Assemble
Meter
SecureDeploy,
Test & Debug
Monitor
Scale
Version
51
API Developer: Create, Secure & Version APIs
Simple interface accelerates iterative API development & deployment
API Developer:
Assemble New APIs Through Configuration
 Assemble a new API
by combining multiple
REST or SOAP
services into a
composite API
 Provide examples of
the request and
response messages,
headers and
parameters
 Drag and connect
linking the request and
response messages
 Transform the
message elements
with a click
API Providers & Consumers:
Test API readiness with Ready! API plugin
Export:
Define new APIs in
Ready! API product
by uploading
Swagger, WADL,
RAML, WSDL, etc.,
and then test the
API.
 Commit to a full
range of tests –
functional, load,
security
 When ready, click a
button to
Export API to insert
the tested API into
API Manager UI
Import:
Use Ready! API
testing platform to
Import SOAP &
REST API
definitions directly
from IBM API Mgmt
Dev portal for
unit/functional
testing, load testing,
service virtualization
& more
 Select any API from
Dev Portal
 Auto-generate test
suite
 Validate
functionality and &
API Consumers API Providers
Custom API Portal using IBM API Mgmt & Drupal CMS
API Provider: “Productize” APIs using Plans
 Introduce API Trial Use
 Free, limited plans can
be made available
alongside premium plans
 For example, a free plan
could be unrestricted,
and a premium plan
restricted
 Include multiple APIs
and Resources per
Plan
 Version your Plans
 Apply Rate Limit by
Plan or Resource
 Reject calls when limit
reached
API Provider: Publish your APIs to multiple
developer portals
Multiple Developer Portals
API Manager
API Provider
App Developers
In group 1
App Developers
in group 2
Securely share APIs/Plans with various
select developer communities
Fine grained plan deployment
Non-disruptive Publish: Replace a currently
published version of a Plan without any
disruption in API availability
API Provider: Gain Business Insights
• Pinpoint key
market
fluctuations and
find correlations
related to your
business
• Analytics for both
API provider and
application
developer:
• Analyze
performance of
APIs
• Enables chargeback
or billing for API
consumption
App Developer: Register application
 Register new
application
 Request
security keys
with enhanced
privacy
 Deferred
retrieval of
client secret
App Developer: Analyze App Performance,
Get notified
 Monitor most
active
applications and
APIs
 Rate limit
developer
notifications
IT Admin: Manage Overall Environment*
 At-a-glance
server
utilization
metrics
 Management &
Gateway Server
utilization -
CPU, Memory,
Disk
 Usage over
time available
by drilling down
* Not applicable to SaaS
Enabling businesses to join the API Economy
IBM API Management - on-cloud & on-premise
Engage with app developers through portals
• API exploration
• Self-service sign up
• Interactive API testing
• App & Key management
• API usage analytics
• Rate limit notification
• Multiple dev communities
• Build custom portal with blogs, forums
• Define & Secure REST & SOAP APIs, Publish to multiple
developer portals & users, Analyze API usage &
performance
• A resilient integrated API runtime gateway infrastructure
with IBM DataPower Gateway for enforcement of runtime
policies to secure & control API traffic
• Seamlessly move APIs & Plans from public to private cloud
or on-prem for complete flexibility
Define, publish & manage APIs
• OAuth security management
• Backend service discovery
• API lifecycle management
• API subscription management
• Data transformation/redaction
• Rate limiting at Plan/Resource level
• API user & Plan management
• API deployment to Gateway
• API security enforcement
• API Analytics to gain business
insight
• Custom roles & role-based access
control
Manage API environment
• Administer & scale system
resources
• Monitor runtime health
• Multi-tenancy
REST APIs to extend/customize
• Developer Portal
• User onboarding
• Integration with API testing
tools (SoapUI NG Pro,
Ready! API)
• Integration with Content
Management System
(Drupal)

Iag api management architect presentation

  • 1.
    © 2015 IBMCorporation The API Economy and IBM API Management Overview Alan Glickenhouse glick@us.ibm.com @ARGlick API Management Business Strategist IBM
  • 2.
    © 2015 IBMCorporation Agenda •API Economy •What is IBM API Management? •Governance •Architecture •Getting Started with a Successful API Initiative
  • 3.
    © 2015 IBMCorporation3 Why APIs? Why Now?
  • 4.
    © 2015 IBMCorporation Adoption of cloud, analytics, mobile & social computing is forcing organizations to open IT assets to new business channels …and challenging them to rethink the way they have traditionally approached security & control Between 2005 and 2020, the amount of data in the world will grow 300X, from 130 to 40,000 exabytes. 81% of adults use personally owned mobile devices for conducting business 70% of employees are engaged in social activities both internally and externally 73% of organizations discovered cloud usage outside of IT or security policies
  • 5.
    © 2015 IBMCorporation Websites Connected Appliances Partners Websites/Sensors Internet TVs Smartphones Tablets Game Consoles Connected Cars Millions 1993 - 2000 “…in 1993 and 1994 we were deeming the web as the next place for FedEx to be.” -Thomas Wicinski, VP Digital Marketing FedEx The way we reach customers is evolving APIs Trillions 2013+
  • 6.
    © 2015 IBMCorporation What is a Business API?  A Business API is a public persona for an enterprise; exposing defined assets, data or services for public consumption  A Business API is simple for app developers to use, access and understand  A Business API can be easily invoked What Value Does a Business API Provide?  Extends an enterprise and opens new markets by allowing external app developers to easily leverage, publicize and/or aggregate a company’s assets for broad-based consumption What “assets, data or services” are exposed via a Business API?:  Product catalogs  Store listings  Order status  Inventory  Social interaction Business API = Web API = Productized Service App Developer
  • 7.
    © 2015 IBMCorporation Does this sound familiar? A repeatable business task – e.g., check customer credit; open new account A Service A way of thinking about your business through linked services and the outcomes that they bring Service Orientation Service Oriented Architecture (SOA) An business-centric architectural approach based on service oriented principles 7 Most characteristics of a good service are “hidden” in this definition
  • 8.
    © 2015 IBMCorporation Business Design is an end-to-end Endeavor
  • 9.
    © 2015 IBMCorporation APIs are not a new name for SOA Services There are many similarities – but one very important difference: The objective they are intended to achieve APIs SOA “How can I increase the pace of innovation?” “How can I increase the agility and effectiveness of delivery?” Reuse → Speed to deliver Sharing → Expediency Encapsulate → Less to learn Reuse → Effort to deliver Sharing → Effectiveness Encapsulate → Less to change
  • 10.
    © 2015 IBMCorporation Public API Examples – Insurance Agencyport Turnstyle provides for extraction of data from ACORD-compliant forms used in the insurance industry for serialization as XML. It aims to integrate form data and form-based processes into efficient XML-based workflows to transfer data to point-of-sale, customer relationship management (CRM), and other backoffice systems. This process is intended to replace manual rekeying and sequestration of data in emailed ACORD forms, PDF files, and other inaccessible formats. Progressive SuperCREWS provides information comparing the rates of other major insurance companies to its own. The SuperCREWS API provides programmatic access to this information in a string or in ticker format. Users can input criteria such as age, gender, marital status, state of residence, and type of car and then receive their unique insurance rate comparison information. Insured Rating enables users to develop a rate plan reflecting risk levels posed by prospective customers. Quote requests can then be made via the Insured Rating API which return coverage and premium information. The data generated helps to manage insurance product offerings and provide accurate rate quotes matched to determinants of risk. NAIC Registry allows automated filing of standard reporting documentation required of insurance providers for compliance with state regulations. The provider is a cooperative agency maintained by state governments to encourage consistent regulatory and business practices for insurance companies.
  • 11.
    © 2015 IBMCorporation API Economy Supply Chain
  • 12.
    © 2015 IBMCorporation
  • 13.
    © 2015 IBMCorporation
  • 14.
    © 2015 IBMCorporation Public, Open- To-All APIs Protected, Open-To- Partner APIs Private, Internal APIs Typical Audiences
  • 15.
    © 2015 IBMCorporation  Drives Adoptions of APIs  Typically low valued assets  Drive brand loyalty  Enter new channels For Free Facebook Login API provides free authentication for any Web / mobile app Example: Developer Pays  Business Asset must be of high value to the Developer  For example, marketing analytics, news,  Capabilities such as credit checks Amazon EC2 Web Services – APIs charge per usage to launch and manage virtual servers. Example: Developer Gets Paid  Provides incentive for developer to leverage web API  Ad placements  Percentage of revenue sold product or services Google AdSense APIs pay developers who include advertising content into apps Example: Indirect  Use of API achieves some goal that drives business model.  E.g. Increase awareness of specific content, or offerings eBay Trading APIs offer developers access to trading services extending the reach of listings and transactions Example: The Business of APIs
  • 16.
    © 2015 IBMCorporation  48 hours, 25 developers, over 400,000 API calls  Impressive 13 pieces of Intellectual Property for ASDA  Winning Ideas - “George Go!” - search application using multiple descriptors - “Clothing Shaker” - create your outfit by shaking your device - “Virtual Fitting Room” - use of Xbox Kinect and APIs  IBM API Management on Cloud provided Developer Portal & secure access to APIs  https://www.youtube.com/watch?v=biTvnghl5x8  Looking to transform the Digital Banking landscape: - Innovative mobile solutions & IoT/ Wearables  40,000 API calls from more than 100 different groups  Prototype APIs allowing Developers to interact with fake accounts - Account Details (APR/Interest Rate, Available Credit, Payment Due Date, etc) - Customer Information (Name, Addresses, Phone Numbers, Email Addresses) - Payment Details (Scheduled payments, payment history, etc)  IBM API Management on Cloud provided Developer Portal & secure access to APIs  https://citimobilechallenge.ciondemand.com/citimobilechallenge/pub/#/apis New approach to Innovation: Hackathons, Developer Challenges
  • 17.
    © 2015 IBMCorporation Who is the Audience?  If you are not clear on the audience you have no clue what makes a good API  In 2014 More than 80% of API use cases were internal  APIs are the currency of Cloud and Mobile – often good places to start What do they want?  Exposing “what you have” as an API isn’t particularly useful  Good APIs are simple to understand and use  There is an art to a “delightful API experience”  Many APIs may not last very long, that is an opportunity not a problem Under what terms and conditions are you willing to share?  Un-managed APIs quickly lead to chaos  Business Ts&Cs are important (Plans)  Its not a one-way street, give and take  Make sharing easy Three Questions Lead to Good APIs https://developer.ibm.com/apimanagement/2015/05/07/how-to-get-to-two-speed-it/
  • 18.
    © 2015 IBMCorporation How can the API Economy help you? •Mobile (internal dev) – •What data/transactions would your own mobile apps need? •Is there data that is generic (e.g. business locations, rates, etc.)? •Is there data that is specific to existing customers that should be accessible via your app? •Partnering – •Is partner on boarding a long difficult process? Would self registration of partners be of value (e.g. more partners, wider geographic coverage)? •What data/transactions do you share between yourself and your partners? •Public Composite Apps – •What apps might others write that could use your data/transactions? •If there were a comparison app for you vs. your competitors would you want to be listed as an option? •What other industry sales might also use your products (e.g. car purchase needs bank loan)? •Think Mash-ups – what other APIs might make sense with yours? Mapping? Social?
  • 19.
    © 2015 IBMCorporation How can the API Economy help you? •Social / Big Data – •How do your systems interact with social media? Can you spot trends in social media and raise alerts or take action? •Can you gain insight on your brand and your competition via social media? •Can you do real time analytics combining current customer status/behavior and history? •Device integration/wearables – •How are you positioned to integrate the next UI technology (after Mobile/Tablets)? •Does your company deal with devices (e.g. cars, appliances, sensors/meters)? What scenarios can apply to the device (e.g. needs repair/supplies, needs to send status info, interaction between device and xxx)? •Valuable Data – •What data do you collect on your clients? •Can your data identify market segments that would be of interest to a non- related industry? (e.g. expensive cars are purchased in this neighborhood, lots of child related purchases occurring in this neighborhood).
  • 20.
    © 2015 IBMCorporation Sample API Scenarios for IAG •IAG Internal Mobile App development – general information about offerings – life, car, home, travel, business, etc. based on audience (individual, business, adviser). Find an adviser/location, insurance calculators, tools. FAQs, Document access. Tailored information such as view/update profile, contact your agent, policy terms. Make payments, renew policy, file a claim, claim status. Goal oriented planning and advice, Mapping status to goals. •Partner integration – Partner on boarding, Providing APIs would allow partners to offer your insurance options to their customers (White labeling insurance offerings through partners). Business onboarding to set up insurance plans for employees – make set up part of the employee on boarding process. Supplier interfaces for acquiring insured replacement items. •Public API – Offerings available API for use by a comparative app. Some of the general information APIs from the internal mobile (above). The Business next door - Financial education businesses, Healthcare, Banking, Auto sales, real estate, travel. •Social – Various interest groups for finance, travel, etc. Twitter feeds that reference your company combined with your own analytics can help determine if actions need to be taken to rectify customer satisfaction issues. References to consumer or business needs might allow you to act to offer insurance solutions. Provide news, promote local activities. •Device – Plan ahead for wearables. Health monitoring, auto driver monitoring. •Data / Analytics – Target prospects to cross-sell products, offer data access for a fee to other industries. https://developer.ibm.com/apimanagement/2014/09/12/apis-for-the-insurance-industry/
  • 21.
    © 2015 IBMCorporation API externalization Multi-tenancy Rate limiting Runtime policy enforcement API deployment OAuth security management Data transformation/redaction Backend service discovery Version management Analytics support Role-based access control Environment management Monitoring and notification API exploration Self-service sign up Interactive API testing App key provisioning API usage analytics Rate limit notification Multiple dev communities Real API Success = API externalization + realization API realization
  • 22.
    © 2015 IBMCorporation Securely expose your business to an internal/external developer ecosystem Provide self-service API portals to internal/external app developers Expose business services securely as APIs to select developer communities & analyze API usage Manage & monitor the entire API platform On-premise private Off-premise SaaS Off-premise dedicated Hybrid IBM API Management
  • 23.
    © 2015 IBMCorporation Compose a new API, Import APIs, or Discover APIs, specify security & API behavior, version APIs Create a Plan, add API resources, choose rate limits, stage it in a runtime environment, test API resource, version Plans Invite developer organizations to use your APIs & communicate with them Publish your Plan to select developer organizations & portals; manage subscribability Analyze API usage Managing APIs is simple
  • 24.
    © 2015 IBMCorporation IBM API Management Fully on-premise, multi-tenant solution, for API providers IBM DataPower API Gateway for security, control, integration & optimized access to a full range of Mobile, Web, API, SOA, B2B & Cloud workloads Over a decade of innovation, 10,000+ units sold, 2000+ customer installations worldwide A single, comprehensive solution to design, secure, control, publish, monitor & manage APIs
  • 25.
    © 2015 IBMCorporation Runtime view IIB or other ESB WAS or other app server Applications/Services in Java, NET, Cobol, etc z/OS, IMS, CICS, DB2 Mobile Third party APIs Web Business Partner application IoT API Management
  • 26.
    © 2015 IBMCorporation Easily manage your APIs, in your private environment design, secure, control, publish, monitor & manage Explore API documentation Provision application keys Self-service experience Developer Portal API Manager Management Console Define and manage APIs Explore API usage with analytics Manage API user communities Provision system resources Monitor runtime health Scale the environment API Gateway (IBM DataPower) Enforce runtime policies to control API traffic
  • 27.
    © 2015 IBMCorporation27 API Management solution Product APIs allow customers to interact with the API Management solution, and extend/customize Product APIs Management layer Gateway layer The management layer embodies the capability for organizations to define, manage, expose and control APIs Provides API Manager, Developer Portal and Management Console API configurations are deployed to the gateway, which provides the enforcement point for runtime policies to control API traffic Gateway is DataPower physical or virtual
  • 28.
    © 2015 IBMCorporation© 2015 IBM Corporation On premise On CloudDedicated 3 | On premise Behind your firewall for most sensitive workloads & complete control API Manager Cloud Management Console*Developer Portals API Management – The way you want it 2 | On Cloud Maximize on cloud economics and agility. Offered as SaaS on SoftLayer and also available through Bluemix 1 | Dedicated With Bluemix Dedicated API Management, everything is dedicated and connected to you — agility of public cloud, yet feels like home
  • 29.
    © 2015 IBMCorporation API Developer • How do I assemble APIs? • How do I manage security? • Will the infrastructure scale? • How do I measure performance? App Developer •Where do I access APIs? •How do I understand the APIs? •How do I measure success? API Product Manager • How can I rapidly release & update my APIs? • How do I publicize my API? • How do I measure success? Operations Lead •How do I manage all the API Environments that are being requested? •How can I scale each environment? •How can I easily find and fix issues? API Success Requires Addressing Needs of Multiple Stakeholders
  • 30.
    © 2015 IBMCorporation Developer organizations (consume APIs develop Apps) API Provider organizations Users Cloud system admin Clusters of servers User registry (identity provider) email server configuration Anatomy of API Management IBM /apimanagement 15 Developer portal API Manager Cloud Management Console
  • 31.
    © 2015 IBMCorporation Organization Structure Executive Steering Committee Core API Team Business Domain Owners API Product Manager (Business) Integration / API Developer (Technical) Operations Integration Architects Service Owners Internal App Developers •Executive commitment •Funding •Resource commitments •Measurements/Reports Need a strong Core Team and Business leader to own the success of the API initiative
  • 32.
    © 2015 IBMCorporation “Just Enough” Governance For APIs, focus is on speed and time to market. A light weight Governance model is required. Governance model will vary based on the control of the API consumer audience with increased governance the less the API consumer is controlled. Always required: •Communication •Measurements Internal: •Lighter concern on API identification, versioning, security (use internal) •Monetization = Chargeback •Entitlement enforcement usually soft Partner: •API identification, •Versioning plan, •Security, •Privacy •Monetization – maybe? •Entitlement enforcement soft or hard Public: •API identification, •Versioning plan, •Security, •Privacy •Legal •Monetization •Entitlement enforcement more often hard
  • 33.
    © 2015 IBMCorporation33 The “API Factory” Approach Standardized API development process in a production factory process While the APIs vary considerably in terms of their functionality, all APIs follow a similar lifecycle of proposal, architecture review, business owner review, followed by packaging for test, and then deployment to production, deprecated due to re- versioning, and then retired Because the API creation process is repetitive, we can use a production engineering approach to automating API development In effect, we are building an API Factory: much of the purpose of API Lifecycle Management is to define how that factory can operate most effectively
  • 34.
    © 2015 IBMCorporation34 IBM APIM - API Lifecycle Management Start Retired Proposed API Designer proposes API Defined Architect Review (Data & Lead) Constructed Business Owner Review Certified Updates Suggested API Packaged, Versioned Staged Published Deprecated Retirement Decision Re-Versioned Test Rework Required Deployment to Production Old Service State New Service State Action or Activity Design Time Run time INDEX Owner Rejects
  • 35.
    © 2015 IBMCorporation Technical Governance For APIs, focus is on speed and time to market. A light weight Governance model is required for the technical Governance as well. •API Standards / Best Practices – REST and SOAP are most common. Usually REST/JSON is used for lower bandwidth devices and to reduce the amount of data transmitted. Set up naming standards! There is no “official” REST standard. •Granularity / Simplicity – see next slide •Lifecycle – few stages should be required •Security – App security handled via App keys and secrets. Users of the App may be identified using OAuth to shield their private login information from the App itself. •Deployment / Publishing – early environments are usually handled synchronously. However, Production is usually isolated and requires a disconnected deployment approach (usually scripted). •Versioning – most critical for public APIs. Plan for change. Try to make APIs backward compatible so you can move consumers automatically to the new level. Often will have multiple versions in production at the same time, but need to plan for consumer movement to new versions. •Scale – API entitlement levels are used to plan for capacity, the gateway enforces these entitlements. Scaling should be simple using additional instances added to a cluster. •Integration – simple integrations to back end services directly or to an ESB to do more complex integration. Generic results can be returned to the gateway and customized to the required API response to reduce the amount of data transmitted.
  • 36.
    © 2015 IBMCorporation Simplicity and Granularity Design for ease of consumption by an App developer •APIs are fine grained (not like SOA Services) •They do one thing •Easy to understand parameters – aim for self documenting. Supply samples to call the API and the returned data. •Don’t do anything unusual •Make it easy to try Behind the API systems may be complex •Don’t show the complexity •One API call may access 3 backend systems, extract lots of data, throw 90% of it away and reply back with the 10% that answers the API request. Don’t have 3 APIs and make the consumer do the work. By having fine grained simple APIs, it may be possible to keep the API consistent even when back end systems change.
  • 37.
    © 2015 IBMCorporation Management-Gateway Communications
  • 38.
    © 2015 IBMCorporation Topology – Gateway Cluster in DMZ 38 FIREWALL DMZ Trusted INTERNAL SERVICES FIREWALL LOAD BALANCER (OPTIONAL) MANAGEMENT CLUSTER GATEWAY CLUSTER IDP : END USER AUTHENTICATION https https:24 43 https:94 43 https:55 50 APPLICATIONS (API CONSUMERS) SMTP SERVER IDP FOR PORTAL USERS REVERSE PROXY OR DATAPOWER WAF LOAD BALANCER APP DEVELOPERS https https
  • 39.
    © 2015 IBMCorporation Topology – Gateway Cluster in Trusted Zone 39 FIREWALL DMZ Trusted INTERNAL SERVICES FIREWALL LOAD BALANCER OR DATAPOWER MANAGEMENT CLUSTER GATEWAY CLUSTER IDP : END USER AUTHENTICATION https APPLICATIONS (API CONSUMERS) SMTP SERVER IDP FOR PORTAL USERS REVERSE PROXY OR DATAPOWER WAF LOAD BALANCER APP DEVELOPERS https httpshttps INTERNAL APP DEVELOPERS INTERNAL APPLICATIONS
  • 40.
    © 2015 IBMCorporation Topology – Multiple Gateway Clusters 40 FIREWALL DMZ Trusted INTERNAL SERVICES FIREWALL LOAD BALANCER (OPTIONAL) MANAGEMENT CLUSTER GATEWAY CLUSTER INTERNAL APIS IDP : END USER AUTHENTICATION https APPLICATIONS (API CONSUMERS) INTERNAL APPLICATIONS GATEWAY CLUSTER EXTERNAL APIS GATEWAY CLUSTER DEV & TESTING DEVELOPERS TESTERS 24 43 94 43 555 0 https
  • 41.
    © 2015 IBMCorporation Cluster Topology – Single Management Cluster Topology
  • 42.
    © 2015 IBMCorporation Multi-Management Cluster Topology OR Disconnected Cloud Topology
  • 43.
    © 2015 IBMCorporation Where does API Management fit?
  • 44.
    © 2015 IBMCorporation A successful API initiative requires end-to-end focus APIs Apps Social Feedback and Communities Marketplace Self-Service Portal: Registration • Documentation • Sandbox Security, Metering and Control API Design and Integration Analytics and Monetization API Lifecycle Management Composition Infrastructure Services DevOps and App Management Mobile Services Internal Developers Partner Developers External Developers Channels: Smartphones • Tablets • Desktops • Cars • TVs • Others Services: Data • Processes • Applications Cloud
  • 45.
    © 2015 IBMCorporation  Leverage a robust API Gateway to launch your API platform • An API Management platform needs a robust, secure and scalable API Gateway for runtime enforcement • IBM API Management has optimized integration with IBM DataPower gateway appliances • Single pane of glass to manage APIs, Plans, Users, Clusters to provide a unified operational view • DataPower is the industry leading security & integration gateway for a range of workloads, with over 2200 customers and 10,000 units deployed worldwide  Flexible deployment options • IBM API Management is available as on-premise, hosted, and SaaS  Thought Leadership & Active developer community • Free access to experts to help with API strategy • Discussion forums, blog posts, events at developer.ibm.com/api • 1M+ participants on IBM developerWorks  Access to a worldwide marketplace • IBM Bluemix and IBM Cloud marketplace represent a unique broad developer audience, building apps  Choose the API Mgmt vendor strategically • IBM is investing heavily in API Mgmt, Mobile, Cloud, Analytics, IoT & Big Data 45 Why IBM?
  • 46.
    © 2015 IBMCorporation Key Points to Remember 46 1.IBM DataPower has NOT partnered with any API Mgmt vendor –There is NO product-level integration 2.IBM provides immediate feature availability –Take advantage of DataPower new features as soon as it is GA’ed by IBM instead of waiting months/years for others to add to their product e.g. WebSockets support added mid-2014 in DataPower v7.0 3.IBM APIM/DataPower natively integrates with WAS, WXS, MobileFirst & Bluemix 4.IBM APIM generates efficient configurations/policies for DataPower to execute/enforce –Beware of others creating inefficient policies for DataPower. This may result in more DataPower needed 5.IBM APIM has self-contained virtual appliance packaging –Beware of others requiring a DB plus addressing DB replication for analytics data 6.IBM’s APIM solution deployment topology is simple – mgmt & gateway –Beware of others requiring various components sitting on separate servers, plus load balancers & another DB for HA 7.API Management is strategic to IBM –IBM is investing heavily in API Mgmt, Mobile, Cloud, Integration, Analytics, IoT & Big Data –We plan to provide a unified platform for Mobile App Mgmt & API Mgmt using a single gateway 8.With IBM, customers gain access to a worldwide marketplace –IBM Bluemix & IBM Cloud marketplace represent a unique broad developer audience, building apps 9.IBM provides Thought Leadership & Active developer community with 1M+ participants –Free access to experts to help with API strategy –Discussion forums, blog posts, events at developer.ibm.com/apimanagement
  • 47.
    © 2015 IBMCorporation Getting Started 1. Executive and Business Backing • APIs are a product to be delivered, not a technology for IT to improve efficiency • Lack of executive or business buy-in will result in a technology implementation with no/little impact on the business. • Leadership absolutely must participate and back the initiative. 2. Establish a strategy and goals • Understand why you are executing an API strategy • Set Goals for the initiative with time frames and reporting metrics 3. Commitment to Roles, Responsibilities, and Resources • There will need to be resources dedicated to the API initiative. • Enable enough key resources to make governance effective. 4. Get the Message Out • Involve some folks skilled in formal communication and education campaigns. • Do some API evangelist work • The core team’s role(s) must be understood and propagated • Collect and Publish Metrics
  • 48.
    © 2015 IBMCorporation API developer community site on APIs, API economy, API Mgmt Includes API community forum API events Best practices blog Videos developer.ibm.com/api
  • 49.
    API Management Resources ProductPage • ibm.com/apimanagement API developer community • developer.ibm.com/api Twitter • @ibmapimgt YouTube Channel • youtube.com/ibmapimanagement Slideshare • slideshare.net/ibmapimgmt Speaker Deck • speakerdeck.com/ibmapimgmt 49
  • 50.
  • 51.
    Intuitively and iterativelydefine APIs and associated policies Rapidly assemble APIs via configuration, not coding Minimize risk with industry leading security & scalability Define API Developer Assemble Meter SecureDeploy, Test & Debug Monitor Scale Version 51 API Developer: Create, Secure & Version APIs Simple interface accelerates iterative API development & deployment
  • 52.
    API Developer: Assemble NewAPIs Through Configuration  Assemble a new API by combining multiple REST or SOAP services into a composite API  Provide examples of the request and response messages, headers and parameters  Drag and connect linking the request and response messages  Transform the message elements with a click
  • 53.
    API Providers &Consumers: Test API readiness with Ready! API plugin Export: Define new APIs in Ready! API product by uploading Swagger, WADL, RAML, WSDL, etc., and then test the API.  Commit to a full range of tests – functional, load, security  When ready, click a button to Export API to insert the tested API into API Manager UI Import: Use Ready! API testing platform to Import SOAP & REST API definitions directly from IBM API Mgmt Dev portal for unit/functional testing, load testing, service virtualization & more  Select any API from Dev Portal  Auto-generate test suite  Validate functionality and & API Consumers API Providers
  • 54.
    Custom API Portalusing IBM API Mgmt & Drupal CMS
  • 55.
    API Provider: “Productize”APIs using Plans  Introduce API Trial Use  Free, limited plans can be made available alongside premium plans  For example, a free plan could be unrestricted, and a premium plan restricted  Include multiple APIs and Resources per Plan  Version your Plans  Apply Rate Limit by Plan or Resource  Reject calls when limit reached
  • 56.
    API Provider: Publishyour APIs to multiple developer portals Multiple Developer Portals API Manager API Provider App Developers In group 1 App Developers in group 2 Securely share APIs/Plans with various select developer communities Fine grained plan deployment Non-disruptive Publish: Replace a currently published version of a Plan without any disruption in API availability
  • 57.
    API Provider: GainBusiness Insights • Pinpoint key market fluctuations and find correlations related to your business • Analytics for both API provider and application developer: • Analyze performance of APIs • Enables chargeback or billing for API consumption
  • 58.
    App Developer: Registerapplication  Register new application  Request security keys with enhanced privacy  Deferred retrieval of client secret
  • 59.
    App Developer: AnalyzeApp Performance, Get notified  Monitor most active applications and APIs  Rate limit developer notifications
  • 60.
    IT Admin: ManageOverall Environment*  At-a-glance server utilization metrics  Management & Gateway Server utilization - CPU, Memory, Disk  Usage over time available by drilling down * Not applicable to SaaS
  • 61.
    Enabling businesses tojoin the API Economy IBM API Management - on-cloud & on-premise Engage with app developers through portals • API exploration • Self-service sign up • Interactive API testing • App & Key management • API usage analytics • Rate limit notification • Multiple dev communities • Build custom portal with blogs, forums • Define & Secure REST & SOAP APIs, Publish to multiple developer portals & users, Analyze API usage & performance • A resilient integrated API runtime gateway infrastructure with IBM DataPower Gateway for enforcement of runtime policies to secure & control API traffic • Seamlessly move APIs & Plans from public to private cloud or on-prem for complete flexibility Define, publish & manage APIs • OAuth security management • Backend service discovery • API lifecycle management • API subscription management • Data transformation/redaction • Rate limiting at Plan/Resource level • API user & Plan management • API deployment to Gateway • API security enforcement • API Analytics to gain business insight • Custom roles & role-based access control Manage API environment • Administer & scale system resources • Monitor runtime health • Multi-tenancy REST APIs to extend/customize • Developer Portal • User onboarding • Integration with API testing tools (SoapUI NG Pro, Ready! API) • Integration with Content Management System (Drupal)

Editor's Notes

  • #2 Update your name and contact information Also you can personalize the title by adding their company name and logo to the slide.
  • #3 the fact is that by dec 2013, it crossed 10000 api   shows the xponential growth of APIs, almost doubling every 5 months
  • #5 In the past, private data, software and code could be reasonably protected behind a network perimeter of security & control. With the rise of mobile, that perimeter can no longer be the most important line of defense when it comes to security threats & IT control. Organizations must develop mobile security & control strategies that go beyond the perimeter of the enterprise and into the mobile sphere. Similarly, as the API economy continues to expand, organizations are realizing that they are providing services to new users, new stakeholders that may or may not fit into the security & control realms that have been previously established. The dramatic growth in adoption of mobile, cloud, and social computing presents many security & control challenges for the multi-channel enterprise. There exists an increased demand to be able to control access to systems and resources that were previously only available from within the enterprise. However, as these applications are opened up to new business channels, and made accessible across the Internet, enterprises must control who is accessing those systems and under what context.
  • #9 In addition to the SoE discussion we’ve had today, it’s important to note that SoR will continue to be important for many applications. Our goal is to continue to provide the middleware that supports reliable Systems of Record, to build a platform for rapidly building Systems of Engagement, and to provide tools that integrate the two environments. This is where products like WMB, DataPower, WAS and MQ will continue to provide value for our customers.
  • #13 Let’s look at the Cars.com mobile app as an example. Cars.com is a consumer of APIs, and has assembled several 3rd party apis together to form the base function of their cars app. For example, they use a Map Provider API to provide a “store locator function” APIs from a car dealer data aggregator for availability of certain makes and models. They use APIs from a Bank to offer Loan calculators and origination Auto insurance from an Insurance companies APIs And can imagine them using the new Xtify API from IBM to provide notifications, that a car they were looking for was now found.
  • #14 Now, let’s look at the API Economy from the Providers perspective The Bank can extend it’s reach beyond customers doing on-line banking. By offering an API, that includes Mortgage Calculators, Lon Origination, On-line Payment, and Account Query the bank can reach new mobile app providers link Cars.com (automotive sales), Zillow (on line real-estate), and Mint (financial data aggregator) Which…
  • #22 You as an API Provider need to make sure you focus on not only providing secure and managed APIs but also ensuring a self-service and rich developer experience for your API consumers
  • #25 IBM API Mgmt provides the management platform, while IBM DataPower provides the API Gateway to enforce API security and control . IBM APIM sits on a server as a virtual appliance, while DataPower can be a virtual appliance or a physical appliance
  • #29 * Not applicable for on cloud offering
  • #39 This is a common pattern for exposing APIs to External Developers and Partners. For API requests, DataPower acting as the API Gateway sits in the DMZ. It can also be used as a consolidated Load Balancer or optionally, an external Load Balancer could be facing it. The API Gateway, in the DMZ, needs access to Internal Services, the User Registry used for Authentication and the Management Cluster. For that firewall ports need to be opened as shown in the picture. The Management Cluster also needs access to the Gateway Clusters to configure them (and monitor their status). In this case of Extenral APIs, the API Portal also needs to be externalized. That can be achieved by using a Revert Proxy or DataPower, proxying external Portal requests through the DMZ.
  • #40 When exposing Internal and External APIs, supporting Internal and External Developers, a good alternative is to host the Gateway Clusters in the Trusted Zone. A Load Balancer of a DataPower Security Gateway would sit in the DMZ to provide external access to the same cluster
  • #41 When exposing Internal and External APIs, supporting Internal and External Developers, a good alternative is to host the Gateway Clusters in the Trusted Zone. A Load Balancer of a DataPower Security Gateway would sit in the DMZ to provide external access to the same cluster This option shows an alternative of separating Environments in different Gateway Clusters. Sandbox and Testing environments are published to an internal Gateway Cluster, while the production systems for APIs are configured as different clusters.
  • #61 Easy out of the box setup. LDAP or internal identity provider support.