This systematic review analyzed 5 randomized controlled trials involving 553 patients on warfarin therapy undergoing dental procedures. Continuing warfarin therapy at the usual dose was not associated with an increased risk of clinically significant nonmajor bleeding or minor bleeding compared to interrupting or modifying the warfarin dose. The review aimed to determine the bleeding risk for patients who continued warfarin therapy versus those whose dose was reduced or interrupted prior to dental procedures.