SlideShare a Scribd company logo
1
Ahmed Salem
Project Manager
Saudi Mobile: +966 56 7016514
Egypt mobile: +2 010-09880903
Egypt Tel: +2 013-3360296
E-mail: taker2210@hotmail.com
Personal informations:
Date of Birth: 22-10-1983
Gender: Male
Marital Status: Married
Nationality: Egyptian
Military Service: Exempted
EDUCATION:
Bachelor in electrical power and machine engineering 2005
Faculty of engineering Shoubra - Benha university
cumulative grade : Good
Graduation project : A New Approach For A Long Transmission Line Design Under Economic Considerations
Project grade : excellent
Experince :
1- Project Manager for Ext. of TAIMAH S/S 132/33/13.8 KV DELTA company – SA Sep 2015-Now
Responsibilities:-
1-Have end-to-end responsibility for a project (Ext. of TAIMAH S/S 132/33/13.8 SUBSTATION) from
conception through to energize Substation.
2- control and supervise all project contract activities and report the job status periodically to direct
manager on critical issues with solutions required for maintaining project progress.
3- can resolve project related issues in coordination with external and internal relevant parties and
capable of withstanding high pressure needs to complete project requirement for client within the
stipulated time.
2- Project Engineer at DELTA LIMITED Company- Saudi Arabia. Mar 2013-Aug 2015
Responsibilities:-
1- Work as a coordinator to project with NG engineers and Provide technical support to site staff.
2-Assist Project Manager by preparing all necessary back up relating to change requests, schedule and document
management to track and record project performance.
3-Preparing complete, accurate and timely submittal logs for construction projects based on project drawings and
specifications.
2
4- Preparing for all approved detail design drawings, get IFC version for activity execution, and Distribute final
requirement documentation to subcontractors and bookkeeper/ documents controller.
5- Prepare correspondence with Owner, Engineers, Subcontractors, Suppliers, etc. Examples of referenced
correspondence include, but not confined to the following items: Schedule of Values, project schedule, memos,
request for information’s, transmittals and submittals.
6-During Construction Phase, proactively manage project to achieve quality, schedule, budget, safety, Utilize and
maintain tools.
7- Managing FAT with third party Agencies (SGS, Intertek and AICO).
8-Follow up with all suppliers/ subcontractors in order to clear critical snags and requesting missing materials
before s/s energization.
9-Document quality and progress of each Subcontractor and Suppliers, Update Subcontractors and Suppliers of
any changes to the plans, specifications and/or schedule.
10- Responsible for the all protection relays configuration, Follow up signals from protection relays, GIS LCC panels
& switch gear to SAS.
11-Have responsibility to finalize the agreements and contracts between company and subcontractors.
12- Responsible to finish all sang points and fished the remaining work at RAFHAA substation.
13- Follow up with all suppliers and NG to finish spare parts of RAFHAA S/S.
3-Protection & Commissioning Engineer
Egyptian Electricity Transmission Company –El Qalubia 220/66/11 KV substation June 2008-feb 2013
Responsibilities:-
1. High ability in designing & modification of schematic diagrams for 220&66 KV substations in transmission
networks.
2. Can add or replace any protection relay in substation such as I replaced many types of distance relays like
RAZFE,L8, LZ96, MICRO MHO AND LH1W by new such as MICOM P442 and SIEMENS 7SA610,7SA611,7SA612
& 7SA522 many old types of old differential relay such D202 and R30 by new such as ABB RET 615 , SIEMENS
7UT612 and MICOM P631 & P632 and many types of old over current relays by new one such as SIEMENS 7SJ
602 and ABB RET 615 and work with the software of that relays such as Siemens DIGSI 4.84,ABB PCM600 and
MICOM S1 STUDIO .
3. Testing& commissioning the protection relays in the transformer power stations with the device tester as
(MANTA –SPHARKER- FREGAA 300 -Isa- Q.Z).
4. I can deal with any faults in substations by analyzing it and eliminate it.
5. I can add many types of power metering devices on feeders and transformer &fault recorder.
6. Some substations I worked in are old and so I make many updates in it by replace old switchgear such old air
plast circuit breakers by new like ABB (edf-sk1-1).
7. I can carry testing on CT using CT analyzer, VT & circuit breaker.
8. I make distention in substation by adding a 66/11 KV transformer by its 11 KV feeders section & drawing its
schematic diagrams by MS VISIO software.
9. Commissioning & installation of switchgear up to 220 kV (C.B type rade koncar, Siemens, ABB, & Merlin
grain) and Design control circuits for all types of high voltage equipment’s.
10. Working with teleprotection function in protection relays between substations And national control in power
of Egypt to send them the signals and indication throw the remote terminal unite (RTU).
11. Working with teleprotection project function in distance relays between substations (Basos 500 KV, Quisna
220 kV& Elqalubia 220 kV).
3
4-Working in SCADA INNOVATIONS company as a design and installation engineer in substation
automation in GECOL 10 DCC'S PROJECT (general electricity company of Libya) July 2006-Jun 2008
10 DCC GECOL SCADA project
 This project is executed by SIEMENS/ABB /SCADA INNOVATIONS/GECOL each has its rule, where
SIEMENS is the provider and the main contractor for the 10 master stations hardware and software to
be delivered as a turnkey , and the provider for the components will be installed in the outstations
such as the feeder manager, RTU’s .
 SCADA INNOVATIONS and GECOL are responsible for the site survey and the installations in the
outstations “about 1500 outstations” to be linked to the master stations.
 SCADA INNOVATIONS is the consultant for the whole project.
Responsibilities:-
1. I have experience in scada systems in substation automation & telecontrol and in the I/O list of
substations to connect to DCS.
2. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and
communication systems used to connect substations to DCS such as optical fiber ,plc & wimax .
3. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, &
ENERGOINVEST to be able to log on scada system.
4. I have experience on using computerized testing equipment’s and to carry out testing of the relays
used in protection by tester such as SMC euro.
5. I have the site experience in high voltage substation & ability to read drawings and technical
specifications.
6. I have a good experience to carry out testing of CT & VT.
7. Supervisor on All installation & commissioning work for the following Equipment AG :
 All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its
utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).
 Remote Terminal Unit SPRECHER (RTU).
8. I have experience in scada systems in substation automation & telecontrol and in the I/O list of
substations to connect to DCS.
9. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and
communication systems used to connect substations to DCS such as optical fiber ,plc & wimax .
10. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, &
ENERGOINVEST to be able to log on scada system.
11. I have experience on using computerized testing equipment’s and to carry out testing of the relays
used in protection by tester such as SMC euro.
12. I have the site experience in high voltage substation & ability to read drawings and technical
specifications.
13. I have a good experience to carry out testing of CT & VT.
14. Supervisor on All installation & commissioning work for the following Equipment AG :
 All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its
utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).
 Remote Terminal Unit SPRECHER (RTU).
4
15. I have a good knowledge EMS (energy management system), DCS (distribution control center) &
telecom.
16. Supervisor on installation of communication work for the following Equipment supplied by ABB
 ODF(optical distribution fram) & ABB SDH FOX515 X
 make the splicing to optical fiber to ODF
 make a test on the line using OTDR
5-Working IN KAHROMICA COMPANY in (OPGW) and wire installation site engineer Aug. 2005- July 2006
1- SHBIN ELKOM (66kv) to ELSHOHADA (66kv) (WIRE INSTALLATION)
2- QUSNA (220kv) to EL Qalubia (220kv) (OPGW)
3- EL Qalubia (220 kV) to BASOS (500 kV) (OPGW)
Responsibilities:
1. Team leader of installation work group.
2. Supervisor on All installation work for the last two project supplied by FUJIKURA Japan.
3. Make splicing between joints by (FSM-17S) FUJIKURA fusion splicer.
Work on pushing machine of (OPGW) TESMIC Italy.
Training courses :
1. Have cores in (OPTICAL COMMUNICATION SYSTEM) at national telecommunication
institute
2007
2. Training from ABB Switzerland on SDH fox 515x installation & commissioning 2007
3. Training on JDSU MTS-6000 OTDR by universal academy systems and Training on
SUMITOMO FUSION SPLICER T39 by universal academy systems (UAS).
2007
Skills:
Language Fluent in Arabic and English
Computer knowledge Windows, MS Office, SPSS, Visual Basic for Applications Or cad, Pspice ,
Electrical Work Bench, MS Project, MS VISIO and AutoCAD.

More Related Content

What's hot

CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
Izgen Engineering Ltd
Izgen Engineering LtdIzgen Engineering Ltd
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
 
Cover letter
Cover letterCover letter
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERNguyen Thuc
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
Khaled EL-Hag Ahmed
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Iprofessional
IprofessionalIprofessional
Iprofessionalkaraguppi
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
Walt Williams
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 

What's hot (20)

CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Intertest
IntertestIntertest
Intertest
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
CV-Bokarica
CV-BokaricaCV-Bokarica
CV-Bokarica
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
Izgen Engineering Ltd
Izgen Engineering LtdIzgen Engineering Ltd
Izgen Engineering Ltd
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Cover letter
Cover letterCover letter
Cover letter
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Iprofessional
IprofessionalIprofessional
Iprofessional
 
khaled cv
khaled cvkhaled cv
khaled cv
 
M Imran
M ImranM Imran
M Imran
 
VIJAY_RESUME
VIJAY_RESUMEVIJAY_RESUME
VIJAY_RESUME
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 

Similar to Ahmed Elsayed Salem CV

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Gokul resume
Gokul resumeGokul resume
14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cvenayatullah wahab
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
3856 basem azzouz cv june-2016
3856 basem azzouz cv june-20163856 basem azzouz cv june-2016
3856 basem azzouz cv june-2016
basem ali
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Ibrahem Sakkot
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefs
AGE Technologies
 
CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)Sherif Gafar
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BEmirza gulrez
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
 

Similar to Ahmed Elsayed Salem CV (20)

Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
M Adel CV 2016
M Adel CV 2016M Adel CV 2016
M Adel CV 2016
 
Gokul resume
Gokul resumeGokul resume
Gokul resume
 
DG cement exprnc
DG cement exprncDG cement exprnc
DG cement exprnc
 
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
3856 basem azzouz cv june-2016
3856 basem azzouz cv june-20163856 basem azzouz cv june-2016
3856 basem azzouz cv june-2016
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefs
 
CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)
 
Wael Alnagar CV
Wael Alnagar CVWael Alnagar CV
Wael Alnagar CV
 
CV Details
CV DetailsCV Details
CV Details
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 

Ahmed Elsayed Salem CV

  • 1. 1 Ahmed Salem Project Manager Saudi Mobile: +966 56 7016514 Egypt mobile: +2 010-09880903 Egypt Tel: +2 013-3360296 E-mail: taker2210@hotmail.com Personal informations: Date of Birth: 22-10-1983 Gender: Male Marital Status: Married Nationality: Egyptian Military Service: Exempted EDUCATION: Bachelor in electrical power and machine engineering 2005 Faculty of engineering Shoubra - Benha university cumulative grade : Good Graduation project : A New Approach For A Long Transmission Line Design Under Economic Considerations Project grade : excellent Experince : 1- Project Manager for Ext. of TAIMAH S/S 132/33/13.8 KV DELTA company – SA Sep 2015-Now Responsibilities:- 1-Have end-to-end responsibility for a project (Ext. of TAIMAH S/S 132/33/13.8 SUBSTATION) from conception through to energize Substation. 2- control and supervise all project contract activities and report the job status periodically to direct manager on critical issues with solutions required for maintaining project progress. 3- can resolve project related issues in coordination with external and internal relevant parties and capable of withstanding high pressure needs to complete project requirement for client within the stipulated time. 2- Project Engineer at DELTA LIMITED Company- Saudi Arabia. Mar 2013-Aug 2015 Responsibilities:- 1- Work as a coordinator to project with NG engineers and Provide technical support to site staff. 2-Assist Project Manager by preparing all necessary back up relating to change requests, schedule and document management to track and record project performance. 3-Preparing complete, accurate and timely submittal logs for construction projects based on project drawings and specifications.
  • 2. 2 4- Preparing for all approved detail design drawings, get IFC version for activity execution, and Distribute final requirement documentation to subcontractors and bookkeeper/ documents controller. 5- Prepare correspondence with Owner, Engineers, Subcontractors, Suppliers, etc. Examples of referenced correspondence include, but not confined to the following items: Schedule of Values, project schedule, memos, request for information’s, transmittals and submittals. 6-During Construction Phase, proactively manage project to achieve quality, schedule, budget, safety, Utilize and maintain tools. 7- Managing FAT with third party Agencies (SGS, Intertek and AICO). 8-Follow up with all suppliers/ subcontractors in order to clear critical snags and requesting missing materials before s/s energization. 9-Document quality and progress of each Subcontractor and Suppliers, Update Subcontractors and Suppliers of any changes to the plans, specifications and/or schedule. 10- Responsible for the all protection relays configuration, Follow up signals from protection relays, GIS LCC panels & switch gear to SAS. 11-Have responsibility to finalize the agreements and contracts between company and subcontractors. 12- Responsible to finish all sang points and fished the remaining work at RAFHAA substation. 13- Follow up with all suppliers and NG to finish spare parts of RAFHAA S/S. 3-Protection & Commissioning Engineer Egyptian Electricity Transmission Company –El Qalubia 220/66/11 KV substation June 2008-feb 2013 Responsibilities:- 1. High ability in designing & modification of schematic diagrams for 220&66 KV substations in transmission networks. 2. Can add or replace any protection relay in substation such as I replaced many types of distance relays like RAZFE,L8, LZ96, MICRO MHO AND LH1W by new such as MICOM P442 and SIEMENS 7SA610,7SA611,7SA612 & 7SA522 many old types of old differential relay such D202 and R30 by new such as ABB RET 615 , SIEMENS 7UT612 and MICOM P631 & P632 and many types of old over current relays by new one such as SIEMENS 7SJ 602 and ABB RET 615 and work with the software of that relays such as Siemens DIGSI 4.84,ABB PCM600 and MICOM S1 STUDIO . 3. Testing& commissioning the protection relays in the transformer power stations with the device tester as (MANTA –SPHARKER- FREGAA 300 -Isa- Q.Z). 4. I can deal with any faults in substations by analyzing it and eliminate it. 5. I can add many types of power metering devices on feeders and transformer &fault recorder. 6. Some substations I worked in are old and so I make many updates in it by replace old switchgear such old air plast circuit breakers by new like ABB (edf-sk1-1). 7. I can carry testing on CT using CT analyzer, VT & circuit breaker. 8. I make distention in substation by adding a 66/11 KV transformer by its 11 KV feeders section & drawing its schematic diagrams by MS VISIO software. 9. Commissioning & installation of switchgear up to 220 kV (C.B type rade koncar, Siemens, ABB, & Merlin grain) and Design control circuits for all types of high voltage equipment’s. 10. Working with teleprotection function in protection relays between substations And national control in power of Egypt to send them the signals and indication throw the remote terminal unite (RTU). 11. Working with teleprotection project function in distance relays between substations (Basos 500 KV, Quisna 220 kV& Elqalubia 220 kV).
  • 3. 3 4-Working in SCADA INNOVATIONS company as a design and installation engineer in substation automation in GECOL 10 DCC'S PROJECT (general electricity company of Libya) July 2006-Jun 2008 10 DCC GECOL SCADA project  This project is executed by SIEMENS/ABB /SCADA INNOVATIONS/GECOL each has its rule, where SIEMENS is the provider and the main contractor for the 10 master stations hardware and software to be delivered as a turnkey , and the provider for the components will be installed in the outstations such as the feeder manager, RTU’s .  SCADA INNOVATIONS and GECOL are responsible for the site survey and the installations in the outstations “about 1500 outstations” to be linked to the master stations.  SCADA INNOVATIONS is the consultant for the whole project. Responsibilities:- 1. I have experience in scada systems in substation automation & telecontrol and in the I/O list of substations to connect to DCS. 2. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and communication systems used to connect substations to DCS such as optical fiber ,plc & wimax . 3. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, & ENERGOINVEST to be able to log on scada system. 4. I have experience on using computerized testing equipment’s and to carry out testing of the relays used in protection by tester such as SMC euro. 5. I have the site experience in high voltage substation & ability to read drawings and technical specifications. 6. I have a good experience to carry out testing of CT & VT. 7. Supervisor on All installation & commissioning work for the following Equipment AG :  All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).  Remote Terminal Unit SPRECHER (RTU). 8. I have experience in scada systems in substation automation & telecontrol and in the I/O list of substations to connect to DCS. 9. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and communication systems used to connect substations to DCS such as optical fiber ,plc & wimax . 10. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, & ENERGOINVEST to be able to log on scada system. 11. I have experience on using computerized testing equipment’s and to carry out testing of the relays used in protection by tester such as SMC euro. 12. I have the site experience in high voltage substation & ability to read drawings and technical specifications. 13. I have a good experience to carry out testing of CT & VT. 14. Supervisor on All installation & commissioning work for the following Equipment AG :  All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).  Remote Terminal Unit SPRECHER (RTU).
  • 4. 4 15. I have a good knowledge EMS (energy management system), DCS (distribution control center) & telecom. 16. Supervisor on installation of communication work for the following Equipment supplied by ABB  ODF(optical distribution fram) & ABB SDH FOX515 X  make the splicing to optical fiber to ODF  make a test on the line using OTDR 5-Working IN KAHROMICA COMPANY in (OPGW) and wire installation site engineer Aug. 2005- July 2006 1- SHBIN ELKOM (66kv) to ELSHOHADA (66kv) (WIRE INSTALLATION) 2- QUSNA (220kv) to EL Qalubia (220kv) (OPGW) 3- EL Qalubia (220 kV) to BASOS (500 kV) (OPGW) Responsibilities: 1. Team leader of installation work group. 2. Supervisor on All installation work for the last two project supplied by FUJIKURA Japan. 3. Make splicing between joints by (FSM-17S) FUJIKURA fusion splicer. Work on pushing machine of (OPGW) TESMIC Italy. Training courses : 1. Have cores in (OPTICAL COMMUNICATION SYSTEM) at national telecommunication institute 2007 2. Training from ABB Switzerland on SDH fox 515x installation & commissioning 2007 3. Training on JDSU MTS-6000 OTDR by universal academy systems and Training on SUMITOMO FUSION SPLICER T39 by universal academy systems (UAS). 2007 Skills: Language Fluent in Arabic and English Computer knowledge Windows, MS Office, SPSS, Visual Basic for Applications Or cad, Pspice , Electrical Work Bench, MS Project, MS VISIO and AutoCAD.