Ahmed Salem is an Egyptian electrical engineer seeking a project manager position. He has 15 years of experience managing electrical substation projects in Saudi Arabia and Egypt, including experience designing, testing, and commissioning high voltage equipment. His background includes designing transmission line schematics, configuring protection relays, and managing projects from conception to energization. He is proficient in English and Arabic and knowledgeable about computer design programs, project management software, and electrical engineering simulation tools.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
• Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements
• Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks)
• Good Experience in electrical cables Installations L.V (Infrastructure).
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ahmed Elsayed Salem CV
1. 1
Ahmed Salem
Project Manager
Saudi Mobile: +966 56 7016514
Egypt mobile: +2 010-09880903
Egypt Tel: +2 013-3360296
E-mail: taker2210@hotmail.com
Personal informations:
Date of Birth: 22-10-1983
Gender: Male
Marital Status: Married
Nationality: Egyptian
Military Service: Exempted
EDUCATION:
Bachelor in electrical power and machine engineering 2005
Faculty of engineering Shoubra - Benha university
cumulative grade : Good
Graduation project : A New Approach For A Long Transmission Line Design Under Economic Considerations
Project grade : excellent
Experince :
1- Project Manager for Ext. of TAIMAH S/S 132/33/13.8 KV DELTA company – SA Sep 2015-Now
Responsibilities:-
1-Have end-to-end responsibility for a project (Ext. of TAIMAH S/S 132/33/13.8 SUBSTATION) from
conception through to energize Substation.
2- control and supervise all project contract activities and report the job status periodically to direct
manager on critical issues with solutions required for maintaining project progress.
3- can resolve project related issues in coordination with external and internal relevant parties and
capable of withstanding high pressure needs to complete project requirement for client within the
stipulated time.
2- Project Engineer at DELTA LIMITED Company- Saudi Arabia. Mar 2013-Aug 2015
Responsibilities:-
1- Work as a coordinator to project with NG engineers and Provide technical support to site staff.
2-Assist Project Manager by preparing all necessary back up relating to change requests, schedule and document
management to track and record project performance.
3-Preparing complete, accurate and timely submittal logs for construction projects based on project drawings and
specifications.
2. 2
4- Preparing for all approved detail design drawings, get IFC version for activity execution, and Distribute final
requirement documentation to subcontractors and bookkeeper/ documents controller.
5- Prepare correspondence with Owner, Engineers, Subcontractors, Suppliers, etc. Examples of referenced
correspondence include, but not confined to the following items: Schedule of Values, project schedule, memos,
request for information’s, transmittals and submittals.
6-During Construction Phase, proactively manage project to achieve quality, schedule, budget, safety, Utilize and
maintain tools.
7- Managing FAT with third party Agencies (SGS, Intertek and AICO).
8-Follow up with all suppliers/ subcontractors in order to clear critical snags and requesting missing materials
before s/s energization.
9-Document quality and progress of each Subcontractor and Suppliers, Update Subcontractors and Suppliers of
any changes to the plans, specifications and/or schedule.
10- Responsible for the all protection relays configuration, Follow up signals from protection relays, GIS LCC panels
& switch gear to SAS.
11-Have responsibility to finalize the agreements and contracts between company and subcontractors.
12- Responsible to finish all sang points and fished the remaining work at RAFHAA substation.
13- Follow up with all suppliers and NG to finish spare parts of RAFHAA S/S.
3-Protection & Commissioning Engineer
Egyptian Electricity Transmission Company –El Qalubia 220/66/11 KV substation June 2008-feb 2013
Responsibilities:-
1. High ability in designing & modification of schematic diagrams for 220&66 KV substations in transmission
networks.
2. Can add or replace any protection relay in substation such as I replaced many types of distance relays like
RAZFE,L8, LZ96, MICRO MHO AND LH1W by new such as MICOM P442 and SIEMENS 7SA610,7SA611,7SA612
& 7SA522 many old types of old differential relay such D202 and R30 by new such as ABB RET 615 , SIEMENS
7UT612 and MICOM P631 & P632 and many types of old over current relays by new one such as SIEMENS 7SJ
602 and ABB RET 615 and work with the software of that relays such as Siemens DIGSI 4.84,ABB PCM600 and
MICOM S1 STUDIO .
3. Testing& commissioning the protection relays in the transformer power stations with the device tester as
(MANTA –SPHARKER- FREGAA 300 -Isa- Q.Z).
4. I can deal with any faults in substations by analyzing it and eliminate it.
5. I can add many types of power metering devices on feeders and transformer &fault recorder.
6. Some substations I worked in are old and so I make many updates in it by replace old switchgear such old air
plast circuit breakers by new like ABB (edf-sk1-1).
7. I can carry testing on CT using CT analyzer, VT & circuit breaker.
8. I make distention in substation by adding a 66/11 KV transformer by its 11 KV feeders section & drawing its
schematic diagrams by MS VISIO software.
9. Commissioning & installation of switchgear up to 220 kV (C.B type rade koncar, Siemens, ABB, & Merlin
grain) and Design control circuits for all types of high voltage equipment’s.
10. Working with teleprotection function in protection relays between substations And national control in power
of Egypt to send them the signals and indication throw the remote terminal unite (RTU).
11. Working with teleprotection project function in distance relays between substations (Basos 500 KV, Quisna
220 kV& Elqalubia 220 kV).
3. 3
4-Working in SCADA INNOVATIONS company as a design and installation engineer in substation
automation in GECOL 10 DCC'S PROJECT (general electricity company of Libya) July 2006-Jun 2008
10 DCC GECOL SCADA project
This project is executed by SIEMENS/ABB /SCADA INNOVATIONS/GECOL each has its rule, where
SIEMENS is the provider and the main contractor for the 10 master stations hardware and software to
be delivered as a turnkey , and the provider for the components will be installed in the outstations
such as the feeder manager, RTU’s .
SCADA INNOVATIONS and GECOL are responsible for the site survey and the installations in the
outstations “about 1500 outstations” to be linked to the master stations.
SCADA INNOVATIONS is the consultant for the whole project.
Responsibilities:-
1. I have experience in scada systems in substation automation & telecontrol and in the I/O list of
substations to connect to DCS.
2. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and
communication systems used to connect substations to DCS such as optical fiber ,plc & wimax .
3. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, &
ENERGOINVEST to be able to log on scada system.
4. I have experience on using computerized testing equipment’s and to carry out testing of the relays
used in protection by tester such as SMC euro.
5. I have the site experience in high voltage substation & ability to read drawings and technical
specifications.
6. I have a good experience to carry out testing of CT & VT.
7. Supervisor on All installation & commissioning work for the following Equipment AG :
All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its
utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).
Remote Terminal Unit SPRECHER (RTU).
8. I have experience in scada systems in substation automation & telecontrol and in the I/O list of
substations to connect to DCS.
9. I Have experience of scada systems components such as RTU, Teleprotection equipment’s & SDH and
communication systems used to connect substations to DCS such as optical fiber ,plc & wimax .
10. Design of wire drawings to the modified types of old substations such as BBC, ARIVA, MEDELEC, &
ENERGOINVEST to be able to log on scada system.
11. I have experience on using computerized testing equipment’s and to carry out testing of the relays
used in protection by tester such as SMC euro.
12. I have the site experience in high voltage substation & ability to read drawings and technical
specifications.
13. I have a good experience to carry out testing of CT & VT.
14. Supervisor on All installation & commissioning work for the following Equipment AG :
All Protection Relays (Feeder Manager Relays, Distance Relays, Differential Relays) and all its
utilities such as (VAMP, SIEMENS, ONE BOX SOLUTION SPERCHER).
Remote Terminal Unit SPRECHER (RTU).
4. 4
15. I have a good knowledge EMS (energy management system), DCS (distribution control center) &
telecom.
16. Supervisor on installation of communication work for the following Equipment supplied by ABB
ODF(optical distribution fram) & ABB SDH FOX515 X
make the splicing to optical fiber to ODF
make a test on the line using OTDR
5-Working IN KAHROMICA COMPANY in (OPGW) and wire installation site engineer Aug. 2005- July 2006
1- SHBIN ELKOM (66kv) to ELSHOHADA (66kv) (WIRE INSTALLATION)
2- QUSNA (220kv) to EL Qalubia (220kv) (OPGW)
3- EL Qalubia (220 kV) to BASOS (500 kV) (OPGW)
Responsibilities:
1. Team leader of installation work group.
2. Supervisor on All installation work for the last two project supplied by FUJIKURA Japan.
3. Make splicing between joints by (FSM-17S) FUJIKURA fusion splicer.
Work on pushing machine of (OPGW) TESMIC Italy.
Training courses :
1. Have cores in (OPTICAL COMMUNICATION SYSTEM) at national telecommunication
institute
2007
2. Training from ABB Switzerland on SDH fox 515x installation & commissioning 2007
3. Training on JDSU MTS-6000 OTDR by universal academy systems and Training on
SUMITOMO FUSION SPLICER T39 by universal academy systems (UAS).
2007
Skills:
Language Fluent in Arabic and English
Computer knowledge Windows, MS Office, SPSS, Visual Basic for Applications Or cad, Pspice ,
Electrical Work Bench, MS Project, MS VISIO and AutoCAD.