How to sell a traditional client
  on an Agile project plan
         Presented to AgileCville 7/16/2009




     Arin Sime asime@o19s.com 434 996 5226
Outline



•   Why do we need to sell it?
•   Background/Bio
•   Defining a “traditional” environment
•   Survey on Selling Agile
•   Strategies for persuasion
•   The importance of continuing to sell
    the process throughout the project
The Project Plan they are afraid of....
“Some kind of structure
(or architecture) is
imperative because
decentralization
without structure is
chaos.”

- J.A. Zachman, 1987, “A
framework for
information systems
architecture”
2
More from Zachman...
“The architect must convince the owner
that the owner’s desires are understood
well enough so that the owner will pay
for the creative work to follow, and in
effect, initiate the project.”
We need to convince our clients that we
understand their desires, and that Agile can
substitute for most, if not all, of the up front
documentation
Automating the Science To Enable the Art




         A little about me...
                       Senior Consultant, OpenSource Connections

                       Custom software development consulting for
                       entrepreneurial, government, and military clients



                               Graduate student (M.S. in Management of I.T.) at the
                               University of Virginia’s McIntire School of Commerce



                               Adjunct Instructor in a corporate software engineering
                               program for Virginia Commonwealth University
Automating the Science To Enable the Art


             Some of our clients....




                                                      Platforms and Languages
                                           ASP .Net         C        C#         Java
                                            Linux        MySQL     Oracle       PHP
                                           Python         Ruby     Solaris   SQL Server
Booz Allen Hamilton
                                     SAIC
                                     Capitol One
                                     International Monetary Fund
                                     US Air Force
Surveyed fellow students             AutoZone
of MSMIT program and                 QinetiQ
                                     US Department of Justice
other colleagues for                 Fannie Mae
                                     Freddie Mac
examples of how they                 AOL
                                     IBM
have sold Agile or been              ManTech
sold on Agile.                       Department of Veterans Affairs
                                     University of Virginia


     http://www.tinyurl.com/SellingAgileSurvey/
“Agile seems to carry the connotation of 'c ode-
like-hell' or just, 'work faster'.”


“I am skeptical of any methods that that could
be interpreted as ‘cutting corners’”
What exactly is a traditional environment?


“Plan Driven methods are
generally considered the traditional way
to develop software. Based on concepts
drawn from the mainline engineering
fields, these methods approach
development in a
requirements/design/
build paradigm with standard, well-
defined processes that organizations
improve continuously.”
Strategies for Persuasion

1. Trial by Sprint
2. Case Studies of Success
3. Client/Customer Testimonials
4. Finding a champion in Key Stakeholders
5. Using metrics of success
6. Showing how Agile combats common IT project failures
7. Examples of industry/government leaders using Agile
8. Comparison to other methodologies
9. Listen to their needs and address them
10. Sneak it in
11. Compromise
“You need to show a success to get adoption.”
Strategy #1: Trial by Sprint

“Trust me for two
weeks. If you hate
it, you can fire
me.”
Dwight Gibbs, CTO at Legg Mason     Dwight Gibbs, Senior Vice
                                     President of Technology
Capital Management, promising the    for INPUT, formerly the
                                    CTO at Legg Mason Capital
Director of Research that if he            Management

didn’t see development team
improvements after only one
sprint, then they would abandon
Agile.
“The sprint went well and we stayed with Scrum”
Strategy #2: Case Studies in Success
• Present case studies of Agile
       success from your own client
       history

          • Example burndowns
          • Stories of benefits to teams
          • Highlight how the process
                caught risks early, and
                addressed them
          •     Use graphics

• Present industry examples of Agile
       success

Links to Agile Case Studies can be found at: http://www.notesfromatooluser.com/2008/11/scrum-case-studies.html
Strategy #3: Client/Customer Testimonials
                         “Biggest gain from Scrum was
                         just keeping the project going.”

“Complexity          “certainly one of the
dictated we          most successful
couldn’t know it
all up front - we    projects ever here”
have to
                           “Eliminated biases of
prototype.”
                           what developers can do
                           by letting them self-
“Got it done a lot better  select”
because team is well
integrated. I didn’t have to
plan who worked on what.”
Strategy #3: Client/Customer Testimonials
“I don’t have to lord over people, no siddling over people with a
coffee cup like in Office Space.”
“I highlighted the benefits to the Project
Manager: higher productivity and less team-
management stuff since the team will take
care of lots of team-management and updating
(burn charts) instead of PM's managing those
details.”
Strategy #4: Finding a Champion in Key Stakeholders




• Identify Stakeholder most in need
• Address their needs with Agile
• Enlist their support in adoption
• Helps to already have a relationship
“The development team applies Agile. I think it
is useful to obtain metrics and organize the
work. From a business perspective, I have not
seen the benefit.”
Strategy #5: Using Metrics of Success


•   Show metrics in proposals and
    throughout your project.
•   Show Burndowns over the course
    of the project
•   Use test coverage/test success as
    a metric
•   Velocity/Story points
    accomplished by your team
•   Defects from issue tracking tools
•   Shown here is an excerpt from a
    ThoughtWorks Project Manager's
    Status Report (as reported in
    Forrester Research Inc)



                                        http://www.forrester.com/Research/Document/0,7211,37380,00.html
“I created a presentation [showing] increased
productivity, better risk management (through
early detection), lower defect rates and
enhanced team experience (which will translate
to higher retention, less conflict management
and more productive future projects).”
Strategy #6: Show how Agile combats common IT failures

Top 10 Classic Mistakes
    1.      Poor estimation and scheduling
            Poor estimation and scheduling
    2.      Ineffective stakeholder management
            Ineffective stakeholder management
                                                                                                 Classic Mistakes that can
    3.      Insufficient management
            Insufficient riskrisk management
                                                                                                  be mitigated by Agile, as
    4.      Insufficient planning                                                                     identified in article
                                                                                                 Classic Mistakes that can
    5.      Shortchanged quality assurance
            Shortchanged quality assurance                                                       also arguably be mitigated
    6.      Weak personnel and/or team
            Weak personnel and/or team issues issues                                                 by Agile and Scrum
                                                                                                        (my addition)
    7.      Insufficient project sponsorship
            Insufficient project sponsorship
    8.      Poor requirements determination
            Poor requirements determination
    9.      Inattention to politics
    10. Lack of user involvement
    10. Lack of user involvement

Source: Prof. R. Ryan Nelson, University of Virginia. As published in MIS Quarterly Executive,
“IT Project Management: Infamous Failures, Classic Mistakes, and Best Practices”, June 2007
“Clients, especially the military, are wary of
catch phrases and sometimes unwilling to
change their habits.”
Strategy #7: Examples of industry/government leaders using Agile


    • CIA IT Projects follow this spiral lifecycle:

         •   Understand the mission
         •   Establish the vision
         •   Develop the architecture                      Jill Singer
         •   Define plans                        Deputy Chief Information Officer
                                                  Central Intelligence Agency
         •   Resource plans                           former VP for Project
         •   Execute plans                              Management, SAIC

         •   Measure progress

    • But within that lifecycle, they use Scrum,
        primarily 4 week sprints
Strategy #7: Examples of industry/government leaders using Agile

• Benefits the CIA has seen with Scrum:

     •   Regular and tangible deliverables
     •   Customer buy-in
     •   Trying out prototypes
     •   Users enjoy being able to add features Deputy Chief Information Officer
                                                            Jill Singer

         and change priorities with each iteration Central Intelligence Agency
     •   If a project is late, users don’t mind as   former VP for Project
                                                       Management, SAIC
         much

• Challenges the CIA has run into:

     • “What is Version 1.0?”
“I gave an overview of the Scrum process and
highlighted the ease of transition since
iterative/incremental development has been in
practice for a long time (in other forms such as
a spiral approach)”
Strategy #8: Comparison to other methodologies




From “Scrum in 5 Minutes”, by Softhouse. Available at: www.softhouse.se/Uploades/Scrum_eng_webb.pdf
“I am always skeptical of anything that
promises it is the 'o nly' or the
'best' [methodology].”
Strategy #9: Listen to their needs and address them

The Politics of Persuasion
 1.   Spend a lot of time listening. Ask
      people what challenges they are
      facing in their projects.
 2.   Make mental notes of each
      challenge.
 3.   Turn those challenges around and
      use them to segue into something
      you wanted to talk about anyways.
      (ie, how Agile will solve those
      problems)
 4.   Customers appreciate that you are
      offering positive solutions to their
      problems instead of just pushing
      your ideas without listening to
      them first.
“Agile practices usually find their way into the
Soft ware Development Lifecycle even if they
are not officially blessed.”


“I make sure I utilize agile practices where ever
I can - I just don't use the agile terminology.”
Strategy #10: Sneak it in


• Implement it piece by piece, without
   saying what you are doing.

• Start with iterations and demos, daily
   stand ups. PM’s love those.

• Then move to developer driven practices
   like sprint planning, XP, CI.

• Risky strategy, but can be used to
   overcome fear of the word Agile
“The methodology that has worked in my
experience has been to incrementally introduce
Agile ... Start using a limited set of the
practices and gradually start bringing in
more.”
Strategy #11: Compromise

            •   Some clients will
                require checkboxes of
                all documentation they
                always ask everyone
                for. (I’m looking at you,
                Federal Government)

            •   Try to shift when those
                documents are due.
                Focus only on those
                that provide value up
                front, leave the rest till
                the end.
Never stop selling Agile.

 When you’re in a project and it just saved
you (ie, due to increased agility to changes),
          let the client know why.

When things are going bad, point out how
the increased visibility into the project at
    least caught the problems earlier.




                                            SELLING
                                             AGILE
Automating the Science To Enable the Art




                                           Questions?

          Follow up....
                       www.OpenSourceConnections.com/Blog/

                       ASime@OpenSourceConnections.com

                       434 996 5226

AgileCville: How to sell a traditional client on an Agile project plan

  • 1.
    How to sella traditional client on an Agile project plan Presented to AgileCville 7/16/2009 Arin Sime asime@o19s.com 434 996 5226
  • 2.
    Outline • Why do we need to sell it? • Background/Bio • Defining a “traditional” environment • Survey on Selling Agile • Strategies for persuasion • The importance of continuing to sell the process throughout the project
  • 3.
    The Project Planthey are afraid of....
  • 4.
    “Some kind ofstructure (or architecture) is imperative because decentralization without structure is chaos.” - J.A. Zachman, 1987, “A framework for information systems architecture”
  • 5.
  • 6.
    More from Zachman... “Thearchitect must convince the owner that the owner’s desires are understood well enough so that the owner will pay for the creative work to follow, and in effect, initiate the project.” We need to convince our clients that we understand their desires, and that Agile can substitute for most, if not all, of the up front documentation
  • 7.
    Automating the ScienceTo Enable the Art A little about me... Senior Consultant, OpenSource Connections Custom software development consulting for entrepreneurial, government, and military clients Graduate student (M.S. in Management of I.T.) at the University of Virginia’s McIntire School of Commerce Adjunct Instructor in a corporate software engineering program for Virginia Commonwealth University
  • 8.
    Automating the ScienceTo Enable the Art Some of our clients.... Platforms and Languages ASP .Net C C# Java Linux MySQL Oracle PHP Python Ruby Solaris SQL Server
  • 9.
    Booz Allen Hamilton SAIC Capitol One International Monetary Fund US Air Force Surveyed fellow students AutoZone of MSMIT program and QinetiQ US Department of Justice other colleagues for Fannie Mae Freddie Mac examples of how they AOL IBM have sold Agile or been ManTech sold on Agile. Department of Veterans Affairs University of Virginia http://www.tinyurl.com/SellingAgileSurvey/
  • 10.
    “Agile seems tocarry the connotation of 'c ode- like-hell' or just, 'work faster'.” “I am skeptical of any methods that that could be interpreted as ‘cutting corners’”
  • 11.
    What exactly isa traditional environment? “Plan Driven methods are generally considered the traditional way to develop software. Based on concepts drawn from the mainline engineering fields, these methods approach development in a requirements/design/ build paradigm with standard, well- defined processes that organizations improve continuously.”
  • 12.
    Strategies for Persuasion 1.Trial by Sprint 2. Case Studies of Success 3. Client/Customer Testimonials 4. Finding a champion in Key Stakeholders 5. Using metrics of success 6. Showing how Agile combats common IT project failures 7. Examples of industry/government leaders using Agile 8. Comparison to other methodologies 9. Listen to their needs and address them 10. Sneak it in 11. Compromise
  • 13.
    “You need toshow a success to get adoption.”
  • 14.
    Strategy #1: Trialby Sprint “Trust me for two weeks. If you hate it, you can fire me.” Dwight Gibbs, CTO at Legg Mason Dwight Gibbs, Senior Vice President of Technology Capital Management, promising the for INPUT, formerly the CTO at Legg Mason Capital Director of Research that if he Management didn’t see development team improvements after only one sprint, then they would abandon Agile. “The sprint went well and we stayed with Scrum”
  • 15.
    Strategy #2: CaseStudies in Success • Present case studies of Agile success from your own client history • Example burndowns • Stories of benefits to teams • Highlight how the process caught risks early, and addressed them • Use graphics • Present industry examples of Agile success Links to Agile Case Studies can be found at: http://www.notesfromatooluser.com/2008/11/scrum-case-studies.html
  • 16.
    Strategy #3: Client/CustomerTestimonials “Biggest gain from Scrum was just keeping the project going.” “Complexity “certainly one of the dictated we most successful couldn’t know it all up front - we projects ever here” have to “Eliminated biases of prototype.” what developers can do by letting them self- “Got it done a lot better select” because team is well integrated. I didn’t have to plan who worked on what.”
  • 17.
    Strategy #3: Client/CustomerTestimonials “I don’t have to lord over people, no siddling over people with a coffee cup like in Office Space.”
  • 18.
    “I highlighted thebenefits to the Project Manager: higher productivity and less team- management stuff since the team will take care of lots of team-management and updating (burn charts) instead of PM's managing those details.”
  • 19.
    Strategy #4: Findinga Champion in Key Stakeholders • Identify Stakeholder most in need • Address their needs with Agile • Enlist their support in adoption • Helps to already have a relationship
  • 20.
    “The development teamapplies Agile. I think it is useful to obtain metrics and organize the work. From a business perspective, I have not seen the benefit.”
  • 21.
    Strategy #5: UsingMetrics of Success • Show metrics in proposals and throughout your project. • Show Burndowns over the course of the project • Use test coverage/test success as a metric • Velocity/Story points accomplished by your team • Defects from issue tracking tools • Shown here is an excerpt from a ThoughtWorks Project Manager's Status Report (as reported in Forrester Research Inc) http://www.forrester.com/Research/Document/0,7211,37380,00.html
  • 22.
    “I created apresentation [showing] increased productivity, better risk management (through early detection), lower defect rates and enhanced team experience (which will translate to higher retention, less conflict management and more productive future projects).”
  • 23.
    Strategy #6: Showhow Agile combats common IT failures Top 10 Classic Mistakes 1. Poor estimation and scheduling Poor estimation and scheduling 2. Ineffective stakeholder management Ineffective stakeholder management Classic Mistakes that can 3. Insufficient management Insufficient riskrisk management be mitigated by Agile, as 4. Insufficient planning identified in article Classic Mistakes that can 5. Shortchanged quality assurance Shortchanged quality assurance also arguably be mitigated 6. Weak personnel and/or team Weak personnel and/or team issues issues by Agile and Scrum (my addition) 7. Insufficient project sponsorship Insufficient project sponsorship 8. Poor requirements determination Poor requirements determination 9. Inattention to politics 10. Lack of user involvement 10. Lack of user involvement Source: Prof. R. Ryan Nelson, University of Virginia. As published in MIS Quarterly Executive, “IT Project Management: Infamous Failures, Classic Mistakes, and Best Practices”, June 2007
  • 24.
    “Clients, especially themilitary, are wary of catch phrases and sometimes unwilling to change their habits.”
  • 25.
    Strategy #7: Examplesof industry/government leaders using Agile • CIA IT Projects follow this spiral lifecycle: • Understand the mission • Establish the vision • Develop the architecture Jill Singer • Define plans Deputy Chief Information Officer Central Intelligence Agency • Resource plans former VP for Project • Execute plans Management, SAIC • Measure progress • But within that lifecycle, they use Scrum, primarily 4 week sprints
  • 26.
    Strategy #7: Examplesof industry/government leaders using Agile • Benefits the CIA has seen with Scrum: • Regular and tangible deliverables • Customer buy-in • Trying out prototypes • Users enjoy being able to add features Deputy Chief Information Officer Jill Singer and change priorities with each iteration Central Intelligence Agency • If a project is late, users don’t mind as former VP for Project Management, SAIC much • Challenges the CIA has run into: • “What is Version 1.0?”
  • 27.
    “I gave anoverview of the Scrum process and highlighted the ease of transition since iterative/incremental development has been in practice for a long time (in other forms such as a spiral approach)”
  • 28.
    Strategy #8: Comparisonto other methodologies From “Scrum in 5 Minutes”, by Softhouse. Available at: www.softhouse.se/Uploades/Scrum_eng_webb.pdf
  • 29.
    “I am alwaysskeptical of anything that promises it is the 'o nly' or the 'best' [methodology].”
  • 30.
    Strategy #9: Listento their needs and address them The Politics of Persuasion 1. Spend a lot of time listening. Ask people what challenges they are facing in their projects. 2. Make mental notes of each challenge. 3. Turn those challenges around and use them to segue into something you wanted to talk about anyways. (ie, how Agile will solve those problems) 4. Customers appreciate that you are offering positive solutions to their problems instead of just pushing your ideas without listening to them first.
  • 31.
    “Agile practices usuallyfind their way into the Soft ware Development Lifecycle even if they are not officially blessed.” “I make sure I utilize agile practices where ever I can - I just don't use the agile terminology.”
  • 32.
    Strategy #10: Sneakit in • Implement it piece by piece, without saying what you are doing. • Start with iterations and demos, daily stand ups. PM’s love those. • Then move to developer driven practices like sprint planning, XP, CI. • Risky strategy, but can be used to overcome fear of the word Agile
  • 33.
    “The methodology thathas worked in my experience has been to incrementally introduce Agile ... Start using a limited set of the practices and gradually start bringing in more.”
  • 34.
    Strategy #11: Compromise • Some clients will require checkboxes of all documentation they always ask everyone for. (I’m looking at you, Federal Government) • Try to shift when those documents are due. Focus only on those that provide value up front, leave the rest till the end.
  • 35.
    Never stop sellingAgile. When you’re in a project and it just saved you (ie, due to increased agility to changes), let the client know why. When things are going bad, point out how the increased visibility into the project at least caught the problems earlier. SELLING AGILE
  • 36.
    Automating the ScienceTo Enable the Art Questions? Follow up.... www.OpenSourceConnections.com/Blog/ ASime@OpenSourceConnections.com 434 996 5226