Agile Project Implementation Methodology
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 2
© 2014 SAP AG. All rights reserved. 2
Key Take Aways
 Drive for better “Time to Value”; customers are looking for early confirmation that
requirements can be met.
 Best Practices and Rapid Deployment Solutions greatly shorten deployment of SAP
solutions.
 SAP offers a proven set of Acceleration Techniques and Deployment Strategies in
SAP Activate Methodology
 Agile has been used successfully in SAP projects of various sizes and solution scope
 Level of acceleration and approach need to be tailored to the customer’s situation,
requirements and culture
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 3
SHORTEN TIME TO VALUE
AND REDUCE COSTS
REDUCE RISKS, WHILE
MOVING FORWARD
Visibility
Incremental Approach
Better Engagement between
Business and IT
FLEXIBILITY AND CHOICE
Solution and Product Fit
Business Expectations Changed
On cloud On
premises
Mobile
Hybrid
Cost Time to Value
Cost Time to Value
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 4
The Basics of Agile Methods
ITERATIVE
Frequent Inspection & Adoption
PEOPLE CENTRIC
Trust, Self-organizing teams and
individuals
FOCUS
Team focuses on one thing at a
time until it’s done
CROSS-FUNCTIONAL TEAMS
Face to face communication
/ no silos
CONSTANT LEARNING
Better fail early to learn fast, and
improve
ADAPTIVE PLANNING
To hit a moving target
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 5
SAP Activate for managed cloud and on-premise [ASAP successor]
Jump-start project
with pre-assembled
solution
Identify & validate
delta requirements
and gaps
Build customer
solution in short,
time-boxed sprints
Safeguard build
and run with ICC**,
OCC** and MCC**
Prepare
Pre-
Assembly
Solution Scope
and Value
Determination
Initial Roadmap
and Approach
Explore
Delta
Design
Deploy
Technical and
System testing
Realize
Baseline Build
Sprint Execution
Solution Validation including
Gap Validation**
Prioritize Backlog
Release and
Sprint Plan
Integration Testing
Value Audits
Setup Operations
or OCC**
Organizational
and Production
Readiness
Cutover
Support after
Go-Live
Run
Operations
Control Center
Application
Lifecycle
Management
Value
Management
** Deliverables, milestones and activities are only applicable in SAP Premium Engagements.
Best Practices
that fit customer
scope
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 6
Agile Project Execution and Benefits
Prepare Realize
Explore Deploy Run
Sprints
1-3
Iterations / Demos
Demo
Support
Release Planning
Tests
Final
Prep.
Organizational
Readiness
Pre-built
system or
pre-
assembled
solution
Solution
Validation
Must
Should
Could
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
Would
4
5
1
8
2
7
3
4
2
2
4
3
3
6
4
5
Backlog
Priority [d]
WS A WS B
String
String
Sprints
4-6
Epic
Epic
Delta Design
Jump Start Buy In
Drive
Priorities
Visibility
Agile Project Delivery
Fundamentals
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 8
SCRUM Methodology – leading Agile approach
Sprint Backlog
Sprint Retrospective
Sprint Execution
Sprint Planning Meeting
Sprint Review Meeting
Scrum Process
Recurring Cycle
Design
Scope
Product
Backlog
Usable
Software
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 9
Agile Implementation Methodology
Business Value Focused Explore Phase
Evaluation
& Release
Planning
• Define & Analyze, Scope,
• Demo Standard SAP
Explore
Process WS and
Sol. Architecture
Demo
Checkpoint
Checkpoint
Checkpoint
Baseline Build
Product Backlog
Must
Should
Could
Would
Priority days
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
4
5
1
8
2
7
3
4
2
2
4
3
3
6
4
5
Key components of Scope
Validation
 Iterative Baseline Build
 Solution Demo
 Visualization
 Focus on Business Value
through-out
 Prioritized Product Backlog
 Lean documentation
templates
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 10
Fit/Gap Workshops Approach
1. Reference Value
 Provide Process, Value and
Strategic Context
 Set Boundaries
 Tie to Business Case, Value
Drivers
2. Validation of SAP
Solution
 Show and tell SAP
standard key design
elements
3. GAP Identification
 Identify gaps to Standard
 Log additional scope
items
5. Delta Design
 Update Business Models
and Process Design
 Solution Design and
Visualize
6. Verify & Accept
 Verify process & solution
design
 Drive Acceptance
4. Delta Scope
Prioritization
Workshop Type A
Solution Validation
Workshop Type B
Delta Design
7. Release &
Sprint Planning
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 11
Agile Implementation Methodology
Iterative, Incremental Realize Phase
Agile Release of working software
Business
Priority
Product Backlog
Must
Should
Could
Would
Priority days
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
4
5
1
8
2
7
3
4
2
2
4
3
3
6
4
5
Realize
… Explore
Iterations / Demos
Sign-Off
(Organization
readiness)
Sprint 1
Sprint 2
String Test
Unit
Unit
Epic / Scenario
Sprint 3
Sprint 4
String Test
Integration
Test
UAT
Unit
Unit
Epic / Scenario
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 12
Agile Implementation Methodology
Closer look at a Sprint / Iteration
2-4 weeks time box
2.1
Sprint
Planning
2.3 Sprint Execution
2.2 Daily Team Meeting
2.4
Sprint
Demo
2.5
Sprint
Retrospective
Design
Build
Test
Document
Delta Requirement A
Design
Build
Test
Document
Delta Requirement C
Design
Build
Test
Document
Delta Requirement B
Design
Build
Test
Document
Delta Requirement D
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 13
Prepare Explore Realize Deploy
SBX (Pre-Assembled) DEV DEV/QA QA QA QA PROD
Project Preparation
Completion
Business Solution Validation
Completion
Sprint 1 Solution Tested Start of Production
User
Acceptance
Testing
Testing Assessment
Project Testing
Strategy
Test
Plan
Unit
Testing
Epic (String)
Testing
Unit
Testing
Integration
Testing 1
Integration
Testing n
Finalize Testing
Tools & Installation
Data Migration Testing 1
Data
Migration
Testing n
Data
Migration
Testing n
Test Case Development
Test Team Mobilization &
Training
Regression Testing
Security Testing
Performance Testing
Project System
Environment
Project Milestone / Q-
Gates
Testing Work Packages
User Story Definition
Sprint n Epic
Agile Implementation Methodology
Testing Overview
Baseline Build
Agile Governance and Scaling
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 15
Scaling Agile
Agile is not only for small projects, is also scales for large programs on a
global level
Characteristics of larger teams
 Higher functional, technical and integration complexities and dependencies
 Higher integration demands
 Multiple stakeholder groups and conflicting interests in product features and design
 Cultural differences
 Distributed decision making processes
 Higher communication demands, geographically dispersed
 Higher needs for organizational adoption of Agile principles
 Planning and execution requires more coordination
 Sign off and review processes require input from dispersed team members
 Logistically more challenging, in particular across time zones and work environments
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 16
© 2014 SAP AG. All rights reserved. 16
How to start scaling Agile teams
Guiding Principles Global Agile Programs
 Start with a small core team to setup project structure and identify initial product
back log
 Onboard team members gradually over time and identify leads and coaches as
scrum teams are build out
 Stick to the agile principles but replicate them in “scrum of scrums”
 Identify a core team to focus on planning activities
 Identify a dedicated integration team to focus on integration aspects including
architecture, functions, technology and organizational change management
 Leverage a hierarchical product backlog that has multiple product owners and is
decomposed into work stream backlogs
 As necessary start with a pilot project to demonstrate Agile success
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 17
© 2014 SAP AG. All rights reserved. 17
Program
Product Backlog
Work Stream
Sprint Backlogs
(Scrum teams)
Work Stream
Product Backlogs
(Scrum teams)
Product Owners
Product Backlogs
Scrum of Scrum Backlog Development
• Feature A
• Feature B
• Feature C
• Feature D
• Feature E
• Feature A
• Feature E
• Feature F
• Feature G
• Feature F
• Feature H
• Feature I
• Feature J
• Feature A
• Feature B
• Feature C
• Feature D
• Feature E
• Feature F
• Feature G
• Feature I
• Feature H
• Feature J
Finance
• Feature A1 (Org.)
• Feature B
• Feature C
Manufacturing
• Feature A3
• Feature F
• Feature G
Procurement
• Feature A4
• Feature H
• Feature I
• Feature J
Priorities
Priorities
Priorities
Priorities
Sales and
Distribution
• Feature A2
• Feature D
• Feature E
• Sprint 0 (A)
• Sprint 1 (B1)
• Sprint 2 (B2)
• Sprint 3 (C)
• Sprint 0 (A3)
• Sprint 1 (F)
• Sprint 2 (G1)
• Sprint 3 (G2)
• Sprint 0 (A4)
• Sprint 1 (H)
• Sprint 2 (I)
• Sprint 3 (J)
• Sprint 0 (A2)
• Sprint 1 (D)
• Sprint 2 (E1)
• Sprint 3 (E2)
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 18
© 2014 SAP AG. All rights reserved. 18
Scaling Agile – Product Ownership Complexities
Chief
Product
Owner
Finance
Process
Owner
Planning
Experts
Assets
Manage
ment
Sales
Process
Owner
Manufac
turing
Owner
Procure
ment
Owner
 Product ownership can be complex in
large organizations.
 Establish product ownership hierarchy
to involve all key stakeholders in the
right stages of the project.
 Align the SCRUM teams with the
product owners for maximum impact.
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 19
© 2014 SAP AG. All rights reserved. 19
Sprint Planning and Execution
Sprint Planning
 Add Sprint Zero for Product Backlog, Release
Plan, Infrastructure and Organizational
Structure Setup
 Develop common themes for sprints
 Align product development across sprints
based on dependencies
 Pay attention to common master and
organizational structures
Sprint Execution
 Add Integration sprints for integrated
functions
 Coordinate master and transactional data
needs
 Work with aligned cross functional story lines
Working Software
Product Backlog
Must
Should
Could
Would
Priority days
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
4
5
1
8
2
7
3
4
2
2
4
3
3
6
4
5
Sprint 1
Sprint 2
Integration
Sprint
Epic
Sprint 3
Sprint 4
Integration
Sprint
Epic
Unit
Sprint 0
Workstream 1 Finance
Workstream 2 Sales and Distribution
Workstream 3 Manufacturing
Workstream 4 Procurement
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 20
© 2014 SAP AG. All rights reserved. 20
Scrum of
Scrums 2
Agile Project Governance
Work Stream /
Scrum Team 1
e.g. Finance
Work Stream /
Scrum Team 2
Sales and Distribution
Work Stream /
Scrum Team 3
Manufacturing Core Team,
Project Manager,
Chief Product Owner,
Chief Architect,
Agile Coach
Work Stream /
Scrum Team 4
Procurement
Scrum of
Scrums 1-n
Core Team
Focus on program
leadership, backlog
management, planning
and decision making,
guiding principles
Scrum Master (s)
responsible for consistent scrum
execution and standards,
1 for 3 scrum teams
Focus on integration topics and
cohesive solution build,
Consists of the lead consultants and
product owners from the individual
scrum teams
Agile Coach
Guides through the
execution of the overall
Agile program
Executive Steering
Committee
Strategically directs project
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 21
© 2014 SAP AG. All rights reserved. 21
Working with parallel Scrum teams
Finance
Sales and
Distribution
Manufacturing
Procurement
Agile
Coach
Project Manager
Chief Product Owner
Scrum Master
Product Owner
Scrum Master
Product Owner
Scrum Master
Product Owner
Scrum Master
Product Owner
Solution Architect
Weekly or
Biweekly
Product Owner
Meeting
PM Review
(Daily)
Technical
Scrum of Scrums
(Weekly or
biweekly)
 Regular cadence of
meetings between
SCRUM Masters of
all SCRUM teams
 Goal is to coordinate
and align work;
highlight
dependencies;
discuss cross-topics
 SCRUM Masters
have responsibility to
debrief their
respective teams on
the results
Typical Deliverables per phase
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 23
SAP Activate for on-premise [ASAP successor]
Jump-start project
with pre-assembled
solution
Identify & validate
delta requirements
and gaps
Build customer
solution in short,
time-boxed sprints
Safeguard build
and run with ICC**,
OCC** and MCC**
Prepare
Pre-
Assembly
Solution Scope
and Value
Determination
Initial Roadmap
and Approach
Explore
Delta
Design
Deploy
Technical and
System testing
Realize
Baseline Build
Sprint Execution
Solution Validation including
Gap Validation**
Prioritize Backlog
Release and
Sprint Plan
Integration Testing
Value Audits
Setup Operations
or OCC**
Organizational
and
Production
Readiness
Cutover
Support after
Go-Live
Run
Operations
Control Center
Application
Lifecycle
Management
Value
Management
** Deliverables, milestones and activities are only applicable in SAP Premium Engagements.
Best Practices
that fit customer
scope
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 24
Prepare Phase Typical Deliverables
Engagement Model
Project Organization
Project Charter
Kick-Off Workshop
Scope Statement
Project Governance
Project Schedule and
Budget
Project Management Plan
Project Management
Plans
Project and Organizational
Standards
Execution Standards for
Agile
ICC/MCC standards in
Premium Engagements
Project Standards and
Policies
Organizational Change
Management Roadmap
Project Training Strategy
and Plan (team + key-users)
OCM and Training
Strategy
Project Team Training
Ramp up on methodology,
engagement model,
deliverables, SOW,
planning, etc.
Team Onboarding
Project Support Tools and
System Setup
Project Room
Facilities Access and
Security
Project Team
Infrastructure
Value Determination
Capability Business /
Process Needs Mapping
Solution Scope and Value
Determination
Technical Requirements
and Design
Initial Hardware Sizing
Proposal
Technical Infrastructure
and Sizing
Data Readiness Analysis
Data Migration Approach
and Strategy
Data Migration Approach
and Strategy
Determine Baseline Solution
A) Pre-Assembly per RDS
or Best Practice
B) Model Company Setup
C) Prototyping
D) Story Map / User Stories
Baseline Solution
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 25
Explore Phase: Typical Deliverables
Phase Initiation
Execution
Monitoring and Controlling
Results
PM Execution,
Management and
Controlling Results
Stakeholder Analysis
Change Impact Analysis
Communication Plan
Change Impact Analysis
and Communication
If no SAP Standard Solution
(RDS) available to address
customer needs
Prioritize features
Baseline Build Plan
Baseline Build
Sign-Off
Baseline Build
Set expectations on Scope
of Modifications
Solution Validation
(Workshop Type A)
Backlog build (translate
features in functions)
Parking lot items identified
Value Realization
Solution Validation
Prioritize Backlog based on
business value drivers
Identify Delta scope items
for current release
Gap Validation via ICC (PE)
Backlog Prioritization
Solution Design for Deltas
(Workshop type B)
Develop BPDs and
Functional Specifications
Sign of design documents
Design for Gaps and
Deltas
Legacy Data Migration
Legacy Data Archive
Legacy Data Migration
Design and Plan
Technical Solution Design
User Access and Security
Development Environment
Technology Design and
Setup of DEV environment
Testing Strategy
Test Strategy and Plan
Estimate Backlog items
Plan release executions
Allocate all backlog items to
sprints
Consider technical and
business dependencies and
sequences
Release and Sprint Plan
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 26
Realize Phase: Typical Deliverables
Phase Initiation
Execution
Monitoring and Controlling
Results
PM Execution,
Management and
Controlling Results
Organizational Alignment
Knowledge Transfer / Train
Key Users
End User Training Delivery
Enabled
Organizational Alignment
and User Enablement
Quality Assurance
Environment (QAS) / Switch
to QA
Production Environment
(PRD)
Security and Authorizations
setup
Technology Setup for
QAS and PRD
Sprint Planning
Sprint Execution (Build and
Unit Test)
Sprint Demo
Sprint Retrospective
Firm-up Sprints (Transports
+ String Testing + Solution
Documentation completion)
Sprint Execution
Scenario Tests
Approved Integration Test
(Iterative)
Approved User Acceptance
Test - Test Solution
System and Performance
Test
Integrated Solution and
Non-Functional Testing
Legacy Data Migration
SAP Data Archiving
Legacy Data Migration
Value Audits
Value Audits
SAP Going Live Check
System User Roles and
Authorization Administration
Technical Operations and
Handover Plan
Technical Operations
Setup Plan including OCC
Preliminary Cutover plan
Cutover and Transition
Plan
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 27
Deploy Phase: Typical Deliverables
Phase Initiation
Execution
Monitoring and Controlling
Results
PM Execution,
Management and
Controlling Results
Pre Go-Live End-User
Training Delivery / Validate
End User training material
Organizational and
Production Support
Readiness Check
System and Performance
Test
Approved Technical System
Tests
Technical and System
Testing
Project Team validates the
integration of the customer’s
IT solution with non-
functional tests
(performance-data
consistency check), and
prepares and implements
Run SAP Like a Factory,
Setup Operational
Support including OCC
Includes organizational and
technical readiness
Readiness for Cutover
Check
Project team will execute
the cutover to the
production software and go
live
Cutover to Production
Operations Control Center
or customer’s operations
team will take over the
solution.
Production Support after
Go Live
© 2016 SAP SE or an SAP affiliate company. All rights reserved. 28
© 2014 SAP AG. All rights reserved. 28
Key Take Aways
 Drive for better “Time to Value”; customers are looking for early confirmation that
requirements can be met.
 Best Practices, Rapid Deployment Solutions and Model Company greatly shorten
deployment of SAP solutions.
 SAP offers a proven set of Acceleration Techniques and Deployment Strategies in
Implementation Methodology
 Agile has been used successfully in SAP projects of various sizes and solution scope
 Level of acceleration and approach need to be tailored to the customer’s situation,
requirements and culture
© 2016 SAP AG or an SAP affiliate company. All rights reserved.
Thank you

More Related Content

Similar to Agile Project Delivery Fundamentals by SAP

Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and PracticesJosef Scherer
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAleem Khan
 
Wake Up – It’s Time to Upgrade Your S/4HANA System!
Wake Up – It’s Time to Upgrade Your S/4HANA System!Wake Up – It’s Time to Upgrade Your S/4HANA System!
Wake Up – It’s Time to Upgrade Your S/4HANA System!panayaofficial
 
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsSAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsRoberto Carlos Roldán
 
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and more
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and moreSAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and more
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and moreBernhard Luecke
 
Lean Kanban and Lean Portfolio Management in SAFe 4.5
Lean Kanban and Lean Portfolio Management in SAFe 4.5Lean Kanban and Lean Portfolio Management in SAFe 4.5
Lean Kanban and Lean Portfolio Management in SAFe 4.5Craig Cockburn
 
Kickoff meeting template
Kickoff meeting templateKickoff meeting template
Kickoff meeting templateVan Chau
 
Sap Implementation Presentation
Sap Implementation PresentationSap Implementation Presentation
Sap Implementation Presentationlarrymcc
 
Agile methodology v 4.5 s
Agile methodology   v 4.5 sAgile methodology   v 4.5 s
Agile methodology v 4.5 sJames Sutter
 
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...Scrum Bangalore
 
SAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Customer Experience
 
Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate PresentationSupriya SAVIC
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2pmimkecomm
 
S4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfS4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfmail2cnivas1
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Hari Krishna
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Hari Krishna
 
Pole emploi at Agile Cambridge
Pole emploi at Agile CambridgePole emploi at Agile Cambridge
Pole emploi at Agile CambridgeCecile Auret
 

Similar to Agile Project Delivery Fundamentals by SAP (20)

Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and Practices
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
 
Asap overview
Asap overviewAsap overview
Asap overview
 
Wake Up – It’s Time to Upgrade Your S/4HANA System!
Wake Up – It’s Time to Upgrade Your S/4HANA System!Wake Up – It’s Time to Upgrade Your S/4HANA System!
Wake Up – It’s Time to Upgrade Your S/4HANA System!
 
Design Sample
Design SampleDesign Sample
Design Sample
 
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsSAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactors
 
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and more
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and moreSAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and more
SAP Forum 2015 Madrid: Support for Innovation - S/4 HANA and more
 
Lean Kanban and Lean Portfolio Management in SAFe 4.5
Lean Kanban and Lean Portfolio Management in SAFe 4.5Lean Kanban and Lean Portfolio Management in SAFe 4.5
Lean Kanban and Lean Portfolio Management in SAFe 4.5
 
Kickoff meeting template
Kickoff meeting templateKickoff meeting template
Kickoff meeting template
 
Sap Implementation Presentation
Sap Implementation PresentationSap Implementation Presentation
Sap Implementation Presentation
 
Agile methodology v 4.5 s
Agile methodology   v 4.5 sAgile methodology   v 4.5 s
Agile methodology v 4.5 s
 
Introduction to ERP Concept
Introduction to ERP ConceptIntroduction to ERP Concept
Introduction to ERP Concept
 
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
 
SAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful project
 
Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate Presentation
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2
 
S4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfS4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdf
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
 
Pole emploi at Agile Cambridge
Pole emploi at Agile CambridgePole emploi at Agile Cambridge
Pole emploi at Agile Cambridge
 

Recently uploaded

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

Agile Project Delivery Fundamentals by SAP

  • 2. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 2 © 2014 SAP AG. All rights reserved. 2 Key Take Aways  Drive for better “Time to Value”; customers are looking for early confirmation that requirements can be met.  Best Practices and Rapid Deployment Solutions greatly shorten deployment of SAP solutions.  SAP offers a proven set of Acceleration Techniques and Deployment Strategies in SAP Activate Methodology  Agile has been used successfully in SAP projects of various sizes and solution scope  Level of acceleration and approach need to be tailored to the customer’s situation, requirements and culture
  • 3. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 3 SHORTEN TIME TO VALUE AND REDUCE COSTS REDUCE RISKS, WHILE MOVING FORWARD Visibility Incremental Approach Better Engagement between Business and IT FLEXIBILITY AND CHOICE Solution and Product Fit Business Expectations Changed On cloud On premises Mobile Hybrid Cost Time to Value Cost Time to Value
  • 4. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 4 The Basics of Agile Methods ITERATIVE Frequent Inspection & Adoption PEOPLE CENTRIC Trust, Self-organizing teams and individuals FOCUS Team focuses on one thing at a time until it’s done CROSS-FUNCTIONAL TEAMS Face to face communication / no silos CONSTANT LEARNING Better fail early to learn fast, and improve ADAPTIVE PLANNING To hit a moving target
  • 5. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 5 SAP Activate for managed cloud and on-premise [ASAP successor] Jump-start project with pre-assembled solution Identify & validate delta requirements and gaps Build customer solution in short, time-boxed sprints Safeguard build and run with ICC**, OCC** and MCC** Prepare Pre- Assembly Solution Scope and Value Determination Initial Roadmap and Approach Explore Delta Design Deploy Technical and System testing Realize Baseline Build Sprint Execution Solution Validation including Gap Validation** Prioritize Backlog Release and Sprint Plan Integration Testing Value Audits Setup Operations or OCC** Organizational and Production Readiness Cutover Support after Go-Live Run Operations Control Center Application Lifecycle Management Value Management ** Deliverables, milestones and activities are only applicable in SAP Premium Engagements. Best Practices that fit customer scope
  • 6. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 6 Agile Project Execution and Benefits Prepare Realize Explore Deploy Run Sprints 1-3 Iterations / Demos Demo Support Release Planning Tests Final Prep. Organizational Readiness Pre-built system or pre- assembled solution Solution Validation Must Should Could 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 Would 4 5 1 8 2 7 3 4 2 2 4 3 3 6 4 5 Backlog Priority [d] WS A WS B String String Sprints 4-6 Epic Epic Delta Design Jump Start Buy In Drive Priorities Visibility
  • 8. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 8 SCRUM Methodology – leading Agile approach Sprint Backlog Sprint Retrospective Sprint Execution Sprint Planning Meeting Sprint Review Meeting Scrum Process Recurring Cycle Design Scope Product Backlog Usable Software
  • 9. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 9 Agile Implementation Methodology Business Value Focused Explore Phase Evaluation & Release Planning • Define & Analyze, Scope, • Demo Standard SAP Explore Process WS and Sol. Architecture Demo Checkpoint Checkpoint Checkpoint Baseline Build Product Backlog Must Should Could Would Priority days 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 4 5 1 8 2 7 3 4 2 2 4 3 3 6 4 5 Key components of Scope Validation  Iterative Baseline Build  Solution Demo  Visualization  Focus on Business Value through-out  Prioritized Product Backlog  Lean documentation templates
  • 10. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 10 Fit/Gap Workshops Approach 1. Reference Value  Provide Process, Value and Strategic Context  Set Boundaries  Tie to Business Case, Value Drivers 2. Validation of SAP Solution  Show and tell SAP standard key design elements 3. GAP Identification  Identify gaps to Standard  Log additional scope items 5. Delta Design  Update Business Models and Process Design  Solution Design and Visualize 6. Verify & Accept  Verify process & solution design  Drive Acceptance 4. Delta Scope Prioritization Workshop Type A Solution Validation Workshop Type B Delta Design 7. Release & Sprint Planning
  • 11. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 11 Agile Implementation Methodology Iterative, Incremental Realize Phase Agile Release of working software Business Priority Product Backlog Must Should Could Would Priority days 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 4 5 1 8 2 7 3 4 2 2 4 3 3 6 4 5 Realize … Explore Iterations / Demos Sign-Off (Organization readiness) Sprint 1 Sprint 2 String Test Unit Unit Epic / Scenario Sprint 3 Sprint 4 String Test Integration Test UAT Unit Unit Epic / Scenario
  • 12. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 12 Agile Implementation Methodology Closer look at a Sprint / Iteration 2-4 weeks time box 2.1 Sprint Planning 2.3 Sprint Execution 2.2 Daily Team Meeting 2.4 Sprint Demo 2.5 Sprint Retrospective Design Build Test Document Delta Requirement A Design Build Test Document Delta Requirement C Design Build Test Document Delta Requirement B Design Build Test Document Delta Requirement D
  • 13. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 13 Prepare Explore Realize Deploy SBX (Pre-Assembled) DEV DEV/QA QA QA QA PROD Project Preparation Completion Business Solution Validation Completion Sprint 1 Solution Tested Start of Production User Acceptance Testing Testing Assessment Project Testing Strategy Test Plan Unit Testing Epic (String) Testing Unit Testing Integration Testing 1 Integration Testing n Finalize Testing Tools & Installation Data Migration Testing 1 Data Migration Testing n Data Migration Testing n Test Case Development Test Team Mobilization & Training Regression Testing Security Testing Performance Testing Project System Environment Project Milestone / Q- Gates Testing Work Packages User Story Definition Sprint n Epic Agile Implementation Methodology Testing Overview Baseline Build
  • 15. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 15 Scaling Agile Agile is not only for small projects, is also scales for large programs on a global level Characteristics of larger teams  Higher functional, technical and integration complexities and dependencies  Higher integration demands  Multiple stakeholder groups and conflicting interests in product features and design  Cultural differences  Distributed decision making processes  Higher communication demands, geographically dispersed  Higher needs for organizational adoption of Agile principles  Planning and execution requires more coordination  Sign off and review processes require input from dispersed team members  Logistically more challenging, in particular across time zones and work environments
  • 16. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 16 © 2014 SAP AG. All rights reserved. 16 How to start scaling Agile teams Guiding Principles Global Agile Programs  Start with a small core team to setup project structure and identify initial product back log  Onboard team members gradually over time and identify leads and coaches as scrum teams are build out  Stick to the agile principles but replicate them in “scrum of scrums”  Identify a core team to focus on planning activities  Identify a dedicated integration team to focus on integration aspects including architecture, functions, technology and organizational change management  Leverage a hierarchical product backlog that has multiple product owners and is decomposed into work stream backlogs  As necessary start with a pilot project to demonstrate Agile success
  • 17. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 17 © 2014 SAP AG. All rights reserved. 17 Program Product Backlog Work Stream Sprint Backlogs (Scrum teams) Work Stream Product Backlogs (Scrum teams) Product Owners Product Backlogs Scrum of Scrum Backlog Development • Feature A • Feature B • Feature C • Feature D • Feature E • Feature A • Feature E • Feature F • Feature G • Feature F • Feature H • Feature I • Feature J • Feature A • Feature B • Feature C • Feature D • Feature E • Feature F • Feature G • Feature I • Feature H • Feature J Finance • Feature A1 (Org.) • Feature B • Feature C Manufacturing • Feature A3 • Feature F • Feature G Procurement • Feature A4 • Feature H • Feature I • Feature J Priorities Priorities Priorities Priorities Sales and Distribution • Feature A2 • Feature D • Feature E • Sprint 0 (A) • Sprint 1 (B1) • Sprint 2 (B2) • Sprint 3 (C) • Sprint 0 (A3) • Sprint 1 (F) • Sprint 2 (G1) • Sprint 3 (G2) • Sprint 0 (A4) • Sprint 1 (H) • Sprint 2 (I) • Sprint 3 (J) • Sprint 0 (A2) • Sprint 1 (D) • Sprint 2 (E1) • Sprint 3 (E2)
  • 18. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 18 © 2014 SAP AG. All rights reserved. 18 Scaling Agile – Product Ownership Complexities Chief Product Owner Finance Process Owner Planning Experts Assets Manage ment Sales Process Owner Manufac turing Owner Procure ment Owner  Product ownership can be complex in large organizations.  Establish product ownership hierarchy to involve all key stakeholders in the right stages of the project.  Align the SCRUM teams with the product owners for maximum impact.
  • 19. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 19 © 2014 SAP AG. All rights reserved. 19 Sprint Planning and Execution Sprint Planning  Add Sprint Zero for Product Backlog, Release Plan, Infrastructure and Organizational Structure Setup  Develop common themes for sprints  Align product development across sprints based on dependencies  Pay attention to common master and organizational structures Sprint Execution  Add Integration sprints for integrated functions  Coordinate master and transactional data needs  Work with aligned cross functional story lines Working Software Product Backlog Must Should Could Would Priority days 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 4 5 1 8 2 7 3 4 2 2 4 3 3 6 4 5 Sprint 1 Sprint 2 Integration Sprint Epic Sprint 3 Sprint 4 Integration Sprint Epic Unit Sprint 0 Workstream 1 Finance Workstream 2 Sales and Distribution Workstream 3 Manufacturing Workstream 4 Procurement
  • 20. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 20 © 2014 SAP AG. All rights reserved. 20 Scrum of Scrums 2 Agile Project Governance Work Stream / Scrum Team 1 e.g. Finance Work Stream / Scrum Team 2 Sales and Distribution Work Stream / Scrum Team 3 Manufacturing Core Team, Project Manager, Chief Product Owner, Chief Architect, Agile Coach Work Stream / Scrum Team 4 Procurement Scrum of Scrums 1-n Core Team Focus on program leadership, backlog management, planning and decision making, guiding principles Scrum Master (s) responsible for consistent scrum execution and standards, 1 for 3 scrum teams Focus on integration topics and cohesive solution build, Consists of the lead consultants and product owners from the individual scrum teams Agile Coach Guides through the execution of the overall Agile program Executive Steering Committee Strategically directs project
  • 21. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 21 © 2014 SAP AG. All rights reserved. 21 Working with parallel Scrum teams Finance Sales and Distribution Manufacturing Procurement Agile Coach Project Manager Chief Product Owner Scrum Master Product Owner Scrum Master Product Owner Scrum Master Product Owner Scrum Master Product Owner Solution Architect Weekly or Biweekly Product Owner Meeting PM Review (Daily) Technical Scrum of Scrums (Weekly or biweekly)  Regular cadence of meetings between SCRUM Masters of all SCRUM teams  Goal is to coordinate and align work; highlight dependencies; discuss cross-topics  SCRUM Masters have responsibility to debrief their respective teams on the results
  • 23. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 23 SAP Activate for on-premise [ASAP successor] Jump-start project with pre-assembled solution Identify & validate delta requirements and gaps Build customer solution in short, time-boxed sprints Safeguard build and run with ICC**, OCC** and MCC** Prepare Pre- Assembly Solution Scope and Value Determination Initial Roadmap and Approach Explore Delta Design Deploy Technical and System testing Realize Baseline Build Sprint Execution Solution Validation including Gap Validation** Prioritize Backlog Release and Sprint Plan Integration Testing Value Audits Setup Operations or OCC** Organizational and Production Readiness Cutover Support after Go-Live Run Operations Control Center Application Lifecycle Management Value Management ** Deliverables, milestones and activities are only applicable in SAP Premium Engagements. Best Practices that fit customer scope
  • 24. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 24 Prepare Phase Typical Deliverables Engagement Model Project Organization Project Charter Kick-Off Workshop Scope Statement Project Governance Project Schedule and Budget Project Management Plan Project Management Plans Project and Organizational Standards Execution Standards for Agile ICC/MCC standards in Premium Engagements Project Standards and Policies Organizational Change Management Roadmap Project Training Strategy and Plan (team + key-users) OCM and Training Strategy Project Team Training Ramp up on methodology, engagement model, deliverables, SOW, planning, etc. Team Onboarding Project Support Tools and System Setup Project Room Facilities Access and Security Project Team Infrastructure Value Determination Capability Business / Process Needs Mapping Solution Scope and Value Determination Technical Requirements and Design Initial Hardware Sizing Proposal Technical Infrastructure and Sizing Data Readiness Analysis Data Migration Approach and Strategy Data Migration Approach and Strategy Determine Baseline Solution A) Pre-Assembly per RDS or Best Practice B) Model Company Setup C) Prototyping D) Story Map / User Stories Baseline Solution
  • 25. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 25 Explore Phase: Typical Deliverables Phase Initiation Execution Monitoring and Controlling Results PM Execution, Management and Controlling Results Stakeholder Analysis Change Impact Analysis Communication Plan Change Impact Analysis and Communication If no SAP Standard Solution (RDS) available to address customer needs Prioritize features Baseline Build Plan Baseline Build Sign-Off Baseline Build Set expectations on Scope of Modifications Solution Validation (Workshop Type A) Backlog build (translate features in functions) Parking lot items identified Value Realization Solution Validation Prioritize Backlog based on business value drivers Identify Delta scope items for current release Gap Validation via ICC (PE) Backlog Prioritization Solution Design for Deltas (Workshop type B) Develop BPDs and Functional Specifications Sign of design documents Design for Gaps and Deltas Legacy Data Migration Legacy Data Archive Legacy Data Migration Design and Plan Technical Solution Design User Access and Security Development Environment Technology Design and Setup of DEV environment Testing Strategy Test Strategy and Plan Estimate Backlog items Plan release executions Allocate all backlog items to sprints Consider technical and business dependencies and sequences Release and Sprint Plan
  • 26. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 26 Realize Phase: Typical Deliverables Phase Initiation Execution Monitoring and Controlling Results PM Execution, Management and Controlling Results Organizational Alignment Knowledge Transfer / Train Key Users End User Training Delivery Enabled Organizational Alignment and User Enablement Quality Assurance Environment (QAS) / Switch to QA Production Environment (PRD) Security and Authorizations setup Technology Setup for QAS and PRD Sprint Planning Sprint Execution (Build and Unit Test) Sprint Demo Sprint Retrospective Firm-up Sprints (Transports + String Testing + Solution Documentation completion) Sprint Execution Scenario Tests Approved Integration Test (Iterative) Approved User Acceptance Test - Test Solution System and Performance Test Integrated Solution and Non-Functional Testing Legacy Data Migration SAP Data Archiving Legacy Data Migration Value Audits Value Audits SAP Going Live Check System User Roles and Authorization Administration Technical Operations and Handover Plan Technical Operations Setup Plan including OCC Preliminary Cutover plan Cutover and Transition Plan
  • 27. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 27 Deploy Phase: Typical Deliverables Phase Initiation Execution Monitoring and Controlling Results PM Execution, Management and Controlling Results Pre Go-Live End-User Training Delivery / Validate End User training material Organizational and Production Support Readiness Check System and Performance Test Approved Technical System Tests Technical and System Testing Project Team validates the integration of the customer’s IT solution with non- functional tests (performance-data consistency check), and prepares and implements Run SAP Like a Factory, Setup Operational Support including OCC Includes organizational and technical readiness Readiness for Cutover Check Project team will execute the cutover to the production software and go live Cutover to Production Operations Control Center or customer’s operations team will take over the solution. Production Support after Go Live
  • 28. © 2016 SAP SE or an SAP affiliate company. All rights reserved. 28 © 2014 SAP AG. All rights reserved. 28 Key Take Aways  Drive for better “Time to Value”; customers are looking for early confirmation that requirements can be met.  Best Practices, Rapid Deployment Solutions and Model Company greatly shorten deployment of SAP solutions.  SAP offers a proven set of Acceleration Techniques and Deployment Strategies in Implementation Methodology  Agile has been used successfully in SAP projects of various sizes and solution scope  Level of acceleration and approach need to be tailored to the customer’s situation, requirements and culture
  • 29. © 2016 SAP AG or an SAP affiliate company. All rights reserved. Thank you