This proposal outlines a plan to design and build a drone equipped with a high-quality camera to analyze landslide risk in communities around Guatemala City. A team of students will design a drone that can take aerial photos to be compiled into 3D images and analyzed using software programs to map terrain and slope for landslide assessment. The drone aims to provide clear photos from high elevations and hazardous areas to help warn communities of risks and prevent loss of life from landslides.