SlideShare a Scribd company logo
Curriculum Vitae
I. PERSONAL DATA
• Name : Adji Prasetyo
• Place & Date of
Birth
: Jakarta, 19 July 1971
• Address : Perum Bojong Depok Baru II Sukahati,
Jl. Nusantara XI HC – 05, Cibinong
Bogor - 16913
• Sex : Male
• Height : 172 Cm
• Religion : Muslim
• Marital Status : Married (with 1 daughter)
• Phone Number : (Mobile) 0811 – 111 - 5462
• Hobby
: Travelling, Swimming, Reading and
Computer Programming.
II. EDUCATION
A. Formal Education
• Electronic Engineering with Electrical Engineering major
in Polytechnics of University of Indonesia
(1989 – 1992)
• Senior High School in SMANegeri 39- Jakarta (1986 – 1989)
• Junior High School in SMPNegeri 20 - Jakarta (1983 – 1986)
B. Non Formal Education
• Introduction of Certification ISO 9002
held by PT Sanyo
1996
• Introduction of ISO 14001
held by PT Sanyo
1997
• Gemba Kaizen Training
held by PT Sanyo
1999
• Six Sigma Quality Training
held by PT Sanyo
2001
• Basic English Training
held by PT Sanyo
2001
• English Conversation Program
held by PT Sanyo
2001 – 2002
• Basic Theory of Digital Still Camera Training
held by PT Sanyo
2002
• Keselamatan & Kesehatan Kerja Course held
by PT Sanyo
2003
• Guidance to Supervisor Course
held by PT Sanyo
2003
• Training Within Industry Course held
by PT Sanyo
2003
• Internal Quality Auditing ISO 14001 Course
held by PT Sanyo
2003
• Internal Quality Auditor Course
held by PT Sanyo
2004
• Keselamatan & Kesehatan Kerja Course
held by PT Sanyo Electronic Indonesia – Cikarang
2010
• Occupational Safety and Health Expert
held by PT. Delta Indonesia
2015
III. COMPUTER SKILL
• All Windows Operating System experience user.
• Advanced user of Microsoft Office such as word, excel, and Power Point.
• Digital Imaging and design with Photoshop and Corel Draw application.
• Programming using Turbo Basic, Turbo Pascal and Visual Basic language.
• Develop NC Data Converter Program from TCM 3000 to Marantz using Turbo
Basic Language in PT. Sanyo Jaya Components Indonesia.
Result : Reduce 3 hour setting became only 3 minutes.
IV. WORKING EXPERIENCE
• Project Data Center PT. Telkomsel,
Jl. TB. Simatupang – Jakarta Selatan
Oct 2015 – Des 2016
Position : Site Manager
Main Responsibility :
o Coordination that work meet the planning and schedule;
o Support the project manager in supervision of vendors;
o Coordinate work plan between sub-contractors;
o Organize and manage the team to maintain team activity;
• Project Data Center KementerianDesa,
Pembangunan Daerah Tertinggal dan
Transmigrasi (Kemendesa),
Jl. Abdul Muis – Jakarta
2015
Position : Site Manager
Main Responsibility :
o Coordination that work meet the planning and schedule;
o Support the project manager in supervision of vendors;
o Coordinate work plan between sub-contractors;
o Organize and manage the team to maintain team activity;
• Project Data Center Badan Nasional
PenanggulanganBencana (BNPB),
Sentul – Bogor
Oct 2014 – Jan 2015
Position : Site Manager
Main Responsibility :
o Coordination that work meet the planning and schedule;
o Support the project manager in supervision of vendors;
o Coordinate work plan between sub-contractors;
o Organize and manage the team to maintain team activity;
• Project Expansion Data Center
PT. Telkomsel,
Bumi Serpong Damai City - Serpong
Nov 2013 – Aug 2014
Position: Project Admin / Site Coordinator
Main Responsibility:
o Support the project related to documentation needs;
o Support project activities related in and out of documents;
o Support the project manager in supervision of sub contractors;
o Coordinate work plan between sub contractors.
o Check that all materials onsite meet the technical, specification and need the
Project.
• PT Cahaya Artha Semesta – ME Contractor,
Bekasi
2012
Position : Head Administrator
Main Responsibility :
o Managing job desks for all office staff;
o Controlling all staffs on the office working as their responsibility.
o Finding the right materials which meet the technical, specification and price
with the tender request, to be applied to Project.
• PT Sanyo Electronics Indonesia, Cikarang
Selatan
2010 – 2011
Position: Senior Engineer of Quality Control – SMT
Department
Main Responsibility :
o To manage and control flow of supply from SMT production to next process;
o Ensure SMT Quality Control able to run smooth with production planning and
quality target;
o Control quality production of SMT production;
o Arrange Quality team to fulfill their job desk and reach the quality target;
o Controlling all programs and AOI machines are ready use to support
production;
o Improvement to achieve good quality and productivity;
o Trainning SMT employee for improve quality awarness to performs efficiently
and effectively.
Special Responsibility:
o In charge in Single PPM project in SMT
Department;
o Sub Contractor coordinator of SMT
Departement;
o Internal and External Quality Auditor of SMT
Department.
• IQROMEDIA – Computer Sale, Rental,
Services, and Trainning – Bogor
Jun 2006 – Jun 2010
Position: Owner and Senior Sales
Main Responsibility
o To manage the store including planning, evaluating and budgeting;
o To control all employee and computers ready to use and run smothly;
o Search and recieve order of rental, services and trainning;
o Trainning all employees to perform efficiently and effectively.
• PT Sanyo Jaya Components Indonesia,
Depok
1993 – May,2006
Position : Production Assistant Manager (SMT
Department)
2000 – 2006
Main Responsibility
o Responsible for the management and administration of SMT production
including planning, controlling, evaluating, coordinating and supporting to
production shift supervisor.
o To ensure that production activities are performed efficiently and effectively in
accordance with company policies and procedures.
o To ensure the production able to be run smoothly and good in accordance
with production planning and quality target
o To improve quality, productivity and efficiency of line production as well as
controlling 5S implementation
o To analyze the production activities to make efficient, develop system and
procedure of production, conduct motion and time study for production
process
Job Description :
To develop detail SMT Production Planning of line machine base on
main schedule
Do improvement to reduce defect of product and productivity in
production process
To give a technical assistant to increase productivity and quality
To implement ISO 9001:2000 & 14000 in production process
To ensure the achievement of daily and monthly production target by
collecting reports from production shift group supervisor and follow-up
necessary action taken if problem occurred
To plan and decide quality requirement through proper management
policy
To monitor and promote quality of line production
To control and monitor raw material supply availability and finished
good delivery in timely manner
To handle and monitor product of new model from Introduction of
production to mass production
To organize training for supervisor, line leader and operators to reach
high performance and ability of team which is required by company
To cooperate and coordinate with related department to achieve
company goal
To motivate and develop production group supervisor, line leader and
operators to reach Improvement and Innovation achievement
To control and monitor the document of production
Position :Production Supervisor (Auto Insert
Dept.)
1993-2000
Main Responsibility
o To lead team consist of line leader and operators to meet target for Quality ,
Productivity and Delivery.
o To lead and organize all team activities with the focus on achievement product
quality, safety, environmental and productivity objectives
o To control and coordinate the production activities to ensure that production
schedule, quality, efficiency and delivery are achieved
o To ensure the activities of production able to be done in accordance with Work
Instruction, Standard Operating Procedure and Standard of Quality
o To ensure the action of counter measure, action of improvement able to be
done effectively and continuously
o To improve quality, productivity and efficiency of line production as well as
controlling 5S implementation.
o To motivated and develop line leader and operators to reach Improvement
and Innovation achievement.
Job Description :
To check and monitor process of line production is to be run smoothly
and give technical assistant if any problem occurred.
To check, monitor and improve the condition of machine performance
in line production to meet target of capacities
To check and monitor management data of mounting machine to
reduce part loss
To check and improve quality of output line production to meet target
of quality
To check and improve 5S condition in line production to meet efficiency
and effectively
To check condition of supporting tools in line production
To control, monitor and improve management data of machine to
reduce part loss
To monitor and improve work less of operator movement in production
activities to achieve efficiency and effectively
To supervise that handling and way how to treat from operators in
production activities to be done in accordance with guidance.
Portfolio of work available for review
REFERENCES WILL BE PROVIDED ON REQUEST

More Related Content

What's hot

New curriculum vitae sandhu dalbir/Engineer
New curriculum vitae sandhu dalbir/EngineerNew curriculum vitae sandhu dalbir/Engineer
New curriculum vitae sandhu dalbir/Engineer
Sandhu Khalsadalbir
 
Paul A Ostrenga -Resume 2015
Paul A  Ostrenga -Resume 2015Paul A  Ostrenga -Resume 2015
Paul A Ostrenga -Resume 2015Paul Ostrenga
 
AlfredoRodriguezResume2014II1
AlfredoRodriguezResume2014II1AlfredoRodriguezResume2014II1
AlfredoRodriguezResume2014II1Alfredo Rodriguez
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John FabianJohn Fabian
 
Deepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production EngineerDeepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production EngineerDeepak chandel
 
Patti A. Fuhrman_2015 Resume
Patti A. Fuhrman_2015 ResumePatti A. Fuhrman_2015 Resume
Patti A. Fuhrman_2015 ResumePatti Fuhrman
 
CURRICULUM VITAE(update With Picture)
CURRICULUM VITAE(update With Picture)CURRICULUM VITAE(update With Picture)
CURRICULUM VITAE(update With Picture)cuong pham hung
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)Lee Hang Li
 
Quality resume
Quality resumeQuality resume
Quality resume
k Srinivasa Raghavan
 
Resume-Isrrael Ibarra(17-5-2016)
Resume-Isrrael Ibarra(17-5-2016)Resume-Isrrael Ibarra(17-5-2016)
Resume-Isrrael Ibarra(17-5-2016)Isrrael Ibarra
 
Jaime Pielago Evor1
Jaime Pielago Evor1Jaime Pielago Evor1
Jaime Pielago Evor1jaime evora
 
Monica's resume 2015
Monica's resume 2015Monica's resume 2015
Monica's resume 2015Monica Velez
 

What's hot (20)

New curriculum vitae sandhu dalbir/Engineer
New curriculum vitae sandhu dalbir/EngineerNew curriculum vitae sandhu dalbir/Engineer
New curriculum vitae sandhu dalbir/Engineer
 
Paul A Ostrenga -Resume 2015
Paul A  Ostrenga -Resume 2015Paul A  Ostrenga -Resume 2015
Paul A Ostrenga -Resume 2015
 
CV_Pariyawadee Sarikha
CV_Pariyawadee SarikhaCV_Pariyawadee Sarikha
CV_Pariyawadee Sarikha
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume for production Enng
Resume for production EnngResume for production Enng
Resume for production Enng
 
AlfredoRodriguezResume2014II1
AlfredoRodriguezResume2014II1AlfredoRodriguezResume2014II1
AlfredoRodriguezResume2014II1
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John Fabian
 
Deepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production EngineerDeepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production Engineer
 
Patti A. Fuhrman_2015 Resume
Patti A. Fuhrman_2015 ResumePatti A. Fuhrman_2015 Resume
Patti A. Fuhrman_2015 Resume
 
CURRICULUM VITAE(update With Picture)
CURRICULUM VITAE(update With Picture)CURRICULUM VITAE(update With Picture)
CURRICULUM VITAE(update With Picture)
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)
 
Resume
ResumeResume
Resume
 
Garry's CV
Garry's CVGarry's CV
Garry's CV
 
Quality resume
Quality resumeQuality resume
Quality resume
 
Ademar resume 2016
Ademar resume 2016Ademar resume 2016
Ademar resume 2016
 
Resume-Isrrael Ibarra(17-5-2016)
Resume-Isrrael Ibarra(17-5-2016)Resume-Isrrael Ibarra(17-5-2016)
Resume-Isrrael Ibarra(17-5-2016)
 
Jaime Pielago Evor1
Jaime Pielago Evor1Jaime Pielago Evor1
Jaime Pielago Evor1
 
Monica's resume 2015
Monica's resume 2015Monica's resume 2015
Monica's resume 2015
 
ADELAJA RAHMAN A.
ADELAJA RAHMAN A.ADELAJA RAHMAN A.
ADELAJA RAHMAN A.
 

Similar to Adjie Prasetyo - Curriculum_Vitae 2016

CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3
CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3
CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3Nisfu Syahbanda
 
Resume dated May'16
Resume dated May'16Resume dated May'16
Resume dated May'16Thanga Gauri
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3Handri Susanto
 
ekanshsinghal-3 (1) (1)
ekanshsinghal-3 (1) (1)ekanshsinghal-3 (1) (1)
ekanshsinghal-3 (1) (1)Ekansh Singhal
 
Suresh New Resume
Suresh New ResumeSuresh New Resume
Suresh New ResumeKode Vs
 
Contemporary Resume 2016
Contemporary Resume 2016Contemporary Resume 2016
Contemporary Resume 2016BKY Muftidien
 
Elango - Updated
Elango - UpdatedElango - Updated
Elango - UpdatedElangovan M
 
Elango - Updated
Elango - UpdatedElango - Updated
Elango - UpdatedElangovan M
 
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Managementsuraj kumar
 
Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16
Thennarasu G
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416lenin venugopal
 

Similar to Adjie Prasetyo - Curriculum_Vitae 2016 (20)

CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3
CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3
CV Nisfu_syahbanda Quality & Improvement Engineer_Greenbelt _3
 
Narongrit RSM-G
Narongrit RSM-GNarongrit RSM-G
Narongrit RSM-G
 
Resume dated May'16
Resume dated May'16Resume dated May'16
Resume dated May'16
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3
 
Yaowana Charoenporn_Mar2016
Yaowana Charoenporn_Mar2016Yaowana Charoenporn_Mar2016
Yaowana Charoenporn_Mar2016
 
ekanshsinghal-3 (1) (1)
ekanshsinghal-3 (1) (1)ekanshsinghal-3 (1) (1)
ekanshsinghal-3 (1) (1)
 
Resume
ResumeResume
Resume
 
CV-MASRURI
CV-MASRURI CV-MASRURI
CV-MASRURI
 
Suresh New Resume
Suresh New ResumeSuresh New Resume
Suresh New Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Contemporary Resume 2016
Contemporary Resume 2016Contemporary Resume 2016
Contemporary Resume 2016
 
Cornelis_Sijabat_CV
Cornelis_Sijabat_CVCornelis_Sijabat_CV
Cornelis_Sijabat_CV
 
Elango - Updated
Elango - UpdatedElango - Updated
Elango - Updated
 
Elango - Updated
Elango - UpdatedElango - Updated
Elango - Updated
 
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Management
 
S.Baktha-QA-Process-Audits
S.Baktha-QA-Process-AuditsS.Baktha-QA-Process-Audits
S.Baktha-QA-Process-Audits
 
Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
 
Resume Muniandy
Resume MuniandyResume Muniandy
Resume Muniandy
 

Adjie Prasetyo - Curriculum_Vitae 2016

  • 1. Curriculum Vitae I. PERSONAL DATA • Name : Adji Prasetyo • Place & Date of Birth : Jakarta, 19 July 1971 • Address : Perum Bojong Depok Baru II Sukahati, Jl. Nusantara XI HC – 05, Cibinong Bogor - 16913 • Sex : Male • Height : 172 Cm • Religion : Muslim • Marital Status : Married (with 1 daughter) • Phone Number : (Mobile) 0811 – 111 - 5462 • Hobby : Travelling, Swimming, Reading and Computer Programming. II. EDUCATION A. Formal Education • Electronic Engineering with Electrical Engineering major in Polytechnics of University of Indonesia (1989 – 1992) • Senior High School in SMANegeri 39- Jakarta (1986 – 1989) • Junior High School in SMPNegeri 20 - Jakarta (1983 – 1986) B. Non Formal Education • Introduction of Certification ISO 9002 held by PT Sanyo 1996 • Introduction of ISO 14001 held by PT Sanyo 1997 • Gemba Kaizen Training held by PT Sanyo 1999 • Six Sigma Quality Training held by PT Sanyo 2001 • Basic English Training held by PT Sanyo 2001 • English Conversation Program held by PT Sanyo 2001 – 2002 • Basic Theory of Digital Still Camera Training held by PT Sanyo 2002 • Keselamatan & Kesehatan Kerja Course held by PT Sanyo 2003 • Guidance to Supervisor Course held by PT Sanyo 2003 • Training Within Industry Course held by PT Sanyo 2003 • Internal Quality Auditing ISO 14001 Course held by PT Sanyo 2003 • Internal Quality Auditor Course held by PT Sanyo 2004 • Keselamatan & Kesehatan Kerja Course held by PT Sanyo Electronic Indonesia – Cikarang 2010 • Occupational Safety and Health Expert held by PT. Delta Indonesia 2015
  • 2. III. COMPUTER SKILL • All Windows Operating System experience user. • Advanced user of Microsoft Office such as word, excel, and Power Point. • Digital Imaging and design with Photoshop and Corel Draw application. • Programming using Turbo Basic, Turbo Pascal and Visual Basic language. • Develop NC Data Converter Program from TCM 3000 to Marantz using Turbo Basic Language in PT. Sanyo Jaya Components Indonesia. Result : Reduce 3 hour setting became only 3 minutes. IV. WORKING EXPERIENCE • Project Data Center PT. Telkomsel, Jl. TB. Simatupang – Jakarta Selatan Oct 2015 – Des 2016 Position : Site Manager Main Responsibility : o Coordination that work meet the planning and schedule; o Support the project manager in supervision of vendors; o Coordinate work plan between sub-contractors; o Organize and manage the team to maintain team activity; • Project Data Center KementerianDesa, Pembangunan Daerah Tertinggal dan Transmigrasi (Kemendesa), Jl. Abdul Muis – Jakarta 2015 Position : Site Manager Main Responsibility : o Coordination that work meet the planning and schedule; o Support the project manager in supervision of vendors; o Coordinate work plan between sub-contractors; o Organize and manage the team to maintain team activity; • Project Data Center Badan Nasional PenanggulanganBencana (BNPB), Sentul – Bogor Oct 2014 – Jan 2015 Position : Site Manager Main Responsibility : o Coordination that work meet the planning and schedule; o Support the project manager in supervision of vendors; o Coordinate work plan between sub-contractors; o Organize and manage the team to maintain team activity; • Project Expansion Data Center PT. Telkomsel, Bumi Serpong Damai City - Serpong Nov 2013 – Aug 2014 Position: Project Admin / Site Coordinator Main Responsibility: o Support the project related to documentation needs; o Support project activities related in and out of documents; o Support the project manager in supervision of sub contractors; o Coordinate work plan between sub contractors. o Check that all materials onsite meet the technical, specification and need the Project.
  • 3. • PT Cahaya Artha Semesta – ME Contractor, Bekasi 2012 Position : Head Administrator Main Responsibility : o Managing job desks for all office staff; o Controlling all staffs on the office working as their responsibility. o Finding the right materials which meet the technical, specification and price with the tender request, to be applied to Project. • PT Sanyo Electronics Indonesia, Cikarang Selatan 2010 – 2011 Position: Senior Engineer of Quality Control – SMT Department Main Responsibility : o To manage and control flow of supply from SMT production to next process; o Ensure SMT Quality Control able to run smooth with production planning and quality target; o Control quality production of SMT production; o Arrange Quality team to fulfill their job desk and reach the quality target; o Controlling all programs and AOI machines are ready use to support production; o Improvement to achieve good quality and productivity; o Trainning SMT employee for improve quality awarness to performs efficiently and effectively. Special Responsibility: o In charge in Single PPM project in SMT Department; o Sub Contractor coordinator of SMT Departement; o Internal and External Quality Auditor of SMT Department. • IQROMEDIA – Computer Sale, Rental, Services, and Trainning – Bogor Jun 2006 – Jun 2010 Position: Owner and Senior Sales Main Responsibility o To manage the store including planning, evaluating and budgeting; o To control all employee and computers ready to use and run smothly; o Search and recieve order of rental, services and trainning; o Trainning all employees to perform efficiently and effectively. • PT Sanyo Jaya Components Indonesia, Depok 1993 – May,2006 Position : Production Assistant Manager (SMT Department) 2000 – 2006 Main Responsibility o Responsible for the management and administration of SMT production including planning, controlling, evaluating, coordinating and supporting to production shift supervisor. o To ensure that production activities are performed efficiently and effectively in accordance with company policies and procedures.
  • 4. o To ensure the production able to be run smoothly and good in accordance with production planning and quality target o To improve quality, productivity and efficiency of line production as well as controlling 5S implementation o To analyze the production activities to make efficient, develop system and procedure of production, conduct motion and time study for production process Job Description : To develop detail SMT Production Planning of line machine base on main schedule Do improvement to reduce defect of product and productivity in production process To give a technical assistant to increase productivity and quality To implement ISO 9001:2000 & 14000 in production process To ensure the achievement of daily and monthly production target by collecting reports from production shift group supervisor and follow-up necessary action taken if problem occurred To plan and decide quality requirement through proper management policy To monitor and promote quality of line production To control and monitor raw material supply availability and finished good delivery in timely manner To handle and monitor product of new model from Introduction of production to mass production To organize training for supervisor, line leader and operators to reach high performance and ability of team which is required by company To cooperate and coordinate with related department to achieve company goal To motivate and develop production group supervisor, line leader and operators to reach Improvement and Innovation achievement To control and monitor the document of production Position :Production Supervisor (Auto Insert Dept.) 1993-2000 Main Responsibility o To lead team consist of line leader and operators to meet target for Quality , Productivity and Delivery. o To lead and organize all team activities with the focus on achievement product quality, safety, environmental and productivity objectives o To control and coordinate the production activities to ensure that production schedule, quality, efficiency and delivery are achieved o To ensure the activities of production able to be done in accordance with Work Instruction, Standard Operating Procedure and Standard of Quality o To ensure the action of counter measure, action of improvement able to be done effectively and continuously o To improve quality, productivity and efficiency of line production as well as controlling 5S implementation. o To motivated and develop line leader and operators to reach Improvement and Innovation achievement. Job Description : To check and monitor process of line production is to be run smoothly and give technical assistant if any problem occurred. To check, monitor and improve the condition of machine performance in line production to meet target of capacities To check and monitor management data of mounting machine to reduce part loss To check and improve quality of output line production to meet target of quality
  • 5. To check and improve 5S condition in line production to meet efficiency and effectively To check condition of supporting tools in line production To control, monitor and improve management data of machine to reduce part loss To monitor and improve work less of operator movement in production activities to achieve efficiency and effectively To supervise that handling and way how to treat from operators in production activities to be done in accordance with guidance. Portfolio of work available for review REFERENCES WILL BE PROVIDED ON REQUEST