Background
ISCF Transforming Construction objectives:
• deliver new built assets 50% faster and 33% cheaper
• halve the lifetime carbon emissions
• improve whole-life performance
We have:
• Pulse, an application used for commissioning large, industrial projects
• Extensive experience in manufacturing industry
• eco|Driver, an application for reducing the carbon emissions of buildings
• A record of innovation & a desire to do things better
Hence our Innovate UK application
Specifically by:
• Designing and managing buildings through digitally-enabled performance management
• Constructing quality buildings using a manufacturing approach
• Powering buildings with active energy components and improving build quality
Copyright TR Control Solutions Ltd 2019
Justification
According to GIRI (getitright.uk.com/):
…..estimates of total costs of error ranging between 10% and 25% of project cost or
between £10–25Bn per annum across the sector
GIRI research found that the most frequently reported root causes of error were:
Management and Planning (including inadequate supervision)
Communications (including a reluctance to ask questions)
Taking our cue from manufacturing industry, where efforts are focused on prevention
rather than detection, and combining it with the above, our project is focused on the
prevention of errors by improving understanding of the tasks to be performed
Copyright TR Control Solutions Ltd 2019
Innovate UK Project (21506), Jan – Dec 2019, £248k
Feasibility study: Adaptive Learning for Zero Defects in Buildings Construction
in conjunction with Anglian Ruskin University
Copyright TR Control Solutions Ltd 2019
BIM model
Drawings, specs & work
instructions
Interpretation &
Understanding
Contractor
Errors?
Errors?
Construction process - now
Copyright TR Control Solutions Ltd 2019
Errors?
Errors?
Construction process - proposed
Adaptive Learning
Application
Questions to test
understanding with
answers to clarify
Copyright TR Control Solutions Ltd 2019
Memory Time
Forgetting Curve
Reinforcing training is important because…
Copyright TR Control Solutions Ltd 2019
Checking understanding is important because assumptions can result in error
Well this is how we usually do it!
Copyright TR Control Solutions Ltd 2019
12-month feasibility project
We are here
Prototype Ideas
We are engaged with several construction companies
Would you also like to be involved?
Please contact: john.taylor@trcontrolsolutions.com
Copyright TR Control Solutions Ltd 2019

Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019

  • 1.
    Copyright TR ControlSolutions Ltd 2019 Adaptive Learning for Zero Defects in Buildings Construction Innovate UK Project: 21506 ISCF Transforming Construction Increase productivity, performance and quality in UK construction in collaboration with Anglia Ruskin University assisted by
  • 2.
    Copyright TR ControlSolutions Ltd 2019 Background ISCF Transforming Construction objectives: • deliver new built assets 50% faster and 33% cheaper • halve the lifetime carbon emissions • improve whole-life performance We have: • Pulse, an application used for commissioning large, industrial projects • Extensive experience in manufacturing industry • eco|Driver, an application for reducing the carbon emissions of buildings • A record of innovation & a desire to do things better Hence our Innovate UK application Specifically by: • Designing and managing buildings through digitally-enabled performance management • Constructing quality buildings using a manufacturing approach • Powering buildings with active energy components and improving build quality
  • 3.
    Copyright TR ControlSolutions Ltd 2019 Justification According to GIRI (getitright.uk.com/): …..estimates of total costs of error ranging between 10% and 25% of project cost or between £10–25Bn per annum across the sector GIRI research found that the most frequently reported root causes of error were: Management and Planning (including inadequate supervision) Communications (including a reluctance to ask questions) Taking our cue from manufacturing industry, where efforts are focused on prevention rather than detection, and combining it with the above, our project is focused on the prevention of errors by improving understanding of the tasks to be performed
  • 4.
    Copyright TR ControlSolutions Ltd 2019 Innovate UK Project (21506), Jan – Dec 2019, £248k Feasibility study: Adaptive Learning for Zero Defects in Buildings Construction in conjunction with Anglian Ruskin University
  • 5.
    Copyright TR ControlSolutions Ltd 2019 BIM model Drawings, specs & work instructions Interpretation & Understanding Contractor Errors? Errors? Construction process - now
  • 6.
    Copyright TR ControlSolutions Ltd 2019 Errors? Errors? Construction process - proposed Adaptive Learning Application Questions to test understanding with answers to clarify
  • 7.
    Copyright TR ControlSolutions Ltd 2019 Memory Time Forgetting Curve Reinforcing training is important because…
  • 8.
    Copyright TR ControlSolutions Ltd 2019 Checking understanding is important because assumptions can result in error Well this is how we usually do it!
  • 9.
    Copyright TR ControlSolutions Ltd 2019 12-month feasibility project We are here Prototype Ideas We are engaged with several construction companies Would you also like to be involved? Please contact: john.taylor@trcontrolsolutions.com
  • 10.
    Copyright TR ControlSolutions Ltd 2019