The document is an activity duration estimating worksheet used to estimate project durations. It contains sections for parametric estimates using hours and resources, analogous estimates using previous similar activities as a baseline, and three point estimates using optimistic, most likely, and pessimistic durations with weightings to calculate an expected duration. The worksheet is intended to help estimate durations for work breakdown structure (WBS) items in a project.